PROFESSIONAL RESUMÉ
EDWARD BYRNE
SENIOR PROJECT MANAGER
ID No 5502205172182
Qualifications
Higher National Certificate – Mechanical (1976), Kirby College (UK)
PMP at PM Institute of South Africa
DOB 20
th
February 1955
Experience (Summary)
 2015 – Project Manager. DFS Underground Conveying System. CSA Copper Mine, Cobar, NSW, Australia.
Value R14Million.
 2014 – Project Manager. Engineering and Equipment supply for 3 x Platinum Concentrate Plants.
FLSmidth/Russian Platinum PLC. Rugby, England & Khabarovsk, Eastern Siberia. Value ₤27Million.
 2013 – Project Manager. Engineering and Equipment supply of Gold Processing Plant. FLSmidth/Arlan
PLC. Wiesbaden, Germany & Magadan, Eastern Siberia. Value US$23 Million.
 2013 – Project Manager. Engineering and Equipment supply of Gold Processing Plant. FLSmidth/Poyus
Gold PLC. Wiesbaden, Germany & Bodaybo, Eastern Siberia.
 2012 – Business Development Manager. Saudi Arabia. Royal Haskoning DHV PLC.
 2012 – Senior Project Manager. Head PMO. Aveng Water (AW)
 2012 - Project Manager. AW - Feasibility studies for Mine Water Drainage Treatment Plants at for
Newlands & Collinsville coal Mines, Western Australia. Study Value - R13 million.
 2012 - Project Manager. - EPCM Water Treatment Plant for Langer Heinrich Mine Stage 3 Expansion,
Namibia. Value R36 million.
 2012 - Project Manager. - EPC Reverse Osmosis Plant for Langer Heinrich Mine Stage 3 Expansion,
Namibia. Value R10 million.
 2010 - Project Manager. – EPC Sea Water Desalination Plant for Areva Uranium. Namibia.
Value R625 million.
 2009 - Project Manager. Avenge EPC (EPC) – EPCM Stage II Uranium Process Plant Expansion. Langer
Heinrich Uranium Mine, Namibia. Value R460 million.
 2008 - Business Development Lead. (EPC) - Review establishment of an opencast coal mine and ship
loading facility in Mozambique for Companhia Vale do Rio Doce (CVRD)
 2008 - Project Manager. (EPC) – PFS for Letlhakane Mine Tailings Treatment Plant. Value R6 million.
 2007 - Lead Mechanical Engineer. (EPC) - Fatal flaw analysis of Optimum Colliery’s Marion Dragline fleet.
Value R1.2 million.
 2007 - Project Manager. (EPC) – FS Raw materials load out facility at Dudfield Cement Factory.
Value R2 million.
 2007 - Project Manager. (EPC) – EPCM Upgrade Gas Cleaning and Plant for at Ulco Cement Factory.
Value R9 million.
 2006 - Project Manager. (EPC) – EPCM of 3 x synchronized Coal Processing plants, Kusela Coal. Delmas,
Ogies and Bronkhorstspruit, South Africa. R270 million each.
 2000 – 2006 - Director/Operations Manager. Auger Mining S.A. (Pty) Ltd
 1998 – 2000 - Sales/Business Development Manager. (Dragline Products). Empire Management
 1988 – 1998 – Technical & Engineering Manager / Project Manager. Dresser/Marion S.A.
 1986 – 1988 – Research & Development Technician. Steel Engineering (Pty) Ltd.
 1980 – 1986 - Owner/Partner. Danzens Engineering (Pty) Ltd.
 1976 – 1980 - Foreman / CNC Programmer. Smith Boart (Pty) Ltd
 1971 – 1976 – Apprentice. Laystall Engineering – Liverpool, England
PROFESSIONAL RESUMÉ
Edward (Eddie) Byrne
May 2015 – October 2015 Bara Consulting/JPMC Consulting
Project Manager
Definitive Feasibility Study (DFS) to install an incline conveying system at CSA
(Glencore) Copper Mine in NSW Australia.
The project included approximately 5km of underground mine development for
nine consecutive conveyors and three underground crushing and loading stations.
On completion of the engineering and the capital costing exercise, the business
case was compared to the existing underground truck haulage system. The results
confirmed the favourable economics of the conveying system and the proposed
budget was approved by the Glencore board of directors.
I was stationed on the mine site during the first three months of the engineering
phase and returned to South Africa to complete the costing and business case
studies.
Sept 2012 – May2015 Royal Haskoning DHV
Project Manager
Sub-contracted to FLSmidth (UK) to project manage the supply of three platinum
concentrate processing plants for Russian Platinum PLC’s Kondyor mine,
Khabarovsk, Eastern Siberia.
The contract scope was for the supply of a process engineering design package
including the provision of all of the mechanical and electrical equipment and a
complete controls and instrumentation package. Structural plant design and piping
was completed by the FLS engineering design offices in the UK and Salt Lake City,
USA.
A typical suspended underground
conveyor.
The Kondyor intrusion containing the
source of the “down river” alluvial
platinum deposits
The Kondyor Platinum Concentrate
process plant
PROFESSIONAL RESUMÉ
Edward (Eddie) Byrne
Project Manager
Sub-contracted to FLSmidth (Germany) to project manage the supply of a Gold
Processing plant at the Pavlik gold mine in Magadan, Eastern Siberia, for the Arlan
Investment group.
The contract scope was for the supply of a process engineering design package
including the provision of all of the mechanical and electrical equipment and a
complete controls and instrumentation package. Structural plant design and piping
was undertaken at the Russian Federations Design institute and reviewed by
mechanical and structural engineers in the FLS Salt Lake City engineering office.
The process design package includes the following,
 Review and report on the Russian laboratory’s ore sample testing report.
 Produce Block flow diagrams,
 Process Design Criteria,
 Process Flow Diagrams,
 Piping &Instrumentation Diagrams,
 Computerised material simulation modelling (Metsim),
 Plant Sampling Plan
 Equipment lists
 Equipment Data Sheets
 Valve list
 Instrument list
 Motor list including power take off and load list
 Plant Operation & Control Philosophy.
The procurement function was undertaken through the FLS UK office who supplied
the functional personnel to procure, inspect, expedite and ship the equipment to
Siberia.
Electrical, instrumentation and controls design was undertaken by the FLS
Copenhagen office who also supplied all of the hardware and software for the
plant.
Construction Management was undertaken by the client’s third part
representatives with supervisory and technical authority provided by FLS technical
supervisors.
Final Process commissioning and ramp-up was FLS responsibility.
Project Manager
Sub-contracted to FLSmidth (Germany) to complete the Verninskoye gold
processing plant in Bodaybo, Easter Siberia for Polyus Gold.
I assumed Project management responsibility for this project at the start of the
plant process commissioning phase, with a mandate to resolve a multitude of issues
related to the performance of the project execution and to bring the plant in to
production in line with the contractual performance guarantees. The guarantees
regarding through-put volume and gold recovery rate, proved to be the biggest
challenge and a team of process and mechanical engineers was assembled to
resolve these issues.
Mining Business Development Manager
Kingdom of Saudi Arabia and the Middle East.
Based in Jeddah, Saudi Arabia and responsible for all mining consultancy related
business in the middle east and assumed temporary responsibility for waste water
management business within the same geographic area.
Ball Mills at Verninskoye gold
processing plant
Pavlik Gold processing plant under
construction
PROFESSIONAL RESUMÉ
Edward (Eddie) Byrne
Aug 2006 – Sept 2012 Aveng water/Aveng E+PC Engineering & Projects Company Limited
The Aveng Group
 Senior Project Manager
Head of Aveng Water’s Project Management Office, managing four Project
managers and the project controls departments, including, cost engineering and
cost control, planning and scheduling, procurement & contracting activities.
Process, Mechanical, Electrical & Civil engineering also report in to the PMO on
a project specific basis.
The PMO also provides services to the proposals department.
 Project Manager
2 x feasibility studies for Mine Drainage Water Treatment Plants at for
Newlands & Collinsville coal Mines, Western Australia. Study Value - R13 million
 Project Manager
EPCM of water treatment Plant for Langer Heinrich Mine Stage 3 Expansion,
Namibia. Value R36 million
 Project Manager
EPC of Reverse Osmosis Plant for Langer Heinrich Mine Stage 3 Expansion,
Namibia.
Value R10 million
3D Layout of Newlands
water treatment plant
Langer Heinrich
Water Treatment
Plant
Langer Heinrich RO Plant
PROFESSIONAL RESUMÉ
Edward (Eddie) Byrne
 Project Manager
Sea Water Desalination Plant for Areva Uranium.
Namibia.
Value R625 million
The plant was designed to deliver 20 million M³ of Potable water annually.
 Project Manager
Langer Heinrich Uranium Mine,
Namibia.
Stage II, Process Plant Expansion,
Areva Seawater Desalination
Plant, Namibia
Reverse Osmosis
cartridge banks
Langer Heinrich
Phase II Expansion.
Thickener Erection.
Langer Heinrich
Phase II
Expansion
PROFESSIONAL RESUMÉ
Edward (Eddie) Byrne
 Review and assess project tender viability for the potential establishment of an
opencast coal mine and ship loading facility in Mozambique. (Companhia Vale
do Rio Doce (CVRD)
 Finalise pre-feasibility study for Letlhakane Mine Tailings Treatment Plant.
Value R6 million
 Conduct a fatal flaw analysis of Optimum Colliery’s Marion Dragline fleet.
Review engineering maintenance provision for overall 10 year mining plan.
Value R1.2 million
 Project Manager – feasibility study for installation of new raw materials load
out facility at Dudfield Cement Factory. Value R2 million
 Project Manager – Upgrade of Gas Cleaning Plant at Ulco Cement Factory. R9
million
 Project Manager – EPCM of 3 x synchronized Coal Processing plants, Kusela
Coal. Delmas, Ogies and Bronkhorstspruit, South Africa. R270 million each.
2000 – July 2006 Auger Mining S.A. (Pty) Ltd
Director/Operations Manager
 Feasibility studies for extracting coal from opencast pits using the augur mining
process.
 Management of site operations.
 Plan and synchronise Auger mining / opencast mining activities.
 Logistics (Equipment) management. Approx. 250 tonnes of equipment is
transported and assembled on site
 Logistics (Personnel) accommodation, food, medicals, transport etc.
 Ensure compliance with all mine specific safety requirements
 Ensure that all machinery meets with S.A. mining safety codes
 Initiate start up and monitor day to day operations and production.
 Manage on-site maintenance departments
 Manage on-site spares and consumables stores.
 Manage off-site repairs and the manufacture of new parts and equipment
 Liaison with U.S. based OEM with regard to local repairs and maintenance,
spare parts and machine upgrades
Other activities included:
 In collaboration with the CSIR and a third party manufacturer, the development
and installation of active explosion suppression systems for all of the Auger
machines. This product was further developed for use on continuous
underground mining machines
 Feasibility study and trials with coke breeze briquetting techniques using
standardised clay brick extruders and protein collagen binders
 Establishment of an independent Coal mine in KZN, which was owned and
operated by Auger Mining Pty Ltd.
 Provided operational assistance to Eskom (SA Power Generation Company) with
experimental underground auger mining projects.
Brydet Underground Auger
Auger Cutting Head
Auger mining operations
PROFESSIONAL RESUMÉ
Edward (Eddie) Byrne
1998 – 2000 Empire Management
Sales/Business Development Manager (Dragline Products)
1988 – 1998 Dresser/Marion S.A.
Technical/Engineering Manager / Project Manager
Marion S.A - Technical/Engineering Manager (1992 – 1998)
 Project Management of major shutdown activities.
 Planning for major repairs and parts replacement (e.g., Dragline base frames)
 Management of on and off site repairs.
 Management of client engineering and technical queries
 Field Service Manager (supervising 7 Service Engineers)
 Quality Assurance and Quality Control manager.
 Document Control of Engineering related documents.
 Costing and quotations (Parts & Capital Equipment)
 Control, monitoring and reporting on research and development projects
(Dragline Bucket)
Dresser – Project Manager (1988 – 1992)
Project Manager
 Jeffrey – Underground trackless mining and Continuous Miners
 Haulpak – Off highway Haul Trucks and Water Tankers
 Marion – 3 x Dragline, 2 x Rope Shovels and numerous Blast Hole Drills
Haulpak - 730E Off
Highway Dump Truck
Marion 8200 Dragline
Jeffrey Continuous
Miner
Marion 301 Rope Shovel
PROFESSIONAL RESUMÉ
Edward (Eddie) Byrne
1986 – 1988 Steel Engineering
Research & Development Technician
Underground rock drilling equipment
1980 – 1986 Danzens Engineering
Owner/Partner
General Engineering – machining/fabrication
1976 – 1980 Smith Boart – South Africa
Foreman / CNC Programmer
Tri-cone blast-hole rock bits
Raise boring equipment
General rock drilling equipment
1971 – 1976 Laystall Engineering – Liverpool, England
Apprentice/Mechanical Engineer

More Related Content

What's hot

Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)Danny Kilpatrick
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016Simon Baarde
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan KilpatrickDanny Kilpatrick
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_MastDoug Mast
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527Rob Smith
 
Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)Bartlett (Perth)
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan
 
Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016jeb tyrie
 
Resume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedResume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedDennis Talley
 

What's hot (19)

Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
 
Highbank Resources 43-101 Technical Report
Highbank Resources 43-101 Technical Report Highbank Resources 43-101 Technical Report
Highbank Resources 43-101 Technical Report
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Resume
ResumeResume
Resume
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_Mast
 
projects
projectsprojects
projects
 
Jose Sanchez_Resume
Jose Sanchez_ResumeJose Sanchez_Resume
Jose Sanchez_Resume
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
 
Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
CeeVee-10th January 2017_update
CeeVee-10th January 2017_updateCeeVee-10th January 2017_update
CeeVee-10th January 2017_update
 
Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016
 
Resume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedResume talley 1.5.2016.formatted
Resume talley 1.5.2016.formatted
 

Viewers also liked

Viewers also liked (16)

CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01
 
NLW CV 2016
NLW CV 2016NLW CV 2016
NLW CV 2016
 
Dr I.R. Pope c.v. 2016
Dr I.R. Pope c.v. 2016Dr I.R. Pope c.v. 2016
Dr I.R. Pope c.v. 2016
 
AWAIS CV
AWAIS CVAWAIS CV
AWAIS CV
 
David Ashworth CV
David Ashworth CVDavid Ashworth CV
David Ashworth CV
 
J Sehmi Sept 14 CV
J Sehmi Sept 14 CVJ Sehmi Sept 14 CV
J Sehmi Sept 14 CV
 
cv march 2
cv march 2cv march 2
cv march 2
 
CV and job spec
CV and job specCV and job spec
CV and job spec
 
Alex Calver CV
Alex Calver CVAlex Calver CV
Alex Calver CV
 
zMAys-Finalcv
zMAys-FinalcvzMAys-Finalcv
zMAys-Finalcv
 
rosalee-laws-Curriculum Vitae-2016
rosalee-laws-Curriculum Vitae-2016rosalee-laws-Curriculum Vitae-2016
rosalee-laws-Curriculum Vitae-2016
 
CV Steve Shawcross
CV Steve ShawcrossCV Steve Shawcross
CV Steve Shawcross
 
What's wrong with scholarly publishing today? II
What's wrong with scholarly publishing today? IIWhat's wrong with scholarly publishing today? II
What's wrong with scholarly publishing today? II
 
CV Anselm Jacobs combined 200716
CV Anselm Jacobs combined 200716CV Anselm Jacobs combined 200716
CV Anselm Jacobs combined 200716
 
CRAIG TANSLEY CV
CRAIG TANSLEY CVCRAIG TANSLEY CV
CRAIG TANSLEY CV
 
Kevin Dunkling CV - MARCH 2016
Kevin Dunkling CV - MARCH 2016Kevin Dunkling CV - MARCH 2016
Kevin Dunkling CV - MARCH 2016
 

Similar to Eddie Byrne CV 1.06.16

Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaPankaj Kisnadwala
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015John Wood
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016Rolando Garcia
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1RToet
 
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith
 
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominique Tharandt
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2RToet
 

Similar to Eddie Byrne CV 1.06.16 (20)

Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1
 
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-history
 
Execution of Copper Rod Plant
Execution of  Copper Rod PlantExecution of  Copper Rod Plant
Execution of Copper Rod Plant
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
CV_Rockandel_08-2015
CV_Rockandel_08-2015CV_Rockandel_08-2015
CV_Rockandel_08-2015
 
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_dates
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2
 
JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 

Eddie Byrne CV 1.06.16

  • 1. PROFESSIONAL RESUMÉ EDWARD BYRNE SENIOR PROJECT MANAGER ID No 5502205172182 Qualifications Higher National Certificate – Mechanical (1976), Kirby College (UK) PMP at PM Institute of South Africa DOB 20 th February 1955 Experience (Summary)  2015 – Project Manager. DFS Underground Conveying System. CSA Copper Mine, Cobar, NSW, Australia. Value R14Million.  2014 – Project Manager. Engineering and Equipment supply for 3 x Platinum Concentrate Plants. FLSmidth/Russian Platinum PLC. Rugby, England & Khabarovsk, Eastern Siberia. Value ₤27Million.  2013 – Project Manager. Engineering and Equipment supply of Gold Processing Plant. FLSmidth/Arlan PLC. Wiesbaden, Germany & Magadan, Eastern Siberia. Value US$23 Million.  2013 – Project Manager. Engineering and Equipment supply of Gold Processing Plant. FLSmidth/Poyus Gold PLC. Wiesbaden, Germany & Bodaybo, Eastern Siberia.  2012 – Business Development Manager. Saudi Arabia. Royal Haskoning DHV PLC.  2012 – Senior Project Manager. Head PMO. Aveng Water (AW)  2012 - Project Manager. AW - Feasibility studies for Mine Water Drainage Treatment Plants at for Newlands & Collinsville coal Mines, Western Australia. Study Value - R13 million.  2012 - Project Manager. - EPCM Water Treatment Plant for Langer Heinrich Mine Stage 3 Expansion, Namibia. Value R36 million.  2012 - Project Manager. - EPC Reverse Osmosis Plant for Langer Heinrich Mine Stage 3 Expansion, Namibia. Value R10 million.  2010 - Project Manager. – EPC Sea Water Desalination Plant for Areva Uranium. Namibia. Value R625 million.  2009 - Project Manager. Avenge EPC (EPC) – EPCM Stage II Uranium Process Plant Expansion. Langer Heinrich Uranium Mine, Namibia. Value R460 million.  2008 - Business Development Lead. (EPC) - Review establishment of an opencast coal mine and ship loading facility in Mozambique for Companhia Vale do Rio Doce (CVRD)  2008 - Project Manager. (EPC) – PFS for Letlhakane Mine Tailings Treatment Plant. Value R6 million.  2007 - Lead Mechanical Engineer. (EPC) - Fatal flaw analysis of Optimum Colliery’s Marion Dragline fleet. Value R1.2 million.  2007 - Project Manager. (EPC) – FS Raw materials load out facility at Dudfield Cement Factory. Value R2 million.  2007 - Project Manager. (EPC) – EPCM Upgrade Gas Cleaning and Plant for at Ulco Cement Factory. Value R9 million.  2006 - Project Manager. (EPC) – EPCM of 3 x synchronized Coal Processing plants, Kusela Coal. Delmas, Ogies and Bronkhorstspruit, South Africa. R270 million each.  2000 – 2006 - Director/Operations Manager. Auger Mining S.A. (Pty) Ltd  1998 – 2000 - Sales/Business Development Manager. (Dragline Products). Empire Management  1988 – 1998 – Technical & Engineering Manager / Project Manager. Dresser/Marion S.A.  1986 – 1988 – Research & Development Technician. Steel Engineering (Pty) Ltd.  1980 – 1986 - Owner/Partner. Danzens Engineering (Pty) Ltd.  1976 – 1980 - Foreman / CNC Programmer. Smith Boart (Pty) Ltd  1971 – 1976 – Apprentice. Laystall Engineering – Liverpool, England
  • 2. PROFESSIONAL RESUMÉ Edward (Eddie) Byrne May 2015 – October 2015 Bara Consulting/JPMC Consulting Project Manager Definitive Feasibility Study (DFS) to install an incline conveying system at CSA (Glencore) Copper Mine in NSW Australia. The project included approximately 5km of underground mine development for nine consecutive conveyors and three underground crushing and loading stations. On completion of the engineering and the capital costing exercise, the business case was compared to the existing underground truck haulage system. The results confirmed the favourable economics of the conveying system and the proposed budget was approved by the Glencore board of directors. I was stationed on the mine site during the first three months of the engineering phase and returned to South Africa to complete the costing and business case studies. Sept 2012 – May2015 Royal Haskoning DHV Project Manager Sub-contracted to FLSmidth (UK) to project manage the supply of three platinum concentrate processing plants for Russian Platinum PLC’s Kondyor mine, Khabarovsk, Eastern Siberia. The contract scope was for the supply of a process engineering design package including the provision of all of the mechanical and electrical equipment and a complete controls and instrumentation package. Structural plant design and piping was completed by the FLS engineering design offices in the UK and Salt Lake City, USA. A typical suspended underground conveyor. The Kondyor intrusion containing the source of the “down river” alluvial platinum deposits The Kondyor Platinum Concentrate process plant
  • 3. PROFESSIONAL RESUMÉ Edward (Eddie) Byrne Project Manager Sub-contracted to FLSmidth (Germany) to project manage the supply of a Gold Processing plant at the Pavlik gold mine in Magadan, Eastern Siberia, for the Arlan Investment group. The contract scope was for the supply of a process engineering design package including the provision of all of the mechanical and electrical equipment and a complete controls and instrumentation package. Structural plant design and piping was undertaken at the Russian Federations Design institute and reviewed by mechanical and structural engineers in the FLS Salt Lake City engineering office. The process design package includes the following,  Review and report on the Russian laboratory’s ore sample testing report.  Produce Block flow diagrams,  Process Design Criteria,  Process Flow Diagrams,  Piping &Instrumentation Diagrams,  Computerised material simulation modelling (Metsim),  Plant Sampling Plan  Equipment lists  Equipment Data Sheets  Valve list  Instrument list  Motor list including power take off and load list  Plant Operation & Control Philosophy. The procurement function was undertaken through the FLS UK office who supplied the functional personnel to procure, inspect, expedite and ship the equipment to Siberia. Electrical, instrumentation and controls design was undertaken by the FLS Copenhagen office who also supplied all of the hardware and software for the plant. Construction Management was undertaken by the client’s third part representatives with supervisory and technical authority provided by FLS technical supervisors. Final Process commissioning and ramp-up was FLS responsibility. Project Manager Sub-contracted to FLSmidth (Germany) to complete the Verninskoye gold processing plant in Bodaybo, Easter Siberia for Polyus Gold. I assumed Project management responsibility for this project at the start of the plant process commissioning phase, with a mandate to resolve a multitude of issues related to the performance of the project execution and to bring the plant in to production in line with the contractual performance guarantees. The guarantees regarding through-put volume and gold recovery rate, proved to be the biggest challenge and a team of process and mechanical engineers was assembled to resolve these issues. Mining Business Development Manager Kingdom of Saudi Arabia and the Middle East. Based in Jeddah, Saudi Arabia and responsible for all mining consultancy related business in the middle east and assumed temporary responsibility for waste water management business within the same geographic area. Ball Mills at Verninskoye gold processing plant Pavlik Gold processing plant under construction
  • 4. PROFESSIONAL RESUMÉ Edward (Eddie) Byrne Aug 2006 – Sept 2012 Aveng water/Aveng E+PC Engineering & Projects Company Limited The Aveng Group  Senior Project Manager Head of Aveng Water’s Project Management Office, managing four Project managers and the project controls departments, including, cost engineering and cost control, planning and scheduling, procurement & contracting activities. Process, Mechanical, Electrical & Civil engineering also report in to the PMO on a project specific basis. The PMO also provides services to the proposals department.  Project Manager 2 x feasibility studies for Mine Drainage Water Treatment Plants at for Newlands & Collinsville coal Mines, Western Australia. Study Value - R13 million  Project Manager EPCM of water treatment Plant for Langer Heinrich Mine Stage 3 Expansion, Namibia. Value R36 million  Project Manager EPC of Reverse Osmosis Plant for Langer Heinrich Mine Stage 3 Expansion, Namibia. Value R10 million 3D Layout of Newlands water treatment plant Langer Heinrich Water Treatment Plant Langer Heinrich RO Plant
  • 5. PROFESSIONAL RESUMÉ Edward (Eddie) Byrne  Project Manager Sea Water Desalination Plant for Areva Uranium. Namibia. Value R625 million The plant was designed to deliver 20 million M³ of Potable water annually.  Project Manager Langer Heinrich Uranium Mine, Namibia. Stage II, Process Plant Expansion, Areva Seawater Desalination Plant, Namibia Reverse Osmosis cartridge banks Langer Heinrich Phase II Expansion. Thickener Erection. Langer Heinrich Phase II Expansion
  • 6. PROFESSIONAL RESUMÉ Edward (Eddie) Byrne  Review and assess project tender viability for the potential establishment of an opencast coal mine and ship loading facility in Mozambique. (Companhia Vale do Rio Doce (CVRD)  Finalise pre-feasibility study for Letlhakane Mine Tailings Treatment Plant. Value R6 million  Conduct a fatal flaw analysis of Optimum Colliery’s Marion Dragline fleet. Review engineering maintenance provision for overall 10 year mining plan. Value R1.2 million  Project Manager – feasibility study for installation of new raw materials load out facility at Dudfield Cement Factory. Value R2 million  Project Manager – Upgrade of Gas Cleaning Plant at Ulco Cement Factory. R9 million  Project Manager – EPCM of 3 x synchronized Coal Processing plants, Kusela Coal. Delmas, Ogies and Bronkhorstspruit, South Africa. R270 million each. 2000 – July 2006 Auger Mining S.A. (Pty) Ltd Director/Operations Manager  Feasibility studies for extracting coal from opencast pits using the augur mining process.  Management of site operations.  Plan and synchronise Auger mining / opencast mining activities.  Logistics (Equipment) management. Approx. 250 tonnes of equipment is transported and assembled on site  Logistics (Personnel) accommodation, food, medicals, transport etc.  Ensure compliance with all mine specific safety requirements  Ensure that all machinery meets with S.A. mining safety codes  Initiate start up and monitor day to day operations and production.  Manage on-site maintenance departments  Manage on-site spares and consumables stores.  Manage off-site repairs and the manufacture of new parts and equipment  Liaison with U.S. based OEM with regard to local repairs and maintenance, spare parts and machine upgrades Other activities included:  In collaboration with the CSIR and a third party manufacturer, the development and installation of active explosion suppression systems for all of the Auger machines. This product was further developed for use on continuous underground mining machines  Feasibility study and trials with coke breeze briquetting techniques using standardised clay brick extruders and protein collagen binders  Establishment of an independent Coal mine in KZN, which was owned and operated by Auger Mining Pty Ltd.  Provided operational assistance to Eskom (SA Power Generation Company) with experimental underground auger mining projects. Brydet Underground Auger Auger Cutting Head Auger mining operations
  • 7. PROFESSIONAL RESUMÉ Edward (Eddie) Byrne 1998 – 2000 Empire Management Sales/Business Development Manager (Dragline Products) 1988 – 1998 Dresser/Marion S.A. Technical/Engineering Manager / Project Manager Marion S.A - Technical/Engineering Manager (1992 – 1998)  Project Management of major shutdown activities.  Planning for major repairs and parts replacement (e.g., Dragline base frames)  Management of on and off site repairs.  Management of client engineering and technical queries  Field Service Manager (supervising 7 Service Engineers)  Quality Assurance and Quality Control manager.  Document Control of Engineering related documents.  Costing and quotations (Parts & Capital Equipment)  Control, monitoring and reporting on research and development projects (Dragline Bucket) Dresser – Project Manager (1988 – 1992) Project Manager  Jeffrey – Underground trackless mining and Continuous Miners  Haulpak – Off highway Haul Trucks and Water Tankers  Marion – 3 x Dragline, 2 x Rope Shovels and numerous Blast Hole Drills Haulpak - 730E Off Highway Dump Truck Marion 8200 Dragline Jeffrey Continuous Miner Marion 301 Rope Shovel
  • 8. PROFESSIONAL RESUMÉ Edward (Eddie) Byrne 1986 – 1988 Steel Engineering Research & Development Technician Underground rock drilling equipment 1980 – 1986 Danzens Engineering Owner/Partner General Engineering – machining/fabrication 1976 – 1980 Smith Boart – South Africa Foreman / CNC Programmer Tri-cone blast-hole rock bits Raise boring equipment General rock drilling equipment 1971 – 1976 Laystall Engineering – Liverpool, England Apprentice/Mechanical Engineer