This resume summarizes the work experience of Norfadzly Nordin, including his current position as Construction Manager. Over 13 years of experience in oil and gas projects, he has worked on numerous pipeline and platform installation projects for companies like Petronas, ExxonMobil, and Shell. His responsibilities have included supervising field engineers, interfacing with clients, ensuring safety and cost efficiency, and overseeing offshore construction activities to meet schedules and requirements. He has extensive experience managing the installation of pipelines, platforms, bridges, and other oil and gas infrastructure.
1. PERSONNEL RESUME
NORFADZLY NORDIN
PERSONNEL RESUME
Company Name:
Personnel Name: NORFADZLY NORDIN Birth Date: 31st
March 1978
Personnel
Correspondence
Address:
71,Jalan 9/9A,
Section 9,
43650 Bandar Baru Bangi
Nationality: Malaysian
Gender: Male
IC/Passport
No:
780331-14-5571
Personnel Contact
No:
019-3971114 Current
Position:
Construction
Manager
Highest Qualification: Degree In Mechanical Eng. Years of Experience in:
Oil & Gas or
Pipeline:
13 years
Other Certificate: - Others: -
LIST OF EXPERIENCE
Period of Work: Until Mid of January 2017
Current Company: PBJV GROUP SDN BHD
Period of Work: 2005 - 2016
Company:
Position: Construction Manager / Operation Engineer / Sr Field Engineer / Field Engineer
Nature Of Business Oil & Gas
Responsibilities: Monitor and supervised Field engineers and engineering department during developing
procedures, procurement materials and engineering analysis to meet the client
requirements.
Involved in the interface issues with clients during design stage, fabrication stage and
installation stage during project execution.
Monitor and work closely with clients, barge superintendent and Field engineer on the
installation progress during offshore execution.
Assist Project Manager on the project planning stage, project budget and cost
efficiency, manage HSE related Issues, planning with procurement team, make
selection criteria with Marine Department, provide the necessary info to the document
controller and understand and follow as per project contract requirements.
Monitor and works closely with Contractors regarding the construction issues to meet
the client requirements and meet as per schedule planning.
Assist proposal department in term of works schedule, technical issues and any related
issues with construction activities.
2. PERSONNEL RESUME
NORFADZLY NORDIN
Client : Petronas Carigali Sdn. Bhd.
Project : Bardegg and Baronia Pipeline
Work Barge/Vessel: KL 101
Description:
a) 24” x 43km TTJT-A to BNCPP-B Pipeline, Spool and Riser Installation
b) 24” x 125km BNCPP-B to E11-RC Pipeline, Spool and Riser Installation
Client : Nippon Oil
Project : LWP – 4 Legged Platform Installation
Work Barge/Vessel: SK2000
Description:
a) Jacket weight 1610MT: Stern Lift, Upending and set to seabed.
b) Topside weight 730MT: Stern Lift and set to transition pieces.
Client : ExxonMobil Malaysia
Vessel : LTS 3000
Project :
a) TaB – TaQ – interconnecting bridge Installation
• TaB – TaQ bridge weight 466MT and Length 84m
b) TaQ – TaR – interconnecting bridge installation
• TaQ – TaR bridge weight 783MT and Length 95m
Client : ExxonMobil Malaysia
Vessel : DB 101
Project :
a) TeB – 4 Legged Platform Installation
• TeB Jacket weight 1639MT: Side Lift, Upending and set to seabed.
• TeB Topside weight 1731MT: Stern Lift and set to transition pieces.
b) TaR – 8 Legged Jacket Installation
• Jacket Weight 5194.8MT : Launch by Posh Mogami, self-upending and tow
with 4 nos AHT to location.
c) DaA – 4 Legged Platform Installation
• Jacket Weight 1525MT ; Side Lift, Upending and set to seabed.
• Topside weight 1769MT: Stern Lift and set to transition pieces.
3. PERSONNEL RESUME
NORFADZLY NORDIN
Client : ExxonMobil Malaysia
Vessel : LTS 3000
Project:
a) TeA – 4 Legged Platform Installation
• Jacket Weight 1684MT ; Stern Lift, Upending and set to seabed.
• Topside weight 1791MT: Stern Lift and set to transition pieces.
b) TaQ – 4 Legged Platform Installation
• Jacket Weight 2053MT ; Stern Lift, Upending and set to seabed.
• Topside weight 2129MT: Stern Lift and set to transition pieces.
Client: NEWFIELD Peninsular Malaysia Inc
Vessel : SK2000 / LTS 3000
Project:
a) WHP – 4 Legged Platform and Riser and Subsea Spool Installation
• Jacket Weight 880MT; Stern Lift, Upending and Setup to seabed.
• Topside weight 695MT: Stern Lift and set to transition pieces.
• 16”dia riser and subsea spool installation using stalk-on method.
b) CPP – 4 Legged Platform Installation, Interconnecting Bridge, Flare and
appurtenances.
• Jacket Weight 875MT; Stern Lift, Upending and Setup seabed.
• Topside weight 2710MT: Stern Lift and set to transition pieces.
• Interconnecting Bridge weight 51MT
• Flare Weight 68MT
• Living Quarters Weight 679MT
Client: NEWFIELD Peninsular Malaysia Inc.
Vessel: Sapura 3000
Position: Operation Engineer
Project:
a) WBWP – 4 Legged Platform Installation
• Jacket Weight 710MT; Stern Lift, Upending and Setup seabed.
• Topside weight 460MT: Stern Lift and set to transition pieces.
4. PERSONNEL RESUME
NORFADZLY NORDIN
Client: Petronas Carigali Sdn. Bhd.
Vessel: Quippo Prakash / DB 101/ LTS 3000
Position: Snr Field Engineer
Project:
a) TBDR-A - 6 Legged Jacket Installation
• Jacket Weight 2680MT : Launch by LLB-1, Upending and Setup to seabed.
b) TBCP-A - 8 Legged Jacket Installation
• Jacket Weight 3637.8MT : Launch by SLB-1, Upending and Setup to seabed.
c) TBFP – 3 Legged Platform Installation (Tripod)
• Jacket Weight 341MT: Side lift, upending & Setup to seabed.
d) KNPG-B – 8 Legged Jacket Installation
• Jacket Weight 6157MT: Launch by S-45, Upending and Setup to seabed.
Client: Sarawak Shell Berhad
Vessel: LTS 3000 / DB 101
Position: Snr Field Engineer
Project:
a) SJQ-A – 4 Legged Platform Installation, Interconnecting Bridge and Living
Quarters
• Jacket weight 1050MT; Side lift, upending & Setup to seabed.
• Topside weight 2431MT: Stern Lift and set to transition pieces.
• Bridge weight 123MT
• Living Quarters weight 1565MT
Client: Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
Position: Snr Field Engineer
Project: PLEM and 8 nos of Subsea Spool Installation (Various sizes) for JDA Block B17
Field Development Project
Vessel : Swiber Supporter
5. PERSONNEL RESUME
NORFADZLY NORDIN
Client: Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
Vessel : Sapura 3000 / Lewek Champion
Position: Senior Field Engineer
Project:
a) MDA,MDB,MDC,JKA, MDLQ – 4 Legged Wellhead Platform Installation
• MDA Jacket Weight 509MT & Topside Weight 660MT
• MDB Jacket Weight 585MT & Topside Weight 708MT
• MDC Jacket Weight 597MT & Topside Weight 691MT
• JKA Jacket Weight 622MT & Topside Weight 809MT
• MDLQ Jacket Weight 1085MT & Topside Weight 1705MT
b) MDPP - 8 Legged Jacket Installation
• Jacket Weight 4551MT: Launch by S-45, Self –Upending, tow with 4 nos Tugs
and Setup to seabed.
Client: ExxonMobil & Production (Malaysia) Incorporated
Position: Field Engineer
Project: 18” dia. x 7 km Tapis F to Guntong E Pipeline, Riser and Subsea Spool
Installation, Terengganu
Project: 16” dia x 4 km Jerneh B to Jerneh A CRA Pipeline, Riser Subsea Spool
Installation, Terengganu
Client: Petronas Carigali Sdn. Bhd.
Position: Field Engineer
Project: West Lutong Pipeline Replacement, Sarawak.
Client: ExxonMobil & Production (Malaysia) Incorporated
Position: Field Engineer
Project: 16” dia x 11km Tu-A to Tu-B Pipeline, Riser and Subsea Spool Installation,
Terengganu
Project: 28” dia x 7km Gu-E to Tu-A Pipeline, Riser and Subsea Spool Installation,
Terengganu
6. PERSONNEL RESUME
NORFADZLY NORDIN
Client: Petronas Carigali Sdn. Bhd.
Position: Field Engineer
Project: 10” dia x xkm LEDP-A to Pu-A Pipeline and Riser Installation, Terengganu
Project: LEDP-A Monopod Platform Installation, Terengganu
Consist of 3 nos Anchor Piles complete with Mooring Chain between main
pile to anchor piles.
Client: Petronas Carigali Sdn. Bhd.
Position: Field Engineer
Project: BAJT-H 4- Legged Drilling Platform Installation, Sarawak.
Project: 6” & 16” dia. BAKP-B to BAJT-H Riser and Subsea Spool Installation,
Sarawak
Client : Brunei Shell Petroleum Sdn Bhd (BSP)
Position: Field Engineer
Project : Champion West Phase III & Egret Oil Acceleration
Work covered installation of 1 ea. 16” dia. pipeline (PID 1795) & 2 ea. Risers and
subsea spool from FACP-4 to EGDP-1, installation of 2 ea.16” dia. parallel pipelines
(PID 1493 & PID 1494) & 4 ea. Risers and Subsea Spool from CPCB-7 to CWDP-1
including mattresses installation for crossings from CPCB-7 to CWDP-1,
Laying/Installation of 2 ea. Sub-sea cable from CPFP-3 to CPRP-7 and from CWWJ-2 to
CWDP-1 & installation of 2ea. J-Tube at CPFP-3 and CPRP-7.
Client : TLO (TL Offshore) and TML (Talisman Energy)
Project : PM305 SOUTH ANGSI A DEVELOPMENT PROJECT
South Angsi-A 4-Legged Platform Installation, Terengganu
Client : Sarawak Shell Berhad
Project : Serai Transportation and Installation (14” dia. x xkm Serai Subsea PLEM to
M3DR-A CRA Pipeline, Riser, PLEM and Module Installation
Client : Talisman Malaysia, TL Offshore Sdn Bhd
Project : Block PM3, CAA – Phase 2 & 3 Development (Pipeline
Installation).
Monitoring, supervision and field engineering aspects of pipeline installation. Work
entailed the installation of pipelines, spools, risers, pre-commissioning the pipeline,
hydrotesting for spools & risers.
7. PERSONNEL RESUME
NORFADZLY NORDIN
Period of Work: 2003-2004
Company: GLOBAL OFFSHORE (M) SDN BHD
Nature Business: Oil & Gas
Position: Field Engineer
Project Involved: Client: TLO (TL Offshore) and TML (Talisman Energy)
Project: PM305 SOUTH ANGSI A DEVELOPMENT PROJECT
South Angsi-A 4-Legged Platform Installation, Terengganu
Client: Sarawak Shell Berhad
Project: Serai Transportation and Installation
(14" dia. x xkm Serai Subsea PLEM to M3DR-A CRA Pipeline, Riser, PLEM and Module
Installation
Client : Talisman Malaysia, TL Offshore Sdn Bhd
Project: Block PM3, CM - Phase 2 & 3 Development (Pipeline
Installation).
Monitoring, supervision and field engineering aspects of pipeline installation. Work
entailed the installation of pipelines, spools, risers, pre-commissioning the pipeline,
hydrotesting for spools & risers.