SlideShare a Scribd company logo
1 of 14
Download to read offline
COMPANY PROFILE
MABRO ENGINEERING & TECHNICAL SERVICES CC
Specialists in Petrochemical, Oil, Gas, and Water Services
Company registration number: 2009/107214/23
VAT registration: 4550260527
Tel: +27 11 824 3182
Fax: +27 11 824 2858
Email: nathan.shago@mabro.co.za
Website: www.mabro.co.za
Postal Address:
PO Box 1607
Germiston
1401
Physical Address:
284a Dekema road
Unit E7
Dekema Park
Wadeville
South Africa
1428
Mabro Engineering and Technical
Services previously traded as
MENTS, here and after referred to
as MABRO; is a fully South African
services company for the
petrochemical, oil & gas, mining,
and water industries. The company
has been operational since 2009
and offers specialized services for
plant, pipelines, piping and pipeline
specials to the fore mentioned
industries.
Introduction
Our services include design and project management for the fabrication of pipe components and
(headers/pig traps), pressure testing, pre-commissioning, leak detection, pipeline condition
assessment, commissioning, nitrogen purge, tube inspection, pigging, decommissioning,
cathodic protection.
• Testing (including hydro static testing) and commissioning of pipelines and hydro carbon
systems in general.
• Drying and pre-commissioning
• Nitrogen purge for drying or creating inert environment.
• Supply of welders, mechanics, and fitters.
• Tube inspection for metal loss or general corrosion.
• Pipeline condition assessment.
• Pigging of pipelines.
• Supply of different types of pigs, valves, and flanges.
• Gul inspections for pipelines.
• Phased array corrosion mapping.
• Acoustic leak detection.
• Cathodic protection of underground structures and storage tanks to prevent corrosion,
including ECDA.
• Design, Fabrication and Installation of pipeline components.
• Condition Assessment
1. Management
Our top management includes the 2 directors of the company who are also fully devoted to the
day to day running of the business.
Ernest Madhlophe (MD) Nathan Shago (Technical Director)
Ernest Madhlophe: Managing Director
He has been involved in multi million rand projects for both local and international clients. He
boasts about 12 years of experience on projects in pipelines and chemical plants. He has worked
in different positions including Project Engineer, Senior Project Engineer, Functional manager,
and Project Manager. My involvement on projects include the construction of the 26 inch by 865
km MSP pipeline (CP), integrity assessment Natural gas pipelines in Nigeria, integrity pipelines
for Sasol Ethylene pipeline, Natural gas pipeline, Propane pipeline. Other projects include the
GNP project (Sasol), CP audit (Songas, in Tanzania), SCC (Sasol), CP audit (Sasol), NMPP
(Transnet), South Coast Gas Development (Petrosa), Kizomaba C (BP Angola),
CONSTRUCTION OF THE METOLONG DOWNSTREAM CONVEYANCE SYSTEM PROJECT,
48 inch by 84 km North to South carrier (Botswana) and others.
Nathan Shago: Technical Director
He has been involved with maintenance of refineries and pipeline management for about 9 years.
He holds a BEng and BEng Honours degree from the University of Pretoria. His experience
includes serving as a metallurgical engineer at Sasol Synfuels in Secunda, CP monitoring and
upgrade for a 16” x 204 km natural Gas Pipeline for Songas, and various hydro tests on water
pipelines.
2. BBBEE CONTRIBUTION
• The company is a level 1 BBBEE contributor
• We are 100% black owned by two previously disadvantaged black individuals
3. Strategic Partners
Mabro Engineering and Technical Services (MABRO) provide an all-inclusive pipeline specialist
services package. Together with our partners we offer divers services and a big pool of expertise
to our clients.
MABRO has in-house qualified Project Managers, precommissioning engineers, Test engineers,
Metallurgical engineers, Pipeline supervisors, Mechanics, DCVG surveyors, Cathodic protection
(CP) technicians, etc.
MBILI Engineering
MBILI engineering was founded by Mr Zweni Masilela in 2007. Mr Masilela has been a
professional engineer, specialising on pipelines for more than twenty years. Together with Mbili
Engineering we are able to offer design for cathodic protecting and maintenance manuals for
pipelines and storage tanks.
TRECOIL Srl
With Trecoil we are able to offer pipeline inspection services including pipeline geometry, pipeline
features, intelligent pigging which includes metal loss and general corrosion.
With Trecoil; MABRO is also able to serve the European and Middle Mast countries.
4. Recent Projects
Rand Water pipelines, South Africa
Main Contractor of Zwartkopjes system, (ZKZ), Vereeniging systems (VGZ) Zuikerbosch system
(ZBZ) and Raw Water system (RWZ) Integrated Asset Management for Rand Water pipelines.
MABRO Scope
• Visual - Inspection Survey (also referred to as “Pre-inspection”).
• Drained CCTV Inspections
• Flow Measurement and System Mass Balance.
• Transient Pressure Monitoring.
• External Corrosion Direct Assessment (ECDA).
• External Steel wall thickness.
• NDT Inspections Magnetic Flux Leakage (MFL), Handheld EC and Positive Material
Identification.
• Mechanical and chemical testing.
• Engineering evaluation.
• Integrity management.
• Chamber assessment.
• Installation of RFID Tagging.
• Ground penetrating radar survey work.
• Condition assessment for mechanical equipment.
• Additional Services identified at Chamber assessments related to Surge tanks and
pressure vessels.
• Additional Services identified at Chamber assessments related to CP structures.
• AC Interference Studies and Design and AC Interference Studies and Design.
• Conventional Leak detection: non-disruptive.
• Additional Services identified at Chamber assessments related to Flow meters.
• Additional Services related to Environmental issues and compliance.
North to South Carrier pipeline, Botswana
Government of Botswana Ministry of Minerals, Energy and Water Resources
AN EPC contract awarded to CWJV which was a joint venture between WBHO CCC for the design
and construction of the 48 inch by 84 km of water pipeline. The project also included the design
and construction of a reservoir.
MABRO Scope
Hydro static testing of individual sections of pipe sections in relation to their natural ground level
testing with specific reference to the following activities:
• Filling and Dewatering of Test Sections
• Hydrostatic Testing of Pipeline Sections
• Safety and Environment
• Valve functionality for the scours and air valves
• Pigging
Resources
• MABRO Project Manager: Ernest Madhlophe
• MABRO Project Engineer: Nathan Shago
• MABRO Supervisors and Technicians: Various
• MABRO Site Vehicles: four off
• CWJV opted to provide the hydro test equipment and instrumentation.
PNG-LNG EPC5A ONSHORE PIPELINES
The project included Engineering, Procurement, Construction and Pre-commissioning of a
pipeline system comprising of two main sections. In the south of the project: 58 kilometres of 32"
diameter and 25 kilometres of 34" pipeline sections between Kutubu and Omati landfall including
a swamp portion of approximately 10 km at Omati. In the North of the project: 101 kilometres of
32’’ and 104 kilometres of 8" pipeline sections, mainly in virgin territory with no existing
infrastructure ; 9 kilometres pipeline sections from 2’’ to 22” ; 12 kilometres of 10’’ pipeline section
between oilfields of Kutubu & Gobe and the LNG pipeline.
Mabro Engineering and Technical Services’ Scope
MABRO was involved with the Precommissioning of all cross country pipelines and facilities. This
included the following activities:
• Pre-cleaning
• Gauging
• Filling
• Testing
• Dewatering
• Drying
• Caliper surveys
26” X 127 KM ROMPCO PIPELINE IN MOZAMBIQUE
The Construction of a 26 inch diameter underground coated steel pipe line 127 km long. The pipe
line will be next to (10m away to the eastern side of) the existing 26 inch diameter pipeline from
Temane to Secunda. The pipe line ties in at the Central Processing Facility (CPF) at Temane and
at the first scraper trap station STS1 about 127km to the south.
Mabro Engineering and Technical Services’ Scope
MABRO was involved with the Precommissioning of all cross country pipelines and facilities. This
included the following activities:
• Pre-cleaning
• Gauging
• Filling
• Testing
• Dewatering
• Drying
CONSTRUCTION OF 26” NATURAL GAS ALL WELDED STEEL PIPELINE BETWEEN
SECUNDA REQUEST FOR QUOTATION RFQ 994/100 Works Information AND
SASOLBURG
The project entailed the installation of a 26 inch gas pipeline transporting natural gas from
Secunda to Sasolburg for the expansion of the existing Gauteng network. The pipe material is
API5L Grade X52 with varying wall thicknesses as indicated on the alignment sheets. The majority
of the wall thickness is 9mm with sections of 10.7mm and 16.1mm. The pipeline is designed
according to ASME B31.8 with a design pressure of 70barg.
Mabro Engineering and Technical Services’ Scope
MABRO was involved with the Precommissioning of all cross country pipelines and facilities. This
included the following activities:
• Pre-cleaning
• Gauging
• Filling
• Testing
• Dewatering
• Drying
• Nitrogen Purge
Integrity Assessment of the 16” x 203 km Naturals Gas Pipeline (Songas, Tanzania)
Project Scope
1. Phase (I)a: Initial Survey
a. Accompany aerial (helicopter) survey of Wayleave Dar es salaam
b. Review of summary report of results of visual survey
i. presence/absence of cathodic protection posts
ii. other visual features of note
2. Phase 1b: Post-pigging Songo Songo Island
a. Review results of Rosen and AHAK reports
b. Propose repair/ mitigation measures for corroded pipework in sea-shore zones
c. Advise on programme of subsequent routine pigging
i. Types of pigs
ii. Frequency of pigging
iii. Frequency of electronic pigging
3. Phase IIa: Cathodic Protection Survey
a. Perform a full survey of the wayleave
i. Physical state of cathodic protection
1. Km markers
2. Valve stations
3. GMS measurement of cathodic protection posts and pipeline route
features
ii. Electrical state of cathodic protection
1. Km markers
2. Valve Stations
iii. Report of physical and electrical status including:
1. Recommendations for repair
2. Future frequency of measurement
3. Future frequency and scope of preventative maintenance
4. Phase IIb: Pigging Mainland
a. Proposals for first pig runs
b. Review of results of first pig run
c. Proposals for the main pigging programme
5. Phase III – Pipeline Management System
a. Proposal for software
b. Proposals for data format structure and upload
6. Future Proposals
a. Strategy for developing and implementing a PMS.
16” CP Anode Groundbed Replacement for Engine Refinery
Project Scope
• Survey and design of 2 anode groundbeds complete with one (1) new potential control
TRU at SAFOR; complete with Coupons and reference electrodes.
• Energising and completion of SAT works for the (2) new Anode Groundbed installations
on ENGEN 16” crude line CP System.
• Commissioning and balancing of the entire ENGEN Crude line servitude CP system.
• Decommission and disconnection the old redundant anode ground bed.
• As a minimum a pipe-to-soil potential survey shall be carried out along the entire
ENGEN Crude Pipeline route taking into consideration the necessary IR Drop effects
ECDA Surveys on Rand Water’s NB 1600 B6 and B10 Pipelines
MABRO conducted a DCVG survey, Pipe to soil potentials, and soil resistivity of the B6 and B10
pipeline which is owned by Rand Water. The pipeline has an outside diameter of 1600 mm and
is externally coated with fusion bonded epoxy. The pipeline runs parallel to another Rand water
Pipeline, B10, for the stretch that was surveyed.
Mabro Scope
• DCVG survey
• Soil Resitivity surveys
• Defect Identification
• Reporting
5. Clients
Some of our main clients include the following companies:
• Spiecapag
• WBHO
• Group five
• WK Construction
• Songas
• Rand Water
• Engine Refinery
• Currently on the Vendor list for PetroSA
6. Quality
MABRO is dedicated to quality and continuous process improvement for both clients and
employees. We currently have our own in-house quality management system. Our responsibility
is to ensure that through established standards and measurements, the level of quality at MABRO
matches or exceeds our clients’ expectations.
We develop quality awareness through process improvements, training, measurements and
development for our employees.
Quality is an integral part of our commitment to world-class products and client service. Our quality
process includes:
• Researching improvements to add to the quality of our products.
• Provide our customers with products and services that meet or exceed their quality
requirements
• Dedication in all our services
• Ensure quality and transparency in everything we do.
7. Safety and Environmental Management
MABRO believes that Safety & Environmental control is the direct result of the normal process of
good management which is basically:
a) Describe and plan the task effectively;
b) Provide the correct environment and equipment;
c) Educate each employee in his own duties and responsibilities;
d) Control and correct all deviations from the plan immediately.
e) A Company that is responsible to the environment.
Where there is conflict, matters of Health, Safety & Environmental control takes priority to matters
of service, quality or efficiency.
8. CONTACT PERSON
Nathan Shago
284a Dekema road, Unit E7 Dekema Park
Wadeville, Germiston, South Africa
1428
Tel: +27 11 824 3182
Fax: +27 11 824 2858
Mobile: +27 82 845 9920
Email: Nathan.shago@mabro.co.za

More Related Content

What's hot

SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)Sher Zaman
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Edward Byrne
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016Rolando Garcia
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cvGeoff Chandler
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMA SAMY
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Dr Orhan Degermenci
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton
 
Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul Jennings
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2kim himel
 

What's hot (20)

curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
VNCV150515
VNCV150515VNCV150515
VNCV150515
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
sharndencv
sharndencvsharndencv
sharndencv
 
Engineering Experience Scott Bullock August 2016
Engineering Experience Scott Bullock August 2016Engineering Experience Scott Bullock August 2016
Engineering Experience Scott Bullock August 2016
 
New Resume
New ResumeNew Resume
New Resume
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEER
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Resume 1
Resume 1 Resume 1
Resume 1
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
CV_Hazwan Updated
CV_Hazwan UpdatedCV_Hazwan Updated
CV_Hazwan Updated
 
Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul's Resume 2016 r2
Paul's Resume 2016 r2
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2
 

Similar to company Profile_June 2016

Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15Greg Clifford
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGsiavashn
 
JC Professional Profile 2
JC Professional Profile 2JC Professional Profile 2
JC Professional Profile 2John Churchill
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Sobhy C V 2015 Rev Q S
Sobhy C V  2015 Rev  Q S  Sobhy C V  2015 Rev  Q S
Sobhy C V 2015 Rev Q S sobhey ahmed
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16Iain Cameron
 

Similar to company Profile_June 2016 (20)

Resume_-_Muthalib_Mohammad1
Resume_-_Muthalib_Mohammad1Resume_-_Muthalib_Mohammad1
Resume_-_Muthalib_Mohammad1
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
Report
ReportReport
Report
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
JC Professional Profile 2
JC Professional Profile 2JC Professional Profile 2
JC Professional Profile 2
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Final Project Presentation
Final Project PresentationFinal Project Presentation
Final Project Presentation
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
Sobhy C V 2015 Rev Q S
Sobhy C V  2015 Rev  Q S  Sobhy C V  2015 Rev  Q S
Sobhy C V 2015 Rev Q S
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 

company Profile_June 2016

  • 1. COMPANY PROFILE MABRO ENGINEERING & TECHNICAL SERVICES CC Specialists in Petrochemical, Oil, Gas, and Water Services Company registration number: 2009/107214/23 VAT registration: 4550260527 Tel: +27 11 824 3182 Fax: +27 11 824 2858 Email: nathan.shago@mabro.co.za Website: www.mabro.co.za Postal Address: PO Box 1607 Germiston 1401 Physical Address: 284a Dekema road Unit E7 Dekema Park Wadeville South Africa 1428 Mabro Engineering and Technical Services previously traded as MENTS, here and after referred to as MABRO; is a fully South African services company for the petrochemical, oil & gas, mining, and water industries. The company has been operational since 2009 and offers specialized services for plant, pipelines, piping and pipeline specials to the fore mentioned industries.
  • 2. Introduction Our services include design and project management for the fabrication of pipe components and (headers/pig traps), pressure testing, pre-commissioning, leak detection, pipeline condition assessment, commissioning, nitrogen purge, tube inspection, pigging, decommissioning, cathodic protection. • Testing (including hydro static testing) and commissioning of pipelines and hydro carbon systems in general. • Drying and pre-commissioning • Nitrogen purge for drying or creating inert environment. • Supply of welders, mechanics, and fitters. • Tube inspection for metal loss or general corrosion. • Pipeline condition assessment. • Pigging of pipelines. • Supply of different types of pigs, valves, and flanges. • Gul inspections for pipelines. • Phased array corrosion mapping. • Acoustic leak detection. • Cathodic protection of underground structures and storage tanks to prevent corrosion, including ECDA. • Design, Fabrication and Installation of pipeline components. • Condition Assessment
  • 3. 1. Management Our top management includes the 2 directors of the company who are also fully devoted to the day to day running of the business. Ernest Madhlophe (MD) Nathan Shago (Technical Director)
  • 4. Ernest Madhlophe: Managing Director He has been involved in multi million rand projects for both local and international clients. He boasts about 12 years of experience on projects in pipelines and chemical plants. He has worked in different positions including Project Engineer, Senior Project Engineer, Functional manager, and Project Manager. My involvement on projects include the construction of the 26 inch by 865 km MSP pipeline (CP), integrity assessment Natural gas pipelines in Nigeria, integrity pipelines for Sasol Ethylene pipeline, Natural gas pipeline, Propane pipeline. Other projects include the GNP project (Sasol), CP audit (Songas, in Tanzania), SCC (Sasol), CP audit (Sasol), NMPP (Transnet), South Coast Gas Development (Petrosa), Kizomaba C (BP Angola), CONSTRUCTION OF THE METOLONG DOWNSTREAM CONVEYANCE SYSTEM PROJECT, 48 inch by 84 km North to South carrier (Botswana) and others. Nathan Shago: Technical Director He has been involved with maintenance of refineries and pipeline management for about 9 years. He holds a BEng and BEng Honours degree from the University of Pretoria. His experience includes serving as a metallurgical engineer at Sasol Synfuels in Secunda, CP monitoring and upgrade for a 16” x 204 km natural Gas Pipeline for Songas, and various hydro tests on water pipelines. 2. BBBEE CONTRIBUTION • The company is a level 1 BBBEE contributor • We are 100% black owned by two previously disadvantaged black individuals
  • 5. 3. Strategic Partners Mabro Engineering and Technical Services (MABRO) provide an all-inclusive pipeline specialist services package. Together with our partners we offer divers services and a big pool of expertise to our clients. MABRO has in-house qualified Project Managers, precommissioning engineers, Test engineers, Metallurgical engineers, Pipeline supervisors, Mechanics, DCVG surveyors, Cathodic protection (CP) technicians, etc. MBILI Engineering MBILI engineering was founded by Mr Zweni Masilela in 2007. Mr Masilela has been a professional engineer, specialising on pipelines for more than twenty years. Together with Mbili
  • 6. Engineering we are able to offer design for cathodic protecting and maintenance manuals for pipelines and storage tanks. TRECOIL Srl With Trecoil we are able to offer pipeline inspection services including pipeline geometry, pipeline features, intelligent pigging which includes metal loss and general corrosion. With Trecoil; MABRO is also able to serve the European and Middle Mast countries. 4. Recent Projects Rand Water pipelines, South Africa Main Contractor of Zwartkopjes system, (ZKZ), Vereeniging systems (VGZ) Zuikerbosch system (ZBZ) and Raw Water system (RWZ) Integrated Asset Management for Rand Water pipelines. MABRO Scope • Visual - Inspection Survey (also referred to as “Pre-inspection”). • Drained CCTV Inspections • Flow Measurement and System Mass Balance.
  • 7. • Transient Pressure Monitoring. • External Corrosion Direct Assessment (ECDA). • External Steel wall thickness. • NDT Inspections Magnetic Flux Leakage (MFL), Handheld EC and Positive Material Identification. • Mechanical and chemical testing. • Engineering evaluation. • Integrity management. • Chamber assessment. • Installation of RFID Tagging. • Ground penetrating radar survey work. • Condition assessment for mechanical equipment. • Additional Services identified at Chamber assessments related to Surge tanks and pressure vessels. • Additional Services identified at Chamber assessments related to CP structures. • AC Interference Studies and Design and AC Interference Studies and Design. • Conventional Leak detection: non-disruptive. • Additional Services identified at Chamber assessments related to Flow meters. • Additional Services related to Environmental issues and compliance. North to South Carrier pipeline, Botswana Government of Botswana Ministry of Minerals, Energy and Water Resources AN EPC contract awarded to CWJV which was a joint venture between WBHO CCC for the design and construction of the 48 inch by 84 km of water pipeline. The project also included the design and construction of a reservoir.
  • 8. MABRO Scope Hydro static testing of individual sections of pipe sections in relation to their natural ground level testing with specific reference to the following activities: • Filling and Dewatering of Test Sections • Hydrostatic Testing of Pipeline Sections • Safety and Environment • Valve functionality for the scours and air valves • Pigging Resources • MABRO Project Manager: Ernest Madhlophe • MABRO Project Engineer: Nathan Shago • MABRO Supervisors and Technicians: Various • MABRO Site Vehicles: four off • CWJV opted to provide the hydro test equipment and instrumentation. PNG-LNG EPC5A ONSHORE PIPELINES The project included Engineering, Procurement, Construction and Pre-commissioning of a pipeline system comprising of two main sections. In the south of the project: 58 kilometres of 32" diameter and 25 kilometres of 34" pipeline sections between Kutubu and Omati landfall including a swamp portion of approximately 10 km at Omati. In the North of the project: 101 kilometres of 32’’ and 104 kilometres of 8" pipeline sections, mainly in virgin territory with no existing infrastructure ; 9 kilometres pipeline sections from 2’’ to 22” ; 12 kilometres of 10’’ pipeline section between oilfields of Kutubu & Gobe and the LNG pipeline.
  • 9. Mabro Engineering and Technical Services’ Scope MABRO was involved with the Precommissioning of all cross country pipelines and facilities. This included the following activities: • Pre-cleaning • Gauging • Filling • Testing • Dewatering • Drying • Caliper surveys 26” X 127 KM ROMPCO PIPELINE IN MOZAMBIQUE The Construction of a 26 inch diameter underground coated steel pipe line 127 km long. The pipe line will be next to (10m away to the eastern side of) the existing 26 inch diameter pipeline from Temane to Secunda. The pipe line ties in at the Central Processing Facility (CPF) at Temane and at the first scraper trap station STS1 about 127km to the south. Mabro Engineering and Technical Services’ Scope MABRO was involved with the Precommissioning of all cross country pipelines and facilities. This included the following activities: • Pre-cleaning • Gauging • Filling • Testing • Dewatering • Drying CONSTRUCTION OF 26” NATURAL GAS ALL WELDED STEEL PIPELINE BETWEEN SECUNDA REQUEST FOR QUOTATION RFQ 994/100 Works Information AND SASOLBURG The project entailed the installation of a 26 inch gas pipeline transporting natural gas from Secunda to Sasolburg for the expansion of the existing Gauteng network. The pipe material is
  • 10. API5L Grade X52 with varying wall thicknesses as indicated on the alignment sheets. The majority of the wall thickness is 9mm with sections of 10.7mm and 16.1mm. The pipeline is designed according to ASME B31.8 with a design pressure of 70barg. Mabro Engineering and Technical Services’ Scope MABRO was involved with the Precommissioning of all cross country pipelines and facilities. This included the following activities: • Pre-cleaning • Gauging • Filling • Testing • Dewatering • Drying • Nitrogen Purge
  • 11. Integrity Assessment of the 16” x 203 km Naturals Gas Pipeline (Songas, Tanzania) Project Scope 1. Phase (I)a: Initial Survey a. Accompany aerial (helicopter) survey of Wayleave Dar es salaam b. Review of summary report of results of visual survey i. presence/absence of cathodic protection posts ii. other visual features of note 2. Phase 1b: Post-pigging Songo Songo Island a. Review results of Rosen and AHAK reports b. Propose repair/ mitigation measures for corroded pipework in sea-shore zones c. Advise on programme of subsequent routine pigging i. Types of pigs ii. Frequency of pigging iii. Frequency of electronic pigging 3. Phase IIa: Cathodic Protection Survey a. Perform a full survey of the wayleave i. Physical state of cathodic protection 1. Km markers 2. Valve stations 3. GMS measurement of cathodic protection posts and pipeline route features ii. Electrical state of cathodic protection 1. Km markers 2. Valve Stations iii. Report of physical and electrical status including: 1. Recommendations for repair 2. Future frequency of measurement
  • 12. 3. Future frequency and scope of preventative maintenance 4. Phase IIb: Pigging Mainland a. Proposals for first pig runs b. Review of results of first pig run c. Proposals for the main pigging programme 5. Phase III – Pipeline Management System a. Proposal for software b. Proposals for data format structure and upload 6. Future Proposals a. Strategy for developing and implementing a PMS. 16” CP Anode Groundbed Replacement for Engine Refinery Project Scope • Survey and design of 2 anode groundbeds complete with one (1) new potential control TRU at SAFOR; complete with Coupons and reference electrodes. • Energising and completion of SAT works for the (2) new Anode Groundbed installations on ENGEN 16” crude line CP System. • Commissioning and balancing of the entire ENGEN Crude line servitude CP system. • Decommission and disconnection the old redundant anode ground bed. • As a minimum a pipe-to-soil potential survey shall be carried out along the entire ENGEN Crude Pipeline route taking into consideration the necessary IR Drop effects
  • 13. ECDA Surveys on Rand Water’s NB 1600 B6 and B10 Pipelines MABRO conducted a DCVG survey, Pipe to soil potentials, and soil resistivity of the B6 and B10 pipeline which is owned by Rand Water. The pipeline has an outside diameter of 1600 mm and is externally coated with fusion bonded epoxy. The pipeline runs parallel to another Rand water Pipeline, B10, for the stretch that was surveyed. Mabro Scope • DCVG survey • Soil Resitivity surveys • Defect Identification • Reporting 5. Clients Some of our main clients include the following companies: • Spiecapag • WBHO • Group five • WK Construction • Songas • Rand Water • Engine Refinery • Currently on the Vendor list for PetroSA 6. Quality MABRO is dedicated to quality and continuous process improvement for both clients and employees. We currently have our own in-house quality management system. Our responsibility is to ensure that through established standards and measurements, the level of quality at MABRO matches or exceeds our clients’ expectations.
  • 14. We develop quality awareness through process improvements, training, measurements and development for our employees. Quality is an integral part of our commitment to world-class products and client service. Our quality process includes: • Researching improvements to add to the quality of our products. • Provide our customers with products and services that meet or exceed their quality requirements • Dedication in all our services • Ensure quality and transparency in everything we do. 7. Safety and Environmental Management MABRO believes that Safety & Environmental control is the direct result of the normal process of good management which is basically: a) Describe and plan the task effectively; b) Provide the correct environment and equipment; c) Educate each employee in his own duties and responsibilities; d) Control and correct all deviations from the plan immediately. e) A Company that is responsible to the environment. Where there is conflict, matters of Health, Safety & Environmental control takes priority to matters of service, quality or efficiency. 8. CONTACT PERSON Nathan Shago 284a Dekema road, Unit E7 Dekema Park Wadeville, Germiston, South Africa 1428 Tel: +27 11 824 3182 Fax: +27 11 824 2858 Mobile: +27 82 845 9920 Email: Nathan.shago@mabro.co.za