ABDUL HAKKIM SHAHUBAR SADIQ
Mobile : +91 99761 42689, +91 86105 97554 (India)
Email : hakkim.dee@gmail.com
Position Applying For: QA/QC Inspector / Engineer – E&I (CompEx Certified)
ABRIDGEMENT
Dynamic professional with more than 12 Years of experience in E&I installations, testing, commissioning and
Inspections services particularly in oil and gas sector in Middle East.
Equipped with abilities in Electrical and Instrumentation Inspections, Installations, Testing and Commissioning of
high tech HV/LV motors, cables, MCC and switchgear, HV & LV transformers, UPS & Batteries, Power distribution
panels, DCS & Marshalling panels and field Instruments.
EDUCATION QUALIFICATION
 Diploma in Electrical & Electronics Engineering from Directorate of Technical Education Board, Tamil Nadu-
2002-2005
 Bachelor of Technology in Electrical Engineering from JRN Rajasthan Vidyapeeth University - 2011-2015
(Distance Mode)
ADDITIONAL QUALIFICATION
 CompEx National Certificate of Core Competence (Ex01-04) – Valid till Sep 2022
 Certified IRCA Quality Management System, Lead Auditor ISO 9001:2015 from SGS
 Helicopter Underwater Escape Training (HUET) & Sea Survival Training – Certificate Number 94369
CAREER HIGHLIGHTS
Handled the Inspections on installation, testing & pre-commissioning of following item
• 132/33KV, 33/11KV, 11/3.3KV, 11/0.415KV power transformers, switchgears and HV/LV Motors.
• HV/LV power, control and communication cables installation, Hi-Pot testing.
• Cathodic protection system underground pipe lines and Metal Tanks. Installation of Permanent Anodes,
Temporary Mg Anodes, Galvanic Anodes, Test station, AJB, NJB, MJB and Positive Negative cable laying,
and Termination, Installation and termination of Transformer rectifier.
• Small power distribution, lighting system, battery bank & UPS.
• Plant earthing & lightning protection system.
• Platform Cranes, Motor Operated Valves, etc.
• Inspection of various types of cable trays and conduit system.
• Electrical heat tracing for process area.
• Fiber optic cable testing using OTDR & splicing.
• Conduct material receiving inspection, Cabinet installation, Junction boxes, Instrument local panels, cable
laying inspection and fiber optic cable installation inspection as per ITP.
• Instruments like flow transmitters, level transmitters, temperature indicators, flow control valves, solenoid
valves, pressure control valves.
• Paging system, plant alarm system (smoke detectors, heat detectors, gas detectors & manual call points)
• Impulse tubing by conducting high pressure test using nitrogen & check for leakage & holding pressure.
• Inspection of Enclosures (IP, Ex, Temp & Gas group)
• Perform inspection of cable trench before laying the cables and back-filling after laying the cables.
PROFESSIONAL EXPERIENCE
1. Company : Drydocks World - Dubai
Client : Tennet Offshore Gmbh
Position : E&I QC Inspector
Project : Borwin-3 (Offshore platform)
Duration : Jun 2017 to Aug 2017
RESPONSIBILITY
• Performed surveillance of contractor’s activities and ensure that all Electrical, Instrumentation and Telecom
installation were carried-out in accordance to the approved for construction drawings and specifications,
procedures, instructions and in compliance to the project specification and related International Standard.
• Reviewed project specifications/code requirements and their implementation on the field.
2. Company : INVENSYS acquired by SCHNEIDER ELECTRIC
Client : RASGAS
Position : QC Engineer (E&I)
Project : RasGas Train 1 &2 onshore & offshore DCS & TMR Upgrade Project
Duration : January 2016 to July 2016
RESPONSIBILITY
• Monitored the installation and pre-commissioning process of the contractor by carrying regular inspections.
DCS & TMR UPGRADE FOR ONSHORE AND OFFSHORE PROJECT (RASGAS - QATAR)
• Implementation of QA/QC activities in accordance with approved PQP, ITP, Procedures, method statements
and other contract documents.
• Responsible for complete Quality Assurance and Control of the project, coordinate and attend client
meetings and demonstrate the project quality statistics and reports.
• Preparing, tracking and updating the monthly and overall project Key Performance Indicator (KPI).
• Closely monitoring project schedule and progress, alert project management for potential delays and quality
issues to avoid rework and cost of poor quality.
• Involved in Quality walk-through with the end-user/customer & monitoring /recording the punch points to
identify quality related issues & implement best practices etc.
• Review sub-contractor documents and inspect sub-contractor installation and testing activities.
• Conduct material receiving inspection, cabinet installation inspection, cable laying inspection and fiber optic
cable installation inspection as per ITP.
• Carry out inspections related to electrical & Instrumentation at offshore MCR platform and remote wellheads
in accordance with the offshore specifications.
• Witness and certify electrical, control cable tests and OTDR tests for FO cables.
• Compilation and preparation of dossier for hand over.
3. Company : BUREAU VERITAS - IRAQ
Client : LUKOIL
Position : E&I Inspector (TPI)
Project : West Qurna Phase 2 - 42” Export Pipeline Project
Duration : September 2013 to December 2015
RESPONSIBILITY
• Monitored the installation and pre-commissioning process of the contractor by carrying regular inspections.
Reviewed the various construction drawings and specifications for the project
• Administered all the inspections on the hold points such as Hi-pot tests, Transformer tests, etc.,
• Conduct DCS and Marshalling panels receiving, site installation and energization inspections
• Ensured that all materials are inspected for conformance to required criteria prior to dispatching to site.
Raised NCR against non-conforming products.
• Responsibly worked at all times to the required procedures and processes to meet the company target of zero
LTIs. This includes actively participating in identifying and intervening when any HSE hazards are observed.
• Actively participated and promoted quality improvements to ensure zero quality defects.
• Continuously monitor quality of work and do Inspections on installation, calibration and testing of electrical
and instrumentation activities.
4. Company : TECNIMONT
Client : GASCO (Abu Dhabi Gas Industries LTD)
Position : Electrical QC Inspector
Project : HABSAN-5 Integrated Gas Development Process Plant
Duration : November 2011 to May 2013
RESPONSIBILITY
• Responsible for the over-all implementation of Quality control related electrical works accordance with
project specifications and Engineering standards.
• Perform routine inspection as per RFI, ITP, QCP, Project specifications & approved drawings.
• Preparation of Electrical & instrumentation quality control documents, Prepare Quality control procedure
(QCP), Inspection Test Plan (ITP) and Inspection Test Report (ITR) for electrical and instrumentation works.
• Performing material inspection and ensuring as per approved MAR and project specification.
• Preparation of calibration, installation acceptance, testing and commissioning reports.
• Raising NCR violated against specification. Suggested for correct action follow up closely and closing the
NCR.
• Verify the test equipment and devices used in the project meets the required specifications as per project
requirements, standard, testing accordance with the procedures.
• Responsible for ensuring that all relevant activities are in compliance with the company’s quality
management system.
• Responsible for ensuring that all calibrated equipment used within calibration dates
5. Company : AL-TURKI ENTERPRISES L.L.C
Client : Petroleum Development of Oman (PDO)
Position : Electrical QC Inspector
Project : Amal & Amin Stem Project.
Duration : March 2011 to September 2011
RESPONSIBILITY
• Monitor daily inspection activities and verifies compliance to PDO Standards (DEP), National Electrical
Codes, IEC.
• Handled the Inspections of installation, testing & commissioning of Power Transformers, Beam pump well
motors, MV/LV Switchgears, Motor Control Centers, Distribution boards, etc.
• Supervising quality control functions of a project or its parts, including quality control inspection schedules
and the collection of quality records. Assessing implementation of the quality plan on site.
• Inspection of 11kV, 33kV Overhead Transmission lines installation and erection (Erection of HT & LT poles,
Stringing & Cable Installation).
• Involved in the punch-listing of the completed construction activities (Punch-List –A&B) & ensure closing of
the punch items by the construction team before Mechanical Completion.
6. Company : GAMA Qatar Co, W.L.L, Qatar.
Client : Chiyoda Technip Joint Venture (CTJV)
Position : E&I QC Inspector
Project : Qatargas ConocoPhillips Shell Onshore LNG Project (QG 3&4)
Duration : Sept 2007 to Nov 2010
RESPONSIBILITY
• Responsible for the over-all implementation of Quality control related electrical works accordance with
project specifications and Engineering standards.
• Perform routine inspection as per RFI, ITP, QCP, Project specifications & approved drawings.
• Preparation of Electrical & instrumentation quality control documents, Prepare Quality control procedure
(QCP), Inspection Test Plan (ITP) and Inspection Test Report (ITR) for electrical and instrumentation works.
• Performing material inspection and ensuring as per approved MAR and project specification.
• Preparation of calibration, installation acceptance, testing and commissioning reports.
• Review of all electrical & instrumentation drawings related to scope of project work.
• Suggested for correct action follow up closely and closing the NCR.
• Verify the test equipment and devices used in the project meets the required specifications as per project
requirements, standard, testing accordance with the procedures.
7. Company : Valuthur Gas Turbine Power plant (96MW), Tamilnadu, India.
Position : Maintenance Technician.
Duration : September 2005 to July 2007.
Scope of Works:
 Maintenance of MV/LV panel boards & field controls.
 Testing of the transformers, earthing system, relays, panel boards and circuit breakers.
 Calibration of metering units and relays.
 Fire fighting and safety maintenance.
 Daily Generation Report (Fuel, Water and Energy) Preparation Work.
 Trouble shooting of Transformer, Switch gears and Circuit Breakers.
TRAINING PROGRAMS ATTENDED
 HUET & Sea Survival
 HSE
 RFI Familiarization
course
 Electrical Safety
 Electrical Log out &
Tag out (LOTO)
 Fire and Safety
 PMC & SIMOPS
 Gas Tester
 H2S Awareness
 Scaffolding works at
height
 Confined Space
awareness
PERSONAL PROFILE
Name : S.Abdul Hakkim
Date of Birth : 11th may 1986
Gender : Male
Nationality : Indian
Religion : Muslim
Marital status : Married
Languages Known : English, Tamil, Hindi and Malayalam
Passport Number : Z 3054954
Date of Expire : 22-01-2025
Driving License : UAE Valid Driving License holder
Residence Address : 8/35 West Street,
Therkuthravai (POST),
Ramanathapuram (DIST),
Tamil Nadu,
PIN-623504.
DECLARATION
I hereby declare that all the information’s furnished above are true to the best of my knowledge and belief.
Thanking You,
Yours Truly,
S.ABDUL HAKKIM

More Related Content

What's hot

CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineerMubashir ahmee
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORRegu Mkc
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer zahirtec
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument SupervisorSatish Patel
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandra Sekar
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
Sr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance TechnicianSr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance TechnicianJignesh P. Patel
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cvKarthi keyan
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technicianchandrabhushan rao
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv Yacine Sayad
 

What's hot (20)

CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
QAQC E&I
QAQC E&IQAQC E&I
QAQC E&I
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Sr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance TechnicianSr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance Technician
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cv
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technician
 
Instrument Technician
Instrument TechnicianInstrument Technician
Instrument Technician
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
 
Instrument Technician CV
Instrument Technician CVInstrument Technician CV
Instrument Technician CV
 

Similar to E&I inspector cv (20)

Irfan - Elec Engr
Irfan - Elec EngrIrfan - Elec Engr
Irfan - Elec Engr
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
CURRICULUM VITAE doc
CURRICULUM VITAE docCURRICULUM VITAE doc
CURRICULUM VITAE doc
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Tabrez
TabrezTabrez
Tabrez
 
Tabrez
TabrezTabrez
Tabrez
 
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)
 
QC
QCQC
QC
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
M Imran
M ImranM Imran
M Imran
 
Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
 

Recently uploaded

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 

Recently uploaded (20)

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 

E&I inspector cv

  • 1. ABDUL HAKKIM SHAHUBAR SADIQ Mobile : +91 99761 42689, +91 86105 97554 (India) Email : hakkim.dee@gmail.com Position Applying For: QA/QC Inspector / Engineer – E&I (CompEx Certified) ABRIDGEMENT Dynamic professional with more than 12 Years of experience in E&I installations, testing, commissioning and Inspections services particularly in oil and gas sector in Middle East. Equipped with abilities in Electrical and Instrumentation Inspections, Installations, Testing and Commissioning of high tech HV/LV motors, cables, MCC and switchgear, HV & LV transformers, UPS & Batteries, Power distribution panels, DCS & Marshalling panels and field Instruments. EDUCATION QUALIFICATION  Diploma in Electrical & Electronics Engineering from Directorate of Technical Education Board, Tamil Nadu- 2002-2005  Bachelor of Technology in Electrical Engineering from JRN Rajasthan Vidyapeeth University - 2011-2015 (Distance Mode) ADDITIONAL QUALIFICATION  CompEx National Certificate of Core Competence (Ex01-04) – Valid till Sep 2022  Certified IRCA Quality Management System, Lead Auditor ISO 9001:2015 from SGS  Helicopter Underwater Escape Training (HUET) & Sea Survival Training – Certificate Number 94369 CAREER HIGHLIGHTS Handled the Inspections on installation, testing & pre-commissioning of following item • 132/33KV, 33/11KV, 11/3.3KV, 11/0.415KV power transformers, switchgears and HV/LV Motors. • HV/LV power, control and communication cables installation, Hi-Pot testing. • Cathodic protection system underground pipe lines and Metal Tanks. Installation of Permanent Anodes, Temporary Mg Anodes, Galvanic Anodes, Test station, AJB, NJB, MJB and Positive Negative cable laying, and Termination, Installation and termination of Transformer rectifier. • Small power distribution, lighting system, battery bank & UPS. • Plant earthing & lightning protection system. • Platform Cranes, Motor Operated Valves, etc. • Inspection of various types of cable trays and conduit system. • Electrical heat tracing for process area. • Fiber optic cable testing using OTDR & splicing. • Conduct material receiving inspection, Cabinet installation, Junction boxes, Instrument local panels, cable laying inspection and fiber optic cable installation inspection as per ITP. • Instruments like flow transmitters, level transmitters, temperature indicators, flow control valves, solenoid valves, pressure control valves. • Paging system, plant alarm system (smoke detectors, heat detectors, gas detectors & manual call points) • Impulse tubing by conducting high pressure test using nitrogen & check for leakage & holding pressure. • Inspection of Enclosures (IP, Ex, Temp & Gas group) • Perform inspection of cable trench before laying the cables and back-filling after laying the cables. PROFESSIONAL EXPERIENCE 1. Company : Drydocks World - Dubai Client : Tennet Offshore Gmbh Position : E&I QC Inspector Project : Borwin-3 (Offshore platform) Duration : Jun 2017 to Aug 2017 RESPONSIBILITY
  • 2. • Performed surveillance of contractor’s activities and ensure that all Electrical, Instrumentation and Telecom installation were carried-out in accordance to the approved for construction drawings and specifications, procedures, instructions and in compliance to the project specification and related International Standard. • Reviewed project specifications/code requirements and their implementation on the field. 2. Company : INVENSYS acquired by SCHNEIDER ELECTRIC Client : RASGAS Position : QC Engineer (E&I) Project : RasGas Train 1 &2 onshore & offshore DCS & TMR Upgrade Project Duration : January 2016 to July 2016 RESPONSIBILITY • Monitored the installation and pre-commissioning process of the contractor by carrying regular inspections. DCS & TMR UPGRADE FOR ONSHORE AND OFFSHORE PROJECT (RASGAS - QATAR) • Implementation of QA/QC activities in accordance with approved PQP, ITP, Procedures, method statements and other contract documents. • Responsible for complete Quality Assurance and Control of the project, coordinate and attend client meetings and demonstrate the project quality statistics and reports. • Preparing, tracking and updating the monthly and overall project Key Performance Indicator (KPI). • Closely monitoring project schedule and progress, alert project management for potential delays and quality issues to avoid rework and cost of poor quality. • Involved in Quality walk-through with the end-user/customer & monitoring /recording the punch points to identify quality related issues & implement best practices etc. • Review sub-contractor documents and inspect sub-contractor installation and testing activities. • Conduct material receiving inspection, cabinet installation inspection, cable laying inspection and fiber optic cable installation inspection as per ITP. • Carry out inspections related to electrical & Instrumentation at offshore MCR platform and remote wellheads in accordance with the offshore specifications. • Witness and certify electrical, control cable tests and OTDR tests for FO cables. • Compilation and preparation of dossier for hand over. 3. Company : BUREAU VERITAS - IRAQ Client : LUKOIL Position : E&I Inspector (TPI) Project : West Qurna Phase 2 - 42” Export Pipeline Project Duration : September 2013 to December 2015 RESPONSIBILITY • Monitored the installation and pre-commissioning process of the contractor by carrying regular inspections. Reviewed the various construction drawings and specifications for the project • Administered all the inspections on the hold points such as Hi-pot tests, Transformer tests, etc., • Conduct DCS and Marshalling panels receiving, site installation and energization inspections • Ensured that all materials are inspected for conformance to required criteria prior to dispatching to site. Raised NCR against non-conforming products. • Responsibly worked at all times to the required procedures and processes to meet the company target of zero LTIs. This includes actively participating in identifying and intervening when any HSE hazards are observed. • Actively participated and promoted quality improvements to ensure zero quality defects. • Continuously monitor quality of work and do Inspections on installation, calibration and testing of electrical and instrumentation activities. 4. Company : TECNIMONT Client : GASCO (Abu Dhabi Gas Industries LTD) Position : Electrical QC Inspector Project : HABSAN-5 Integrated Gas Development Process Plant Duration : November 2011 to May 2013 RESPONSIBILITY • Responsible for the over-all implementation of Quality control related electrical works accordance with project specifications and Engineering standards. • Perform routine inspection as per RFI, ITP, QCP, Project specifications & approved drawings.
  • 3. • Preparation of Electrical & instrumentation quality control documents, Prepare Quality control procedure (QCP), Inspection Test Plan (ITP) and Inspection Test Report (ITR) for electrical and instrumentation works. • Performing material inspection and ensuring as per approved MAR and project specification. • Preparation of calibration, installation acceptance, testing and commissioning reports. • Raising NCR violated against specification. Suggested for correct action follow up closely and closing the NCR. • Verify the test equipment and devices used in the project meets the required specifications as per project requirements, standard, testing accordance with the procedures. • Responsible for ensuring that all relevant activities are in compliance with the company’s quality management system. • Responsible for ensuring that all calibrated equipment used within calibration dates 5. Company : AL-TURKI ENTERPRISES L.L.C Client : Petroleum Development of Oman (PDO) Position : Electrical QC Inspector Project : Amal & Amin Stem Project. Duration : March 2011 to September 2011 RESPONSIBILITY • Monitor daily inspection activities and verifies compliance to PDO Standards (DEP), National Electrical Codes, IEC. • Handled the Inspections of installation, testing & commissioning of Power Transformers, Beam pump well motors, MV/LV Switchgears, Motor Control Centers, Distribution boards, etc. • Supervising quality control functions of a project or its parts, including quality control inspection schedules and the collection of quality records. Assessing implementation of the quality plan on site. • Inspection of 11kV, 33kV Overhead Transmission lines installation and erection (Erection of HT & LT poles, Stringing & Cable Installation). • Involved in the punch-listing of the completed construction activities (Punch-List –A&B) & ensure closing of the punch items by the construction team before Mechanical Completion. 6. Company : GAMA Qatar Co, W.L.L, Qatar. Client : Chiyoda Technip Joint Venture (CTJV) Position : E&I QC Inspector Project : Qatargas ConocoPhillips Shell Onshore LNG Project (QG 3&4) Duration : Sept 2007 to Nov 2010 RESPONSIBILITY • Responsible for the over-all implementation of Quality control related electrical works accordance with project specifications and Engineering standards. • Perform routine inspection as per RFI, ITP, QCP, Project specifications & approved drawings. • Preparation of Electrical & instrumentation quality control documents, Prepare Quality control procedure (QCP), Inspection Test Plan (ITP) and Inspection Test Report (ITR) for electrical and instrumentation works. • Performing material inspection and ensuring as per approved MAR and project specification. • Preparation of calibration, installation acceptance, testing and commissioning reports. • Review of all electrical & instrumentation drawings related to scope of project work. • Suggested for correct action follow up closely and closing the NCR. • Verify the test equipment and devices used in the project meets the required specifications as per project requirements, standard, testing accordance with the procedures. 7. Company : Valuthur Gas Turbine Power plant (96MW), Tamilnadu, India. Position : Maintenance Technician. Duration : September 2005 to July 2007. Scope of Works:  Maintenance of MV/LV panel boards & field controls.  Testing of the transformers, earthing system, relays, panel boards and circuit breakers.  Calibration of metering units and relays.  Fire fighting and safety maintenance.
  • 4.  Daily Generation Report (Fuel, Water and Energy) Preparation Work.  Trouble shooting of Transformer, Switch gears and Circuit Breakers. TRAINING PROGRAMS ATTENDED  HUET & Sea Survival  HSE  RFI Familiarization course  Electrical Safety  Electrical Log out & Tag out (LOTO)  Fire and Safety  PMC & SIMOPS  Gas Tester  H2S Awareness  Scaffolding works at height  Confined Space awareness PERSONAL PROFILE Name : S.Abdul Hakkim Date of Birth : 11th may 1986 Gender : Male Nationality : Indian Religion : Muslim Marital status : Married Languages Known : English, Tamil, Hindi and Malayalam Passport Number : Z 3054954 Date of Expire : 22-01-2025 Driving License : UAE Valid Driving License holder Residence Address : 8/35 West Street, Therkuthravai (POST), Ramanathapuram (DIST), Tamil Nadu, PIN-623504. DECLARATION I hereby declare that all the information’s furnished above are true to the best of my knowledge and belief. Thanking You, Yours Truly, S.ABDUL HAKKIM