1. Simplex Infrastructures Limited
Risk Assessment Record
Hazard / Work Activity Assessed: Dismantling of Scaffold
WORK
ACTIVITIES
RISK FORESEEN DURING
WORK
CONTROL MEASURES Responsibility
1. Isolation of
Electrical power.
1. Ergonomic hazard due to
untrained person.
2. Electrocution.
3. Personal injury due to cut,
burn etc.
1) The entire job will be
carried out under proper
supervision of
experienced & licensed
electrical person.
2) Necessary work permits to
be taken prior to starting
of job.
3) The required PPEs are to
be used by all the persons
during working at site.
4) LOTOTO to be followed
as per the standard of
LIPL.
5) Warning sign to be fixed
at the DBs.
2. Removing all the
Electrical
Installations from
the tower.
1) Slipping/Tripping hazard.
2) Personal injury due to
lifting by hand.
3) Falling of material or
person during dismantling.
4) Personal injury during
dismantling.
5) Improper Material
handling.
1) The entire job to be done in
presence of experienced
supervisor.
2) Co-ordination meetings to
be done with all
concerned persons prior to
commencement of work.
3) Necessary Caution Boards
are to be placed.
4) All the persons must be
trained about the hazards
of the manual handling of
materials.
5) Safe arrangements for
placing of the materials to
be made for taking the
materials from top to
bottom.
6) Damaged ropes for lifting
arrangement must not be
used for lowering of
2. materials.
3. Starting of the
Dismantling from
the topmost part
of the tower.
1) Struck against the scaffold
materials.
2) Sudden entrapment of feet
due to missing plank of the
dismantled platform.
3) Fall of material or person
from height.
4) Failure of load during
material lowering from
height.
5) Poor slinging of load.
6) Ergonomic hazard due to
engaging of inefficient
person for height work.
7) Collapse of Scaffold.
1) Proper PPEs to be used all
the time at work.
2) All the persons must be
trained and aware about
the Scaffolding work as
per the WAH standards of
Lafarge.
3) Permit for Working at
Height to be taken prior to
starting of the job.
4) Right persons must be
engaged for height work.
5) Persons must not wear
loose clothing.
6) All the persons must be
aware about the hazards of
Working at height by
conducting Tool Box
Talk.
7) Proper access and egress
to be given for easy and
safe entry up to the
dismantling position.
8) Arrangements for the
anchoring of Full body
Harness to be fixed for
Working at height.
9) No person will be allowed
underneath or adjacent to
the dismantled area.
10) Throwing of the materials
must be avoided.
11) Proper hand tools must be
used for the dismantling
purpose.
4. Stacking of the
materials at
ground.
1) Ergonomic hazards.
2) Poor Manual Material
Handling.
3) Personal injury.
4) Fall of material due to
improper stacking.
1) Proper PPEs to be used.
2) Experienced and trained
persons must be used.
3) Stacking must not be done
at the access area of the
persons.
4) Stacking to be done at
about 1 mtr. Height.
5) Materials are to be stacked
under shed to avoid the
rain (weather effect) and
damaging.
5. Shifting of the 1. Ergonomic hazard due to 1) The entire job to be done
3. Scaffolding
material.
improper Material
Handling.
2. Personal injury during
shifting.
3. Fall of material on foot.
4. Struck with the materials
during shifting.
in presence of Qualified
and experienced
supervisor.
2) Right person will be
engaged for proper
handling of materials.
3) Proper PPEs are to be
used.
Date: Prepared by: Approved by:
Signature: Signature: