 Safety induction training was conducted for 25 Nos new joiners.
 Hazardous waste OCP prepared & get approved by management.
 Prepared OCP For handling of fire extinguisher.
 Prepared OCP for the handling of compressed gas cylinders
 Near miss reporting & recording initiated in all departments.
 Installation of Fire Extinguisher as per fire Hazard.
 Identification & preparation of Occupational Hazard/Disease report in all Departments.
 05 Nos- Accident Closure report has been received.
 Placed prohibition, warning, mandatory, and emergency assembly area signage boards.
 Denim suits were provided for workers working near extreme heat. (33 Nos)
2
Achievements:-
Improvements:-
 Compliance for PPEs to be improved for contractual workers.
 Dust Emission at SMS to be reduced.
 PTW is to be strengthened during Shutdown for non-routine activities.
EHS Performance LTA, WLTA ( 01.04.2022 To 30.09.2022)
3
1
2
1
1
1
3
0 1 2 3 4 5
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Monthly Accident Details
LTA
WTLA
First Aid
Property
damage
Accident status 01-04-22 To 30-09-22
Area Date LTA WLTA FA Total
Status
Open Close
Elect. Maint 02-04-2022 1
- - 1
-
CCM 08-04-2022 - 1 -
1
-
Bright bar 27-04-2022 1
- - 1
-
SMS 20-05-2022 1
- - 1
--
Mech. Maint 22-07-2022 1
- - 1
-
CFD-2 26-07-2022 1
- -
1
-
Billet yard 25-08-2022 1
- 1
1
-
Rolling Mill 30-09-2022
- 1
1
-
Mech. Maint 24-09-2022
1
1
-
QA Lab. -
-
- - -
- -
Civil - -
- - -
- -
Store -
-
- - -
- -
Scrap yard -
-
- - -
- -
Admin block -
-
- - -
-
Total 6 1 2 9 2 7
Near Miss Details
01-04-2022 To 30-9-2022
Department April-22 May-22 June-22 July-22 Aug-22 Sep-22 Total
Bright bar 0 0 3 3 0 0 06
Mech. Maint 0
1 1 1 0 1 04
Elect. Maint 1 0 0 0 0 0 01
Rolling Mill 03 03 0 03 03 0 12
SMS 1 3 0 0 0 1 05
CFD 0 1 1 0 0 0 02
Scrap Yard 0 1 0 1 0 0 02
Oxygen Plant 2 2 1 3 0 2 10
CCM 0 1 0 0 0 0 1
Admin Block 0 0 0 0 0 0 0
QA 0 3 0 0 02 0 05
Civil 1 3 2 2 0 0 08
Total 08 18 08 13 05 04 56
EHS Training Details 01-04-2022 To 30-02-2022
Training Topic April -22 May-22 June-22 July-22 Aug-22 Sep-22 Man-hours
Behaviour Based
Safety
1 01 01 0 0 0
23
Importance of PPE
1 01 0 0 0 0
07
Near Miss Reporting
0 01 0 0 01 01
17
Manual Handling
Technique
0 01 0 0 0 0
03
Permit to Work 1 0 02 01 01 01 37
Fire Safety 0 0 01 01 0 0 07
Electrical Safety 0 0 0 01 0 0 12
Fall Protection
0 0 0 01 0 0 12
Working at height 1 0 0 01 0 0
08
EOT Crane Safety
0 0 0 0 01 01
14
Accident investigation status LTA, WLTA,FA ( 01.04.2022 To 30.09.2022)
TYPE Dept. Date Accountable
EHS
Responsible
Incident Description
Status/
Closure
Remarks
WLTA CCM 08-04-2022 Mr. Sanjeev Goyal Mool Raj
The elbow of the right arm got hit with the ground surface,
which results in the dislocation of the elbow joint.
Pending
FA Billet yard 27-04-2022 Mr. Vikas Gupta Mool Raj
while the swing grinder operating, the operator's left-hand little
finger got in contact with exposed rotating parts.
In progress
FA RM 30-09-2022 Mr. Vikas Chobey Mool raj Cut injury on the tip of the skin of the ring finger. In progress
Number of Days Without – LTA
Last LTA
< 1Year
1+year
2+year
3+year
Considering 01.04.2021 Base Date
S. No Department
Date of Last
LTA
Days
without LTA
Best
Result
1
Mech.
maintenance
24-09-2022 06 64
2 CFD 26-07-2022 66 481
3 SMS 20-05-2022 133 547
4 Bright bar 27-04-2022 290 156
5
Elect.
maintenance
02-04-2022 181 366
6 Rolling Mill 12-03-2022 202 88
7 CCM 547
8 Civil 547
9 QA 547
10 Store 547
11 Scrap Yard 547
12 Oxygen Plant 547
13 Logistic 547
14 Admin 547
S. No Department
Date of Last
WLTA
Days
without WLTA
Best
Result
1 CCM 08-04-2022 175 372
2 Rolling Mill 24.02.2022 156 218
3 Scrap Yard 16.03.2021 198 349
4 SMS 27.06.2021 460 460
5 Mech. Maintenance 14.06.2021 473 473
6 Bright bar 547
7 CFD 547
8 Civil 547
9 QA 547
10 Store 547
11 Elect. Maint. 547
12 utility 547
13 Logistic 547
14 Admin & HR 547
We are Total 06 Days
Without LTA
Our Best results is 547
Number of Days Without – WLTA
(Updated - as on 30.09.2022)
We are Total 175 Days
WLTA
Our Best result is 547 Days
6
202
547
156
547
133
66
547
181
547
170
473
218
547 547
175
547
182
547 547
198
547
Mech.Maint
.
RM Civil Bright Bar CCM SMS Area CFD-2
Oxygen
Plant
Elect. Maint Scrap yard NAMSPL
Days w/o LTA 6 202 547 156 547 133 66 547 181 547 170
Days w/o WLTA 473 218 547 547 175 547 182 547 547 198 547
Accident free Days
Days w/o LTA Days w/o WLTA
Depts. wise Accident free Days Data
Incident / Near
miss
First aid
center
Shift in –charge/
Foreman/ supervisor
Doctor
HOD
EHS
HR/ADMIN
Director
Accident/incident communication Flow
Victim/
Witnesses
Release FIR in
( Doc no.
AMSPL/EHS/F/001)
I
mmediate
verbal
Injury LTA, WLTA,FA NM, PD, ENV-( A&B Category)

More Related Content

Similar to MRM 01-04-2022 To 30-09-2022.pptx

Monthly Management report for the Month of May 2024
Monthly Management report for the Month of May 2024Monthly Management report for the Month of May 2024
Monthly Management report for the Month of May 2024
facilitymanager11
 
EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West Project
Tapas Das
 
C&I July-2022.pptx
C&I July-2022.pptxC&I July-2022.pptx
C&I July-2022.pptx
PowerMurugan
 
HSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxHSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptx
MohHElkomy
 
Mazagon Dock Recruitment 2022 Notification For 1501 Non Executive Posts
Mazagon Dock Recruitment 2022 Notification For 1501 Non Executive PostsMazagon Dock Recruitment 2022 Notification For 1501 Non Executive Posts
Mazagon Dock Recruitment 2022 Notification For 1501 Non Executive Posts
RajeshKKumar1
 
Presentation 19 04 2022.pdf
Presentation 19 04 2022.pdfPresentation 19 04 2022.pdf
Presentation 19 04 2022.pdf
JaysukhKachhatiya
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Das A. K.
 
ccl-weekly report week8.pptx
ccl-weekly report week8.pptxccl-weekly report week8.pptx
ccl-weekly report week8.pptx
ssuser3e37d9
 
Monthly HSE Report March for overall HSE
Monthly HSE Report March for overall HSEMonthly HSE Report March for overall HSE
Monthly HSE Report March for overall HSE
OlgaOliveaJohn
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Das A. K.
 
MIS-HR.ppt
MIS-HR.pptMIS-HR.ppt
MIS-HR.ppt
DrNishantSaxena1
 
OR PPT Final -July'22.pptx
OR PPT Final -July'22.pptxOR PPT Final -July'22.pptx
OR PPT Final -July'22.pptx
PowerMurugan
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...
Arber Dogani
 
GRADUATES-SUMMARY.pptx
GRADUATES-SUMMARY.pptxGRADUATES-SUMMARY.pptx
GRADUATES-SUMMARY.pptx
ENGINEROOMSIMULATOR
 
2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx
MohammedSalah424258
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
hepemod733
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
noelmanroe1
 
2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt
Shivaguru Venkatraman
 
PM Performamnec report- Jan'23.pptx
PM Performamnec report- Jan'23.pptxPM Performamnec report- Jan'23.pptx
PM Performamnec report- Jan'23.pptx
santosh509014
 
Presentation 95
Presentation 95Presentation 95
Presentation 95
Tarek Fagal
 

Similar to MRM 01-04-2022 To 30-09-2022.pptx (20)

Monthly Management report for the Month of May 2024
Monthly Management report for the Month of May 2024Monthly Management report for the Month of May 2024
Monthly Management report for the Month of May 2024
 
EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West Project
 
C&I July-2022.pptx
C&I July-2022.pptxC&I July-2022.pptx
C&I July-2022.pptx
 
HSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxHSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptx
 
Mazagon Dock Recruitment 2022 Notification For 1501 Non Executive Posts
Mazagon Dock Recruitment 2022 Notification For 1501 Non Executive PostsMazagon Dock Recruitment 2022 Notification For 1501 Non Executive Posts
Mazagon Dock Recruitment 2022 Notification For 1501 Non Executive Posts
 
Presentation 19 04 2022.pdf
Presentation 19 04 2022.pdfPresentation 19 04 2022.pdf
Presentation 19 04 2022.pdf
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
 
ccl-weekly report week8.pptx
ccl-weekly report week8.pptxccl-weekly report week8.pptx
ccl-weekly report week8.pptx
 
Monthly HSE Report March for overall HSE
Monthly HSE Report March for overall HSEMonthly HSE Report March for overall HSE
Monthly HSE Report March for overall HSE
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
 
MIS-HR.ppt
MIS-HR.pptMIS-HR.ppt
MIS-HR.ppt
 
OR PPT Final -July'22.pptx
OR PPT Final -July'22.pptxOR PPT Final -July'22.pptx
OR PPT Final -July'22.pptx
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...
 
GRADUATES-SUMMARY.pptx
GRADUATES-SUMMARY.pptxGRADUATES-SUMMARY.pptx
GRADUATES-SUMMARY.pptx
 
2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
 
2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt
 
PM Performamnec report- Jan'23.pptx
PM Performamnec report- Jan'23.pptxPM Performamnec report- Jan'23.pptx
PM Performamnec report- Jan'23.pptx
 
Presentation 95
Presentation 95Presentation 95
Presentation 95
 

More from MoolRaj3

GENERAL SAFETY RULES (004).pptx hindi.pptx
GENERAL SAFETY RULES (004).pptx hindi.pptxGENERAL SAFETY RULES (004).pptx hindi.pptx
GENERAL SAFETY RULES (004).pptx hindi.pptx
MoolRaj3
 
404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.ppt404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.ppt
MoolRaj3
 
Crane ratio.docx
Crane ratio.docxCrane ratio.docx
Crane ratio.docx
MoolRaj3
 
emergency-exit-routes-factsheet (1).pdf
emergency-exit-routes-factsheet (1).pdfemergency-exit-routes-factsheet (1).pdf
emergency-exit-routes-factsheet (1).pdf
MoolRaj3
 
MachineGuardingPPT (4).ppt
MachineGuardingPPT (4).pptMachineGuardingPPT (4).ppt
MachineGuardingPPT (4).ppt
MoolRaj3
 
EF-EI04-01.doc
EF-EI04-01.docEF-EI04-01.doc
EF-EI04-01.doc
MoolRaj3
 
Doc1.docx
Doc1.docxDoc1.docx
Doc1.docx
MoolRaj3
 
ACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
ACCIDENT PREVENTION (SLIP, TRIP & FALL).pptACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
ACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
MoolRaj3
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptx
MoolRaj3
 
DAILY TOOL BOX TALKS MODULES (1).docx
DAILY TOOL BOX TALKS MODULES (1).docxDAILY TOOL BOX TALKS MODULES (1).docx
DAILY TOOL BOX TALKS MODULES (1).docx
MoolRaj3
 
EMERGENCY CONTACT NUMBER.pptx
EMERGENCY CONTACT NUMBER.pptxEMERGENCY CONTACT NUMBER.pptx
EMERGENCY CONTACT NUMBER.pptx
MoolRaj3
 

More from MoolRaj3 (11)

GENERAL SAFETY RULES (004).pptx hindi.pptx
GENERAL SAFETY RULES (004).pptx hindi.pptxGENERAL SAFETY RULES (004).pptx hindi.pptx
GENERAL SAFETY RULES (004).pptx hindi.pptx
 
404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.ppt404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.ppt
 
Crane ratio.docx
Crane ratio.docxCrane ratio.docx
Crane ratio.docx
 
emergency-exit-routes-factsheet (1).pdf
emergency-exit-routes-factsheet (1).pdfemergency-exit-routes-factsheet (1).pdf
emergency-exit-routes-factsheet (1).pdf
 
MachineGuardingPPT (4).ppt
MachineGuardingPPT (4).pptMachineGuardingPPT (4).ppt
MachineGuardingPPT (4).ppt
 
EF-EI04-01.doc
EF-EI04-01.docEF-EI04-01.doc
EF-EI04-01.doc
 
Doc1.docx
Doc1.docxDoc1.docx
Doc1.docx
 
ACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
ACCIDENT PREVENTION (SLIP, TRIP & FALL).pptACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
ACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptx
 
DAILY TOOL BOX TALKS MODULES (1).docx
DAILY TOOL BOX TALKS MODULES (1).docxDAILY TOOL BOX TALKS MODULES (1).docx
DAILY TOOL BOX TALKS MODULES (1).docx
 
EMERGENCY CONTACT NUMBER.pptx
EMERGENCY CONTACT NUMBER.pptxEMERGENCY CONTACT NUMBER.pptx
EMERGENCY CONTACT NUMBER.pptx
 

Recently uploaded

Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
Global Landscapes Forum (GLF)
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
pjq9n1lk
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
Global Landscapes Forum (GLF)
 
Global Climate Change and global warming
Global Climate Change and global warmingGlobal Climate Change and global warming
Global Climate Change and global warming
ballkicker20
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
Open Access Research Paper
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
mfasna35
 
Climate Change All over the World .pptx
Climate Change All over the World  .pptxClimate Change All over the World  .pptx
Climate Change All over the World .pptx
sairaanwer024
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
Global Landscapes Forum (GLF)
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
zm9ajxup
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
laozhuseo02
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
amishajha2407
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Global Landscapes Forum (GLF)
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Global Landscapes Forum (GLF)
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
p2npnqp
 
DENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EISDENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EIS
MarlonJayBayag
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
EpconLP
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Joshua Orris
 
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
tiwarimanvi3129
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
Open Access Research Paper
 
Promoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland managementPromoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland management
Global Landscapes Forum (GLF)
 

Recently uploaded (20)

Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
 
Global Climate Change and global warming
Global Climate Change and global warmingGlobal Climate Change and global warming
Global Climate Change and global warming
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
 
Climate Change All over the World .pptx
Climate Change All over the World  .pptxClimate Change All over the World  .pptx
Climate Change All over the World .pptx
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
 
DENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EISDENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EIS
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
 
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
 
Promoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland managementPromoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland management
 

MRM 01-04-2022 To 30-09-2022.pptx

  • 2. EHS – Achievements & Improvements – 01-04-2022 To 30-09-2022  Safety induction training was conducted for 25 Nos new joiners.  Hazardous waste OCP prepared & get approved by management.  Prepared OCP For handling of fire extinguisher.  Prepared OCP for the handling of compressed gas cylinders  Near miss reporting & recording initiated in all departments.  Installation of Fire Extinguisher as per fire Hazard.  Identification & preparation of Occupational Hazard/Disease report in all Departments.  05 Nos- Accident Closure report has been received.  Placed prohibition, warning, mandatory, and emergency assembly area signage boards.  Denim suits were provided for workers working near extreme heat. (33 Nos) 2 Achievements:- Improvements:-  Compliance for PPEs to be improved for contractual workers.  Dust Emission at SMS to be reduced.  PTW is to be strengthened during Shutdown for non-routine activities.
  • 3. EHS Performance LTA, WLTA ( 01.04.2022 To 30.09.2022) 3 1 2 1 1 1 3 0 1 2 3 4 5 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Monthly Accident Details LTA WTLA First Aid Property damage Accident status 01-04-22 To 30-09-22 Area Date LTA WLTA FA Total Status Open Close Elect. Maint 02-04-2022 1 - - 1 - CCM 08-04-2022 - 1 - 1 - Bright bar 27-04-2022 1 - - 1 - SMS 20-05-2022 1 - - 1 -- Mech. Maint 22-07-2022 1 - - 1 - CFD-2 26-07-2022 1 - - 1 - Billet yard 25-08-2022 1 - 1 1 - Rolling Mill 30-09-2022 - 1 1 - Mech. Maint 24-09-2022 1 1 - QA Lab. - - - - - - - Civil - - - - - - - Store - - - - - - - Scrap yard - - - - - - - Admin block - - - - - - Total 6 1 2 9 2 7
  • 4. Near Miss Details 01-04-2022 To 30-9-2022 Department April-22 May-22 June-22 July-22 Aug-22 Sep-22 Total Bright bar 0 0 3 3 0 0 06 Mech. Maint 0 1 1 1 0 1 04 Elect. Maint 1 0 0 0 0 0 01 Rolling Mill 03 03 0 03 03 0 12 SMS 1 3 0 0 0 1 05 CFD 0 1 1 0 0 0 02 Scrap Yard 0 1 0 1 0 0 02 Oxygen Plant 2 2 1 3 0 2 10 CCM 0 1 0 0 0 0 1 Admin Block 0 0 0 0 0 0 0 QA 0 3 0 0 02 0 05 Civil 1 3 2 2 0 0 08 Total 08 18 08 13 05 04 56 EHS Training Details 01-04-2022 To 30-02-2022 Training Topic April -22 May-22 June-22 July-22 Aug-22 Sep-22 Man-hours Behaviour Based Safety 1 01 01 0 0 0 23 Importance of PPE 1 01 0 0 0 0 07 Near Miss Reporting 0 01 0 0 01 01 17 Manual Handling Technique 0 01 0 0 0 0 03 Permit to Work 1 0 02 01 01 01 37 Fire Safety 0 0 01 01 0 0 07 Electrical Safety 0 0 0 01 0 0 12 Fall Protection 0 0 0 01 0 0 12 Working at height 1 0 0 01 0 0 08 EOT Crane Safety 0 0 0 0 01 01 14
  • 5. Accident investigation status LTA, WLTA,FA ( 01.04.2022 To 30.09.2022) TYPE Dept. Date Accountable EHS Responsible Incident Description Status/ Closure Remarks WLTA CCM 08-04-2022 Mr. Sanjeev Goyal Mool Raj The elbow of the right arm got hit with the ground surface, which results in the dislocation of the elbow joint. Pending FA Billet yard 27-04-2022 Mr. Vikas Gupta Mool Raj while the swing grinder operating, the operator's left-hand little finger got in contact with exposed rotating parts. In progress FA RM 30-09-2022 Mr. Vikas Chobey Mool raj Cut injury on the tip of the skin of the ring finger. In progress
  • 6. Number of Days Without – LTA Last LTA < 1Year 1+year 2+year 3+year Considering 01.04.2021 Base Date S. No Department Date of Last LTA Days without LTA Best Result 1 Mech. maintenance 24-09-2022 06 64 2 CFD 26-07-2022 66 481 3 SMS 20-05-2022 133 547 4 Bright bar 27-04-2022 290 156 5 Elect. maintenance 02-04-2022 181 366 6 Rolling Mill 12-03-2022 202 88 7 CCM 547 8 Civil 547 9 QA 547 10 Store 547 11 Scrap Yard 547 12 Oxygen Plant 547 13 Logistic 547 14 Admin 547 S. No Department Date of Last WLTA Days without WLTA Best Result 1 CCM 08-04-2022 175 372 2 Rolling Mill 24.02.2022 156 218 3 Scrap Yard 16.03.2021 198 349 4 SMS 27.06.2021 460 460 5 Mech. Maintenance 14.06.2021 473 473 6 Bright bar 547 7 CFD 547 8 Civil 547 9 QA 547 10 Store 547 11 Elect. Maint. 547 12 utility 547 13 Logistic 547 14 Admin & HR 547 We are Total 06 Days Without LTA Our Best results is 547 Number of Days Without – WLTA (Updated - as on 30.09.2022) We are Total 175 Days WLTA Our Best result is 547 Days
  • 7. 6 202 547 156 547 133 66 547 181 547 170 473 218 547 547 175 547 182 547 547 198 547 Mech.Maint . RM Civil Bright Bar CCM SMS Area CFD-2 Oxygen Plant Elect. Maint Scrap yard NAMSPL Days w/o LTA 6 202 547 156 547 133 66 547 181 547 170 Days w/o WLTA 473 218 547 547 175 547 182 547 547 198 547 Accident free Days Days w/o LTA Days w/o WLTA Depts. wise Accident free Days Data
  • 8. Incident / Near miss First aid center Shift in –charge/ Foreman/ supervisor Doctor HOD EHS HR/ADMIN Director Accident/incident communication Flow Victim/ Witnesses Release FIR in ( Doc no. AMSPL/EHS/F/001) I mmediate verbal Injury LTA, WLTA,FA NM, PD, ENV-( A&B Category)