SlideShare a Scribd company logo
1 of 6
CURRICULUM VITAE
UPENDRA PRASAD
Diploma in Instrumentation
Cell: +7227040156, 7069773801
E-mail: upendrainst2007@gmail.com
Objective: I am looking for a good position in the field of instrumentation in a prestigious
company where previous skills and capabilities can be put to efficient use.
Experience: Having 12.6 years (10.6 years in India & 2 years in Gulf) relevant experience in
site supervision execution, erection, construction, loop checking, pre commissioning, commissioning
& trouble shooting.
Summaryof Skills:
●Abilitytoreadinstrumentationdrawings,P&ID,Instrumentationlocationdrawing,Cable schedule,
interconnection wiringdiagram,Instrumentloopdiagram(ILD),InstrumentsIndex,DataSheets.
Cause & effectchart,Processflowdiagram(PFD).
● Knowledge of all instrumentconstructionworkactivity, sitework planning,projectexecution,
toolstackle,manpowerhandlinginlarge site.
● Able toleada team of supervisor, foreman, co-ordinateswithclientandprogress meeting.
●Familiarwith differenttypesof Instrument Installation&inspectionof PT,FT,LT, TT, DPT, TE,
(EmersonRosemount, ABB, Endress & Hauser, Honeywell,Yokogawaasperdrawing.
●Hand experience tocalibration andconfigurationof differenttype of electronic&pneumatic
instruments(PT,FT,TE, TT,LT, Level Troll) withlatestcalibrationequipment.
●Hand Experience inLoopchecking,commissioningof fieldinstruments,PT,FT,,LT,TT,Control valve,
withprocessand HART 475, fromfieldtoControl roomas per loopfolder.
●FamiliarwithControl valve stroke checking,calibration&splitrage checking,functionalchecking
and trouble shooting, on/off valvechecking withinterlock andlimitswitchsetting.
● Knowledge of workingof fire andgassystem, F&G instruments(Gasdetector,manual call point,
and smoke detector,heatdetector,delugesystem installationandtesting.
●Good knowledgeof workingprinciple,installation,commissioning,FFInstruments,Smart
Transmitters,calibrationandtrouble shooting.
●Knowledgeof Hazardousarea,zone,gasgroup andprotectiontype.Intrinsicsafetyprincipal and
Intrinsicsafe equipment.
● FamiliarwithDCS,PLC,PID control,Cascade control,splitrange,ESD system.
Career Profile:
SINCLUS ENGINEERING AND CONSULTANCY
Since: June 25-2016 to till date
SMART AUTOMATION
Since: March 2-2015 to February 19-2016.
K C C ENGINEERING & CONSTRUCTION (KUWAIT)
Since: November 5-2014 to January 20 – 2015
DODSAL ENGINEERING & CONSTRUCTION PTE LIMITED ABU DHABI (UAE)
Since: October 10 - 2012 to March15- 2014
L&T CONSTRUCTION (POWER TRANSMISSION & DISTRIBUTION)
Since: September 28 - 2007 to September 28 - 2012
SIGMA CONSTRUCTION KOLKATA
Since: June 5 - 2003 to September 24 – 2007
Projects:
Working in RIL Refinery J3 Project (PCG DTA) Jamnagar, under Sinclus Engineering and
Consultancy as an Instrumentation Engineerfrom Jan- 2017 to TILL date.
Responsibilities:
Working for execution of PSA & CO Shift unit all instrumentation site construction works.
JB installation, cable tray erection, stanchion erection, panel erection, analyzer work.
Field Instruments Installation as per location & with P&ID diagram.
Responsible for main cable & branch cable laying, dressing, tagging, glanding, termination.
Instruments Impulse piping, Process tubing & control valve tubing as per hookup.
Monitoring Instrument Impulse piping & tubing hydro testing.
Responsible for Punch point closing and ITP signing by client.
Monitoring field Instrument dry loop checking & trouble shooting.
Material co-ordination, man power planning, daily progress monitoring.
Worked in RIL Refinery J3 Project (SEZ & PX 4) Jamnagar, under Sinclus Engineering and
Consultancy as an Instrumentation Engineerfrom June 25 – 2016 to Dec 30 - 2016.
Responsibilities:
Successfully completed Impulse piping & tubing hydro testing of aromatics unit.
Responsible for valve pneumatic tubing & leak testing.
Field Instruments Installation as per location & with P&ID diagram.
Responsibility of Punch point closing and ITP signing by client.
Cable tray erection, JB installation, Air manifold erection in SEZ.
Package Panel erection in control room as per equipment lay out drawing.
Worked in RIL CBM Project Shahdol underSmart Automation as Instrumentation
Engineer. From March 2- 2015 to February 19 - 2016
Responsibilities:
Responsible for execution of GDU Unit all instrumentation site construction works.
Instrument JB installation and Instrument stanchion installation as per location drawing.
Responsible for Field Instruments Installation (PT, FT, LT, TT, RTD, THERMOCOUPLE) as per
P&ID & Location drawing.
Responsible for Instrument cable pulling, Testing & G/T as per cable list & JB wiring diagram.
Supervision of Instrument Impulse Tubing as per hook up. Instrument air tubing of control
valve, Shutdown valve.
Responsible for Fire & Gas detector system instruments installation as per drawing.
Calibration and stroke checking of control valves. Interlock checking.
Loop checking of field instruments with HART 375.
Field calibration and configuration of level transmitter DP and Radar, ultrasonic type.
HCR Unit Instrumentation Shutdown work of KNPC underKCC as an Instrument
Supervisor from November 5 – 2014 to January 20 – 2015
Responsibilities:
Responsible for Field Instruments Installation (PT, FT, LT, TT, RTD, THERMOCOUPLE) as per
P&ID & Location drawing.
Monitoring secondary Instrument cable pulling as per JB wiring diagram & Cable list.
Supervision of Instrument Impulse Tubing of PT, FT, instrument air tubing of control valve,
Shutdown valve as per Hookup diagram.
Sequence checking and interlock checking of pump.
Loop checking and commissioning of gas compressor instruments.
Prepare RFI for Inspection and co-ordination with QC people for any comments.
Shah Gas Development (SGD) Project Abu Dhabi of Al Hosan Gas under Dodsal
Engineering & Construction Limited as a Sr. Instrumentation Engineer from October 10 -
2012 to March 15 – 2014
Responsibilities:
Leading a team for Execution of SRU Unit Instruments Field Cable tray erection, JB
installation, stanchion erection, Conduit laying.
Instrument cable laying & Glanding Termination as per Cable list and JB wiring details.
Control room Panel frame erection & DCS Panel installation as per lay out drawing.
Installation of Field Instruments (PT, FT, LT, TT, TE) fire and gas (Manual call point, Horn
Beacon Gas detector) system.
Responsible for Field Instruments Loop checking, interlock checking & Trouble shooting.
Assign job for the sub-contractor. Monitor / Control the activities of the sub-contractor and
ensure timely completion of the project.
Completed Impulse tubing of field Instruments and control valve tubing as per Hookup
drawing.
Co-ordination for loop checking of field instruments and package. (PT, FT, LT, TT, CV, SDV)
with HART 375 Transmitters,
Responsibility for Instrument Punch point closing. With Consultants & Client.
Prepare TQ for any modification & completed job as per Site instruction.
Co-ordination for all instrumentation work, material, manpower planning. Handle progress
review Meeting client meeting. Follow up with client and vendors.
Prepare RFI for inspection & Co-ordination with QC People for any comments
FCC Unit (RR Package ) of IOCL Paradip under Larsen and Toubro Limited (L & T) as an
Instrumentation Engineer from July 8 - 2010 to September 28 – 2012
Responsibilities:
Field JB installation, cable tray erection, stanchion installation.
Installation of field Instruments of pre heater, reactor and regenerator as per ILP drawing
&P&ID.
Responsible for Impulse Piping of field Instruments as per Hook up drawing.
Involved in instruments calibration and calibration report preparation.
Instrument cable laying & Glanding Termination as per Cable list and JB wiring details
Associated with field Instruments loop checking from field to DCS & Trouble shooting.
Ensures proper documentation of files, records, databases, and drawings to meet
regulatory and project requirements, and maintains current requirements as to
equipment/materials specifications and vendor preferences.
GGS – 2 Project Rudrasagar Of ONGC Assam under Larsen and ToubroLimited (L & T) as
an Instrumentation Engineer from May 2 – 2009 to July 6 – 2010
Responsibilities:
Supervise and carryout site execution JB installation, cable tray erection, cable laying.
Field Instruments (PT/FT, LT, TT, TE ) Installation as per location &P&ID diagram.
Responsible for Instruments Impulse piping & control valve tubing as per Hookup.
Associated with Field Instrument Calibration & Report Preparation.
Installation F&G detector systemas per drawing.
Configuration and calibration of level transmitter of vessel.
Loop checking and commissioning of separator and manifold area instruments.
Involve in Sequence Checking/Interlock checking of Bath Heater & Separator.
Pre-commissioning & Commissioning of all field instruments & fire water system.
Pre-commissioning of Package Instruments Bath heater, Heater, Air compressor.
Baramura GGS Project of ONGC Tripura under Larsen and ToubroLimited (L & T) as an
Instrumentation Engineer from September 2007 to April 30 – 2009
Responsibilities:
Carryout site execution field instruments, JB installation, cable tray erection.
Field Instruments Installation as per location &P&ID diagram
Responsible for Instruments Impulse piping & control valve tubing as per hookup.
Installation of Telecom system & Gas detector system as per drawing.
Installation and loop checking of fire and gas detector system.
Pre-commissioning of Package Instruments Bath heater, heater, Air compressor, Flame front
generator. Fire water system.
Involve in field instrument Commissioning & Trouble shooting.
Responsible for BMS systemInstrument Installation, Loop checking & commissioning.
250 MW Thermal Power Plant Project MSEB Paras Of under Sigma Construction as an
Instrumentation Engineer from February 1 – 2007 to September 24 – 2007
Responsibilities:
Supervise and carryout site execution work like instruments installation, JB installation,
cable tray erection, cable laying, glanding termination etc.
Loop checking of all turbine related instruments
Involved in Loop checking, commissioning and sequence test of BFP instruments.
Loop checking, commissioning and sequence test of ID FAN, FD FAN .Involved in loop
checking and commissioning of field instruments HART Transmitters, control valve, on- Of
250 MW Thermal Power Plant Project NTPC Unchahar under SigmaConstruction as an
Instrumentation Engineer from July 30 – 2006 to June 25 -2007
Responsibilities:
Monitoring site execution work like instruments installation, JB installation, cable tray
erection cable laying, glanding termination etc.
Loop checking, commissioning of Boiler and Turbine instruments.
Review of P&ID’S, Logics, Specification, Hookup, Cable Schedule, Closed loops .
Involved in Loop checking, commissioning and sequence test of BFP instruments.
Involved in instruments calibration and calibration report preparation.
110 MW Thermal Power Plant Project TATAPower Jamshedpur underSigma Construction
as an Instrumentation Engineer from June 5 – 2003 to May 10 – 2004
Responsibility:
Supervise and carryout site execution work like instruments installation, JB installation,
cable tray erection, cable laying, glanding termination etc.
Involve in loop checking of turbine / boiler instruments.
Loop checking of boiler instruments.
Loop checking of all turbine related instruments.
Involved in instruments calibration and calibration report preparation.
Computer proficiency:
Microsoft’s, Outlook, windows10, XP, 7
Education qualification:
Three years Diploma in Instrumentation and control engineering from UPBTE in 2003.
10th passed in the year of 1998.
Personal detail:
Name : Upendra Prasad
Father’s name : Mahanth Prasad
Date of birth : 1st August, 1980
Sex : Male
Language known : English, Hindi
Marital status : Married
Passport no : N3360160
Date of issue : 18.09.2015
Date of Expiry : 17.09.2025
Place of Issue : Lucknow
Permanent Address: Village- pipara Baghel, Post-laxmipur Babu, Dist- Kushinagar (U.P)
274407
Declaration: I do hereby declare that all the above furnished details are true in best of my
knowledge.
Date Signature

More Related Content

What's hot

Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Jr. Vacaro
 
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION  INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION umesh patel
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years expParthsarathy vijayan
 
Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Apolinario Fontiveros
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.SAJID MALLICK
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORRegu Mkc
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years expParthsarathy vijayan
 
Instrument Technician (1)
Instrument  Technician  (1)Instrument  Technician  (1)
Instrument Technician (1)Amit More
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&INASIM NEZAM
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Rahman
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
Bryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CVBryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CVBryan Cledoro
 

What's hot (20)

Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
SUDHEESH CV .
SUDHEESH CV .SUDHEESH CV .
SUDHEESH CV .
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION  INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
 
Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
New cv rohit
New cv rohitNew cv rohit
New cv rohit
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp
 
asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
Instrument Technician (1)
Instrument  Technician  (1)Instrument  Technician  (1)
Instrument Technician (1)
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Bryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CVBryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CV
 

Similar to Resume-Instrumentation engineer

Similar to Resume-Instrumentation engineer (20)

Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
Fahad CV
Fahad CVFahad CV
Fahad CV
 
Instrumentation Construction Pre- CommnEngineer RESUME
Instrumentation Construction  Pre- CommnEngineer  RESUMEInstrumentation Construction  Pre- CommnEngineer  RESUME
Instrumentation Construction Pre- CommnEngineer RESUME
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 
REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016
 
DIPESH KUMAR
DIPESH KUMARDIPESH KUMAR
DIPESH KUMAR
 
Mario Gali Cv
Mario Gali CvMario Gali Cv
Mario Gali Cv
 
C.v Muhammad Moaviah. M
C.v Muhammad Moaviah. MC.v Muhammad Moaviah. M
C.v Muhammad Moaviah. M
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
Suman Professional
Suman ProfessionalSuman Professional
Suman Professional
 
Resume-Rajib Sharma(L)
Resume-Rajib Sharma(L)Resume-Rajib Sharma(L)
Resume-Rajib Sharma(L)
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
PRATIK PATEL
PRATIK PATELPRATIK PATEL
PRATIK PATEL
 
Resume-Rajib Sharma
Resume-Rajib SharmaResume-Rajib Sharma
Resume-Rajib Sharma
 
Liyong CV
Liyong CVLiyong CV
Liyong CV
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 

Recently uploaded

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

Resume-Instrumentation engineer

  • 1. CURRICULUM VITAE UPENDRA PRASAD Diploma in Instrumentation Cell: +7227040156, 7069773801 E-mail: upendrainst2007@gmail.com Objective: I am looking for a good position in the field of instrumentation in a prestigious company where previous skills and capabilities can be put to efficient use. Experience: Having 12.6 years (10.6 years in India & 2 years in Gulf) relevant experience in site supervision execution, erection, construction, loop checking, pre commissioning, commissioning & trouble shooting. Summaryof Skills: ●Abilitytoreadinstrumentationdrawings,P&ID,Instrumentationlocationdrawing,Cable schedule, interconnection wiringdiagram,Instrumentloopdiagram(ILD),InstrumentsIndex,DataSheets. Cause & effectchart,Processflowdiagram(PFD). ● Knowledge of all instrumentconstructionworkactivity, sitework planning,projectexecution, toolstackle,manpowerhandlinginlarge site. ● Able toleada team of supervisor, foreman, co-ordinateswithclientandprogress meeting. ●Familiarwith differenttypesof Instrument Installation&inspectionof PT,FT,LT, TT, DPT, TE, (EmersonRosemount, ABB, Endress & Hauser, Honeywell,Yokogawaasperdrawing. ●Hand experience tocalibration andconfigurationof differenttype of electronic&pneumatic instruments(PT,FT,TE, TT,LT, Level Troll) withlatestcalibrationequipment. ●Hand Experience inLoopchecking,commissioningof fieldinstruments,PT,FT,,LT,TT,Control valve, withprocessand HART 475, fromfieldtoControl roomas per loopfolder. ●FamiliarwithControl valve stroke checking,calibration&splitrage checking,functionalchecking and trouble shooting, on/off valvechecking withinterlock andlimitswitchsetting. ● Knowledge of workingof fire andgassystem, F&G instruments(Gasdetector,manual call point, and smoke detector,heatdetector,delugesystem installationandtesting. ●Good knowledgeof workingprinciple,installation,commissioning,FFInstruments,Smart Transmitters,calibrationandtrouble shooting. ●Knowledgeof Hazardousarea,zone,gasgroup andprotectiontype.Intrinsicsafetyprincipal and Intrinsicsafe equipment. ● FamiliarwithDCS,PLC,PID control,Cascade control,splitrange,ESD system. Career Profile: SINCLUS ENGINEERING AND CONSULTANCY Since: June 25-2016 to till date SMART AUTOMATION Since: March 2-2015 to February 19-2016. K C C ENGINEERING & CONSTRUCTION (KUWAIT) Since: November 5-2014 to January 20 – 2015 DODSAL ENGINEERING & CONSTRUCTION PTE LIMITED ABU DHABI (UAE)
  • 2. Since: October 10 - 2012 to March15- 2014 L&T CONSTRUCTION (POWER TRANSMISSION & DISTRIBUTION) Since: September 28 - 2007 to September 28 - 2012 SIGMA CONSTRUCTION KOLKATA Since: June 5 - 2003 to September 24 – 2007 Projects: Working in RIL Refinery J3 Project (PCG DTA) Jamnagar, under Sinclus Engineering and Consultancy as an Instrumentation Engineerfrom Jan- 2017 to TILL date. Responsibilities: Working for execution of PSA & CO Shift unit all instrumentation site construction works. JB installation, cable tray erection, stanchion erection, panel erection, analyzer work. Field Instruments Installation as per location & with P&ID diagram. Responsible for main cable & branch cable laying, dressing, tagging, glanding, termination. Instruments Impulse piping, Process tubing & control valve tubing as per hookup. Monitoring Instrument Impulse piping & tubing hydro testing. Responsible for Punch point closing and ITP signing by client. Monitoring field Instrument dry loop checking & trouble shooting. Material co-ordination, man power planning, daily progress monitoring. Worked in RIL Refinery J3 Project (SEZ & PX 4) Jamnagar, under Sinclus Engineering and Consultancy as an Instrumentation Engineerfrom June 25 – 2016 to Dec 30 - 2016. Responsibilities: Successfully completed Impulse piping & tubing hydro testing of aromatics unit. Responsible for valve pneumatic tubing & leak testing. Field Instruments Installation as per location & with P&ID diagram. Responsibility of Punch point closing and ITP signing by client. Cable tray erection, JB installation, Air manifold erection in SEZ. Package Panel erection in control room as per equipment lay out drawing. Worked in RIL CBM Project Shahdol underSmart Automation as Instrumentation Engineer. From March 2- 2015 to February 19 - 2016 Responsibilities: Responsible for execution of GDU Unit all instrumentation site construction works. Instrument JB installation and Instrument stanchion installation as per location drawing. Responsible for Field Instruments Installation (PT, FT, LT, TT, RTD, THERMOCOUPLE) as per P&ID & Location drawing. Responsible for Instrument cable pulling, Testing & G/T as per cable list & JB wiring diagram. Supervision of Instrument Impulse Tubing as per hook up. Instrument air tubing of control valve, Shutdown valve. Responsible for Fire & Gas detector system instruments installation as per drawing.
  • 3. Calibration and stroke checking of control valves. Interlock checking. Loop checking of field instruments with HART 375. Field calibration and configuration of level transmitter DP and Radar, ultrasonic type. HCR Unit Instrumentation Shutdown work of KNPC underKCC as an Instrument Supervisor from November 5 – 2014 to January 20 – 2015 Responsibilities: Responsible for Field Instruments Installation (PT, FT, LT, TT, RTD, THERMOCOUPLE) as per P&ID & Location drawing. Monitoring secondary Instrument cable pulling as per JB wiring diagram & Cable list. Supervision of Instrument Impulse Tubing of PT, FT, instrument air tubing of control valve, Shutdown valve as per Hookup diagram. Sequence checking and interlock checking of pump. Loop checking and commissioning of gas compressor instruments. Prepare RFI for Inspection and co-ordination with QC people for any comments. Shah Gas Development (SGD) Project Abu Dhabi of Al Hosan Gas under Dodsal Engineering & Construction Limited as a Sr. Instrumentation Engineer from October 10 - 2012 to March 15 – 2014 Responsibilities: Leading a team for Execution of SRU Unit Instruments Field Cable tray erection, JB installation, stanchion erection, Conduit laying. Instrument cable laying & Glanding Termination as per Cable list and JB wiring details. Control room Panel frame erection & DCS Panel installation as per lay out drawing. Installation of Field Instruments (PT, FT, LT, TT, TE) fire and gas (Manual call point, Horn Beacon Gas detector) system. Responsible for Field Instruments Loop checking, interlock checking & Trouble shooting. Assign job for the sub-contractor. Monitor / Control the activities of the sub-contractor and ensure timely completion of the project. Completed Impulse tubing of field Instruments and control valve tubing as per Hookup drawing. Co-ordination for loop checking of field instruments and package. (PT, FT, LT, TT, CV, SDV) with HART 375 Transmitters, Responsibility for Instrument Punch point closing. With Consultants & Client. Prepare TQ for any modification & completed job as per Site instruction. Co-ordination for all instrumentation work, material, manpower planning. Handle progress review Meeting client meeting. Follow up with client and vendors. Prepare RFI for inspection & Co-ordination with QC People for any comments FCC Unit (RR Package ) of IOCL Paradip under Larsen and Toubro Limited (L & T) as an Instrumentation Engineer from July 8 - 2010 to September 28 – 2012
  • 4. Responsibilities: Field JB installation, cable tray erection, stanchion installation. Installation of field Instruments of pre heater, reactor and regenerator as per ILP drawing &P&ID. Responsible for Impulse Piping of field Instruments as per Hook up drawing. Involved in instruments calibration and calibration report preparation. Instrument cable laying & Glanding Termination as per Cable list and JB wiring details Associated with field Instruments loop checking from field to DCS & Trouble shooting. Ensures proper documentation of files, records, databases, and drawings to meet regulatory and project requirements, and maintains current requirements as to equipment/materials specifications and vendor preferences. GGS – 2 Project Rudrasagar Of ONGC Assam under Larsen and ToubroLimited (L & T) as an Instrumentation Engineer from May 2 – 2009 to July 6 – 2010 Responsibilities: Supervise and carryout site execution JB installation, cable tray erection, cable laying. Field Instruments (PT/FT, LT, TT, TE ) Installation as per location &P&ID diagram. Responsible for Instruments Impulse piping & control valve tubing as per Hookup. Associated with Field Instrument Calibration & Report Preparation. Installation F&G detector systemas per drawing. Configuration and calibration of level transmitter of vessel. Loop checking and commissioning of separator and manifold area instruments. Involve in Sequence Checking/Interlock checking of Bath Heater & Separator. Pre-commissioning & Commissioning of all field instruments & fire water system. Pre-commissioning of Package Instruments Bath heater, Heater, Air compressor. Baramura GGS Project of ONGC Tripura under Larsen and ToubroLimited (L & T) as an Instrumentation Engineer from September 2007 to April 30 – 2009 Responsibilities: Carryout site execution field instruments, JB installation, cable tray erection. Field Instruments Installation as per location &P&ID diagram Responsible for Instruments Impulse piping & control valve tubing as per hookup. Installation of Telecom system & Gas detector system as per drawing. Installation and loop checking of fire and gas detector system. Pre-commissioning of Package Instruments Bath heater, heater, Air compressor, Flame front generator. Fire water system. Involve in field instrument Commissioning & Trouble shooting. Responsible for BMS systemInstrument Installation, Loop checking & commissioning. 250 MW Thermal Power Plant Project MSEB Paras Of under Sigma Construction as an Instrumentation Engineer from February 1 – 2007 to September 24 – 2007
  • 5. Responsibilities: Supervise and carryout site execution work like instruments installation, JB installation, cable tray erection, cable laying, glanding termination etc. Loop checking of all turbine related instruments Involved in Loop checking, commissioning and sequence test of BFP instruments. Loop checking, commissioning and sequence test of ID FAN, FD FAN .Involved in loop checking and commissioning of field instruments HART Transmitters, control valve, on- Of 250 MW Thermal Power Plant Project NTPC Unchahar under SigmaConstruction as an Instrumentation Engineer from July 30 – 2006 to June 25 -2007 Responsibilities: Monitoring site execution work like instruments installation, JB installation, cable tray erection cable laying, glanding termination etc. Loop checking, commissioning of Boiler and Turbine instruments. Review of P&ID’S, Logics, Specification, Hookup, Cable Schedule, Closed loops . Involved in Loop checking, commissioning and sequence test of BFP instruments. Involved in instruments calibration and calibration report preparation. 110 MW Thermal Power Plant Project TATAPower Jamshedpur underSigma Construction as an Instrumentation Engineer from June 5 – 2003 to May 10 – 2004 Responsibility: Supervise and carryout site execution work like instruments installation, JB installation, cable tray erection, cable laying, glanding termination etc. Involve in loop checking of turbine / boiler instruments. Loop checking of boiler instruments. Loop checking of all turbine related instruments. Involved in instruments calibration and calibration report preparation. Computer proficiency: Microsoft’s, Outlook, windows10, XP, 7 Education qualification: Three years Diploma in Instrumentation and control engineering from UPBTE in 2003. 10th passed in the year of 1998. Personal detail: Name : Upendra Prasad Father’s name : Mahanth Prasad Date of birth : 1st August, 1980 Sex : Male Language known : English, Hindi Marital status : Married Passport no : N3360160 Date of issue : 18.09.2015 Date of Expiry : 17.09.2025
  • 6. Place of Issue : Lucknow Permanent Address: Village- pipara Baghel, Post-laxmipur Babu, Dist- Kushinagar (U.P) 274407 Declaration: I do hereby declare that all the above furnished details are true in best of my knowledge. Date Signature