1. A D C
93 Covent Garden Road , Caister-on-Sea , Norfolk NR30 5WA ◆ H: 01493377183 ◆ C: 07704867317 ◆
cooieuk@yahoo.co.uk
I Have been working with in the oil and gas industry for over 25 years from my early drilling days with
Penrod to my Nowsco days with a service company, am now working as a consultant on various
projects, i am a very self motivated and enthusiastic Site Supervisor dedicated to continuous process
improvement in the face of rapidly evolving and changing markets. Extremely results-orientated and
proactive in addressing and resolving problems i am use to supervising crews on a day to day basis and
ensuring work is completed safely and and to a high standard, and with in time scale allocated also
reasonable for planning and completing and testing all work scopes and ensuring recording and
reporting procedures are adhered to I am used to working in Demanding environments where the ability
to work quickly efficiently and safely are of great importance have the ability to to learn new skills both
mentally and physically while adapting to changing situations i think one of my best quality's is to be
able to work in multicultural environments i like to support management in identifying and recruiting
appropriate liked work resources and training for both my self and crew are up to date when needed
a Dependable supervisor bringing management experience and a willingness to take on added
responsibility to meet tight deadlines. Enthusiastic team player with a strong work ethic and advanced
complex problem solving skill
Exceptional interpersonal communication
Effective leader
Staff training/development
Self Motivated
Consistently meet goals
Efficient multi-tasker
Organised
Problem Solver
Flexable with in Operations
Being Abel to Bring Teams together
S
S
2. Supervisor, 09/2015 to Current
Baker Hughes Ltd – Australia Perth WA
Currently working on Major Wheatstone prodject in WA Australia ,completeing all hydro testing sub
sea lines from offshore locations to main land location at Onslow terminal. Using flooding pumps
Chemical injection spreads and high pressure fluid pumps.Supervising Crews and involment with HSE
and third Party activatys.
Snr Operator, 09/2015 to 09/2015
Baker Hughes Ltd – Holland
Working for Baker Hughes in Holland for NAM on a Coil tubing campain performing Sand clean outs
and Gas lifts riggin up and down of 480 standard coil tubing equipment and 180k N2 pumps ,standard
Bakers Batch mixers and chemical pumps
Trained, coached and mentored staff to ensure smooth adoption of new programme.
Supervisor, 06/2015 to 08/2015
Baker Hughes – Australia
This was working for Baker hughes/Chevron on Wheatstone Prodjects offshore on Vessel Highland
Rover ,Flooding and completing Hydro testing on all sub sea line from offshore location prior to tie
ins for flow lines back to Onslow location on mainland.Using Flooding pumps chemical injection
spreads and high pressure pumping equipment.
Partnered successfully with Chevron to produce complete tested flow lines prior to them being Tied
in later in the prodject.
Supervisor, 01/2015 to 06/2015
Enermech – Qatar
Working for Enermech Qatar /Shell on Pearl location Ras Gas ,Providing N2 and leak testing
services,using 180k N2 units ,hand held Tester (PHD4+) preperation of all equipment and
coordinating mobilastion of crews to clients location .All documentation , to be up dated and
submitted on time
Strengthened company's business by leading implementation of Shell pearl Prodject , Trained,
W H
3. coached and mentored staff to ensure smooth adoption of new programme.Work with Client to
identify any forseable problems prior to work scope.
Snr CT Operator, 07/2014 to 12/2014
Baker Hughes – Baku
Snr CT Operator in Baku with Baker Hughes working for BP on Various locations ,Azuri East and west
/Central platforms Rigging up and down of 180k and 90k N2 pumps HR680 and 6100 CT equipment for
Concentric and capillary coil V8 Pacemaker fluid pumps for clean out operations use of Mini tongs and
instalation of shears seals to well head and all pressure testing operations.
N2 supervisor/Snr CT Operator, 05/2014 to 06/2014
Smape – Italy
Working for Italian CT company SMAPE/Sipem in southern Italy ,rigging up standard 480CT spread
and 180k N2 units performing gas lifts and clean out operations.performing all matinance and redressing
of BOPs on site .
Supervisor, 01/2014 to 04/2014
Enermech – Qatar
Working for Enermech at Ras laffan Qatar as PPs supervisor ,pre planning of work scope supervising all
pressure testing and unit checks in yard prior to mobilation to site ,supervision of crews running
standard 180k N2 units ,setting up OPP skids and boosters use of hand hels testers MP4
maspex,Reading of PIDs .
Snr CT Operator, 04/2013 to 12/2013
Baker Hughes – Great Yarmouth UK
Snr CT Operator for Bakers working for RWE on major Frac campain in North sea UK,use of work towers
,rig up and down and install shears seals on various wells,all testing operations including tree cap
installition on completion of well operations.Use of high torque machines and mini tongs running
standard V8 fluid pumps 180k N2 units and 480 injectors.Mixing and use of batch mixers assisting deck
crews with lifting operations ,and completeing spooling operations from boat to platform .
Pre Rig up Supervisor, 03/2013 to 04/2013
4. Baker Hughes Ltd – Norway
Working for Bakers in Norway for Statoil ,as Pre rigup supervisor,Rigging up all equipment 480
injectors 180k N2 pumps and pacemaker fluid pumps for milling and clean out operations ,pre building
new deck floor to accomadate heavy equipment on main deck following clients and Bakers procedures.
Snr Operator, 04/2013 to 05/2013
Halliburton – Australia
Working for Halliburton out of the Momba base in Queensland ,for Santos Performing Frac suport to frac
operations .rigging up and down of trailer mounted CT units ,90k N2 units and cement trucks
,performing all pressure testing , and pumping Ops ,completeing mantance of equipment and supervising
movement of truck from diffrent locations.
CT Frac Supervisor, 06/2012 to 03/2013
Sclumberger – Qatar
Working for Sclumberger out of Fahud Qatar working for BP on Frac/CT support Running the complete
CT spread including 5 x hydrolic towers 2 x mounted fluid pumps,480 CT unit,Trailor mounted, trnsfur
pumps frac tanks chemical spread ,running of crews ,helping third party Stinger with Frac head
instalation ,all testing and rebuilding of eqipment both on site and in yard ,supervise all testing
operations.
Snr Operator, 01/2012 to 02/2012
Weatherfords – Yemen
Supervisor, 11/2012
A-Hak – Dubai
Working for A-Hak on Dubai dry docks ,performing leak testing and pigging operations, using a tailor
mounted membrane unit ,also 90k N2 unit as back up. Running of crews and day to day operations
General Meeting with clients
Trained, coached and mentored staff to ensure smooth adoption of new programme.
Snr CT Operator,
Halliburton – Australia /Moomba
5. Supervisor/coordinator,
BJ Services – Dubai
Supervisor/coordinator,
BJ Services – Australia /Perth
Supervisor, 11/2009 to 12/2009
BJ Services – Holland/CT
GCSE:
Caister High School - High School
I attanded Caister high school and left in 1981, have gained GSCE in
Maths
English
History
Science
PE
Art
Geography
Rigging & Lifting Ensco 2005
High Tourqe 2004
E
C
6. Mini Tongs Well Tonic 2004
Defencive Driving drive and servive 2003
Coil Tubing simulator BJ Services 2003
Basci H2s training Total Safty 2002
CT Data Acquistion Scottish 2001
CT Ops Manual BJ Services 2001
CT Coil Ops Tubing 2001
Tubing Fluid pumping 2001
Hydrofloric Acid North sea med centure 2000
Engineering Hand Book BJ Services 2000
Banksman slingers BJ Services 1999
Risk Assesment offshore BJ Services 1999
Acid & therry calculations BJ Services 1999
PICWS Permits shell 1999
CIRCA BJ Services 1999
N2 Operators 1 BJ Services 1998
Manual Handling ensco 1998
CT/OPS BJservices 1998
CITB banksman Bircham 1994
Basci N2 Nowsco 1990
Fluid pumping Nowsco 1991
Excel basic Orxy North East 1999
Word Basic Orxy North East 1999
CT/OPS Procedures BJ Services 1998
PPS Double block & Bleed Baker Hughes 2015
PPS Fittings Baker Hughes 1 & 2 2015
PPS Iron 1 & 2 Baker Hughes 2015
PPS Pigs and Pigging Baker Huges 2015
PPS introduction to pre commitioning 2015
PPS Ariel LP Booster 2015
PPS Introduction to Mechanical joint integrity
7. PPS Ariel HP Booser 2015
PPS Combo Compressor 2015
PPS Sullair compressor 2015
PPS Dead weight Gauge 2015
Please see further Jobs and Projects I have worked on
July/Oct 2009 BJ Services/supervisor on Fulmar leak testing
May 2009 BJ services PPS as Coordinator various locations in the Arabian Gulf Leak testing
Operations.
Sept 2009 BJ Great Yarmouth CT 2 7/8 completions This includes both Flush Joint and 2 7/8
completions.
Jan 2008 BJ Dubai dry dock A 2 year long project (The Knock Allen and Jimboa) these projects
where a complete retest of whole vessel.
Other locations where i have worked
Angola
EG
Norway
Holland
Baku
Gabon
Australia
Dubai
Please see names of two Refrences.
Mr Chris Christofi
I T
A