Students are required to attempt a building services field case study and
write a word-processed essay on the topic below.
The following guidelines should be strictly adhered to:
1. The minimum and maximum word limits for the assignment appear
at the end of the assignment. These limits should be adhered to,
otherwise the student will be penalised. Each submission should
include a word count.
2. Footnotes/endnotes should be included in the essay. A bibliography
should appear at the end of the essay. The bibliography should
contain all relevant material consulted by the student, whether
referred to in footnotes or not and material in the bibliography
should be arranged under the following headings, where applicable:
Textbooks
Building By-Laws
Legislation
Internet resources
Other resources
Words in footnotes and bibliography should not be included when
taking into account the essay word count.
3. Footnotes/endnotes must be used for referencing and further
reading only and should contain as little text as possible.
4. The completed coursework assignment must be submitted, prior to
the submission deadline (see below), by submission via a softcopy
to the TIMeS – note that further information on this will be notified
to students in advance of the submission date. Note that one
submission only is permitted to avoid multiple submissions (where
a later submission by a student is stated or intended to supersede
an earlier one). Students must be satisfied that the version of the
completed coursework is the absolutely final version prior to
submission.
1 August 2016 Semester
School of Architecture,Building & Design
5. The completed coursework assignment must be submitted using the
template (a Microsoft Word document) provided. The template
should be completed in full prior to submission. Use of the
template is intended to ensure that the coursework submission is
contained in a single document and contains all relevant student
details.
6. The completed coursework assignment must be submitted in Week
13 followed by a presentation by each group members.
Extensions to this deadline may exceptionally be granted.
Applications for an extension should be sent, with full reasons, to
the lecturer at heechai.tan@taylors.edu.my
Any extensions should be applied for as early as possible and will be
considered at the sole discretion of the module co-ordinator.
Applications close to the deadline should be avoided wherever
possible, and unless made at the earliest opportunity, are likely to
be refused. Please note that pressure of work, unless exceptional
and verified, will not be accepted as a valid extension justification.
Failure to submit the completed coursework assignment properly or
by the stated submission deadline will result in the student’s scoring
marks less 5 marks per week of delay for the assignment.
7. Any deviation from the above guidelines will be penalised, either by
a zero score or a lower mark.
8. Students will form groups to undertake the case study. The
maximum members in a group will be kept to five (5) with the
exception of a few groups having 6 members.
2 August 2016 Semester
School of Architecture,Building & Design
Group Assignment
Objectives
• To expose students to the real life case study of the basic principles,
processes and equipment of various building services systems for a
shopping complex.
• To provide an opportunity for students to demonstrate their
understanding of building services systems in compliance with the
local authority requirements.
• To make students aware of the challenges and problems in
executing the installation of the various building services
Outcomes
• Upon completion of the case study, students should be able to
identify and understand the functions of each system.
• Understand and the application of the requirements of local
authority.
• Understand and appreciate the solutions to the problems and
challenges in carrying out the installation of the various building
services.
The Tasks
• Each group are requested to carry out a case study related to
building services for a completed shopping complex.
• Identify and perform a thorough study on the following building
services:
1. Mechanical Ventilation and Air-Conditioning System
2. Fire Protection System
3. Vertical Transportation System and
4. Electrical Power Supply System
• Identify and obtain estimate size of the spaces (room) required for
major plant and equipment.
• Briefly explain the functions of the building services components
identified.
3 August 2016 Semester
School of Architecture,Building & Design
• No calculation is required for this case study.
• It is envisaged that the systems can be illustrated in a diagram.
• The case study shall indicate and make references to the
requirements of the local uniform building by-laws (UBBL 1984)
pertaining to the above components.
4 August 2016 Semester

More Related Content

What's hot

102084 inclusiveeducationtheorypolicyandpractice (1)
102084 inclusiveeducationtheorypolicyandpractice (1)102084 inclusiveeducationtheorypolicyandpractice (1)
102084 inclusiveeducationtheorypolicyandpractice (1)Nil Mukherjee
 
Detf updated jan 2013 for dean group
Detf updated jan 2013 for dean groupDetf updated jan 2013 for dean group
Detf updated jan 2013 for dean groupcccscoetc
 
Outcome based education
Outcome based educationOutcome based education
Outcome based educationVaisakh M.V.
 
PGCTHE handbook 2008 - 2009
PGCTHE handbook 2008 - 2009PGCTHE handbook 2008 - 2009
PGCTHE handbook 2008 - 2009butest
 
Guidelines for SAR Writing
Guidelines for SAR WritingGuidelines for SAR Writing
Guidelines for SAR WritingMd. Nazrul Islam
 
Equivalency of courses transcripts, credit system
Equivalency of courses  transcripts, credit systemEquivalency of courses  transcripts, credit system
Equivalency of courses transcripts, credit systemSoumya Ranjan Parida
 
Noble cbcs prsentation noble college
Noble cbcs prsentation noble collegeNoble cbcs prsentation noble college
Noble cbcs prsentation noble collegeSrirangam Mathew
 
Planning Cycle and Use of Results
Planning Cycle and Use of ResultsPlanning Cycle and Use of Results
Planning Cycle and Use of ResultsBradley Vaden
 
Special Blend: Developing a Model for Technology-Enhanced, Flexible Learning
Special Blend: Developing a Model for Technology-Enhanced, Flexible LearningSpecial Blend: Developing a Model for Technology-Enhanced, Flexible Learning
Special Blend: Developing a Model for Technology-Enhanced, Flexible LearningLeo Havemann
 
Choice based credit semester system (cbcss)
Choice based credit semester system (cbcss)Choice based credit semester system (cbcss)
Choice based credit semester system (cbcss)Tiji Thomas
 
EMBED Framework for OOFHEC2019 conference
EMBED Framework for OOFHEC2019 conferenceEMBED Framework for OOFHEC2019 conference
EMBED Framework for OOFHEC2019 conferenceWillem van Valkenburg
 
Choice Based Credit System(CBCS)-Ugc guidelines:SSB Lec/Gp Dis 14:
Choice Based Credit System(CBCS)-Ugc guidelines:SSB Lec/Gp Dis 14:Choice Based Credit System(CBCS)-Ugc guidelines:SSB Lec/Gp Dis 14:
Choice Based Credit System(CBCS)-Ugc guidelines:SSB Lec/Gp Dis 14:Col Mukteshwar Prasad
 
Choice Based Credit System
Choice Based Credit SystemChoice Based Credit System
Choice Based Credit SystemMadan Mankotia
 
NAAC (Criterion-I : Curricular Aspects for Autonomous Engineering Colleges)
NAAC (Criterion-I : Curricular Aspects  for Autonomous Engineering Colleges)NAAC (Criterion-I : Curricular Aspects  for Autonomous Engineering Colleges)
NAAC (Criterion-I : Curricular Aspects for Autonomous Engineering Colleges)Dr.Raja R
 

What's hot (19)

102084 inclusiveeducationtheorypolicyandpractice (1)
102084 inclusiveeducationtheorypolicyandpractice (1)102084 inclusiveeducationtheorypolicyandpractice (1)
102084 inclusiveeducationtheorypolicyandpractice (1)
 
Detf updated jan 2013 for dean group
Detf updated jan 2013 for dean groupDetf updated jan 2013 for dean group
Detf updated jan 2013 for dean group
 
Outcome based education
Outcome based educationOutcome based education
Outcome based education
 
PGCTHE handbook 2008 - 2009
PGCTHE handbook 2008 - 2009PGCTHE handbook 2008 - 2009
PGCTHE handbook 2008 - 2009
 
Guidelines for SAR Writing
Guidelines for SAR WritingGuidelines for SAR Writing
Guidelines for SAR Writing
 
Equivalency of courses transcripts, credit system
Equivalency of courses  transcripts, credit systemEquivalency of courses  transcripts, credit system
Equivalency of courses transcripts, credit system
 
Policies on implementation of ste
Policies on implementation of stePolicies on implementation of ste
Policies on implementation of ste
 
Presentaion on cbcs
Presentaion on cbcsPresentaion on cbcs
Presentaion on cbcs
 
Noble cbcs prsentation noble college
Noble cbcs prsentation noble collegeNoble cbcs prsentation noble college
Noble cbcs prsentation noble college
 
Iqac ppt
Iqac pptIqac ppt
Iqac ppt
 
Planning Cycle and Use of Results
Planning Cycle and Use of ResultsPlanning Cycle and Use of Results
Planning Cycle and Use of Results
 
Special Blend: Developing a Model for Technology-Enhanced, Flexible Learning
Special Blend: Developing a Model for Technology-Enhanced, Flexible LearningSpecial Blend: Developing a Model for Technology-Enhanced, Flexible Learning
Special Blend: Developing a Model for Technology-Enhanced, Flexible Learning
 
Choice based credit semester system (cbcss)
Choice based credit semester system (cbcss)Choice based credit semester system (cbcss)
Choice based credit semester system (cbcss)
 
EMBED Framework for OOFHEC2019 conference
EMBED Framework for OOFHEC2019 conferenceEMBED Framework for OOFHEC2019 conference
EMBED Framework for OOFHEC2019 conference
 
Choice Based Credit System(CBCS)-Ugc guidelines:SSB Lec/Gp Dis 14:
Choice Based Credit System(CBCS)-Ugc guidelines:SSB Lec/Gp Dis 14:Choice Based Credit System(CBCS)-Ugc guidelines:SSB Lec/Gp Dis 14:
Choice Based Credit System(CBCS)-Ugc guidelines:SSB Lec/Gp Dis 14:
 
Choice Based Credit System
Choice Based Credit SystemChoice Based Credit System
Choice Based Credit System
 
NAAC (Criterion-I : Curricular Aspects for Autonomous Engineering Colleges)
NAAC (Criterion-I : Curricular Aspects  for Autonomous Engineering Colleges)NAAC (Criterion-I : Curricular Aspects  for Autonomous Engineering Colleges)
NAAC (Criterion-I : Curricular Aspects for Autonomous Engineering Colleges)
 
Do 31, s2020
Do 31, s2020Do 31, s2020
Do 31, s2020
 
e-portfolio
e-portfolioe-portfolio
e-portfolio
 

Viewers also liked

What Is More Important, Profitability or Growth?
What Is More Important, Profitability or Growth?What Is More Important, Profitability or Growth?
What Is More Important, Profitability or Growth?Andrew Stotz, PhD, CFA
 
abhiraj 27july 2015 ()
abhiraj 27july 2015 ()abhiraj 27july 2015 ()
abhiraj 27july 2015 ()a112345
 
Authorization Card Sceco
Authorization  Card ScecoAuthorization  Card Sceco
Authorization Card ScecoAli Asad
 
Uttoxeter & Cheadle Voice Issue 65
Uttoxeter & Cheadle Voice Issue 65Uttoxeter & Cheadle Voice Issue 65
Uttoxeter & Cheadle Voice Issue 65Noel Sergeant
 
PUSH DOWN AUTOMATA VS TURING MACHINE
PUSH DOWN AUTOMATA VS TURING MACHINEPUSH DOWN AUTOMATA VS TURING MACHINE
PUSH DOWN AUTOMATA VS TURING MACHINEAbhishek Shivhare
 
IBM Cognos Licensing Changes: What You Need to Know
IBM Cognos Licensing Changes: What You Need to KnowIBM Cognos Licensing Changes: What You Need to Know
IBM Cognos Licensing Changes: What You Need to KnowSenturus
 
Fisiopatológia del deficit de hierro en la insuficiencia cardiaca: más allá d...
Fisiopatológia del deficit de hierro en la insuficiencia cardiaca: más allá d...Fisiopatológia del deficit de hierro en la insuficiencia cardiaca: más allá d...
Fisiopatológia del deficit de hierro en la insuficiencia cardiaca: más allá d...Sociedad Española de Cardiología
 
En la prevención y seguimiento de los pacientes en riesgo de cardiotoxicidad
En la prevención y seguimiento de los pacientes en riesgo de cardiotoxicidadEn la prevención y seguimiento de los pacientes en riesgo de cardiotoxicidad
En la prevención y seguimiento de los pacientes en riesgo de cardiotoxicidadSociedad Española de Cardiología
 

Viewers also liked (20)

== Smartmatic == smart office (en)
== Smartmatic == smart office (en)== Smartmatic == smart office (en)
== Smartmatic == smart office (en)
 
What Is More Important, Profitability or Growth?
What Is More Important, Profitability or Growth?What Is More Important, Profitability or Growth?
What Is More Important, Profitability or Growth?
 
Green Supply Chain for a Sustainable Tomorrow
Green Supply Chain for a Sustainable TomorrowGreen Supply Chain for a Sustainable Tomorrow
Green Supply Chain for a Sustainable Tomorrow
 
Catolicismo 3
Catolicismo 3Catolicismo 3
Catolicismo 3
 
The Art of Enjoying Opera
The Art of Enjoying OperaThe Art of Enjoying Opera
The Art of Enjoying Opera
 
abhiraj 27july 2015 ()
abhiraj 27july 2015 ()abhiraj 27july 2015 ()
abhiraj 27july 2015 ()
 
DSPmobi_PPT
DSPmobi_PPTDSPmobi_PPT
DSPmobi_PPT
 
Authorization Card Sceco
Authorization  Card ScecoAuthorization  Card Sceco
Authorization Card Sceco
 
Cognos Software Development Kit
Cognos Software Development KitCognos Software Development Kit
Cognos Software Development Kit
 
Uttoxeter & Cheadle Voice Issue 65
Uttoxeter & Cheadle Voice Issue 65Uttoxeter & Cheadle Voice Issue 65
Uttoxeter & Cheadle Voice Issue 65
 
PUSH DOWN AUTOMATA VS TURING MACHINE
PUSH DOWN AUTOMATA VS TURING MACHINEPUSH DOWN AUTOMATA VS TURING MACHINE
PUSH DOWN AUTOMATA VS TURING MACHINE
 
My Publication details
My Publication detailsMy Publication details
My Publication details
 
IBM Cognos Licensing Changes: What You Need to Know
IBM Cognos Licensing Changes: What You Need to KnowIBM Cognos Licensing Changes: What You Need to Know
IBM Cognos Licensing Changes: What You Need to Know
 
Fisiopatológia del deficit de hierro en la insuficiencia cardiaca: más allá d...
Fisiopatológia del deficit de hierro en la insuficiencia cardiaca: más allá d...Fisiopatológia del deficit de hierro en la insuficiencia cardiaca: más allá d...
Fisiopatológia del deficit de hierro en la insuficiencia cardiaca: más allá d...
 
NoSQL Type, Bigdata, and Analytics
NoSQL Type, Bigdata, and AnalyticsNoSQL Type, Bigdata, and Analytics
NoSQL Type, Bigdata, and Analytics
 
Data modelling qlik view
Data modelling qlik viewData modelling qlik view
Data modelling qlik view
 
En la prevención y seguimiento de los pacientes en riesgo de cardiotoxicidad
En la prevención y seguimiento de los pacientes en riesgo de cardiotoxicidadEn la prevención y seguimiento de los pacientes en riesgo de cardiotoxicidad
En la prevención y seguimiento de los pacientes en riesgo de cardiotoxicidad
 
Togaf 9 template system use case diagram
Togaf 9 template   system use case diagramTogaf 9 template   system use case diagram
Togaf 9 template system use case diagram
 
Financial Management (Globe Telecom)
Financial Management (Globe Telecom)Financial Management (Globe Telecom)
Financial Management (Globe Telecom)
 
Ikea's strategy
Ikea's strategyIkea's strategy
Ikea's strategy
 

Similar to BS 2 Group assignment brief question august 2016

BS 2 Individual assignment brief question august 2016
BS 2 Individual assignment brief  question august 2016BS 2 Individual assignment brief  question august 2016
BS 2 Individual assignment brief question august 2016Est
 
Assignment 1 - Report
Assignment 1 - ReportAssignment 1 - Report
Assignment 1 - ReportKai Yun Pang
 
Itgs internal assessment guide project
Itgs internal assessment guide projectItgs internal assessment guide project
Itgs internal assessment guide projectYvonne Mafunga
 
Assessment Brief ENG7142 INPER 25%.pdf
Assessment Brief ENG7142 INPER 25%.pdfAssessment Brief ENG7142 INPER 25%.pdf
Assessment Brief ENG7142 INPER 25%.pdffrankdavis51
 
Module outline building services august 2015(lecturer)
Module outline building services august 2015(lecturer)Module outline building services august 2015(lecturer)
Module outline building services august 2015(lecturer)Anthony Chew
 
Building construction 1 (arc 1523) module outline aug 2014
Building construction 1 (arc 1523)  module outline aug 2014Building construction 1 (arc 1523)  module outline aug 2014
Building construction 1 (arc 1523) module outline aug 2014Anthony Chew
 
Blockchain Implementation Project Plan Every project th
Blockchain Implementation Project Plan  Every project thBlockchain Implementation Project Plan  Every project th
Blockchain Implementation Project Plan Every project thChantellPantoja184
 
Research methods and Project Design (BUSS1008) – Spring– 19.docx
Research methods and Project Design (BUSS1008) – Spring– 19.docxResearch methods and Project Design (BUSS1008) – Spring– 19.docx
Research methods and Project Design (BUSS1008) – Spring– 19.docxAASTHA76
 
Annexure ‘CD – 01’LTPSSWFWTotal credi.docx
Annexure ‘CD – 01’LTPSSWFWTotal credi.docxAnnexure ‘CD – 01’LTPSSWFWTotal credi.docx
Annexure ‘CD – 01’LTPSSWFWTotal credi.docxSHIVA101531
 
Employment law case briefInternet, select and research an emplo.docx
Employment law case briefInternet, select and research an emplo.docxEmployment law case briefInternet, select and research an emplo.docx
Employment law case briefInternet, select and research an emplo.docxAASTHA76
 
Building Construction 1 (arc 1523) Module Outline 2015
Building Construction 1 (arc 1523) Module Outline 2015Building Construction 1 (arc 1523) Module Outline 2015
Building Construction 1 (arc 1523) Module Outline 2015Darshiini Vig
 
FAQS Posed By Students While Writing Engineering Dissertation - phdassistanc...
FAQS Posed By Students While Writing Engineering Dissertation  - phdassistanc...FAQS Posed By Students While Writing Engineering Dissertation  - phdassistanc...
FAQS Posed By Students While Writing Engineering Dissertation - phdassistanc...PhD Assistance
 
SE-IT MINI PROJECT SYLLABUS
SE-IT MINI PROJECT SYLLABUSSE-IT MINI PROJECT SYLLABUS
SE-IT MINI PROJECT SYLLABUSnikshaikh786
 
Unit Code HI5029 Project Management.docx
Unit Code HI5029 Project Management.docxUnit Code HI5029 Project Management.docx
Unit Code HI5029 Project Management.docxwrite5
 
MBA Project Guidelines 2022-23.pdf
MBA Project Guidelines 2022-23.pdfMBA Project Guidelines 2022-23.pdf
MBA Project Guidelines 2022-23.pdfAvinashSahu75
 
Syllabus mgt610 2013_s
Syllabus mgt610 2013_sSyllabus mgt610 2013_s
Syllabus mgt610 2013_shenry KKK
 
MA-SEM-IV-Economics-Project-Engligh-Version.pdf
MA-SEM-IV-Economics-Project-Engligh-Version.pdfMA-SEM-IV-Economics-Project-Engligh-Version.pdf
MA-SEM-IV-Economics-Project-Engligh-Version.pdfTarannumkhan79
 
B sc (hons)(arch) computer applications csc60503 mar 2015
B sc (hons)(arch)  computer applications csc60503 mar 2015B sc (hons)(arch)  computer applications csc60503 mar 2015
B sc (hons)(arch) computer applications csc60503 mar 2015Anthony Chew
 

Similar to BS 2 Group assignment brief question august 2016 (20)

BS 2 Individual assignment brief question august 2016
BS 2 Individual assignment brief  question august 2016BS 2 Individual assignment brief  question august 2016
BS 2 Individual assignment brief question august 2016
 
Assignment 1 - Report
Assignment 1 - ReportAssignment 1 - Report
Assignment 1 - Report
 
Itgs internal assessment guide project
Itgs internal assessment guide projectItgs internal assessment guide project
Itgs internal assessment guide project
 
Assessment Brief ENG7142 INPER 25%.pdf
Assessment Brief ENG7142 INPER 25%.pdfAssessment Brief ENG7142 INPER 25%.pdf
Assessment Brief ENG7142 INPER 25%.pdf
 
Module outline building services august 2015(lecturer)
Module outline building services august 2015(lecturer)Module outline building services august 2015(lecturer)
Module outline building services august 2015(lecturer)
 
Building construction 1 (arc 1523) module outline aug 2014
Building construction 1 (arc 1523)  module outline aug 2014Building construction 1 (arc 1523)  module outline aug 2014
Building construction 1 (arc 1523) module outline aug 2014
 
Blockchain Implementation Project Plan Every project th
Blockchain Implementation Project Plan  Every project thBlockchain Implementation Project Plan  Every project th
Blockchain Implementation Project Plan Every project th
 
Research methods and Project Design (BUSS1008) – Spring– 19.docx
Research methods and Project Design (BUSS1008) – Spring– 19.docxResearch methods and Project Design (BUSS1008) – Spring– 19.docx
Research methods and Project Design (BUSS1008) – Spring– 19.docx
 
Annexure ‘CD – 01’LTPSSWFWTotal credi.docx
Annexure ‘CD – 01’LTPSSWFWTotal credi.docxAnnexure ‘CD – 01’LTPSSWFWTotal credi.docx
Annexure ‘CD – 01’LTPSSWFWTotal credi.docx
 
Employment law case briefInternet, select and research an emplo.docx
Employment law case briefInternet, select and research an emplo.docxEmployment law case briefInternet, select and research an emplo.docx
Employment law case briefInternet, select and research an emplo.docx
 
Building Construction 1 (arc 1523) Module Outline 2015
Building Construction 1 (arc 1523) Module Outline 2015Building Construction 1 (arc 1523) Module Outline 2015
Building Construction 1 (arc 1523) Module Outline 2015
 
Syllabus-Term Paper.pdf
Syllabus-Term Paper.pdfSyllabus-Term Paper.pdf
Syllabus-Term Paper.pdf
 
FAQS Posed By Students While Writing Engineering Dissertation - phdassistanc...
FAQS Posed By Students While Writing Engineering Dissertation  - phdassistanc...FAQS Posed By Students While Writing Engineering Dissertation  - phdassistanc...
FAQS Posed By Students While Writing Engineering Dissertation - phdassistanc...
 
SE-IT MINI PROJECT SYLLABUS
SE-IT MINI PROJECT SYLLABUSSE-IT MINI PROJECT SYLLABUS
SE-IT MINI PROJECT SYLLABUS
 
Unit Code HI5029 Project Management.docx
Unit Code HI5029 Project Management.docxUnit Code HI5029 Project Management.docx
Unit Code HI5029 Project Management.docx
 
Pp1
Pp1 Pp1
Pp1
 
MBA Project Guidelines 2022-23.pdf
MBA Project Guidelines 2022-23.pdfMBA Project Guidelines 2022-23.pdf
MBA Project Guidelines 2022-23.pdf
 
Syllabus mgt610 2013_s
Syllabus mgt610 2013_sSyllabus mgt610 2013_s
Syllabus mgt610 2013_s
 
MA-SEM-IV-Economics-Project-Engligh-Version.pdf
MA-SEM-IV-Economics-Project-Engligh-Version.pdfMA-SEM-IV-Economics-Project-Engligh-Version.pdf
MA-SEM-IV-Economics-Project-Engligh-Version.pdf
 
B sc (hons)(arch) computer applications csc60503 mar 2015
B sc (hons)(arch)  computer applications csc60503 mar 2015B sc (hons)(arch)  computer applications csc60503 mar 2015
B sc (hons)(arch) computer applications csc60503 mar 2015
 

More from Est

BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmEst
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM PartneringEst
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in constructionEst
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscmEst
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangementEst
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systemsEst
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmEst
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docxEst
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignmentEst
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MSEst
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrmEst
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergEst
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationEst
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communicationEst
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016Est
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatitionEst
 
BS 2 Group assignment example Building services-bangsar-village-1
BS 2 Group assignment example Building services-bangsar-village-1BS 2 Group assignment example Building services-bangsar-village-1
BS 2 Group assignment example Building services-bangsar-village-1Est
 
MS Southwest airlines mbti case study ms
MS Southwest airlines mbti case study msMS Southwest airlines mbti case study ms
MS Southwest airlines mbti case study msEst
 

More from Est (20)

BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatition
 
BS 2 Group assignment example Building services-bangsar-village-1
BS 2 Group assignment example Building services-bangsar-village-1BS 2 Group assignment example Building services-bangsar-village-1
BS 2 Group assignment example Building services-bangsar-village-1
 
MS Southwest airlines mbti case study ms
MS Southwest airlines mbti case study msMS Southwest airlines mbti case study ms
MS Southwest airlines mbti case study ms
 

Recently uploaded

办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一F La
 
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackVIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackSuhani Kapoor
 
NPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdfNPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdfDivyeshPatel234692
 
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...Suhani Kapoor
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一A SSS
 
Business Development and Product Strategy for a SME named SARL based in Leban...
Business Development and Product Strategy for a SME named SARL based in Leban...Business Development and Product Strategy for a SME named SARL based in Leban...
Business Development and Product Strategy for a SME named SARL based in Leban...Soham Mondal
 
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一Fs
 
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home MadeDubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Madekojalkojal131
 
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...Suhani Kapoor
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterHector Del Castillo, CPM, CPMM
 
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证obuhobo
 
VIP Call Girls in Cuttack Aarohi 8250192130 Independent Escort Service Cuttack
VIP Call Girls in Cuttack Aarohi 8250192130 Independent Escort Service CuttackVIP Call Girls in Cuttack Aarohi 8250192130 Independent Escort Service Cuttack
VIP Call Girls in Cuttack Aarohi 8250192130 Independent Escort Service CuttackSuhani Kapoor
 
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiVIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiSuhani Kapoor
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfjtzach
 
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位obuhobo
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxGry Tina Tinde
 
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012rehmti665
 
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士obuhobo
 
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...gurkirankumar98700
 

Recently uploaded (20)

办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
 
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackVIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
 
NPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdfNPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdf
 
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
 
Business Development and Product Strategy for a SME named SARL based in Leban...
Business Development and Product Strategy for a SME named SARL based in Leban...Business Development and Product Strategy for a SME named SARL based in Leban...
Business Development and Product Strategy for a SME named SARL based in Leban...
 
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
 
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home MadeDubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
 
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring Chapter
 
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
 
VIP Call Girls in Cuttack Aarohi 8250192130 Independent Escort Service Cuttack
VIP Call Girls in Cuttack Aarohi 8250192130 Independent Escort Service CuttackVIP Call Girls in Cuttack Aarohi 8250192130 Independent Escort Service Cuttack
VIP Call Girls in Cuttack Aarohi 8250192130 Independent Escort Service Cuttack
 
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiVIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdf
 
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptx
 
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
 
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
 
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
 
Call Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 

BS 2 Group assignment brief question august 2016

  • 1. School of Architecture,Building & Design BUILDING SERVICES 2 (BLD 60503) Group Assignment Guidelines Students are required to attempt a building services field case study and write a word-processed essay on the topic below. The following guidelines should be strictly adhered to: 1. The minimum and maximum word limits for the assignment appear at the end of the assignment. These limits should be adhered to, otherwise the student will be penalised. Each submission should include a word count. 2. Footnotes/endnotes should be included in the essay. A bibliography should appear at the end of the essay. The bibliography should contain all relevant material consulted by the student, whether referred to in footnotes or not and material in the bibliography should be arranged under the following headings, where applicable: Textbooks Building By-Laws Legislation Internet resources Other resources Words in footnotes and bibliography should not be included when taking into account the essay word count. 3. Footnotes/endnotes must be used for referencing and further reading only and should contain as little text as possible. 4. The completed coursework assignment must be submitted, prior to the submission deadline (see below), by submission via a softcopy to the TIMeS – note that further information on this will be notified to students in advance of the submission date. Note that one submission only is permitted to avoid multiple submissions (where a later submission by a student is stated or intended to supersede an earlier one). Students must be satisfied that the version of the completed coursework is the absolutely final version prior to submission. 1 August 2016 Semester
  • 2. School of Architecture,Building & Design 5. The completed coursework assignment must be submitted using the template (a Microsoft Word document) provided. The template should be completed in full prior to submission. Use of the template is intended to ensure that the coursework submission is contained in a single document and contains all relevant student details. 6. The completed coursework assignment must be submitted in Week 13 followed by a presentation by each group members. Extensions to this deadline may exceptionally be granted. Applications for an extension should be sent, with full reasons, to the lecturer at heechai.tan@taylors.edu.my Any extensions should be applied for as early as possible and will be considered at the sole discretion of the module co-ordinator. Applications close to the deadline should be avoided wherever possible, and unless made at the earliest opportunity, are likely to be refused. Please note that pressure of work, unless exceptional and verified, will not be accepted as a valid extension justification. Failure to submit the completed coursework assignment properly or by the stated submission deadline will result in the student’s scoring marks less 5 marks per week of delay for the assignment. 7. Any deviation from the above guidelines will be penalised, either by a zero score or a lower mark. 8. Students will form groups to undertake the case study. The maximum members in a group will be kept to five (5) with the exception of a few groups having 6 members. 2 August 2016 Semester
  • 3. School of Architecture,Building & Design Group Assignment Objectives • To expose students to the real life case study of the basic principles, processes and equipment of various building services systems for a shopping complex. • To provide an opportunity for students to demonstrate their understanding of building services systems in compliance with the local authority requirements. • To make students aware of the challenges and problems in executing the installation of the various building services Outcomes • Upon completion of the case study, students should be able to identify and understand the functions of each system. • Understand and the application of the requirements of local authority. • Understand and appreciate the solutions to the problems and challenges in carrying out the installation of the various building services. The Tasks • Each group are requested to carry out a case study related to building services for a completed shopping complex. • Identify and perform a thorough study on the following building services: 1. Mechanical Ventilation and Air-Conditioning System 2. Fire Protection System 3. Vertical Transportation System and 4. Electrical Power Supply System • Identify and obtain estimate size of the spaces (room) required for major plant and equipment. • Briefly explain the functions of the building services components identified. 3 August 2016 Semester
  • 4. School of Architecture,Building & Design • No calculation is required for this case study. • It is envisaged that the systems can be illustrated in a diagram. • The case study shall indicate and make references to the requirements of the local uniform building by-laws (UBBL 1984) pertaining to the above components. 4 August 2016 Semester