ST Electronics
From 2011 - Present
Installation Engineer
Signalling And PSD Department
From Aug 2013 to present
Part of Thomson East Coast Line (TEL) T252 project which involve in Documentation (Installation
Procedure write up, PMF and construction drawing), Coordination, Installation and
Testing Signalling equipment and system.
Main Job Responsibilities
Site Co-ordination
 Overall in charge for TEL stage 3 and Mandai Depot. Oversee ERL Depot.
 Responsible for coordinating with consultant (Parson Brinckerhoff) for ERL Depot.
 Responsible for co-ordinating the Signalling Interface with the Civil Contractor for
stations, tunnels and Depots that under my charge for all the cable routing and
equipments needed to be installed for Signalling system.
 Attended Civil/System Wide Contractor (CWC & SWC) meetings and working session
to resolve interfacing issues involving Signalling equipment.
Technical Responsibilities
 To write on technical documents (Installation Procedure) and typical mounting detail
drawing.
 Plan and review Equipment Layout and Routing Drawing (ELARD). Prepare drawings
and documents for submission to LTA.
 Review and comment Civil/System Wide Contractor (CWC & SWC) drawings to ensure
that all Signalling requirements are incorporated and ensure in accordance to ELARD. To
ensure that all comments raised and are satisfactorily closed-out.
 Attend CIP meeting and to ensure that installation activities are incorporate with
reference to the Baseline programme. To monitor and report any changes in the CIP
timescales (e.g. delays, to start later date) to Installation Manager and Project Manager.
Other Responsibilities
 To assist the new Entrants by departing my previous knowledge and experience in order
to familarise them with the Signalling & PSD Systems.
 To evaluate design for changes given by LTA and Main contactor (Alstom). e.g. change
in track alignment and architecture layout in station.
From Aug 2011 to Aug 2013
Part of Downtown Line (DTL) project team which involve in Coordination, Installation and
Testing Signalling equipment and system.
Main Job Responsibilties
Site Co-ordination
 Responsible for co-ordinating the Signalling Interface with the Civil Contractor for
stations and tunnels that under my charge for all the cable routing and equipment needed
to be installed for Signalling system.
 Attended Civil/System Wide Contractor (CWC & SWC) meetings and resolve interfacing
issues at site during the installation of Signalling equipment and keep the Project
Manager and Main contractor (Invensys Rail Group) updated on any relevant issues.
 To attend Site Inspections for Signalling related works (casting inspections, point
machine setting up, cable laying etc). To prepare progress reports relating to site
activities.
Technical Responsibilities
 To review and comment on all technical documents, Civil/System Wide Contractor
(CWC & SWC) and drawings to ensure that all Signalling requirements are realized and
ensure it accordance to design specification. To ensure that all comments raised and are
satisfactorily closed-out.
 To monitor installation progress and provide clear and concise reports. To monitor the
CIP’s, 4WRP and Baseline programme to ensure installation activities are undertaken
within the agreed timescales. To report any slippage in the aforesaid to the PM.
 To plan and supervise Signalling Equipment Installation in station and tunnel for DTL 1,
Kim Chuan Depot Test Track and Tai Seng Facility Building
 To plan and carry out Defect listing activities with the LTA and Operator. To ensure that
the Defects comments are detailed, clear and concise with the respective chainage being
recorded. To ensure that the Defects are closed accordingly.
 To carry out Signalling Testing activities (STC, T&C, ITC) when required.
 To carry out and ensure that all Testing Documentation has been fully signed-off,
collated and ready for submission to LTA upon completion.
 To highlight to the Overall In Charge and PM any anomalies found during installation,
testing and to follow through the aforesaid anomalies with the Sub Contractor to
satisfactory closure.
 To ensure that all Signalling Installation and Testing activities (including ITC) are
completed accordance to schedule baseline programme prior to Train Test Running.
 To attend monthly Planned General Inspections (PGI) at site with LTA.

More Related Content

What's hot (20)

asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
rachand
rachandrachand
rachand
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
NOHMAN CV
NOHMAN CVNOHMAN CV
NOHMAN CV
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 
Professional Experience
Professional ExperienceProfessional Experience
Professional Experience
 
Current Job Description
Current Job DescriptionCurrent Job Description
Current Job Description
 
RESUME C&I
RESUME C&IRESUME C&I
RESUME C&I
 
update cv AUG2011
update cv AUG2011update cv AUG2011
update cv AUG2011
 
CV
CVCV
CV
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
Jonathan Suarez Resume 2016
Jonathan Suarez Resume 2016Jonathan Suarez Resume 2016
Jonathan Suarez Resume 2016
 
Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
Usman khan Resume
Usman khan ResumeUsman khan Resume
Usman khan Resume
 
CV New 2016
CV New 2016CV New 2016
CV New 2016
 
omarPro updated latest 2015
omarPro updated latest 2015omarPro updated latest 2015
omarPro updated latest 2015
 
Somchai J.'s CV_2016 ++
Somchai J.'s CV_2016 ++Somchai J.'s CV_2016 ++
Somchai J.'s CV_2016 ++
 
pankaj resume
pankaj resumepankaj resume
pankaj resume
 

Viewers also liked

Image Presentation and Type of Management Analysis
Image Presentation and Type of Management AnalysisImage Presentation and Type of Management Analysis
Image Presentation and Type of Management AnalysisTheodoros P. Dimopoulos
 
Presentation of Saint Elizabeth Regional Medical Center Cancer Institute
Presentation of Saint Elizabeth Regional Medical Center Cancer InstitutePresentation of Saint Elizabeth Regional Medical Center Cancer Institute
Presentation of Saint Elizabeth Regional Medical Center Cancer InstituteTheodoros P. Dimopoulos
 
迷你仓 | 自存倉
迷你仓 | 自存倉迷你仓 | 自存倉
迷你仓 | 自存倉serenaponting
 
Indicadores tercer periodo
Indicadores tercer periodoIndicadores tercer periodo
Indicadores tercer periodosarmientoe
 
Περιγραφή των υγειονομικών συνθηκών στην ευρύτερη περιοχή της Νοτιοανατολικής...
Περιγραφή των υγειονομικών συνθηκών στην ευρύτερη περιοχή της Νοτιοανατολικής...Περιγραφή των υγειονομικών συνθηκών στην ευρύτερη περιοχή της Νοτιοανατολικής...
Περιγραφή των υγειονομικών συνθηκών στην ευρύτερη περιοχή της Νοτιοανατολικής...Theodoros P. Dimopoulos
 
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.Theodoros P. Dimopoulos
 
Passive irradiated disk with inner hole
Passive irradiated disk with inner holePassive irradiated disk with inner hole
Passive irradiated disk with inner holetunde akinsanmi
 
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστωνΗ μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστωνTheodoros P. Dimopoulos
 
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.Theodoros P. Dimopoulos
 
Mini warehouse hongkong (迷你倉 , 自存倉)
Mini warehouse hongkong (迷你倉 , 自存倉)Mini warehouse hongkong (迷你倉 , 自存倉)
Mini warehouse hongkong (迷你倉 , 自存倉)serenaponting
 
Mayores logros de manuel elkin patarroyo
Mayores logros de manuel  elkin  patarroyoMayores logros de manuel  elkin  patarroyo
Mayores logros de manuel elkin patarroyosarmientoe
 
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων Theodoros P. Dimopoulos
 

Viewers also liked (19)

Disintegrating Asteroid
Disintegrating AsteroidDisintegrating Asteroid
Disintegrating Asteroid
 
Image Presentation and Type of Management Analysis
Image Presentation and Type of Management AnalysisImage Presentation and Type of Management Analysis
Image Presentation and Type of Management Analysis
 
Presentation of Saint Elizabeth Regional Medical Center Cancer Institute
Presentation of Saint Elizabeth Regional Medical Center Cancer InstitutePresentation of Saint Elizabeth Regional Medical Center Cancer Institute
Presentation of Saint Elizabeth Regional Medical Center Cancer Institute
 
Apresentção BBOM
Apresentção BBOMApresentção BBOM
Apresentção BBOM
 
迷你仓 | 自存倉
迷你仓 | 自存倉迷你仓 | 自存倉
迷你仓 | 自存倉
 
Indicadores tercer periodo
Indicadores tercer periodoIndicadores tercer periodo
Indicadores tercer periodo
 
Περιγραφή των υγειονομικών συνθηκών στην ευρύτερη περιοχή της Νοτιοανατολικής...
Περιγραφή των υγειονομικών συνθηκών στην ευρύτερη περιοχή της Νοτιοανατολικής...Περιγραφή των υγειονομικών συνθηκών στην ευρύτερη περιοχή της Νοτιοανατολικής...
Περιγραφή των υγειονομικών συνθηκών στην ευρύτερη περιοχή της Νοτιοανατολικής...
 
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.
 
Social Entrepreneurship Ideas-vikasacenter
Social Entrepreneurship Ideas-vikasacenterSocial Entrepreneurship Ideas-vikasacenter
Social Entrepreneurship Ideas-vikasacenter
 
RiskMan Article
RiskMan ArticleRiskMan Article
RiskMan Article
 
Passive irradiated disk with inner hole
Passive irradiated disk with inner holePassive irradiated disk with inner hole
Passive irradiated disk with inner hole
 
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστωνΗ μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων
 
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.
Εργασία για τον Ιατρικό Τουρισμό - Παρουσίαση HARMONY S.A.
 
Mini warehouse hongkong (迷你倉 , 自存倉)
Mini warehouse hongkong (迷你倉 , 自存倉)Mini warehouse hongkong (迷你倉 , 自存倉)
Mini warehouse hongkong (迷你倉 , 自存倉)
 
Mayores logros de manuel elkin patarroyo
Mayores logros de manuel  elkin  patarroyoMayores logros de manuel  elkin  patarroyo
Mayores logros de manuel elkin patarroyo
 
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων
Η μετάβαση του ΕΣΥ από την εποχή των αρεστών στην εποχή των άριστων
 
Matric Certificate
Matric CertificateMatric Certificate
Matric Certificate
 
Robot 2010 patie3
Robot 2010 patie3Robot 2010 patie3
Robot 2010 patie3
 
Formation Robo2010 patie1
Formation Robo2010 patie1Formation Robo2010 patie1
Formation Robo2010 patie1
 

Similar to ST Electronics (20)

ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
Challenor-paul 13-01-16
Challenor-paul 13-01-16Challenor-paul 13-01-16
Challenor-paul 13-01-16
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
rineesh cv IN
rineesh cv  INrineesh cv  IN
rineesh cv IN
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Ashutosh updated C.V
Ashutosh updated C.VAshutosh updated C.V
Ashutosh updated C.V
 
ARSHAD cv with pic
ARSHAD cv with picARSHAD cv with pic
ARSHAD cv with pic
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
DML CV 17
DML CV 17DML CV 17
DML CV 17
 
Divaker resume updated
Divaker resume updatedDivaker resume updated
Divaker resume updated
 
Thomas Yates Resume
Thomas Yates ResumeThomas Yates Resume
Thomas Yates Resume
 
MARK P BOUVIER
MARK P BOUVIERMARK P BOUVIER
MARK P BOUVIER
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Sreekumar_Resume
Sreekumar_ResumeSreekumar_Resume
Sreekumar_Resume
 
upated c.v sa S.E.C (1)
upated c.v sa S.E.C (1)upated c.v sa S.E.C (1)
upated c.v sa S.E.C (1)
 

ST Electronics

  • 1. ST Electronics From 2011 - Present Installation Engineer Signalling And PSD Department From Aug 2013 to present Part of Thomson East Coast Line (TEL) T252 project which involve in Documentation (Installation Procedure write up, PMF and construction drawing), Coordination, Installation and Testing Signalling equipment and system. Main Job Responsibilities Site Co-ordination  Overall in charge for TEL stage 3 and Mandai Depot. Oversee ERL Depot.  Responsible for coordinating with consultant (Parson Brinckerhoff) for ERL Depot.  Responsible for co-ordinating the Signalling Interface with the Civil Contractor for stations, tunnels and Depots that under my charge for all the cable routing and equipments needed to be installed for Signalling system.  Attended Civil/System Wide Contractor (CWC & SWC) meetings and working session to resolve interfacing issues involving Signalling equipment. Technical Responsibilities  To write on technical documents (Installation Procedure) and typical mounting detail drawing.  Plan and review Equipment Layout and Routing Drawing (ELARD). Prepare drawings and documents for submission to LTA.  Review and comment Civil/System Wide Contractor (CWC & SWC) drawings to ensure that all Signalling requirements are incorporated and ensure in accordance to ELARD. To ensure that all comments raised and are satisfactorily closed-out.  Attend CIP meeting and to ensure that installation activities are incorporate with reference to the Baseline programme. To monitor and report any changes in the CIP timescales (e.g. delays, to start later date) to Installation Manager and Project Manager. Other Responsibilities
  • 2.  To assist the new Entrants by departing my previous knowledge and experience in order to familarise them with the Signalling & PSD Systems.  To evaluate design for changes given by LTA and Main contactor (Alstom). e.g. change in track alignment and architecture layout in station. From Aug 2011 to Aug 2013 Part of Downtown Line (DTL) project team which involve in Coordination, Installation and Testing Signalling equipment and system. Main Job Responsibilties Site Co-ordination  Responsible for co-ordinating the Signalling Interface with the Civil Contractor for stations and tunnels that under my charge for all the cable routing and equipment needed to be installed for Signalling system.  Attended Civil/System Wide Contractor (CWC & SWC) meetings and resolve interfacing issues at site during the installation of Signalling equipment and keep the Project Manager and Main contractor (Invensys Rail Group) updated on any relevant issues.  To attend Site Inspections for Signalling related works (casting inspections, point machine setting up, cable laying etc). To prepare progress reports relating to site activities. Technical Responsibilities  To review and comment on all technical documents, Civil/System Wide Contractor (CWC & SWC) and drawings to ensure that all Signalling requirements are realized and ensure it accordance to design specification. To ensure that all comments raised and are satisfactorily closed-out.  To monitor installation progress and provide clear and concise reports. To monitor the CIP’s, 4WRP and Baseline programme to ensure installation activities are undertaken within the agreed timescales. To report any slippage in the aforesaid to the PM.  To plan and supervise Signalling Equipment Installation in station and tunnel for DTL 1, Kim Chuan Depot Test Track and Tai Seng Facility Building  To plan and carry out Defect listing activities with the LTA and Operator. To ensure that the Defects comments are detailed, clear and concise with the respective chainage being recorded. To ensure that the Defects are closed accordingly.
  • 3.  To carry out Signalling Testing activities (STC, T&C, ITC) when required.  To carry out and ensure that all Testing Documentation has been fully signed-off, collated and ready for submission to LTA upon completion.  To highlight to the Overall In Charge and PM any anomalies found during installation, testing and to follow through the aforesaid anomalies with the Sub Contractor to satisfactory closure.  To ensure that all Signalling Installation and Testing activities (including ITC) are completed accordance to schedule baseline programme prior to Train Test Running.  To attend monthly Planned General Inspections (PGI) at site with LTA.