1. ABDUL HAKKIM SHAHUBAR SADIQ
Mobile : +91 99761 42689, +91 86105 97554 (India)
Email : hakkim.dee@gmail.com
Position Applying For: QA/QC Inspector / Engineer – E&I (CompEx Certified)
ABRIDGEMENT
Dynamic professional with more than 12 Years of experience in E&I installations, testing, commissioning and
Inspections services particularly in oil and gas sector in Middle East.
Equipped with abilities in Electrical and Instrumentation Inspections, Installations, Testing and Commissioning of
high tech HV/LV motors, cables, MCC and switchgear, HV & LV transformers, UPS & Batteries, Power distribution
panels, DCS & Marshalling panels and field Instruments.
EDUCATION QUALIFICATION
Diploma in Electrical & Electronics Engineering from Directorate of Technical Education Board, Tamil Nadu-
2002-2005
Bachelor of Technology in Electrical Engineering from JRN Rajasthan Vidyapeeth University - 2011-2015
(Distance Mode)
ADDITIONAL QUALIFICATION
CompEx National Certificate of Core Competence (Ex01-04) – Valid till Sep 2022
Certified IRCA Quality Management System, Lead Auditor ISO 9001:2015 from SGS
Helicopter Underwater Escape Training (HUET) & Sea Survival Training – Certificate Number 94369
CAREER HIGHLIGHTS
Handled the Inspections on installation, testing & pre-commissioning of following item
• 132/33KV, 33/11KV, 11/3.3KV, 11/0.415KV power transformers, switchgears and HV/LV Motors.
• HV/LV power, control and communication cables installation, Hi-Pot testing.
• Cathodic protection system underground pipe lines and Metal Tanks. Installation of Permanent Anodes,
Temporary Mg Anodes, Galvanic Anodes, Test station, AJB, NJB, MJB and Positive Negative cable laying,
and Termination, Installation and termination of Transformer rectifier.
• Small power distribution, lighting system, battery bank & UPS.
• Plant earthing & lightning protection system.
• Platform Cranes, Motor Operated Valves, etc.
• Inspection of various types of cable trays and conduit system.
• Electrical heat tracing for process area.
• Fiber optic cable testing using OTDR & splicing.
• Conduct material receiving inspection, Cabinet installation, Junction boxes, Instrument local panels, cable
laying inspection and fiber optic cable installation inspection as per ITP.
• Instruments like flow transmitters, level transmitters, temperature indicators, flow control valves, solenoid
valves, pressure control valves.
• Paging system, plant alarm system (smoke detectors, heat detectors, gas detectors & manual call points)
• Impulse tubing by conducting high pressure test using nitrogen & check for leakage & holding pressure.
• Inspection of Enclosures (IP, Ex, Temp & Gas group)
• Perform inspection of cable trench before laying the cables and back-filling after laying the cables.
PROFESSIONAL EXPERIENCE
1. Company : Drydocks World - Dubai
Client : Tennet Offshore Gmbh
Position : E&I QC Inspector
Project : Borwin-3 (Offshore platform)
Duration : Jun 2017 to Aug 2017
RESPONSIBILITY
2. • Performed surveillance of contractor’s activities and ensure that all Electrical, Instrumentation and Telecom
installation were carried-out in accordance to the approved for construction drawings and specifications,
procedures, instructions and in compliance to the project specification and related International Standard.
• Reviewed project specifications/code requirements and their implementation on the field.
2. Company : INVENSYS acquired by SCHNEIDER ELECTRIC
Client : RASGAS
Position : QC Engineer (E&I)
Project : RasGas Train 1 &2 onshore & offshore DCS & TMR Upgrade Project
Duration : January 2016 to July 2016
RESPONSIBILITY
• Monitored the installation and pre-commissioning process of the contractor by carrying regular inspections.
DCS & TMR UPGRADE FOR ONSHORE AND OFFSHORE PROJECT (RASGAS - QATAR)
• Implementation of QA/QC activities in accordance with approved PQP, ITP, Procedures, method statements
and other contract documents.
• Responsible for complete Quality Assurance and Control of the project, coordinate and attend client
meetings and demonstrate the project quality statistics and reports.
• Preparing, tracking and updating the monthly and overall project Key Performance Indicator (KPI).
• Closely monitoring project schedule and progress, alert project management for potential delays and quality
issues to avoid rework and cost of poor quality.
• Involved in Quality walk-through with the end-user/customer & monitoring /recording the punch points to
identify quality related issues & implement best practices etc.
• Review sub-contractor documents and inspect sub-contractor installation and testing activities.
• Conduct material receiving inspection, cabinet installation inspection, cable laying inspection and fiber optic
cable installation inspection as per ITP.
• Carry out inspections related to electrical & Instrumentation at offshore MCR platform and remote wellheads
in accordance with the offshore specifications.
• Witness and certify electrical, control cable tests and OTDR tests for FO cables.
• Compilation and preparation of dossier for hand over.
3. Company : BUREAU VERITAS - IRAQ
Client : LUKOIL
Position : E&I Inspector (TPI)
Project : West Qurna Phase 2 - 42” Export Pipeline Project
Duration : September 2013 to December 2015
RESPONSIBILITY
• Monitored the installation and pre-commissioning process of the contractor by carrying regular inspections.
Reviewed the various construction drawings and specifications for the project
• Administered all the inspections on the hold points such as Hi-pot tests, Transformer tests, etc.,
• Conduct DCS and Marshalling panels receiving, site installation and energization inspections
• Ensured that all materials are inspected for conformance to required criteria prior to dispatching to site.
Raised NCR against non-conforming products.
• Responsibly worked at all times to the required procedures and processes to meet the company target of zero
LTIs. This includes actively participating in identifying and intervening when any HSE hazards are observed.
• Actively participated and promoted quality improvements to ensure zero quality defects.
• Continuously monitor quality of work and do Inspections on installation, calibration and testing of electrical
and instrumentation activities.
4. Company : TECNIMONT
Client : GASCO (Abu Dhabi Gas Industries LTD)
Position : Electrical QC Inspector
Project : HABSAN-5 Integrated Gas Development Process Plant
Duration : November 2011 to May 2013
RESPONSIBILITY
• Responsible for the over-all implementation of Quality control related electrical works accordance with
project specifications and Engineering standards.
• Perform routine inspection as per RFI, ITP, QCP, Project specifications & approved drawings.
3. • Preparation of Electrical & instrumentation quality control documents, Prepare Quality control procedure
(QCP), Inspection Test Plan (ITP) and Inspection Test Report (ITR) for electrical and instrumentation works.
• Performing material inspection and ensuring as per approved MAR and project specification.
• Preparation of calibration, installation acceptance, testing and commissioning reports.
• Raising NCR violated against specification. Suggested for correct action follow up closely and closing the
NCR.
• Verify the test equipment and devices used in the project meets the required specifications as per project
requirements, standard, testing accordance with the procedures.
• Responsible for ensuring that all relevant activities are in compliance with the company’s quality
management system.
• Responsible for ensuring that all calibrated equipment used within calibration dates
5. Company : AL-TURKI ENTERPRISES L.L.C
Client : Petroleum Development of Oman (PDO)
Position : Electrical QC Inspector
Project : Amal & Amin Stem Project.
Duration : March 2011 to September 2011
RESPONSIBILITY
• Monitor daily inspection activities and verifies compliance to PDO Standards (DEP), National Electrical
Codes, IEC.
• Handled the Inspections of installation, testing & commissioning of Power Transformers, Beam pump well
motors, MV/LV Switchgears, Motor Control Centers, Distribution boards, etc.
• Supervising quality control functions of a project or its parts, including quality control inspection schedules
and the collection of quality records. Assessing implementation of the quality plan on site.
• Inspection of 11kV, 33kV Overhead Transmission lines installation and erection (Erection of HT & LT poles,
Stringing & Cable Installation).
• Involved in the punch-listing of the completed construction activities (Punch-List –A&B) & ensure closing of
the punch items by the construction team before Mechanical Completion.
6. Company : GAMA Qatar Co, W.L.L, Qatar.
Client : Chiyoda Technip Joint Venture (CTJV)
Position : E&I QC Inspector
Project : Qatargas ConocoPhillips Shell Onshore LNG Project (QG 3&4)
Duration : Sept 2007 to Nov 2010
RESPONSIBILITY
• Responsible for the over-all implementation of Quality control related electrical works accordance with
project specifications and Engineering standards.
• Perform routine inspection as per RFI, ITP, QCP, Project specifications & approved drawings.
• Preparation of Electrical & instrumentation quality control documents, Prepare Quality control procedure
(QCP), Inspection Test Plan (ITP) and Inspection Test Report (ITR) for electrical and instrumentation works.
• Performing material inspection and ensuring as per approved MAR and project specification.
• Preparation of calibration, installation acceptance, testing and commissioning reports.
• Review of all electrical & instrumentation drawings related to scope of project work.
• Suggested for correct action follow up closely and closing the NCR.
• Verify the test equipment and devices used in the project meets the required specifications as per project
requirements, standard, testing accordance with the procedures.
7. Company : Valuthur Gas Turbine Power plant (96MW), Tamilnadu, India.
Position : Maintenance Technician.
Duration : September 2005 to July 2007.
Scope of Works:
Maintenance of MV/LV panel boards & field controls.
Testing of the transformers, earthing system, relays, panel boards and circuit breakers.
Calibration of metering units and relays.
Fire fighting and safety maintenance.
4. Daily Generation Report (Fuel, Water and Energy) Preparation Work.
Trouble shooting of Transformer, Switch gears and Circuit Breakers.
TRAINING PROGRAMS ATTENDED
HUET & Sea Survival
HSE
RFI Familiarization
course
Electrical Safety
Electrical Log out &
Tag out (LOTO)
Fire and Safety
PMC & SIMOPS
Gas Tester
H2S Awareness
Scaffolding works at
height
Confined Space
awareness
PERSONAL PROFILE
Name : S.Abdul Hakkim
Date of Birth : 11th may 1986
Gender : Male
Nationality : Indian
Religion : Muslim
Marital status : Married
Languages Known : English, Tamil, Hindi and Malayalam
Passport Number : Z 3054954
Date of Expire : 22-01-2025
Driving License : UAE Valid Driving License holder
Residence Address : 8/35 West Street,
Therkuthravai (POST),
Ramanathapuram (DIST),
Tamil Nadu,
PIN-623504.
DECLARATION
I hereby declare that all the information’s furnished above are true to the best of my knowledge and belief.
Thanking You,
Yours Truly,
S.ABDUL HAKKIM