Simplex Infrastructures Limited
Risk Assessment Record
Hazard / Work Activity Assessed: Dismantling of Scaffold
WORK
ACTIVITIES
RISK FORESEEN DURING
WORK
CONTROL MEASURES Responsibility
1. Isolation of
Electrical power.
1. Ergonomic hazard due to
untrained person.
2. Electrocution.
3. Personal injury due to cut,
burn etc.
1) The entire job will be
carried out under proper
supervision of
experienced & licensed
electrical person.
2) Necessary work permits to
be taken prior to starting
of job.
3) The required PPEs are to
be used by all the persons
during working at site.
4) LOTOTO to be followed
as per the standard of
LIPL.
5) Warning sign to be fixed
at the DBs.
2. Removing all the
Electrical
Installations from
the tower.
1) Slipping/Tripping hazard.
2) Personal injury due to
lifting by hand.
3) Falling of material or
person during dismantling.
4) Personal injury during
dismantling.
5) Improper Material
handling.
1) The entire job to be done in
presence of experienced
supervisor.
2) Co-ordination meetings to
be done with all
concerned persons prior to
commencement of work.
3) Necessary Caution Boards
are to be placed.
4) All the persons must be
trained about the hazards
of the manual handling of
materials.
5) Safe arrangements for
placing of the materials to
be made for taking the
materials from top to
bottom.
6) Damaged ropes for lifting
arrangement must not be
used for lowering of
materials.
3. Starting of the
Dismantling from
the topmost part
of the tower.
1) Struck against the scaffold
materials.
2) Sudden entrapment of feet
due to missing plank of the
dismantled platform.
3) Fall of material or person
from height.
4) Failure of load during
material lowering from
height.
5) Poor slinging of load.
6) Ergonomic hazard due to
engaging of inefficient
person for height work.
7) Collapse of Scaffold.
1) Proper PPEs to be used all
the time at work.
2) All the persons must be
trained and aware about
the Scaffolding work as
per the WAH standards of
Lafarge.
3) Permit for Working at
Height to be taken prior to
starting of the job.
4) Right persons must be
engaged for height work.
5) Persons must not wear
loose clothing.
6) All the persons must be
aware about the hazards of
Working at height by
conducting Tool Box
Talk.
7) Proper access and egress
to be given for easy and
safe entry up to the
dismantling position.
8) Arrangements for the
anchoring of Full body
Harness to be fixed for
Working at height.
9) No person will be allowed
underneath or adjacent to
the dismantled area.
10) Throwing of the materials
must be avoided.
11) Proper hand tools must be
used for the dismantling
purpose.
4. Stacking of the
materials at
ground.
1) Ergonomic hazards.
2) Poor Manual Material
Handling.
3) Personal injury.
4) Fall of material due to
improper stacking.
1) Proper PPEs to be used.
2) Experienced and trained
persons must be used.
3) Stacking must not be done
at the access area of the
persons.
4) Stacking to be done at
about 1 mtr. Height.
5) Materials are to be stacked
under shed to avoid the
rain (weather effect) and
damaging.
5. Shifting of the 1. Ergonomic hazard due to 1) The entire job to be done
Scaffolding
material.
improper Material
Handling.
2. Personal injury during
shifting.
3. Fall of material on foot.
4. Struck with the materials
during shifting.
in presence of Qualified
and experienced
supervisor.
2) Right person will be
engaged for proper
handling of materials.
3) Proper PPEs are to be
used.
Date: Prepared by: Approved by:
Signature: Signature:

More Related Content

What's hot

Working at-height
Working at-height Working at-height
Working at-height Reliance
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templatesDwarika Bhushan Sharma
 
Confined Space for Construction by Pennsylvania L&I
Confined Space for Construction by Pennsylvania L&IConfined Space for Construction by Pennsylvania L&I
Confined Space for Construction by Pennsylvania L&IAtlantic Training, LLC.
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYjasonmorgan
 
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docxDanielLove24
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Trainingedale07
 
HSE Guidence for Warehouse
HSE Guidence for WarehouseHSE Guidence for Warehouse
HSE Guidence for WarehouseRudi Admoko
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingKJP Consulting
 
Work permit system
Work permit systemWork permit system
Work permit systemsmithgeigle
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety inductionGanesan Raju
 

What's hot (20)

Working at-height
Working at-height Working at-height
Working at-height
 
Working at heights
Working at heightsWorking at heights
Working at heights
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Work at height. The basic needs.
Work at height. The basic needs.Work at height. The basic needs.
Work at height. The basic needs.
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
Confined Space for Construction by Pennsylvania L&I
Confined Space for Construction by Pennsylvania L&IConfined Space for Construction by Pennsylvania L&I
Confined Space for Construction by Pennsylvania L&I
 
Health and Safety Presentation FINAL
Health and Safety Presentation FINALHealth and Safety Presentation FINAL
Health and Safety Presentation FINAL
 
Apr trabalho em altura 2 (1)
Apr trabalho em altura 2 (1)Apr trabalho em altura 2 (1)
Apr trabalho em altura 2 (1)
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
Work At Height
Work At HeightWork At Height
Work At Height
 
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Training
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
HSE Guidence for Warehouse
HSE Guidence for WarehouseHSE Guidence for Warehouse
HSE Guidence for Warehouse
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 

Similar to Plant ; equipment dismantling of scaffold

risk assessment - pile cap.pdf
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdfmydl2
 
JHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdfJHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdfHaroon AbdulRahim
 
JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building Alvin160771
 
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfHaroon AbdulRahim
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement weldingAanand Subi
 
Excavation & Back filling work 02.docx
Excavation & Back filling work 02.docxExcavation & Back filling work 02.docx
Excavation & Back filling work 02.docxnrphsebarauni
 
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptx
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptxSAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptx
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptxShyam Sundar Roy
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment filechopriroti
 
Safety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekSafety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekRoseGaming1
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) ijceronline
 
constructionsafety-EAA.pdf
constructionsafety-EAA.pdfconstructionsafety-EAA.pdf
constructionsafety-EAA.pdfssuser2c065e
 
Construction safety
Construction  safetyConstruction  safety
Construction safetyRanty Poddar
 
Safety protocols of construction site.pptx
Safety protocols of construction site.pptxSafety protocols of construction site.pptx
Safety protocols of construction site.pptxZeeshan Yousaf
 
150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & SafetyMuhammad Usman
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdfFESTUS RICHARD SIAME
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
 
construction safety.pptx
construction safety.pptxconstruction safety.pptx
construction safety.pptxMarwa Merghani
 

Similar to Plant ; equipment dismantling of scaffold (20)

risk assessment - pile cap.pdf
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdf
 
JHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdfJHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdf
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building
 
ehs
ehsehs
ehs
 
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 
Safety manual
Safety manualSafety manual
Safety manual
 
Excavation & Back filling work 02.docx
Excavation & Back filling work 02.docxExcavation & Back filling work 02.docx
Excavation & Back filling work 02.docx
 
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptx
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptxSAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptx
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptx
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment file
 
Safety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekSafety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhek
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER)
 
constructionsafety-EAA.pdf
constructionsafety-EAA.pdfconstructionsafety-EAA.pdf
constructionsafety-EAA.pdf
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
 
Safety protocols of construction site.pptx
Safety protocols of construction site.pptxSafety protocols of construction site.pptx
Safety protocols of construction site.pptx
 
150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
construction safety.pptx
construction safety.pptxconstruction safety.pptx
construction safety.pptx
 

More from Bimal Chandra Das

More from Bimal Chandra Das (20)

EMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdfEMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdf
 
construction macheinery Safety.pdf
construction macheinery Safety.pdfconstruction macheinery Safety.pdf
construction macheinery Safety.pdf
 
INTRODUCTION TO SAFETY.pdf
INTRODUCTION TO SAFETY.pdfINTRODUCTION TO SAFETY.pdf
INTRODUCTION TO SAFETY.pdf
 
IS 14489 Q.doc
IS 14489 Q.docIS 14489 Q.doc
IS 14489 Q.doc
 
Safety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.pptSafety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.ppt
 
Indian Electricity Act 1910.pdf
Indian  Electricity  Act 1910.pdfIndian  Electricity  Act 1910.pdf
Indian Electricity Act 1910.pdf
 
Indian electricity IE RULES 1956.pdf
Indian electricity  IE RULES 1956.pdfIndian electricity  IE RULES 1956.pdf
Indian electricity IE RULES 1956.pdf
 
ACT&RULE West Bengal.ppt
ACT&RULE West Bengal.pptACT&RULE West Bengal.ppt
ACT&RULE West Bengal.ppt
 
Factories -ACT & RULE.ppt
Factories -ACT &  RULE.pptFactories -ACT &  RULE.ppt
Factories -ACT & RULE.ppt
 
Contractor's _obligation.ppt
Contractor's _obligation.pptContractor's _obligation.ppt
Contractor's _obligation.ppt
 
SAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdfSAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdf
 
Check List for Crane Inspection.pdf
Check List for Crane Inspection.pdfCheck List for Crane Inspection.pdf
Check List for Crane Inspection.pdf
 
COST OF ACCIDENT.ppt
COST OF ACCIDENT.pptCOST OF ACCIDENT.ppt
COST OF ACCIDENT.ppt
 
Safety in use of ladder
Safety in use of ladderSafety in use of ladder
Safety in use of ladder
 
Check list for conveyor belt inspection
Check list for conveyor belt inspectionCheck list for conveyor belt inspection
Check list for conveyor belt inspection
 
Selection of safety appliances
Selection of safety appliancesSelection of safety appliances
Selection of safety appliances
 
Risk
RiskRisk
Risk
 
Safety education and training
Safety education and trainingSafety education and training
Safety education and training
 
Use of PPEs
Use of PPEsUse of PPEs
Use of PPEs
 
Safety while Working at Height
Safety while Working at HeightSafety while Working at Height
Safety while Working at Height
 

Recently uploaded

Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 

Plant ; equipment dismantling of scaffold

  • 1. Simplex Infrastructures Limited Risk Assessment Record Hazard / Work Activity Assessed: Dismantling of Scaffold WORK ACTIVITIES RISK FORESEEN DURING WORK CONTROL MEASURES Responsibility 1. Isolation of Electrical power. 1. Ergonomic hazard due to untrained person. 2. Electrocution. 3. Personal injury due to cut, burn etc. 1) The entire job will be carried out under proper supervision of experienced & licensed electrical person. 2) Necessary work permits to be taken prior to starting of job. 3) The required PPEs are to be used by all the persons during working at site. 4) LOTOTO to be followed as per the standard of LIPL. 5) Warning sign to be fixed at the DBs. 2. Removing all the Electrical Installations from the tower. 1) Slipping/Tripping hazard. 2) Personal injury due to lifting by hand. 3) Falling of material or person during dismantling. 4) Personal injury during dismantling. 5) Improper Material handling. 1) The entire job to be done in presence of experienced supervisor. 2) Co-ordination meetings to be done with all concerned persons prior to commencement of work. 3) Necessary Caution Boards are to be placed. 4) All the persons must be trained about the hazards of the manual handling of materials. 5) Safe arrangements for placing of the materials to be made for taking the materials from top to bottom. 6) Damaged ropes for lifting arrangement must not be used for lowering of
  • 2. materials. 3. Starting of the Dismantling from the topmost part of the tower. 1) Struck against the scaffold materials. 2) Sudden entrapment of feet due to missing plank of the dismantled platform. 3) Fall of material or person from height. 4) Failure of load during material lowering from height. 5) Poor slinging of load. 6) Ergonomic hazard due to engaging of inefficient person for height work. 7) Collapse of Scaffold. 1) Proper PPEs to be used all the time at work. 2) All the persons must be trained and aware about the Scaffolding work as per the WAH standards of Lafarge. 3) Permit for Working at Height to be taken prior to starting of the job. 4) Right persons must be engaged for height work. 5) Persons must not wear loose clothing. 6) All the persons must be aware about the hazards of Working at height by conducting Tool Box Talk. 7) Proper access and egress to be given for easy and safe entry up to the dismantling position. 8) Arrangements for the anchoring of Full body Harness to be fixed for Working at height. 9) No person will be allowed underneath or adjacent to the dismantled area. 10) Throwing of the materials must be avoided. 11) Proper hand tools must be used for the dismantling purpose. 4. Stacking of the materials at ground. 1) Ergonomic hazards. 2) Poor Manual Material Handling. 3) Personal injury. 4) Fall of material due to improper stacking. 1) Proper PPEs to be used. 2) Experienced and trained persons must be used. 3) Stacking must not be done at the access area of the persons. 4) Stacking to be done at about 1 mtr. Height. 5) Materials are to be stacked under shed to avoid the rain (weather effect) and damaging. 5. Shifting of the 1. Ergonomic hazard due to 1) The entire job to be done
  • 3. Scaffolding material. improper Material Handling. 2. Personal injury during shifting. 3. Fall of material on foot. 4. Struck with the materials during shifting. in presence of Qualified and experienced supervisor. 2) Right person will be engaged for proper handling of materials. 3) Proper PPEs are to be used. Date: Prepared by: Approved by: Signature: Signature: