SlideShare a Scribd company logo
1 of 8
RESUME
SAJEEV R. Email: sajeevrajagopal@yahoo.com MOB:
+971564993973
QA/QC E & I AND CP INSPECTOR
(ARAMCO &ZADCO
APPROVED)
PERSONNEL PROFILE:-
NAME : SAJEEV R.
NATIONALITY: INDIAN
EDUCATIONAL QUALIFICATION:-
 Diploma in Electrical and Electronics Engineering
COMPUTER KNOWLEDGE:-
 MS Office
PROFESSIONAL QUALIFICATION:
 Familiar with Saudi Aramco Quality Management Information system ( QMIS ) &
Technip Site Management and Control ( SMC ) Release 4.0
 Completed the Quality Management System (QMS ) Lead Auditor Training Course
– IRCA REFERENCE A17072, Certificate Number 104835
 BASIC H2S (9014) OPITO APPROVED.
 Saudi Aramco permit receiver Certificate
 SUMMARY OF EXPERIENCE:-
Having ample experience in the field of Electrical and instrumentation
Engineering, engaged in inspection, supervision testing and commissioning of
various electrical equipment, instrumentation and cathodic protection. Quality
Sajeev R. – QA/QC E & I Inspector
Page 1 of 8
Control and Supervision for the installation of electrical equipments such as;
lighting, conduit layout, cable tray, cable pulling and termination of medium, low
voltage cable. Testing and commissioning of medium and low voltage cables
including motors. Installation of Cathodic Protection; galvanic anodes and deep
anode beds, Installation of Positive and Negative cables from rectifiers to
structures. Holiday Testing of Positive Anode Cables. Hook-Up and Installation of
Process related instruments such as; impulse tubing, transmitters, controllers,
PI, PDIT, PCV, etc. Calibration and loop checking of instrument’s from field to
DCS/PLC. Installation, Pre-commissioning and testing of 230KV, 34.5KV &
13.8KV Substations, MV/LV Switchgear,MV/LV MCC’S, MV/LV Transformers,
230KV, 34.5KV Cables , Boiler system, Cooling tower, MOV’S, Control panels
and Lightning protection system.
SKILLS AND STRENGTH:-
 Installation of SCADA System, Base Station Radio, Omni-Directional
Antenna and RF Feeder, GPS Antenna and GPS Time Server and Pre-
commissioning testing. Well Hook-up’s, PDHMS & MPFM Installation and
SCADA Integration.
> Electrical heat tracing system
 Installation and Commissioning of Power and other Electrical,
Instrumentation and CP Equipments.
 Electrical, Instrumentation and CP Installation and Standards.
 Installation of various Electrical Machinery and Control Installation.
 Cable Design (Cable Jointing, Glanding and Termination, Laying works,
Cable Tray works).
 Conduit Pipe Installation.
 Ability to Coordinate the Project Activity.
 Installation,Pre-commissioning and testing of 230KV,34.5KV & 13.8KV
Substations,MV/LV Switchgear,MV/LV MCC’S & Transformers.
Sajeev R. – QA/QC E & I Inspector
Page 2 of 8
 Installation, Pre-commissioning & Testing of Lightning protection system.
 Installation, Inspection & Testing of Grounding system.
 Installation, Pre-commissioning & Testing Inspection of MV/LV Motors.
WORKING EXPERIENCE:-
Company : ABB SpA-Process Automation Division
Project : ZAKUM DEVELOPMENT COMPANY ZIRKU FACILITIES
EPC FOR POWER UPGRADE AT ZIRKU PROJECT NO.8374
Position : QC ELECTRICAL INSPECTOR (ZADCO APPROVED)
Duration : 01 APRIL 2015 to till date
Company : Zamil Offshore Services Company, KSA
Project : Offshore Hook-up, Upgrade Modification & Comm. Support
Contract No: 6600027423 / J.O. 10-03026-0037
Position : E&I INSPECTOR (ARAMCO APPROVED)
Duration : 26 Feb 2013 to 04 March 2015
Company : Technip Italy S.P.A
Project : Saudi Aramco Total Refining & Petrochemical Company (SATORP)
Contract No: 3000235433
Position : Electrical Inspector (SATORP Approved)
Duration : 29 Oct. 2011 to 19 Dec. 2012
Company : Mohd.Al Mojil Group Company
Project : Mnifa Co-Generation and Main Substations
B.I.No : 10-00450-0003
Position : QA/QC E&I Inspector (Aramco Approved)
Duration : 18th
Apr.2011 to 20th
Oct. 2011
Company : Contracting & Trading Company (CAT)
Project : MGS Expansion, SRG-2 P/L, PCV & Meter Station Upgrade
B.I. No. : BI-10-00433-0002
Position : QA/QC E & I Inspector (Aramco Approved)
Duration : 12th
Jan. 2010 to 17th
Apr.2011
Sajeev R. – QA/QC E & I Inspector
Page 3 of 8
Company : Al Latifa Cont. Company
Project : Saudi Aramco Corporate Data Center (CDC) Project
Dhahran (BI-10-0273)
Position : QA/QC Electrical Inspector (Aramco Approved)
Duration : 7th
Oct. 2009 to 7th
Jan. 2010
Company : Arabian Bemco
Project : Utility Upgrade Project at Juaymah Gas Plant
Saudi Aramco (BI-10-03454)
Position : QA/QC Electrical Inspector (Aramco Approved)
Duration : 9th
Apr. 2008 to 2nd
Aug. 2009
Job Responsibilities:-
 Verification of inspection readiness before issuing RFI.
 Keeping the Files/Inspection Records always updated.
 Highlighting all discrepancies/anomaly detected during monitoring
inspection and informing the same to QC Manager.
 Initiate Surveillance and Non Conformance Report (NCR) as required in
consultation with QC Manager.
 Follow of corrective and preventive action for NCRs/Surveillance issued
and verification of effectiveness of the same.
 Taking immediate remedial to clear inspection log book comments.
 Submitting daily report to QC Manager at the end of each day of work.
 Sole responsible for all Quality Control Activities for the allotted area of
discipline.
 Verification of materials supplied with that of materials approval.
 Verification of proper functioning and utilization of measuring
instruments.
 Familiarization with overall construction scope of work.
Sajeev R. – QA/QC E & I Inspector
Page 4 of 8
 Verification of correctness of Equipment/Materials identifications provided,
color coding scheme of cables in accordance with internal practice.
 Identification/Numbering of cables and its cores in accordance with IFC
drawings.
 Monitoring, verification of calibration and identification of measuring
instruments.
 Final cable termination inspection of the primary and secondary cables.
 Prepare Inspection Test Plan (ITP) for Electrical Discipline.
 Inspect the work under as per specifications and standards.
 Assuring correct quality materials as per specification.
 Testing and commissioning of electrical installations and equipments.
 Inspection charge for Electrical works at Port Facilities
 Inspection of installation Grounding System, Cathodic Protection System,
Small Power and Lighting Installation, Fabrication of Instrument and
Electrical Equipment Support, Substation Equipments, Low and Medium
Voltage Motors.
 Inspection for the installation of transformer rectifier, Positive and Negative
Cables laying and AC disconnecting switches installation.
 Inspection for the installation of Deep Well Anode beds, Distributed Anode,
Sacrificial magnesium anodes and single pin, three pin test station for
pipelines.
 Inspection for the installation anode/cable marker posts for pipeline.
 Bonding boxes installations.
 Holiday testing of positive anode cables.
 Monthly reading (Pipe to Soil Potential) for cathodic protection system.
 Installation and commissioning of WRMU for cathodic protection system.
 Preparation of RFI, Field Inspections, Co-ordination with Client QA/QC
Inspector / Construction Team.
Sajeev R. – QA/QC E & I Inspector
Page 5 of 8
 Co-ordination with Third Party Independent Laboratory in conducting
Tests.
 Review QCP, ITP and Method of statement.
 Review Pre-commissioning test packages.
Company : Shree Electrical Company, India
Position : QC Electrical Inspector
Duration : Nov. 2001 to Dec. 2007
Company : DAELIM Engineers and Constructors
Project : M/s. NTPC’s 350Mw CCPP (Naphta Based)
Position : QC Electrical Inspector
Duration : Nov. 1996 to Aug. 2001
Company : F.A.C.T., India
Position : Apprentice in Electrical Engineering
Duration : Aug. 1995 to Aug. 1996
Job Responsibilities:-
• Project quality standards specified in the Contract and that the procedures
laid down in the Quality Control procedures and inspection.
• Test Plans to achieve these standards are followed.
• Complete supervision of Panel Erection
• Fabrication, erection, commissioning of electrical equipments.
• Alignment of switchgears and testing as per specification and drawing
provided. Motors, transformers etc as for specification.
• Close Co-ordination and discussion with clients, consultant and other
department concerned.
• Quality and safety system.
• Supervisor for cable tray, cable laying, panel shifting, motor alignment,
termination of power cable control.
Sajeev R. – QA/QC E & I Inspector
Page 6 of 8
• Knowledge about circuit breaker, transformers, panels, relays, Insulator,
motors, generators, bus system, single line diagram of sub-station,
generation, transmission and protection etc.
• Meggering and continuity test of primary and secondary cables from
Junction Box to Instrument.
• Final Cable termination inspection of the primary and secondary cables.
• Final/Individual inspection of the Electrical and Instrumentation
equipment.
• Inspect the work under as per specifications and standards.
• Review Design and development of one line diagram, preparation of
electrical equipment specifications, identifying hazardous areas,
• Installation of Component of Sub-Station.
• Supply of line distribution for consumer’s premises low voltage.
• Prepare installation field check list and mechanical completion package for
electrical and instrumentation part
• Make as-built drawing for all changes in the execution
• Assuring correct quality materials as per specification.
• Inspection of electrical activities in the plant area such as lightning
protection, grounding system, lighting layout, power conduiting, fire & alarm
system etc.
• Inspection for material receiving, Monthly reports, electrical plan/drawings
and Safety Procedures.
• Testing and commissioning of electrical installations and equips
• Conduct megger and insulation test and prepare test record / report
• Inspection & Testing of LV Transformer.
• High voltage and Low voltage Electrical and Equipment installation.
• Site surveillance to check the construction work and give some comments
if necessary according to standard installation.
• Installation of new transformer bus ducts control gears and switch gears,
Sajeev R. – QA/QC E & I Inspector
Page 7 of 8
reconnection and testing of power and control cable.
• Electrical supervisor for shut down activities.
• Inspection for spares for Electrical Projects.
• Daily monitoring works and inspection to ensure conformity with plans,
design and standards.
• Inspect motor cable pulling, grounding copper bar, cable tray emergency
lighting cable installation, pole erection, string of wire and terminals well.
(SAJEEV R.)
Sajeev R. – QA/QC E & I Inspector
Page 8 of 8

More Related Content

What's hot

Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV NewShujaat Jan
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CVYousif Alanazi
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC EngineerSalman Faris
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerSrivenkatesh Padmanaban
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electricianjesegbue
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSanad Samir
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGpappu kumar
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs expSudipto Majumder
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 

What's hot (20)

CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV New
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CV
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
QAQC E&I
QAQC E&IQAQC E&I
QAQC E&I
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs exp
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 

Viewers also liked

Viewers also liked (20)

Updated CV MValenzuela (latest)
Updated CV MValenzuela (latest)Updated CV MValenzuela (latest)
Updated CV MValenzuela (latest)
 
LaoJee Jobs
LaoJee JobsLaoJee Jobs
LaoJee Jobs
 
CV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& WeldingCV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& Welding
 
Sukanya CV
Sukanya CVSukanya CV
Sukanya CV
 
Liyakuddin Shaik CV ok
Liyakuddin Shaik CV okLiyakuddin Shaik CV ok
Liyakuddin Shaik CV ok
 
Amir QC
Amir QCAmir QC
Amir QC
 
Walid Hassaballah CV
Walid Hassaballah CV Walid Hassaballah CV
Walid Hassaballah CV
 
QC SUP CV
QC SUP CVQC SUP CV
QC SUP CV
 
شهادة خبر طاهر خان
شهادة خبر طاهر خانشهادة خبر طاهر خان
شهادة خبر طاهر خان
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
Sadique resume 2015
Sadique resume 2015Sadique resume 2015
Sadique resume 2015
 
cv
cvcv
cv
 
Project _TQR_Manager
Project _TQR_ManagerProject _TQR_Manager
Project _TQR_Manager
 
MFA -CV
MFA -CVMFA -CV
MFA -CV
 
SUPERVISOR-QC INSPECTOR BASHEER CV
SUPERVISOR-QC INSPECTOR BASHEER CVSUPERVISOR-QC INSPECTOR BASHEER CV
SUPERVISOR-QC INSPECTOR BASHEER CV
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 
Hashim khan cv
Hashim khan cvHashim khan cv
Hashim khan cv
 
CV For QA-QC
CV For QA-QCCV For QA-QC
CV For QA-QC
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
 
Naushad_CV 2016
Naushad_CV 2016Naushad_CV 2016
Naushad_CV 2016
 

Similar to LATEST UPDATED CV OF MR SAJEEV R

Similar to LATEST UPDATED CV OF MR SAJEEV R (20)

M Imran
M ImranM Imran
M Imran
 
Rajesh CV -
Rajesh CV - Rajesh CV -
Rajesh CV -
 
Commission resume
Commission resumeCommission resume
Commission resume
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
ZISHAN
ZISHANZISHAN
ZISHAN
 
Abraham CV 03.06.2015
Abraham CV 03.06.2015Abraham CV 03.06.2015
Abraham CV 03.06.2015
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Tamil E&I Compex inspector
Tamil E&I Compex  inspectorTamil E&I Compex  inspector
Tamil E&I Compex inspector
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
Jaikaran Dan ( Testing and Commissioning Engineer )
Jaikaran Dan ( Testing and Commissioning Engineer  ) Jaikaran Dan ( Testing and Commissioning Engineer  )
Jaikaran Dan ( Testing and Commissioning Engineer )
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
Vimal cv
Vimal cv Vimal cv
Vimal cv
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
Tabrez
TabrezTabrez
Tabrez
 
Tabrez
TabrezTabrez
Tabrez
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
Irfan - Elec Engr
Irfan - Elec EngrIrfan - Elec Engr
Irfan - Elec Engr
 

LATEST UPDATED CV OF MR SAJEEV R

  • 1. RESUME SAJEEV R. Email: sajeevrajagopal@yahoo.com MOB: +971564993973 QA/QC E & I AND CP INSPECTOR (ARAMCO &ZADCO APPROVED) PERSONNEL PROFILE:- NAME : SAJEEV R. NATIONALITY: INDIAN EDUCATIONAL QUALIFICATION:-  Diploma in Electrical and Electronics Engineering COMPUTER KNOWLEDGE:-  MS Office PROFESSIONAL QUALIFICATION:  Familiar with Saudi Aramco Quality Management Information system ( QMIS ) & Technip Site Management and Control ( SMC ) Release 4.0  Completed the Quality Management System (QMS ) Lead Auditor Training Course – IRCA REFERENCE A17072, Certificate Number 104835  BASIC H2S (9014) OPITO APPROVED.  Saudi Aramco permit receiver Certificate  SUMMARY OF EXPERIENCE:- Having ample experience in the field of Electrical and instrumentation Engineering, engaged in inspection, supervision testing and commissioning of various electrical equipment, instrumentation and cathodic protection. Quality Sajeev R. – QA/QC E & I Inspector Page 1 of 8
  • 2. Control and Supervision for the installation of electrical equipments such as; lighting, conduit layout, cable tray, cable pulling and termination of medium, low voltage cable. Testing and commissioning of medium and low voltage cables including motors. Installation of Cathodic Protection; galvanic anodes and deep anode beds, Installation of Positive and Negative cables from rectifiers to structures. Holiday Testing of Positive Anode Cables. Hook-Up and Installation of Process related instruments such as; impulse tubing, transmitters, controllers, PI, PDIT, PCV, etc. Calibration and loop checking of instrument’s from field to DCS/PLC. Installation, Pre-commissioning and testing of 230KV, 34.5KV & 13.8KV Substations, MV/LV Switchgear,MV/LV MCC’S, MV/LV Transformers, 230KV, 34.5KV Cables , Boiler system, Cooling tower, MOV’S, Control panels and Lightning protection system. SKILLS AND STRENGTH:-  Installation of SCADA System, Base Station Radio, Omni-Directional Antenna and RF Feeder, GPS Antenna and GPS Time Server and Pre- commissioning testing. Well Hook-up’s, PDHMS & MPFM Installation and SCADA Integration. > Electrical heat tracing system  Installation and Commissioning of Power and other Electrical, Instrumentation and CP Equipments.  Electrical, Instrumentation and CP Installation and Standards.  Installation of various Electrical Machinery and Control Installation.  Cable Design (Cable Jointing, Glanding and Termination, Laying works, Cable Tray works).  Conduit Pipe Installation.  Ability to Coordinate the Project Activity.  Installation,Pre-commissioning and testing of 230KV,34.5KV & 13.8KV Substations,MV/LV Switchgear,MV/LV MCC’S & Transformers. Sajeev R. – QA/QC E & I Inspector Page 2 of 8
  • 3.  Installation, Pre-commissioning & Testing of Lightning protection system.  Installation, Inspection & Testing of Grounding system.  Installation, Pre-commissioning & Testing Inspection of MV/LV Motors. WORKING EXPERIENCE:- Company : ABB SpA-Process Automation Division Project : ZAKUM DEVELOPMENT COMPANY ZIRKU FACILITIES EPC FOR POWER UPGRADE AT ZIRKU PROJECT NO.8374 Position : QC ELECTRICAL INSPECTOR (ZADCO APPROVED) Duration : 01 APRIL 2015 to till date Company : Zamil Offshore Services Company, KSA Project : Offshore Hook-up, Upgrade Modification & Comm. Support Contract No: 6600027423 / J.O. 10-03026-0037 Position : E&I INSPECTOR (ARAMCO APPROVED) Duration : 26 Feb 2013 to 04 March 2015 Company : Technip Italy S.P.A Project : Saudi Aramco Total Refining & Petrochemical Company (SATORP) Contract No: 3000235433 Position : Electrical Inspector (SATORP Approved) Duration : 29 Oct. 2011 to 19 Dec. 2012 Company : Mohd.Al Mojil Group Company Project : Mnifa Co-Generation and Main Substations B.I.No : 10-00450-0003 Position : QA/QC E&I Inspector (Aramco Approved) Duration : 18th Apr.2011 to 20th Oct. 2011 Company : Contracting & Trading Company (CAT) Project : MGS Expansion, SRG-2 P/L, PCV & Meter Station Upgrade B.I. No. : BI-10-00433-0002 Position : QA/QC E & I Inspector (Aramco Approved) Duration : 12th Jan. 2010 to 17th Apr.2011 Sajeev R. – QA/QC E & I Inspector Page 3 of 8
  • 4. Company : Al Latifa Cont. Company Project : Saudi Aramco Corporate Data Center (CDC) Project Dhahran (BI-10-0273) Position : QA/QC Electrical Inspector (Aramco Approved) Duration : 7th Oct. 2009 to 7th Jan. 2010 Company : Arabian Bemco Project : Utility Upgrade Project at Juaymah Gas Plant Saudi Aramco (BI-10-03454) Position : QA/QC Electrical Inspector (Aramco Approved) Duration : 9th Apr. 2008 to 2nd Aug. 2009 Job Responsibilities:-  Verification of inspection readiness before issuing RFI.  Keeping the Files/Inspection Records always updated.  Highlighting all discrepancies/anomaly detected during monitoring inspection and informing the same to QC Manager.  Initiate Surveillance and Non Conformance Report (NCR) as required in consultation with QC Manager.  Follow of corrective and preventive action for NCRs/Surveillance issued and verification of effectiveness of the same.  Taking immediate remedial to clear inspection log book comments.  Submitting daily report to QC Manager at the end of each day of work.  Sole responsible for all Quality Control Activities for the allotted area of discipline.  Verification of materials supplied with that of materials approval.  Verification of proper functioning and utilization of measuring instruments.  Familiarization with overall construction scope of work. Sajeev R. – QA/QC E & I Inspector Page 4 of 8
  • 5.  Verification of correctness of Equipment/Materials identifications provided, color coding scheme of cables in accordance with internal practice.  Identification/Numbering of cables and its cores in accordance with IFC drawings.  Monitoring, verification of calibration and identification of measuring instruments.  Final cable termination inspection of the primary and secondary cables.  Prepare Inspection Test Plan (ITP) for Electrical Discipline.  Inspect the work under as per specifications and standards.  Assuring correct quality materials as per specification.  Testing and commissioning of electrical installations and equipments.  Inspection charge for Electrical works at Port Facilities  Inspection of installation Grounding System, Cathodic Protection System, Small Power and Lighting Installation, Fabrication of Instrument and Electrical Equipment Support, Substation Equipments, Low and Medium Voltage Motors.  Inspection for the installation of transformer rectifier, Positive and Negative Cables laying and AC disconnecting switches installation.  Inspection for the installation of Deep Well Anode beds, Distributed Anode, Sacrificial magnesium anodes and single pin, three pin test station for pipelines.  Inspection for the installation anode/cable marker posts for pipeline.  Bonding boxes installations.  Holiday testing of positive anode cables.  Monthly reading (Pipe to Soil Potential) for cathodic protection system.  Installation and commissioning of WRMU for cathodic protection system.  Preparation of RFI, Field Inspections, Co-ordination with Client QA/QC Inspector / Construction Team. Sajeev R. – QA/QC E & I Inspector Page 5 of 8
  • 6.  Co-ordination with Third Party Independent Laboratory in conducting Tests.  Review QCP, ITP and Method of statement.  Review Pre-commissioning test packages. Company : Shree Electrical Company, India Position : QC Electrical Inspector Duration : Nov. 2001 to Dec. 2007 Company : DAELIM Engineers and Constructors Project : M/s. NTPC’s 350Mw CCPP (Naphta Based) Position : QC Electrical Inspector Duration : Nov. 1996 to Aug. 2001 Company : F.A.C.T., India Position : Apprentice in Electrical Engineering Duration : Aug. 1995 to Aug. 1996 Job Responsibilities:- • Project quality standards specified in the Contract and that the procedures laid down in the Quality Control procedures and inspection. • Test Plans to achieve these standards are followed. • Complete supervision of Panel Erection • Fabrication, erection, commissioning of electrical equipments. • Alignment of switchgears and testing as per specification and drawing provided. Motors, transformers etc as for specification. • Close Co-ordination and discussion with clients, consultant and other department concerned. • Quality and safety system. • Supervisor for cable tray, cable laying, panel shifting, motor alignment, termination of power cable control. Sajeev R. – QA/QC E & I Inspector Page 6 of 8
  • 7. • Knowledge about circuit breaker, transformers, panels, relays, Insulator, motors, generators, bus system, single line diagram of sub-station, generation, transmission and protection etc. • Meggering and continuity test of primary and secondary cables from Junction Box to Instrument. • Final Cable termination inspection of the primary and secondary cables. • Final/Individual inspection of the Electrical and Instrumentation equipment. • Inspect the work under as per specifications and standards. • Review Design and development of one line diagram, preparation of electrical equipment specifications, identifying hazardous areas, • Installation of Component of Sub-Station. • Supply of line distribution for consumer’s premises low voltage. • Prepare installation field check list and mechanical completion package for electrical and instrumentation part • Make as-built drawing for all changes in the execution • Assuring correct quality materials as per specification. • Inspection of electrical activities in the plant area such as lightning protection, grounding system, lighting layout, power conduiting, fire & alarm system etc. • Inspection for material receiving, Monthly reports, electrical plan/drawings and Safety Procedures. • Testing and commissioning of electrical installations and equips • Conduct megger and insulation test and prepare test record / report • Inspection & Testing of LV Transformer. • High voltage and Low voltage Electrical and Equipment installation. • Site surveillance to check the construction work and give some comments if necessary according to standard installation. • Installation of new transformer bus ducts control gears and switch gears, Sajeev R. – QA/QC E & I Inspector Page 7 of 8
  • 8. reconnection and testing of power and control cable. • Electrical supervisor for shut down activities. • Inspection for spares for Electrical Projects. • Daily monitoring works and inspection to ensure conformity with plans, design and standards. • Inspect motor cable pulling, grounding copper bar, cable tray emergency lighting cable installation, pole erection, string of wire and terminals well. (SAJEEV R.) Sajeev R. – QA/QC E & I Inspector Page 8 of 8