Muhammad Usman Khan is an electrical engineer with over 7 years of experience in radio network optimization and radio frequency engineering. He has worked on 2G and 3G networks for Mobilink and Ericsson in Pakistan, monitoring KPIs, conducting drive tests, troubleshooting issues, and handling customer complaints. He holds a BSc in Electrical Engineering and is PEC registered.