SCHOOL OF ARCHITECTURE · BUILDING · DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
PROFESSIONAL PRACTICE [QSB60904]
1. This assignment shall make up 15% weightage of the final marks.
2. This is a individual/group assignment in groups of 3 students.
3. Each group shall conduct a 15 minutes presentation on the required topic, followed by
discussion on the questions given. Assessment shall be made based on the attached
rubric, both for group and individual performance.
Coursework No. 1 – Seminar Presentation of Lecture Topics and Discussion.
P1. Construction Disputes with Interim Certificates.
Q1. Discuss the remedies available to the Contractor if the Employer has failed to pay the
Contractor for three interim certificates issued by the Architect.
Q2. Under Clause 30.1, the Architect is required to issue the Interim Certificate within 21 Days
from receipt of Contractor’s application. The Employer shall pay the amount certified within
the Period of Honouring Certificates. Discuss the activities that are required by the various
consultants from the Contractor’s application to the receipt of payment.
Q3. Contractor has submitted in their interim payment application a claim for material on site
for cement, bricks and plywood (for formwork use). As the Consultant QS, would you
certify these materials?
P2. Delays and Disputes.
Q1. As a Consultant assessing an extension of time application by the Contractor, what are the
i nitial checklist and the principles to be applied?
Q2. What are the purpose of an extension of time clause in most standard contract and its
implications? What is the implications of a Certificate of Non-Completion? What is the
difference between general damages and liquidated damages?
Q3. What are concurrent delays? Is the Contractor entitle to extension of time and loss and
expense if there are concurrent delays by Employer and Contractor?
P3. Construction Claims.
Q1. Under what circumstance is the Contractor entitled to both extension of time and loss and
expense? Please give examples.
Q2. When does a claim for damages arise? Are loss and expense approved and certified
subject to retention fund in the interim certificates? Please explain.
Q3. Can a Contractor claim for loss and expense if he does not give notice of his intention to
claim? Explain also why notice must be given.
1
P4. Partial Possession by Employer.
Q1. Explain the differences between Sectional Completion and Partial Possession in PAM
2006.
Q2. Under what circumstance can the Employer take partial possession of the site? Please
explain for both partial possession with and without consent from the Contractor.
Q3. Explain the contractual implications of partial possession and the items not affected by it.
P5. Rights of Setting Off by Employer.
Q1. Can the Employer set-off payments unilaterally for defects not repaired by the Contractor?
If the Contractor installed a window that is not in compliance with the contract
specifications, what are the remedies available to the Employer? Please support with the
relevant clauses.
Q2. What are the remedies available to the Contractor if he is dissatisfied with the Adjudicator’s
decision on a set-off dispute? What are the conditions that tigger a set-off actions by the
Employer?
Q3. Why are set-off and Liquidated Damages taken up by the Employer separately and is not
stated in Interim Certificate? Can the Employer refer a set-off dispute to arbitration during
the construction period?
P6. Practical Completion and Penultimate Certificate.
Q1. Discuss the implications of Penultimate Certificate and Final Certificate.
Q2. Explain Clause 30.16 as to the conclusiveness of the Final Certificate. If latent defects are
found after the issuance of the Final Certificate, discuss the rights of the Employer.
Q3. Architect issued oral instruction to Contractor on site to change the window size. Discuss
the validity of his instruction and actions to be taken by the Contractor.
P7. Final Accounts.
Q1. Questions shall be posted separately.
P8. Determination of Contractor’s Employment by Employer.
Q1. Discuss the situations where Employer can determine the Contractor’s Employment
provided for in PAM 2006.
Q2. What must the Employer check before determining the Contractor’s Employment? What
can happen if the Employer had failed to pay the sum due on Interim Certificate at the time
of determination?
Q3. Discuss the essential contents required in the Notice of Default and Notice of
Determination.
2
P9. Determination of Own Employment by Contractor.
Q1. If the project is suspended by the Employer for more than 3 months due to design change,
what are the remedies available to the Contractor. Discuss the conditions whereby the
Contractor is entitled to determine his Own Employment.
Q2. Discuss the checklist before the Contractor determine his own employment. What is the
procedure required under PAM 2006 for determination of Contractor’s Own Employment?
Q3. What happen if the Architect resigns from he project and there is no replacement for 4
months?
3
RUBRIC&ASSESSMENT&FOR&GROUP&PRESENTATION
GROUP&REFERENCE
GROUP&MEMBER
ID&NO.
MARKS
Mark%allocated%for%this%assessment 50
%%to%be%C/F%to%final%assessment 15
Student's%mark%for%this%assessment
Students'%%%to%be%C/F%to%final%assessment
NO TRAIT Excellent Very+Good Good Pass Marginal+Pass/+Fail
100+9+80 79+9+75 74+9+65 64+9+50 49+9+0
1) Content
Did+the+presentation+have+
valuable+material?
Weightage:%10
Students'%Mark:
2) Teamwork
Did+everyone+contribute+to+the+
presentation?
Did+everyone+seem+well+versed+in+
the+material?
Weightage:%10
Students'%Mark:
3) Organisation/&Planning
Was+the+presentation+well+
organised+and+easy+to+follow?
Weightage:%10
Students'%Mark:
4) Presentation&Skills
Did+the+presenters+give+good+
impression,+speak+clearly+and+
engage+with+audience?
Weightage:%10
Students'%Mark:
5) Question&and&Answer
Did+the+presenters+handle+the+Q&A+
session+well?
Weightage:%10
Students'%Mark:
COMMENT:
Excellent%answer%with%precise%
theories,%explaination%and%example.
Good%answer%with%relevant%theories%
and%example.
Able%to%answer%the%question%with%
basic%theories%and%example.
Able%to%provide%answer%but%without%
support%of%theory%and%concept.
Unable%to%provide%answer%or%answer%
is%incorrect.
Presenters%were%all%very%
confident%in%delivery%and%they%
did%an%excellent%job%of%engaging%
the%class.%Preparation%is%very%
evident.
Presenters%were%generally%
confident%in%their%presentation%
and%demonstrated%some%skills%in%
engaging%audience.
Presenters%were%occasionally%
confident%with%their%
presentation.%However%the%
presentation%was%not%as%
engaging%as%it%could%hve%been%for%
the%class.
Presenters%were%not%consistent%
with%the%level%of%confidence/%
preparedness.%Low%skill%in%
engaging%audience.
Presenters%were%unconfident%and%
demonstrate%no%or%little%evidence%
of%planning%prior%to%presentation.
The%teammates%always%worked%
from%others'%ideas.%It%was%evident%
that%all%of%the%group%members%
contributed%equally%to%the%
presentation.
The%teammates%worked%from%
others'%ideas%most%of%the%time%
and%it%seems%like%everyone%did%
some%work%and%tried%to%
contribute%to%the%presentation.
The%teammates%worked%from%
others'%ideas%most%of%the%time%
and%it%seems%like%everyone%did%
some%work%but%only%part%of%the%
team%members%carry%out%the%
presentation.
The%teammates%sometimes%
worked%from%others'%ideas.%
However%it%seems%as%though%
certain%people%did%not%do%as%
much%as%others.
The%teammates%never%worked%
from%others'%ideas.%It%seems%as%
though%only%a%few%people%
worked%on%the%presentation.
The%presentation%was%well%
organised,%well%prepared%and%
easy%to%follow.%
The%presentation%had%organising%
ideas%and%easy%to%follow.
The%presentation%had%organising%
ideas%but%could%have%been%much%
stronger%with%better%preparation.
There%were%minimal%signs%of%
organisation%or%preparation.
The%presentation%lacked%of%
organisation%and%had%little%
evidence%of%preparation.
CRITERIA
Presentation%had%an%exceptional%
amount%of%valuable%material%and%
was%extremely%beneficial%to%the%
class.
Presentation%had%a%high%amount%
of%valuable%material%and%was%
higly%beneficial%to%the%class.
Presentation%had%a%good%amount%
of%material%and%benefited%the%
class.
Presentation%had%some%valuable%
material%but%still%lacking%as%a%
whole.
Presentation%contained%no%or%
minimum%material.
MODULE QSB%3614%Professional%Practice%2
DATE
ASSESSMENT&DESCRIPTION Tutorial%Seminar%Presentation
STUDENT'S&NAME
1)
2)
3)
4)
5)
6)

More Related Content

What's hot

PP2 - Assignment
PP2 - AssignmentPP2 - Assignment
PP2 - AssignmentQuo Ming
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2Shze Hwa Lee
 
Professional Practice II
Professional Practice IIProfessional Practice II
Professional Practice IIseenyeeyong
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementationTeo Kean Hui
 
PP1 Project 3 Cover letter
PP1 Project 3 Cover letterPP1 Project 3 Cover letter
PP1 Project 3 Cover letterTeo Kean Hui
 
PP1 Project 2 Project Report
PP1 Project 2 Project ReportPP1 Project 2 Project Report
PP1 Project 2 Project ReportTeo Kean Hui
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignmentfareezsham
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportArissa Loh
 
Pp2 coursework 2 BRIEF 201708
Pp2 coursework 2  BRIEF  201708Pp2 coursework 2  BRIEF  201708
Pp2 coursework 2 BRIEF 201708Pang Khai Shuen
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSLenson Mhango
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808ashleyyeap
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeepSandeep Yadav
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2tfkc1212
 
DEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESDEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESShivam Sood
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentationJeff B
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2ahmong4
 
Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Kai Yun Pang
 

What's hot (20)

PP2 - Assignment
PP2 - AssignmentPP2 - Assignment
PP2 - Assignment
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Professional Practice II
Professional Practice IIProfessional Practice II
Professional Practice II
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 
PP1 Project 3 Cover letter
PP1 Project 3 Cover letterPP1 Project 3 Cover letter
PP1 Project 3 Cover letter
 
PP1 Project 2 Project Report
PP1 Project 2 Project ReportPP1 Project 2 Project Report
PP1 Project 2 Project Report
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignment
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 
Pp2 coursework 2 BRIEF 201708
Pp2 coursework 2  BRIEF  201708Pp2 coursework 2  BRIEF  201708
Pp2 coursework 2 BRIEF 201708
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
Pp2 p5
Pp2   p5Pp2   p5
Pp2 p5
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2
 
Site Possession
Site PossessionSite Possession
Site Possession
 
DEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESDEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSES
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)
 

Similar to Seminar - Question

Lecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-byLecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-byseenyeeyong
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006Melvin Lim
 
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTProfessional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTYee Len Wan
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7Farah Sham
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerTrace96
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industryKheng Hoe Advocates
 
Law relating-to-payment
Law relating-to-paymentLaw relating-to-payment
Law relating-to-paymentArthur Wilson
 
Pp2 coursework 1 p10
Pp2 coursework 1 p10 Pp2 coursework 1 p10
Pp2 coursework 1 p10 Farah Sham
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014SHKLaw
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011Maatla Moadi
 
Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)Tee Joanne
 
Professional Practice II (Group Assignment)
Professional Practice II (Group Assignment)Professional Practice II (Group Assignment)
Professional Practice II (Group Assignment)Yee Len Wan
 
Techno Engineering & Associates
Techno Engineering & AssociatesTechno Engineering & Associates
Techno Engineering & AssociatesCerasela Angelescu
 

Similar to Seminar - Question (20)

Lecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-byLecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-by
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
 
Pp2 chapter 1 cheeyong & yih shyang
Pp2 chapter 1 cheeyong & yih shyangPp2 chapter 1 cheeyong & yih shyang
Pp2 chapter 1 cheeyong & yih shyang
 
Pp2 p7
Pp2   p7Pp2   p7
Pp2 p7
 
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTProfessional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOT
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7
 
Cl presentation
Cl presentationCl presentation
Cl presentation
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by Employer
 
Seminar
SeminarSeminar
Seminar
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
 
Law relating-to-payment
Law relating-to-paymentLaw relating-to-payment
Law relating-to-payment
 
Cl compilation
Cl compilationCl compilation
Cl compilation
 
Pp2 coursework 1 p10
Pp2 coursework 1 p10 Pp2 coursework 1 p10
Pp2 coursework 1 p10
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
 
Cl report final
Cl report finalCl report final
Cl report final
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
 
Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)
 
Professional Practice II (Group Assignment)
Professional Practice II (Group Assignment)Professional Practice II (Group Assignment)
Professional Practice II (Group Assignment)
 
NEC3 programme
NEC3 programmeNEC3 programme
NEC3 programme
 
Techno Engineering & Associates
Techno Engineering & AssociatesTechno Engineering & Associates
Techno Engineering & Associates
 

More from Kai Yun Pang

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiKai Yun Pang
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - ReportKai Yun Pang
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump StationKai Yun Pang
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectKai Yun Pang
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial AppraisalKai Yun Pang
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal Kai Yun Pang
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC ContractKai Yun Pang
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012Kai Yun Pang
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Kai Yun Pang
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S HotelKai Yun Pang
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study ReportKai Yun Pang
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - JournalKai Yun Pang
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service Kai Yun Pang
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerKai Yun Pang
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK LandKai Yun Pang
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial AnalysisKai Yun Pang
 
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)Kai Yun Pang
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
Assignment - Cost Plan
Assignment - Cost PlanAssignment - Cost Plan
Assignment - Cost PlanKai Yun Pang
 

More from Kai Yun Pang (20)

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - Report
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump Station
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft Project
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S Hotel
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study Report
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - Journal
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK Land
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
Assignment - Cost Plan
Assignment - Cost PlanAssignment - Cost Plan
Assignment - Cost Plan
 

Recently uploaded

How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 

Recently uploaded (20)

How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 

Seminar - Question

  • 1. SCHOOL OF ARCHITECTURE · BUILDING · DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) PROFESSIONAL PRACTICE [QSB60904] 1. This assignment shall make up 15% weightage of the final marks. 2. This is a individual/group assignment in groups of 3 students. 3. Each group shall conduct a 15 minutes presentation on the required topic, followed by discussion on the questions given. Assessment shall be made based on the attached rubric, both for group and individual performance. Coursework No. 1 – Seminar Presentation of Lecture Topics and Discussion. P1. Construction Disputes with Interim Certificates. Q1. Discuss the remedies available to the Contractor if the Employer has failed to pay the Contractor for three interim certificates issued by the Architect. Q2. Under Clause 30.1, the Architect is required to issue the Interim Certificate within 21 Days from receipt of Contractor’s application. The Employer shall pay the amount certified within the Period of Honouring Certificates. Discuss the activities that are required by the various consultants from the Contractor’s application to the receipt of payment. Q3. Contractor has submitted in their interim payment application a claim for material on site for cement, bricks and plywood (for formwork use). As the Consultant QS, would you certify these materials? P2. Delays and Disputes. Q1. As a Consultant assessing an extension of time application by the Contractor, what are the i nitial checklist and the principles to be applied? Q2. What are the purpose of an extension of time clause in most standard contract and its implications? What is the implications of a Certificate of Non-Completion? What is the difference between general damages and liquidated damages? Q3. What are concurrent delays? Is the Contractor entitle to extension of time and loss and expense if there are concurrent delays by Employer and Contractor? P3. Construction Claims. Q1. Under what circumstance is the Contractor entitled to both extension of time and loss and expense? Please give examples. Q2. When does a claim for damages arise? Are loss and expense approved and certified subject to retention fund in the interim certificates? Please explain. Q3. Can a Contractor claim for loss and expense if he does not give notice of his intention to claim? Explain also why notice must be given. 1
  • 2. P4. Partial Possession by Employer. Q1. Explain the differences between Sectional Completion and Partial Possession in PAM 2006. Q2. Under what circumstance can the Employer take partial possession of the site? Please explain for both partial possession with and without consent from the Contractor. Q3. Explain the contractual implications of partial possession and the items not affected by it. P5. Rights of Setting Off by Employer. Q1. Can the Employer set-off payments unilaterally for defects not repaired by the Contractor? If the Contractor installed a window that is not in compliance with the contract specifications, what are the remedies available to the Employer? Please support with the relevant clauses. Q2. What are the remedies available to the Contractor if he is dissatisfied with the Adjudicator’s decision on a set-off dispute? What are the conditions that tigger a set-off actions by the Employer? Q3. Why are set-off and Liquidated Damages taken up by the Employer separately and is not stated in Interim Certificate? Can the Employer refer a set-off dispute to arbitration during the construction period? P6. Practical Completion and Penultimate Certificate. Q1. Discuss the implications of Penultimate Certificate and Final Certificate. Q2. Explain Clause 30.16 as to the conclusiveness of the Final Certificate. If latent defects are found after the issuance of the Final Certificate, discuss the rights of the Employer. Q3. Architect issued oral instruction to Contractor on site to change the window size. Discuss the validity of his instruction and actions to be taken by the Contractor. P7. Final Accounts. Q1. Questions shall be posted separately. P8. Determination of Contractor’s Employment by Employer. Q1. Discuss the situations where Employer can determine the Contractor’s Employment provided for in PAM 2006. Q2. What must the Employer check before determining the Contractor’s Employment? What can happen if the Employer had failed to pay the sum due on Interim Certificate at the time of determination? Q3. Discuss the essential contents required in the Notice of Default and Notice of Determination. 2
  • 3. P9. Determination of Own Employment by Contractor. Q1. If the project is suspended by the Employer for more than 3 months due to design change, what are the remedies available to the Contractor. Discuss the conditions whereby the Contractor is entitled to determine his Own Employment. Q2. Discuss the checklist before the Contractor determine his own employment. What is the procedure required under PAM 2006 for determination of Contractor’s Own Employment? Q3. What happen if the Architect resigns from he project and there is no replacement for 4 months? 3 RUBRIC&ASSESSMENT&FOR&GROUP&PRESENTATION GROUP&REFERENCE GROUP&MEMBER ID&NO. MARKS Mark%allocated%for%this%assessment 50 %%to%be%C/F%to%final%assessment 15 Student's%mark%for%this%assessment Students'%%%to%be%C/F%to%final%assessment NO TRAIT Excellent Very+Good Good Pass Marginal+Pass/+Fail 100+9+80 79+9+75 74+9+65 64+9+50 49+9+0 1) Content Did+the+presentation+have+ valuable+material? Weightage:%10 Students'%Mark: 2) Teamwork Did+everyone+contribute+to+the+ presentation? Did+everyone+seem+well+versed+in+ the+material? Weightage:%10 Students'%Mark: 3) Organisation/&Planning Was+the+presentation+well+ organised+and+easy+to+follow? Weightage:%10 Students'%Mark: 4) Presentation&Skills Did+the+presenters+give+good+ impression,+speak+clearly+and+ engage+with+audience? Weightage:%10 Students'%Mark: 5) Question&and&Answer Did+the+presenters+handle+the+Q&A+ session+well? Weightage:%10 Students'%Mark: COMMENT: Excellent%answer%with%precise% theories,%explaination%and%example. Good%answer%with%relevant%theories% and%example. Able%to%answer%the%question%with% basic%theories%and%example. Able%to%provide%answer%but%without% support%of%theory%and%concept. Unable%to%provide%answer%or%answer% is%incorrect. Presenters%were%all%very% confident%in%delivery%and%they% did%an%excellent%job%of%engaging% the%class.%Preparation%is%very% evident. Presenters%were%generally% confident%in%their%presentation% and%demonstrated%some%skills%in% engaging%audience. Presenters%were%occasionally% confident%with%their% presentation.%However%the% presentation%was%not%as% engaging%as%it%could%hve%been%for% the%class. Presenters%were%not%consistent% with%the%level%of%confidence/% preparedness.%Low%skill%in% engaging%audience. Presenters%were%unconfident%and% demonstrate%no%or%little%evidence% of%planning%prior%to%presentation. The%teammates%always%worked% from%others'%ideas.%It%was%evident% that%all%of%the%group%members% contributed%equally%to%the% presentation. The%teammates%worked%from% others'%ideas%most%of%the%time% and%it%seems%like%everyone%did% some%work%and%tried%to% contribute%to%the%presentation. The%teammates%worked%from% others'%ideas%most%of%the%time% and%it%seems%like%everyone%did% some%work%but%only%part%of%the% team%members%carry%out%the% presentation. The%teammates%sometimes% worked%from%others'%ideas.% However%it%seems%as%though% certain%people%did%not%do%as% much%as%others. The%teammates%never%worked% from%others'%ideas.%It%seems%as% though%only%a%few%people% worked%on%the%presentation. The%presentation%was%well% organised,%well%prepared%and% easy%to%follow.% The%presentation%had%organising% ideas%and%easy%to%follow. The%presentation%had%organising% ideas%but%could%have%been%much% stronger%with%better%preparation. There%were%minimal%signs%of% organisation%or%preparation. The%presentation%lacked%of% organisation%and%had%little% evidence%of%preparation. CRITERIA Presentation%had%an%exceptional% amount%of%valuable%material%and% was%extremely%beneficial%to%the% class. Presentation%had%a%high%amount% of%valuable%material%and%was% higly%beneficial%to%the%class. Presentation%had%a%good%amount% of%material%and%benefited%the% class. Presentation%had%some%valuable% material%but%still%lacking%as%a% whole. Presentation%contained%no%or% minimum%material. MODULE QSB%3614%Professional%Practice%2 DATE ASSESSMENT&DESCRIPTION Tutorial%Seminar%Presentation STUDENT'S&NAME 1) 2) 3) 4) 5) 6)