SlideShare a Scribd company logo
1 of 6
Page 1 of 6
Jonathan Hemming
8 Siward Road, Bromley, Kent, BR2 9JZ
07718 059311
jrhemming@yahoo.com
Summary
I have 26 years' experience in the oil and gas industry, as a mechanical design engineer, project
engineer, and project manager. I have project management and engineering experience across the
upstreamsector from well drilling and completion to processplant and platform design, construction
and commissioning, onshore and offshore FEED and detailed design projects. My project
management responsibilities have included coordination of multi-disciplinary engineering teams,
project planning, cost estimating, progress measurement, change management, interface
management, customer liaison, and project reporting.Internationalexperience includesassignments
in Russia, Algeria, Tunisia, Egypt and Norway. I have experience of whole life-cycle of onshore and
offshore projects, from receipt of invitation to tender, through project bidding, concept design, detail
design and development, prototype testing, manufacturing, to installation and commissioning.
Since being made redundantfrom Genesisin August 2016 I have completeda Level 2 GymInstruction
course and Level 3 Personal Trainer course with Premier Training, and have being working
temporarily in retail.
Employment History
2001 – 2016 | Genesis
1990 – 2001 | COOPER CAMERON(UK) LTD
Key Skills
 Project Management
 Engineering inter-discipline coordination
 Interface management
 Tender preparation and estimating
 Technical report writing
 Presentation skills
Education and Qualifications: BEng (Hons), Mechanical Engineering, University of Leeds
Professional Affiliations: Chartered Engineer. MIMechE
Nationality: British
Date of Birth: 16th May 1969
Jonathan Hemming
Page 2 of 6
Experience with Genesis, 2001 – 2016
Khalda PetroleumCompany: Hydra Phases IIIA and IIID, and Tarek Inlet Compression – Egypt –
Onshore - Project Engineering Manager
Genesis executed the detailed design for modifications at the Hydra and Shams facilities for installation of
new interconnecting pipelines. In parallel, two FEEDs were executed for addition of compression facilities at
the Hydra and Tarek facilities to mitigate declining reservoir pressures during later field life.
National Grid: White Rose Carbon Capture and Storage Project FEED – United Kingdom – Offshore &
Onshore – Consultant Engineer
Genesis executed the FEED for the White Rose Carbon Capture & Storage (CCS) project, the purpose of
which is to reduce greenhouse gas emissions by taking CO2 from onshore emitters (power stations), transport
it offshore via pipeline, and inject it into an offshore subsurface storage reservoir.
My role was to assist National Grid in developing tender packages for the Execute phase of the project, and
in technical reviews of EPC tenders for onshore and offshore pipelines, onshore pumping station, offshore
platform, and transport & installation.
NexenPetroleumU.K.Limited: BuzzardPhaseII Development - Jacket FEED – United Kingdom – Offshore
- Project Manager
Genesis was tasked by Nexen with the provision of engineering services associated with the FEED phase of
the project for the Buzzard Phase II jacket, in the UK sector of the North Sea.
The scope included:
 Development of jacket and risers configuration to suit topsides and subsea layouts
 Structural analyses (in-place, boat impact, fatigue, transport, pile installation, upending, lift and un-pile
stability)
 Mudmat sizing and cathodic protection design
 Weight estimate
 FEED drawing package
Particular challenges were designing to ISO 19902 (more onerous than API), an unusual configuration of
having the majority (18 of 21) conductors located outside of the main jacket framing to suit the jack-up
approach, adopting two piles per leg instead of a more conservative 3 piles, and designing for installation by
two potential contractors.
FEED was delivered on time (5.5 months) and within budget (4600 manhours).
Project management of the FEED for the Buzzard Phase II (Northern Area) jacket. At 7400 tonnes in 88m
water, this is the largest jacket Genesis has designed and is a step change in Genesis jacket capability.
RWE Dea UK SNS Limited: Breagh Phase 2 - United Kingdom – Offshore | Project Manager
Management of Pre-FEEDfor the Breagh Bravo platform, developing RWE's conceptof a Clipper South type
topsides on a Breagh Alpha type jacket.
Key disciplines involved were piping/layout, structural, subsea, electrical and safety. Deliverables were a
number of technical notes describing the work done and defining the design to be taken forward into FEED,
preparing the FEED Basis of Design, level 1 schedule, and a +/-30% cost estimate.
BG Tunisia Limited: Acid Gas Management – Tunisia – Onshore | Engineering Manager
BG Tunisia Ltd are owner and operator of the Miskar asset in Tunisia. The asset consists of the Miskar
platform and the Hannibal Gas Treatment Plant. The Hannibal Sour Gas debottlenecking project included
the installation of a new Sulphuric Acid Plant (SAP), but after a failure to operate as expected the SAP was
shut down several years ago.
Genesis was tasked with conducting the FEED for the restart of the SAP as part of the Hannibal plant Acid
Gas Management project.
Management of FEED project to define facilities required to remove H2S from produced gas, and produce
Jonathan Hemming
Page 3 of 6
sulphuric acid as a saleable by-product. Work involved definition of modifications to a currently mothballed
sulphuric acid plant at the Hannibal site, development of a new BTEX removal unit, bringing the plant in-line
with current BG standards, and all necessary brownfield tie-ins.
Noble Energy Mediterranean Limited: Leviathan FEED Support – Israel – Offshore - Client representative
Noble were conducting a FEED competition in order to select an FPSO contractor for the EPCI phase.
Genesis's scope was to provide "Owner's Engineer" support to Noble during this phase as required,
specifically Process and Environmental engineering.
I was seconded to Noble Energy as their resident engineer in the FEED contractor's office in Norway,
supervising topsides design development for the new gas and condensate FPSO.
TechnipAngola - EngenhariaLimitada: Valve Improvement Project – Angola – Offshore - Project Manager
I project managed the engineering and procurement for brownfield replacement of manual and pneumatic
actuated ball, gate, butterfly, DB&B and globe valves (total of 105 valves) on the BP Greater Plutonio FPSO,
ranging in size (3/4" to 20") and rating (#150 to #2500).
Technip Angola - Engenharia Limitada: GtP Water Injection Define & Execute – Angola – Offshore –
Project Manager
Project management of detailed design of brownfield piping modifications to re-instate the WI system to 3-
pump operation on the BP Greater Plutonio FPSO whilst maintaining injection capability and eliminating
offshore hot-work. Detailed design isometrics, pipe supports and fabrication work-packs produced.
HeeremaVlissingen B.V.: Breagh Platform Detailed Design – United Kingdom – Offshore- Project Engineer
The Breagh field is located in the UK SNS, block 42/13. Phase 1 consists of the Breagh Alpha (Breagh A)
platform which is installed on the West side of the field, with 20” gas and 3” MEG/CI pipelines (ca.100km
subsea/10km onshore) to the Teesside Gas Processing Plant.
Genesis as sub contractor to Heerema executed detailed engineering of the Platform and procurement of
Topside equipment.
As project engineer I was responsible for inter-discipline coordination for theGenesis scope, and
management of interfaces with EPC contractor and end client (RWE-Dea).
Bacton Storage Company Limited: Baird Gas Storage Project FEED – United Kingdom – Offshore,
Onshore - Project Engineer
Genesis scope was to develop to FEED level the design for the Baird Gas storage project . Gas will be
supplied from / delivered to the National Grid (NTS) via new facilities located within the existing Perenco
Bacton Terminal. The Baird reservoir is a depleted reservoir located in the Block 49/23 approximately 86 km
east of the Perenco onshore terminal at Bacton.
I was responsible for project engineering of the offshore normally unmanned platform for injection and
withdrawal service of up to 1400 MMscfd gas for a 50 year design life.
Groupement Bir Seba: Bir Seba (BRS) Field Development Phase I – Algeria – Onshore - Project Engineer
The Bir Seba (BRS) field is a commercial project being developed by PetroVietnam Exploration Production
(PVEP-ALGERIA). The BRS field lies within the Blocks 433a & 416b in the Touggourt Permit of Algeria,
approximately 1200 km by road from the Algerian ports. The concept for the surface facilities is a standalone
development for the BRS field. The gathering system comprises well sites and a field network of flow lines
routing production from individual wells via remote manifold stations and production trunklines to a central
processing facility (CPF).
FEEDProject Engineering, including interface study, project management procedures, in-country site survey,
cost estimate, and preparation of EPC ITT packages.
Jonathan Hemming
Page 4 of 6
Various clients: Proposals
Preparation of pre-qualification and proposal documents for concept design, FEED and EPC projects,
including assessment of scopes of work and estimation of man-hours/budgets.
First Calgary Petroleums Ltd. : MLE Plant Algeria – Algeria – Onshore - Project Engineer
Sonatrach and First Calgary petroleum Ltd under Production Sharing Contract, developed the Menzel
Ledjmet Gas Field Block 405b in the Berkine Bassin- Algeria. This is a desert location, approximately 300km
east-south-east from the town of Hassi Messaoud.
Genesis carried out FEED for the development which consists of a field gathering system, central processing
facilities and export pipelines for gas, LPG, condensate and oil and associated infrastructures.
I was responsible for FEED Project Engineering, including Interface study, project management procedures,
liaison with survey contractor, and preparation of LLI ITT packages.
Nigerian Agip Oil Company Limited: FEED - Brass LNG Upstream Project – Nigeria – Onshore - Project
Engineer
The B-LNG Upstream project will gather 850MMscfd gas via a pipeline network, treat the gas in upgraded
existing facilities and deliver the treated gas to the new LNG plant located near the Brass Oil Terminal.
Genesis carried out FEEDfor the facilities upgrading at the Obiafu-Obrikom gas plant, Oshie flowstation, and
Kwale gas plant in the land area, and the Obama and Clough Creek flowstations in the swamp area.
Project management of onshore Nigerian development involving upgrades of five existing plants/flowstations
and new interconnecting pipelines.Liaison between Genesis and in-country engineering sub-contractor.
Amerada Hess E & P: York NUI FEED – United Kingdom – Offshore - Project Engineer
Project engineering on FEED for minimum facilities unmanned platform and subsea gas export pipeline in
the North Sea.
Heerema Vlissingen B.V.: Cavendish Platform – United Kingdom – Offshore - Interface Engineer
As engineering subcontractor, Genesis performed the design and procurement of the Cavendish Platform
and the communication links to the Murdoch Platform. End client was RWE.
I coordinated the interfaces between fabrication contractor, detailed design contractor (Genesis) and
Independent Verification Body for the Cavendish unmanned platform.
Sakhalin Energy Investment Company Ltd: SEIC Manpower Services – Russian Federation – Onshore,
Offshore - Interface Engineer
The Sakhalin II development included two offshore platforms, subsea pipelines, onshore reception plant,
cross-country pipeline and export terminal.
Interface coordination and Risk Management Project Engineer working in the SEIC Client Management Team
which is tasked with managing the Contractor interfaces on Sakhalin Island.
Syntheseas Ltd: Syntheseas Sevenheads PMT Team Support – Ireland – Offshore - Interface Engineer
Project scope is for a subsea development tied back to the Kinsale Alpha platform, including brownfield
modifications to the platform.
Acting on behalf of Syntheseas project management group, co-ordination of interfaces between the various
parties contracted to Ramco. Coordination of Independent Verification activities on the project, liaison
between the IVB and the design, fabrication and installation contractors.
KoreaNational Oil Corporation:KNOC - Technical Assistanceto Rong Doi – Viet Nam – Offshore - Project
Engineer
Project Management and Engineering assistance to Korean National Oil Company for the Rong Doi
development.
Preparation of pre-qualification questionnaires, evaluation of contractors pre-qualification submissions, and
Jonathan Hemming
Page 5 of 6
EPIC ITT preparation.
Burlington Resources (Irish Sea) Ltd: Burlington Irish Sea - Rivers Field Development EPIC – United
Kingdom – Offshore - Project Engineer
As part of a joint venture, Genesis were EPIC contractor for the Calder platform and pipeline in the Irish Sea
"Rivers" field development.
I coordinated interfaces between the Rivers Joint Venture (Genesis & partner), Client and Third Parties, and
was the principal point of contact between Genesis and the platform fabrication sub-contractor. I also
managed the Completion Management System to compile documentation/certification from offshore
mechanical completion and pre-commissioning activities to allow start-up of facility.
Jonathan Hemming
Page 6 of 6
Experience with Cooper Cameron, 1990 - 2001
Project Engineer
Oseberg East
This project had similar requirements to the Jotun equipment, with significantly more onerous requirements
such as uprated working pressure and temperature, and new technical solutions such as oil production from
the wellhead annulus. Running this and the Jotun project simultaneously, supervised a team of ten engineers
and draftsmen.
Project Engineer
Jotun B
Having technical responsibility for the whole project. This consisted of 18/3/4” contact wellheads with 5-1/8”
5000psi oil production trees, 6-3/8” 5000psi water injection trees, and 9” 3000psi water production trees with
1000kVA power cables from downhole pumps. The design objective was to not only meet the Jotun project
requirements, but to design with a view to this design being offered as a standard system on a worldwide
basis
Design Engineer
Shearwater
Worked on this project designing and prototype testing the 6-3/8” Xmas tree for high pressure (15000psi) and
high temperature (350ºF) service. This was a high profile project within Shell as it was the world’s first 6-3/8”
HPHT tree, and the design was commended in the 1998 Expro technology and innovation awards.
Liverpool Bay
Worked on this project as part of the design team, designing the world’s first platform horizontal tree.
Worked on a number of other projects, mainly involving detail design of subsea valves and hydraulic
actuators.
Completed IMechE accredited graduate training programme and gained chartered engineer status.

More Related Content

What's hot

What's hot (18)

Trdrag 04 13 16
Trdrag 04 13 16Trdrag 04 13 16
Trdrag 04 13 16
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
sharndencv
sharndencvsharndencv
sharndencv
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
CV-2015 Rev 0
CV-2015 Rev 0CV-2015 Rev 0
CV-2015 Rev 0
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015
 
CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
 
DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)
 

Viewers also liked

Viewers also liked (19)

Caminho dos sabores
Caminho dos saboresCaminho dos sabores
Caminho dos sabores
 
Presentación: Utilización de Avatares para la educación
Presentación: Utilización de Avatares para la educaciónPresentación: Utilización de Avatares para la educación
Presentación: Utilización de Avatares para la educación
 
National_University-Student Scholarship Conference-2012-LinkedIn
National_University-Student Scholarship Conference-2012-LinkedInNational_University-Student Scholarship Conference-2012-LinkedIn
National_University-Student Scholarship Conference-2012-LinkedIn
 
Ebook diadospais
Ebook diadospaisEbook diadospais
Ebook diadospais
 
6 vsk matisa_37_39(1)
6 vsk matisa_37_39(1)6 vsk matisa_37_39(1)
6 vsk matisa_37_39(1)
 
Klimato kaitos pavojai
Klimato kaitos pavojaiKlimato kaitos pavojai
Klimato kaitos pavojai
 
Bezmugurkaulnieki 1
Bezmugurkaulnieki 1Bezmugurkaulnieki 1
Bezmugurkaulnieki 1
 
Interešu izglītība 5.- 12.kl. 2016./2017.m.g.
Interešu  izglītība 5.- 12.kl. 2016./2017.m.g.Interešu  izglītība 5.- 12.kl. 2016./2017.m.g.
Interešu izglītība 5.- 12.kl. 2016./2017.m.g.
 
šūnas elpošana
šūnas elpošanašūnas elpošana
šūnas elpošana
 
Sunas membrana
Sunas membranaSunas membrana
Sunas membrana
 
imagen
imagenimagen
imagen
 
Augi
AugiAugi
Augi
 
Industry training Experience in UNIVOTEC
Industry training Experience in UNIVOTECIndustry training Experience in UNIVOTEC
Industry training Experience in UNIVOTEC
 
Cilvēka evolūcija
Cilvēka evolūcijaCilvēka evolūcija
Cilvēka evolūcija
 
Pelvic organ prolapse – Management
Pelvic organ prolapse – ManagementPelvic organ prolapse – Management
Pelvic organ prolapse – Management
 
Motivācijas formula. Draugiem Group.
Motivācijas formula. Draugiem Group.Motivācijas formula. Draugiem Group.
Motivācijas formula. Draugiem Group.
 
1ª república
1ª república1ª república
1ª república
 
Cilvēka uzbūve
Cilvēka uzbūveCilvēka uzbūve
Cilvēka uzbūve
 
DENTAL PLAQUE - PART 2 (BIOFILM)
DENTAL PLAQUE - PART 2 (BIOFILM)DENTAL PLAQUE - PART 2 (BIOFILM)
DENTAL PLAQUE - PART 2 (BIOFILM)
 

Similar to Jonathan Hemming CV

R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Edward Byrne
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02Jamal Jamil
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)MaxAlagoa
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineerRobin Dargavel BEng (Hons)
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1RToet
 
GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster WheelerGareth White
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2RToet
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 

Similar to Jonathan Hemming CV (20)

R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
CV PMG
CV PMGCV PMG
CV PMG
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
 
CVPLAING
CVPLAINGCVPLAING
CVPLAING
 
Curricula Vitae - NVB
Curricula Vitae - NVBCurricula Vitae - NVB
Curricula Vitae - NVB
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1
 
GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster Wheeler
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 

Jonathan Hemming CV

  • 1. Page 1 of 6 Jonathan Hemming 8 Siward Road, Bromley, Kent, BR2 9JZ 07718 059311 jrhemming@yahoo.com Summary I have 26 years' experience in the oil and gas industry, as a mechanical design engineer, project engineer, and project manager. I have project management and engineering experience across the upstreamsector from well drilling and completion to processplant and platform design, construction and commissioning, onshore and offshore FEED and detailed design projects. My project management responsibilities have included coordination of multi-disciplinary engineering teams, project planning, cost estimating, progress measurement, change management, interface management, customer liaison, and project reporting.Internationalexperience includesassignments in Russia, Algeria, Tunisia, Egypt and Norway. I have experience of whole life-cycle of onshore and offshore projects, from receipt of invitation to tender, through project bidding, concept design, detail design and development, prototype testing, manufacturing, to installation and commissioning. Since being made redundantfrom Genesisin August 2016 I have completeda Level 2 GymInstruction course and Level 3 Personal Trainer course with Premier Training, and have being working temporarily in retail. Employment History 2001 – 2016 | Genesis 1990 – 2001 | COOPER CAMERON(UK) LTD Key Skills  Project Management  Engineering inter-discipline coordination  Interface management  Tender preparation and estimating  Technical report writing  Presentation skills Education and Qualifications: BEng (Hons), Mechanical Engineering, University of Leeds Professional Affiliations: Chartered Engineer. MIMechE Nationality: British Date of Birth: 16th May 1969
  • 2. Jonathan Hemming Page 2 of 6 Experience with Genesis, 2001 – 2016 Khalda PetroleumCompany: Hydra Phases IIIA and IIID, and Tarek Inlet Compression – Egypt – Onshore - Project Engineering Manager Genesis executed the detailed design for modifications at the Hydra and Shams facilities for installation of new interconnecting pipelines. In parallel, two FEEDs were executed for addition of compression facilities at the Hydra and Tarek facilities to mitigate declining reservoir pressures during later field life. National Grid: White Rose Carbon Capture and Storage Project FEED – United Kingdom – Offshore & Onshore – Consultant Engineer Genesis executed the FEED for the White Rose Carbon Capture & Storage (CCS) project, the purpose of which is to reduce greenhouse gas emissions by taking CO2 from onshore emitters (power stations), transport it offshore via pipeline, and inject it into an offshore subsurface storage reservoir. My role was to assist National Grid in developing tender packages for the Execute phase of the project, and in technical reviews of EPC tenders for onshore and offshore pipelines, onshore pumping station, offshore platform, and transport & installation. NexenPetroleumU.K.Limited: BuzzardPhaseII Development - Jacket FEED – United Kingdom – Offshore - Project Manager Genesis was tasked by Nexen with the provision of engineering services associated with the FEED phase of the project for the Buzzard Phase II jacket, in the UK sector of the North Sea. The scope included:  Development of jacket and risers configuration to suit topsides and subsea layouts  Structural analyses (in-place, boat impact, fatigue, transport, pile installation, upending, lift and un-pile stability)  Mudmat sizing and cathodic protection design  Weight estimate  FEED drawing package Particular challenges were designing to ISO 19902 (more onerous than API), an unusual configuration of having the majority (18 of 21) conductors located outside of the main jacket framing to suit the jack-up approach, adopting two piles per leg instead of a more conservative 3 piles, and designing for installation by two potential contractors. FEED was delivered on time (5.5 months) and within budget (4600 manhours). Project management of the FEED for the Buzzard Phase II (Northern Area) jacket. At 7400 tonnes in 88m water, this is the largest jacket Genesis has designed and is a step change in Genesis jacket capability. RWE Dea UK SNS Limited: Breagh Phase 2 - United Kingdom – Offshore | Project Manager Management of Pre-FEEDfor the Breagh Bravo platform, developing RWE's conceptof a Clipper South type topsides on a Breagh Alpha type jacket. Key disciplines involved were piping/layout, structural, subsea, electrical and safety. Deliverables were a number of technical notes describing the work done and defining the design to be taken forward into FEED, preparing the FEED Basis of Design, level 1 schedule, and a +/-30% cost estimate. BG Tunisia Limited: Acid Gas Management – Tunisia – Onshore | Engineering Manager BG Tunisia Ltd are owner and operator of the Miskar asset in Tunisia. The asset consists of the Miskar platform and the Hannibal Gas Treatment Plant. The Hannibal Sour Gas debottlenecking project included the installation of a new Sulphuric Acid Plant (SAP), but after a failure to operate as expected the SAP was shut down several years ago. Genesis was tasked with conducting the FEED for the restart of the SAP as part of the Hannibal plant Acid Gas Management project. Management of FEED project to define facilities required to remove H2S from produced gas, and produce
  • 3. Jonathan Hemming Page 3 of 6 sulphuric acid as a saleable by-product. Work involved definition of modifications to a currently mothballed sulphuric acid plant at the Hannibal site, development of a new BTEX removal unit, bringing the plant in-line with current BG standards, and all necessary brownfield tie-ins. Noble Energy Mediterranean Limited: Leviathan FEED Support – Israel – Offshore - Client representative Noble were conducting a FEED competition in order to select an FPSO contractor for the EPCI phase. Genesis's scope was to provide "Owner's Engineer" support to Noble during this phase as required, specifically Process and Environmental engineering. I was seconded to Noble Energy as their resident engineer in the FEED contractor's office in Norway, supervising topsides design development for the new gas and condensate FPSO. TechnipAngola - EngenhariaLimitada: Valve Improvement Project – Angola – Offshore - Project Manager I project managed the engineering and procurement for brownfield replacement of manual and pneumatic actuated ball, gate, butterfly, DB&B and globe valves (total of 105 valves) on the BP Greater Plutonio FPSO, ranging in size (3/4" to 20") and rating (#150 to #2500). Technip Angola - Engenharia Limitada: GtP Water Injection Define & Execute – Angola – Offshore – Project Manager Project management of detailed design of brownfield piping modifications to re-instate the WI system to 3- pump operation on the BP Greater Plutonio FPSO whilst maintaining injection capability and eliminating offshore hot-work. Detailed design isometrics, pipe supports and fabrication work-packs produced. HeeremaVlissingen B.V.: Breagh Platform Detailed Design – United Kingdom – Offshore- Project Engineer The Breagh field is located in the UK SNS, block 42/13. Phase 1 consists of the Breagh Alpha (Breagh A) platform which is installed on the West side of the field, with 20” gas and 3” MEG/CI pipelines (ca.100km subsea/10km onshore) to the Teesside Gas Processing Plant. Genesis as sub contractor to Heerema executed detailed engineering of the Platform and procurement of Topside equipment. As project engineer I was responsible for inter-discipline coordination for theGenesis scope, and management of interfaces with EPC contractor and end client (RWE-Dea). Bacton Storage Company Limited: Baird Gas Storage Project FEED – United Kingdom – Offshore, Onshore - Project Engineer Genesis scope was to develop to FEED level the design for the Baird Gas storage project . Gas will be supplied from / delivered to the National Grid (NTS) via new facilities located within the existing Perenco Bacton Terminal. The Baird reservoir is a depleted reservoir located in the Block 49/23 approximately 86 km east of the Perenco onshore terminal at Bacton. I was responsible for project engineering of the offshore normally unmanned platform for injection and withdrawal service of up to 1400 MMscfd gas for a 50 year design life. Groupement Bir Seba: Bir Seba (BRS) Field Development Phase I – Algeria – Onshore - Project Engineer The Bir Seba (BRS) field is a commercial project being developed by PetroVietnam Exploration Production (PVEP-ALGERIA). The BRS field lies within the Blocks 433a & 416b in the Touggourt Permit of Algeria, approximately 1200 km by road from the Algerian ports. The concept for the surface facilities is a standalone development for the BRS field. The gathering system comprises well sites and a field network of flow lines routing production from individual wells via remote manifold stations and production trunklines to a central processing facility (CPF). FEEDProject Engineering, including interface study, project management procedures, in-country site survey, cost estimate, and preparation of EPC ITT packages.
  • 4. Jonathan Hemming Page 4 of 6 Various clients: Proposals Preparation of pre-qualification and proposal documents for concept design, FEED and EPC projects, including assessment of scopes of work and estimation of man-hours/budgets. First Calgary Petroleums Ltd. : MLE Plant Algeria – Algeria – Onshore - Project Engineer Sonatrach and First Calgary petroleum Ltd under Production Sharing Contract, developed the Menzel Ledjmet Gas Field Block 405b in the Berkine Bassin- Algeria. This is a desert location, approximately 300km east-south-east from the town of Hassi Messaoud. Genesis carried out FEED for the development which consists of a field gathering system, central processing facilities and export pipelines for gas, LPG, condensate and oil and associated infrastructures. I was responsible for FEED Project Engineering, including Interface study, project management procedures, liaison with survey contractor, and preparation of LLI ITT packages. Nigerian Agip Oil Company Limited: FEED - Brass LNG Upstream Project – Nigeria – Onshore - Project Engineer The B-LNG Upstream project will gather 850MMscfd gas via a pipeline network, treat the gas in upgraded existing facilities and deliver the treated gas to the new LNG plant located near the Brass Oil Terminal. Genesis carried out FEEDfor the facilities upgrading at the Obiafu-Obrikom gas plant, Oshie flowstation, and Kwale gas plant in the land area, and the Obama and Clough Creek flowstations in the swamp area. Project management of onshore Nigerian development involving upgrades of five existing plants/flowstations and new interconnecting pipelines.Liaison between Genesis and in-country engineering sub-contractor. Amerada Hess E & P: York NUI FEED – United Kingdom – Offshore - Project Engineer Project engineering on FEED for minimum facilities unmanned platform and subsea gas export pipeline in the North Sea. Heerema Vlissingen B.V.: Cavendish Platform – United Kingdom – Offshore - Interface Engineer As engineering subcontractor, Genesis performed the design and procurement of the Cavendish Platform and the communication links to the Murdoch Platform. End client was RWE. I coordinated the interfaces between fabrication contractor, detailed design contractor (Genesis) and Independent Verification Body for the Cavendish unmanned platform. Sakhalin Energy Investment Company Ltd: SEIC Manpower Services – Russian Federation – Onshore, Offshore - Interface Engineer The Sakhalin II development included two offshore platforms, subsea pipelines, onshore reception plant, cross-country pipeline and export terminal. Interface coordination and Risk Management Project Engineer working in the SEIC Client Management Team which is tasked with managing the Contractor interfaces on Sakhalin Island. Syntheseas Ltd: Syntheseas Sevenheads PMT Team Support – Ireland – Offshore - Interface Engineer Project scope is for a subsea development tied back to the Kinsale Alpha platform, including brownfield modifications to the platform. Acting on behalf of Syntheseas project management group, co-ordination of interfaces between the various parties contracted to Ramco. Coordination of Independent Verification activities on the project, liaison between the IVB and the design, fabrication and installation contractors. KoreaNational Oil Corporation:KNOC - Technical Assistanceto Rong Doi – Viet Nam – Offshore - Project Engineer Project Management and Engineering assistance to Korean National Oil Company for the Rong Doi development. Preparation of pre-qualification questionnaires, evaluation of contractors pre-qualification submissions, and
  • 5. Jonathan Hemming Page 5 of 6 EPIC ITT preparation. Burlington Resources (Irish Sea) Ltd: Burlington Irish Sea - Rivers Field Development EPIC – United Kingdom – Offshore - Project Engineer As part of a joint venture, Genesis were EPIC contractor for the Calder platform and pipeline in the Irish Sea "Rivers" field development. I coordinated interfaces between the Rivers Joint Venture (Genesis & partner), Client and Third Parties, and was the principal point of contact between Genesis and the platform fabrication sub-contractor. I also managed the Completion Management System to compile documentation/certification from offshore mechanical completion and pre-commissioning activities to allow start-up of facility.
  • 6. Jonathan Hemming Page 6 of 6 Experience with Cooper Cameron, 1990 - 2001 Project Engineer Oseberg East This project had similar requirements to the Jotun equipment, with significantly more onerous requirements such as uprated working pressure and temperature, and new technical solutions such as oil production from the wellhead annulus. Running this and the Jotun project simultaneously, supervised a team of ten engineers and draftsmen. Project Engineer Jotun B Having technical responsibility for the whole project. This consisted of 18/3/4” contact wellheads with 5-1/8” 5000psi oil production trees, 6-3/8” 5000psi water injection trees, and 9” 3000psi water production trees with 1000kVA power cables from downhole pumps. The design objective was to not only meet the Jotun project requirements, but to design with a view to this design being offered as a standard system on a worldwide basis Design Engineer Shearwater Worked on this project designing and prototype testing the 6-3/8” Xmas tree for high pressure (15000psi) and high temperature (350ºF) service. This was a high profile project within Shell as it was the world’s first 6-3/8” HPHT tree, and the design was commended in the 1998 Expro technology and innovation awards. Liverpool Bay Worked on this project as part of the design team, designing the world’s first platform horizontal tree. Worked on a number of other projects, mainly involving detail design of subsea valves and hydraulic actuators. Completed IMechE accredited graduate training programme and gained chartered engineer status.