Law Relating to
Payment
Lim Chern Yie
Liew Yong Sheng
Overview of Chapter
 1. Introduction
2. Nature of Certificate
3. Certification Process
4. Operation of Interim Certificate
5. Operation of Final Certificate
6. Certifier’s Position
7. Challenge the Certificate
Introduction
 Small contracts are normally paid in a single sum on completion
of the works which is known as an entire contract
 Bigger and complex contract, the common practice of payment is
through interim payments according to progressively valuation of
work completed or stage payment where payments are made at
pre-determined stage of the progress of work.
 In Hoenig v Isaacs (1952), Lord Denning stated the following
position, 'Where a contract provides for a specified sum to be
paid on completion of specified work, the Courts lean against a
construction of contract which would deprive the contractor of any
payment at all simply because there are some defects or
omission'.
Nature of Certificate
 Issued on a regular period, usually monthly
 At the interim stage, it cannot always be a wholly exact
exercise. It must be include an element of assessment and
judgment.
 Secretary of State for Transport v Brise-Farr Joint Venture
(1993)
 Generally, acceptable that the amount certified in an
interim certificate is to treat them as estimates of the value
of the work done up to the date shown on the certificate.
 Beaufort Developments v Gilbert-Ash (1999)
Certification Process
 PAM 2006 Clause 30.1 requires Contractor to submit a payment application
at the Interim Claim Interval ....complete details and particulars as required
by the Architect.
 Under the same clause, the submission of a payment statement is a
condition precedent to the issue of the certificate by the architect.
 Therefore if the contractor does not submit his payment application, the
architect is not obliged to issue any payment certificate and it is deemed that
the contractor has waived his right to that particular payment certificate.
 The effect of this is that the contractor may still retain his common law right
to payment for work done and contractually he is not entitled to that
particular payment.
 Tuck Sin Engineering & Construction Sdn Bhd v Yee Heng Manufacturing
(M) Sdn Bhd (2007).
 Some contracts provide a minimum value of works
completed before the certifier is obliged to issue the first
Interim Certificate, e.g. JKR Design and Build form. The
intention of such a requirement is to encourage contractor
to mobilize and commence work expeditiously.
 After receiving the payment application, the Quantity
Surveyor will carry out the valuation of works and materials
delivered to site jointly with the contractor's representative.
 When the valuation is completed, the quantity surveyor will
issue a recommendation to the Architect for the sum to be
certified. Architect will then decide to follow the
recommendation or to depart if he wants to adjust for
defects or incomplete work.
Operation of Interim
Certificate
 Legally, a properly issued interim certificate creates a debt
which is enforceable like any other debt. A contractor can
seek summary judgment for the amount certified subject to
the employer's right of set-off.
 Most construction contract provides that contractor's
entitlement to payment is conditioned on the issuance of a
condition precedent and the employer cannot refuse to pay
an interim certificate of payment nor seek to reduce the
amount to be paid by way of set-off not provided for in the
contract. This is to protect the right to receive interim
payments from allegation of defects and cross-claim by the
employer.
 In the case of Mae Engineering Ltd v Dragages Singapore Pte Ltd
(2002), it was held that the presentation of an interim certificate
crystallized an employer's obligation to pay and the employer cannot
allege rights of set-offs for purpose of varying this contractual
obligations.
 The above decision is in line with Supreme Court's decision in
Pembenaan Leow Tuck Chui & Sons SdnBhd v Dr Leela's Medical
Centre Sdn Bhd (1995) where it is held that:
 the employer was obliged to honour the certified sum in the
interim certificate despite the employer's cross-claim for
defective work;
 the certificate conferred 'temporary finality' thereon;
 therefore the contractor had a right to immediate payment in full
in the absence of an express contractual provision permitting
any deduction by the employer; and
 notwithstanding the 'temporary finality' of the interim certificates,
the employer's cross- claims against the contractor could still be
litigated or arbitrated even after the payments of the interim
certificates had been made.
Operation of Final
Certificate
“Final certificate shall
state; Final account
less total sum certified
in previous payment
certificate ,whether
paid or unpaid, to the
contractor. The
difference, if any shall
be balance due to
contractor/employer.
Said balance shall be
payable by either
contractor/employer.”
-Paraphrased from
clause 30.15 of PAM
contract
Understanding Final
Certificate
 Certificate is intended to be a final statement that
which certifies the final amount due to the contractor
or vice versa on employer’s side for outstanding
matter under contract.
 Also intended that the work would conform to the
requirement of the contract
In example…
Binding of Certificate
 Clause 30.9 of JCT stipulates that the Final Certificate
shall have effect in any proceedings arising from the
contract as conclusive evidence ... that the particular
quality or standard of materials or goods ... was to the
reasonable satisfaction of the Architect
 PAM Contract clause 30.16 rectifies the issue of
certificate being conclusive stating that it is only
conclusive in its final value of the works.
Retention Money
 Retention money is to allow employer to hold the
money for setting off as express by the contract
(Clause 30.4 and Clause 30.5)
 The intention of the retention money is to act as a
relationship of trust between the employer and
contractor. (Clause 30.6)
 Employer have the fiduciary duty to that the employer
do not use that money. (Lee Kam Chun v Syarikat
Kukuh Maju Sdn Bhd)
Certifier’s Position
 Certifier needs to take account to meet employer’s demand
while at the same time discharge his/her duty impartially
and fairly
 Purpose that the certifier must be fair (Kuala Ibai
Development Sdn Bhd v Kumpulan Perunding) because
“even though he is usually appointed by the employer, the
object of the provisions for temporary finality could be
defeated. It would be no comfort to the contractor that he could
ventilate his dissatisfaction before an arbitrator, with all the
time, trouble and expense that this entails”
Says that one Singapore judge in Aoki Corp v Lippoland
(Singapore) Pte Ltd (1995)
Liability of Employer and
Certifier
 If employer is liable for duty of architect as an agent,
employer is liable under implied obligation to
contractor to ensure the architect exercise his duty
properly as a certifier
 Employer are not liable for default of the architect and
state that it is settled law that an architect has to act
fairly. Contractor may sue architect if he act
negligently in certifying duty. (Hiap Hong & Co Pe Ltd
v Hong Huat Development Co & Pe Ltd 2001)
Challenging the
Certificate
 1. When there is any doubt as to their rights and liabilities
due to ambiguity and uncertainty with respect to the subject
matter being certified. See Token Construction v Charlton
Estates (1973).
 2. Where the certificate has not been issued in accordance
with the terms of contract. See Trade Indemnity Co v
Workington Harbour and Dock Board (1937).
 3. Where a certificate process has been tainted by
elements of fraud, collusion or dishonesty. See Hickman v
Roberts (1913).
 4. Where the certifier has an interest in the matter certified.
See Kimberly v Dick (1871).
 5. Where the employer or his agents prevents the certifier
from issuing a certificate. (Roberts v Bury Commissioners
Remedies of Wrongful
Certification
 Hiap Hong & Co Pte Ltd v Hong Huat Development
Co (Pte) (2001), an architect refused to issue a
certificate with the knowledge of the owner.
The Court of Appeal took the view that the recourse
for the aggrieved contractor is to invoke the arbitration
clause or to proceed to court against the employer
 The Contractor’s contractual remedy in such
situations is by way of reference to arbitration, as
provided for under Clause 34.0 of the PAM 2006
Form.
. Recourse outside the
Terms of Contract
 If the architect’s failure to issue the certificate is due to the
architect’s own incapacity and it’s not due to employer, an
action in arbitration against the employer will only injures
the relationship and goodwill between the employer and
contractor.
 RSP Architect Planners and Engineers v Ocean Front Pte
Ltd (1996) is that an architect in a building contract owes a
duty of care to the contractor not to cause the contractor
economic loss
 Sutcliff v Thackrah (1974) AC 727 deemed that the
Architect is liable in damages if he causes loss to his
Employer by failure to take due care or to exercise
reasonable professional skill in carrying out his duties
Question
 Q1. Can the employer refuse to pay after the certifier
had signed and delivered the interim certificate to the
contractor?
Answer
 Answer: Cannot, this is because employer has to
honour certified amount despite employer’s ‘cross-
claim’ for defective works. Contractor has right to full
payme in absence of provision for deductable and the
certificate conferred 'temporary finality' thereon.
Question
 Q2. What can the contractor do if the employer refuse
to pay?
Answer
 Answer: The contractor can sue the employer to
recover his debt or charge interest until the debt is
settled.
 Contractor can also stop work
 At worst case scenario determine his employment
Question
 When should the architect release the final certificate?
Answer
 1. If there is a penultimate certificate issued under
clause 30.13, then the final certificate shall be issued
within 21 days after the period of honouring certificate
of payment for the penultimate certificate.
 2. If there is no penultimate certificate issued under
clause 30.13, then the final certificate shall be issued
within 28 days after the CMGD has been issued under
clause 15.6
Question
 What are the disputes referable to arbitration?
 34.5a) any matter of whatsoever nature arising or in
connection with the Contract
 34.5b) any matter left by the contract ot the discretion
of the Architect
 34.5c) withholding by the Architect of any certificate to
which the Contractor may be entitled to
 34.5d) the rights and liabilities of the parties under
Clause 25.0, 26.0, 31.0 or 32.0
 Unreasonable withholding of consent or agreement by
the Employer or the Contractor.
Feel free to ask any
questions~!
 Wilson Translator: Please don’t
Appendix
 Token Construction Co Ltd v Charlton Estates Ltd.
In this case, the contractors entered into a contract with the
building owners on a modified prime cost contract for the erection
of four blocks of flats in Regents’ Park Road.
However, the contractor was in delay and the employer deducted
liquidates damages, and refuse to pay the interim certificate
issued by the architect which amounts to £ 16,347. Eventually
the employer contended that the liquidated damage was larger
than the amount in the interim certificate.
Eventually, Lawson J held that: 'If there is a provision in the
contract which on its proper construction entitles a building owner
to deduct damages for delay from amounts shown to be due on
certificates, there is nothing in the authorities which would
preclude such a deduction being made from an interim
certificate'.
 TRADE INDEMNITY CO LTD V WORKINGTON HARBOUR AND
DOCK BOARD (NO 2): HL 1938
The plaintiffs’ action was derived from a bond given by the
defendants guaranteeing a contractor’s performance in building a
dock for the plaintiffs.
The bond provided that a certificate which complied with certain
criteria would prove the amount due. In the action on the bond
the plaintiffs relied upon a certificate which they said complied
with the criteria and was thus conclusive evidence of the
defendants’ liability under the bond.
The action failed because the certificate did not specify a relevant
act or default as required by the bond. The plaintiffs brought a
second action relying, not upon the certificate, but upon the
underlying facts, which they said amounted to breaches of the
contract and thus triggered liability under the bond.
 Hickman & Co. v Roberts (1913) AC 229
The contract provided that the decision of the architect as to
payment due to the contractor was to be final and that payment was
to be made to the contractor on the basis of the architect’s
certificates.
The contractor claimed that he was owed certain sums but the
architect had failed to issue a certificate in his favour.
When challenged by the contractor the architect’s reply was that his
clients, the owners, would not allow it: "in the face of their
instructions to me I cannot issue a certificate whatever my own
private opinion in the matter".
The House of Lords held that he had improperly allowed the owners
to influence him: the owners could not rely on the absence of a
certificate as a reason not to pay the contractor
 Kimberly v Dick (1871)
where the architect who issued the final certificate had
promised the employer that the works would not
exceed a certain figure and allowed this promise to
influence his certification.

More Related Content

What's hot

Eca presentation
Eca presentationEca presentation
Eca presentationwendyteosy
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lee Pei Gie
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A SeminarPang Khai Shuen
 
CL Final Report
CL Final ReportCL Final Report
CL Final ReportMelvin Lim
 
Project management (1)
Project management (1)Project management (1)
Project management (1)aarenneoone
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentHaziq1511
 
Certificates and payments
Certificates and paymentsCertificates and payments
Certificates and paymentsHafizul Mukhlis
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)Hasif Alias
 
Eca presentation
Eca presentationEca presentation
Eca presentationKailyn Lee
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-finalashleyyeap
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 Pang Khai Shuen
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compileTimun Loh
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerTrace96
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slidesahmong4
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA FormKai Yun Pang
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 

What's hot (20)

Eca presentation
Eca presentationEca presentation
Eca presentation
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A Seminar
 
Site possession
Site possessionSite possession
Site possession
 
CL Final Report
CL Final ReportCL Final Report
CL Final Report
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Certificates and payments
Certificates and paymentsCertificates and payments
Certificates and payments
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)
 
Eca presentation
Eca presentationEca presentation
Eca presentation
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
 
ECA presentation
ECA presentationECA presentation
ECA presentation
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by Employer
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 

Similar to Law relating-to-payment

Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Melvin Lim
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation Lin Hui
 
Cl compilation updated
Cl compilation updatedCl compilation updated
Cl compilation updatedYong Sy
 
CL Seminar
CL SeminarCL Seminar
CL Seminarkohwenqi
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014SHKLaw
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfChelDems
 
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...Divyanshu Dayal
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011Maatla Moadi
 
Substitute and vicarious_performance
Substitute and vicarious_performanceSubstitute and vicarious_performance
Substitute and vicarious_performanceHafizul Mukhlis
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industryKheng Hoe Advocates
 
Construction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual ClaimsConstruction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual ClaimsYee Len Wan
 
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTProfessional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTYee Len Wan
 
Techno Engineering & Associates
Techno Engineering & AssociatesTechno Engineering & Associates
Techno Engineering & AssociatesCerasela Angelescu
 
Construction law update august 2015 quarter 2 a
Construction law update august 2015 quarter 2 aConstruction law update august 2015 quarter 2 a
Construction law update august 2015 quarter 2 aColin Tomlinson
 
Commercial and Construction Law Update Q2 2015
Commercial and Construction Law Update Q2 2015Commercial and Construction Law Update Q2 2015
Commercial and Construction Law Update Q2 2015Colin Tomlinson
 
Commericial Management and Construction law update 2015 Q2
Commericial Management and Construction law update 2015 Q2Commericial Management and Construction law update 2015 Q2
Commericial Management and Construction law update 2015 Q2Colin Tomlinson
 

Similar to Law relating-to-payment (20)

Pp2 chapter 1 cheeyong & yih shyang
Pp2 chapter 1 cheeyong & yih shyangPp2 chapter 1 cheeyong & yih shyang
Pp2 chapter 1 cheeyong & yih shyang
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation
 
Cl compilation updated
Cl compilation updatedCl compilation updated
Cl compilation updated
 
Pp2 p5
Pp2   p5Pp2   p5
Pp2 p5
 
CL Seminar
CL SeminarCL Seminar
CL Seminar
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdf
 
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
 
Substitute and vicarious_performance
Substitute and vicarious_performanceSubstitute and vicarious_performance
Substitute and vicarious_performance
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
 
Construction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual ClaimsConstruction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual Claims
 
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTProfessional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOT
 
Techno Engineering & Associates
Techno Engineering & AssociatesTechno Engineering & Associates
Techno Engineering & Associates
 
Formation
FormationFormation
Formation
 
Construction law update august 2015 quarter 2 a
Construction law update august 2015 quarter 2 aConstruction law update august 2015 quarter 2 a
Construction law update august 2015 quarter 2 a
 
Commercial and Construction Law Update Q2 2015
Commercial and Construction Law Update Q2 2015Commercial and Construction Law Update Q2 2015
Commercial and Construction Law Update Q2 2015
 
Commericial Management and Construction law update 2015 Q2
Commericial Management and Construction law update 2015 Q2Commericial Management and Construction law update 2015 Q2
Commericial Management and Construction law update 2015 Q2
 
Seminar
SeminarSeminar
Seminar
 

More from Arthur Wilson

Pm project-control-compiled
Pm project-control-compiledPm project-control-compiled
Pm project-control-compiledArthur Wilson
 
Vm assignment - presentation slide (1)
Vm   assignment - presentation slide (1)Vm   assignment - presentation slide (1)
Vm assignment - presentation slide (1)Arthur Wilson
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)Arthur Wilson
 
De assignment-finalized-28112017
De assignment-finalized-28112017De assignment-finalized-28112017
De assignment-finalized-28112017Arthur Wilson
 
De assignment-finalized-28112017 6
De assignment-finalized-28112017 6De assignment-finalized-28112017 6
De assignment-finalized-28112017 6Arthur Wilson
 
De assignment-finalized-28112017 5
De assignment-finalized-28112017 5De assignment-finalized-28112017 5
De assignment-finalized-28112017 5Arthur Wilson
 
De assignment-finalized-28112017 4
De assignment-finalized-28112017 4De assignment-finalized-28112017 4
De assignment-finalized-28112017 4Arthur Wilson
 
De assignment-finalized-28112017 3
De assignment-finalized-28112017 3De assignment-finalized-28112017 3
De assignment-finalized-28112017 3Arthur Wilson
 
De assignment-finalized-28112017 2
De assignment-finalized-28112017 2De assignment-finalized-28112017 2
De assignment-finalized-28112017 2Arthur Wilson
 
Research proposal draft v3
Research proposal draft v3Research proposal draft v3
Research proposal draft v3Arthur Wilson
 
Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0Arthur Wilson
 
De & be final workshop submission
De & be final workshop submissionDe & be final workshop submission
De & be final workshop submissionArthur Wilson
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysisArthur Wilson
 

More from Arthur Wilson (20)

Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compileddd
 
Activity id
Activity idActivity id
Activity id
 
Pm project-control-compiled
Pm project-control-compiledPm project-control-compiled
Pm project-control-compiled
 
Final 2
Final  2Final  2
Final 2
 
Cl report final
Cl report finalCl report final
Cl report final
 
Vm assignment - presentation slide (1)
Vm   assignment - presentation slide (1)Vm   assignment - presentation slide (1)
Vm assignment - presentation slide (1)
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
 
De assignment-finalized-28112017
De assignment-finalized-28112017De assignment-finalized-28112017
De assignment-finalized-28112017
 
De assignment-finalized-28112017 6
De assignment-finalized-28112017 6De assignment-finalized-28112017 6
De assignment-finalized-28112017 6
 
De assignment-finalized-28112017 5
De assignment-finalized-28112017 5De assignment-finalized-28112017 5
De assignment-finalized-28112017 5
 
De assignment-finalized-28112017 4
De assignment-finalized-28112017 4De assignment-finalized-28112017 4
De assignment-finalized-28112017 4
 
De assignment-finalized-28112017 3
De assignment-finalized-28112017 3De assignment-finalized-28112017 3
De assignment-finalized-28112017 3
 
De assignment-finalized-28112017 2
De assignment-finalized-28112017 2De assignment-finalized-28112017 2
De assignment-finalized-28112017 2
 
Research proposal draft v3
Research proposal draft v3Research proposal draft v3
Research proposal draft v3
 
Chapter 2 draft v1
Chapter 2 draft v1Chapter 2 draft v1
Chapter 2 draft v1
 
Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0
 
De & be final workshop submission
De & be final workshop submissionDe & be final workshop submission
De & be final workshop submission
 
Community service
Community serviceCommunity service
Community service
 
Excavation
ExcavationExcavation
Excavation
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysis
 

Recently uploaded

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 

Recently uploaded (20)

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 

Law relating-to-payment

  • 1. Law Relating to Payment Lim Chern Yie Liew Yong Sheng
  • 2. Overview of Chapter  1. Introduction 2. Nature of Certificate 3. Certification Process 4. Operation of Interim Certificate 5. Operation of Final Certificate 6. Certifier’s Position 7. Challenge the Certificate
  • 3. Introduction  Small contracts are normally paid in a single sum on completion of the works which is known as an entire contract  Bigger and complex contract, the common practice of payment is through interim payments according to progressively valuation of work completed or stage payment where payments are made at pre-determined stage of the progress of work.  In Hoenig v Isaacs (1952), Lord Denning stated the following position, 'Where a contract provides for a specified sum to be paid on completion of specified work, the Courts lean against a construction of contract which would deprive the contractor of any payment at all simply because there are some defects or omission'.
  • 4. Nature of Certificate  Issued on a regular period, usually monthly  At the interim stage, it cannot always be a wholly exact exercise. It must be include an element of assessment and judgment.  Secretary of State for Transport v Brise-Farr Joint Venture (1993)  Generally, acceptable that the amount certified in an interim certificate is to treat them as estimates of the value of the work done up to the date shown on the certificate.  Beaufort Developments v Gilbert-Ash (1999)
  • 5. Certification Process  PAM 2006 Clause 30.1 requires Contractor to submit a payment application at the Interim Claim Interval ....complete details and particulars as required by the Architect.  Under the same clause, the submission of a payment statement is a condition precedent to the issue of the certificate by the architect.  Therefore if the contractor does not submit his payment application, the architect is not obliged to issue any payment certificate and it is deemed that the contractor has waived his right to that particular payment certificate.  The effect of this is that the contractor may still retain his common law right to payment for work done and contractually he is not entitled to that particular payment.  Tuck Sin Engineering & Construction Sdn Bhd v Yee Heng Manufacturing (M) Sdn Bhd (2007).
  • 6.  Some contracts provide a minimum value of works completed before the certifier is obliged to issue the first Interim Certificate, e.g. JKR Design and Build form. The intention of such a requirement is to encourage contractor to mobilize and commence work expeditiously.  After receiving the payment application, the Quantity Surveyor will carry out the valuation of works and materials delivered to site jointly with the contractor's representative.  When the valuation is completed, the quantity surveyor will issue a recommendation to the Architect for the sum to be certified. Architect will then decide to follow the recommendation or to depart if he wants to adjust for defects or incomplete work.
  • 7. Operation of Interim Certificate  Legally, a properly issued interim certificate creates a debt which is enforceable like any other debt. A contractor can seek summary judgment for the amount certified subject to the employer's right of set-off.  Most construction contract provides that contractor's entitlement to payment is conditioned on the issuance of a condition precedent and the employer cannot refuse to pay an interim certificate of payment nor seek to reduce the amount to be paid by way of set-off not provided for in the contract. This is to protect the right to receive interim payments from allegation of defects and cross-claim by the employer.
  • 8.  In the case of Mae Engineering Ltd v Dragages Singapore Pte Ltd (2002), it was held that the presentation of an interim certificate crystallized an employer's obligation to pay and the employer cannot allege rights of set-offs for purpose of varying this contractual obligations.  The above decision is in line with Supreme Court's decision in Pembenaan Leow Tuck Chui & Sons SdnBhd v Dr Leela's Medical Centre Sdn Bhd (1995) where it is held that:  the employer was obliged to honour the certified sum in the interim certificate despite the employer's cross-claim for defective work;  the certificate conferred 'temporary finality' thereon;  therefore the contractor had a right to immediate payment in full in the absence of an express contractual provision permitting any deduction by the employer; and  notwithstanding the 'temporary finality' of the interim certificates, the employer's cross- claims against the contractor could still be litigated or arbitrated even after the payments of the interim certificates had been made.
  • 9. Operation of Final Certificate “Final certificate shall state; Final account less total sum certified in previous payment certificate ,whether paid or unpaid, to the contractor. The difference, if any shall be balance due to contractor/employer. Said balance shall be payable by either contractor/employer.” -Paraphrased from clause 30.15 of PAM contract
  • 10. Understanding Final Certificate  Certificate is intended to be a final statement that which certifies the final amount due to the contractor or vice versa on employer’s side for outstanding matter under contract.  Also intended that the work would conform to the requirement of the contract In example…
  • 11. Binding of Certificate  Clause 30.9 of JCT stipulates that the Final Certificate shall have effect in any proceedings arising from the contract as conclusive evidence ... that the particular quality or standard of materials or goods ... was to the reasonable satisfaction of the Architect  PAM Contract clause 30.16 rectifies the issue of certificate being conclusive stating that it is only conclusive in its final value of the works.
  • 12. Retention Money  Retention money is to allow employer to hold the money for setting off as express by the contract (Clause 30.4 and Clause 30.5)  The intention of the retention money is to act as a relationship of trust between the employer and contractor. (Clause 30.6)  Employer have the fiduciary duty to that the employer do not use that money. (Lee Kam Chun v Syarikat Kukuh Maju Sdn Bhd)
  • 13. Certifier’s Position  Certifier needs to take account to meet employer’s demand while at the same time discharge his/her duty impartially and fairly  Purpose that the certifier must be fair (Kuala Ibai Development Sdn Bhd v Kumpulan Perunding) because “even though he is usually appointed by the employer, the object of the provisions for temporary finality could be defeated. It would be no comfort to the contractor that he could ventilate his dissatisfaction before an arbitrator, with all the time, trouble and expense that this entails” Says that one Singapore judge in Aoki Corp v Lippoland (Singapore) Pte Ltd (1995)
  • 14. Liability of Employer and Certifier  If employer is liable for duty of architect as an agent, employer is liable under implied obligation to contractor to ensure the architect exercise his duty properly as a certifier  Employer are not liable for default of the architect and state that it is settled law that an architect has to act fairly. Contractor may sue architect if he act negligently in certifying duty. (Hiap Hong & Co Pe Ltd v Hong Huat Development Co & Pe Ltd 2001)
  • 15. Challenging the Certificate  1. When there is any doubt as to their rights and liabilities due to ambiguity and uncertainty with respect to the subject matter being certified. See Token Construction v Charlton Estates (1973).  2. Where the certificate has not been issued in accordance with the terms of contract. See Trade Indemnity Co v Workington Harbour and Dock Board (1937).  3. Where a certificate process has been tainted by elements of fraud, collusion or dishonesty. See Hickman v Roberts (1913).  4. Where the certifier has an interest in the matter certified. See Kimberly v Dick (1871).  5. Where the employer or his agents prevents the certifier from issuing a certificate. (Roberts v Bury Commissioners
  • 16. Remedies of Wrongful Certification  Hiap Hong & Co Pte Ltd v Hong Huat Development Co (Pte) (2001), an architect refused to issue a certificate with the knowledge of the owner. The Court of Appeal took the view that the recourse for the aggrieved contractor is to invoke the arbitration clause or to proceed to court against the employer  The Contractor’s contractual remedy in such situations is by way of reference to arbitration, as provided for under Clause 34.0 of the PAM 2006 Form.
  • 17. . Recourse outside the Terms of Contract  If the architect’s failure to issue the certificate is due to the architect’s own incapacity and it’s not due to employer, an action in arbitration against the employer will only injures the relationship and goodwill between the employer and contractor.  RSP Architect Planners and Engineers v Ocean Front Pte Ltd (1996) is that an architect in a building contract owes a duty of care to the contractor not to cause the contractor economic loss  Sutcliff v Thackrah (1974) AC 727 deemed that the Architect is liable in damages if he causes loss to his Employer by failure to take due care or to exercise reasonable professional skill in carrying out his duties
  • 18. Question  Q1. Can the employer refuse to pay after the certifier had signed and delivered the interim certificate to the contractor?
  • 19. Answer  Answer: Cannot, this is because employer has to honour certified amount despite employer’s ‘cross- claim’ for defective works. Contractor has right to full payme in absence of provision for deductable and the certificate conferred 'temporary finality' thereon.
  • 20. Question  Q2. What can the contractor do if the employer refuse to pay?
  • 21. Answer  Answer: The contractor can sue the employer to recover his debt or charge interest until the debt is settled.  Contractor can also stop work  At worst case scenario determine his employment
  • 22. Question  When should the architect release the final certificate?
  • 23. Answer  1. If there is a penultimate certificate issued under clause 30.13, then the final certificate shall be issued within 21 days after the period of honouring certificate of payment for the penultimate certificate.  2. If there is no penultimate certificate issued under clause 30.13, then the final certificate shall be issued within 28 days after the CMGD has been issued under clause 15.6
  • 24. Question  What are the disputes referable to arbitration?
  • 25.  34.5a) any matter of whatsoever nature arising or in connection with the Contract  34.5b) any matter left by the contract ot the discretion of the Architect  34.5c) withholding by the Architect of any certificate to which the Contractor may be entitled to  34.5d) the rights and liabilities of the parties under Clause 25.0, 26.0, 31.0 or 32.0  Unreasonable withholding of consent or agreement by the Employer or the Contractor.
  • 26. Feel free to ask any questions~!  Wilson Translator: Please don’t
  • 27. Appendix  Token Construction Co Ltd v Charlton Estates Ltd. In this case, the contractors entered into a contract with the building owners on a modified prime cost contract for the erection of four blocks of flats in Regents’ Park Road. However, the contractor was in delay and the employer deducted liquidates damages, and refuse to pay the interim certificate issued by the architect which amounts to £ 16,347. Eventually the employer contended that the liquidated damage was larger than the amount in the interim certificate. Eventually, Lawson J held that: 'If there is a provision in the contract which on its proper construction entitles a building owner to deduct damages for delay from amounts shown to be due on certificates, there is nothing in the authorities which would preclude such a deduction being made from an interim certificate'.
  • 28.  TRADE INDEMNITY CO LTD V WORKINGTON HARBOUR AND DOCK BOARD (NO 2): HL 1938 The plaintiffs’ action was derived from a bond given by the defendants guaranteeing a contractor’s performance in building a dock for the plaintiffs. The bond provided that a certificate which complied with certain criteria would prove the amount due. In the action on the bond the plaintiffs relied upon a certificate which they said complied with the criteria and was thus conclusive evidence of the defendants’ liability under the bond. The action failed because the certificate did not specify a relevant act or default as required by the bond. The plaintiffs brought a second action relying, not upon the certificate, but upon the underlying facts, which they said amounted to breaches of the contract and thus triggered liability under the bond.
  • 29.  Hickman & Co. v Roberts (1913) AC 229 The contract provided that the decision of the architect as to payment due to the contractor was to be final and that payment was to be made to the contractor on the basis of the architect’s certificates. The contractor claimed that he was owed certain sums but the architect had failed to issue a certificate in his favour. When challenged by the contractor the architect’s reply was that his clients, the owners, would not allow it: "in the face of their instructions to me I cannot issue a certificate whatever my own private opinion in the matter". The House of Lords held that he had improperly allowed the owners to influence him: the owners could not rely on the absence of a certificate as a reason not to pay the contractor
  • 30.  Kimberly v Dick (1871) where the architect who issued the final certificate had promised the employer that the works would not exceed a certain figure and allowed this promise to influence his certification.