1. B A S H I R A H M E D
House 4340-A, St# 3 , Muhalla Ali Pura Khushab
Mobile : +92300-5658477
OBJECTIVE
Seeking position as a Project Management technical side in the Field of
Telecommunication and challenging environment where I can professionally
utilize my Academics, Professional, Managerial and Administrative Skills.
WORK HISTORY
DIN NEWS
April 2014- TO Date
Designation: Bearue Chief Khushab
Working Experience
Work on a file zilla, camera and reporting. Our aim is make better report for our channels.
We give your channel all reports our Area incedents local and important.
Our management is too good.
SBN TV SAHAR NEWS
April 2013- TO Date 2014
Designation: Bearue Chief Khushab
Working Experience
Work on a file zilla, camera and reporting. Our aim is make better report for our channels.
We give your channel all reports our Area incedents local and important.
Our management is too good.
We have a office for work. Our reporting system is reliable, and give 100% report.
We have all Equipments in working position.
Maftel Network
A International subcontractor worked with ZTE technologies
Mar 2013 – To Date
Designation: Project MANAGER
Project : CM Pak, TP & PTCL Projects
Manegarial Experience
Manage the installation/swap project of Telenor and CMPak.
2. Manage the PTCL New sites installation project as per ZTE standard.
Prepare and share daily Report with customer.
Achive the installation target as per custome time line.
CCS International (China com)
A International subcontractor worked with ZTE technologies
Aug 2007 – Feb 2013
Designation: Project MANAGER (O & M)
Project : CM Pak O&M Project
Manegarial Experience
O& M of complete site including Microwave, ZTE BTS, SDR and other equipments
Troubleshooting of all kinds of SDH and PDH Transmission Equipments including , DG
Telecom Microwave equipment installed on CMPak sites
Trace all types of BTS troubleshooting regarding to rectifier, BTS hardware
Responsible for removing all types of external and internal alarms
Health Check of complete site
Quality Assurance & Quality Control of Installed equipment.
Responsible for coordinating with the customer of issues that arise at the site on daily basis
Monthly KPI Meeting with Customer to improve Network.
Co-Ordination and meetings with Client regarding project for their satisfaction.
Strong technical support to field Engineers for Network services improvement.
Documentation of Network for all of regional project.
Sites Audit for PM [Preventive Maintenance] and CM [Corrective Maintenance ] to check
out the quality of Maintenance and give a better response to Customer.
Connection with NOC for site status and then to guide field engineers.
Daily feedback to NOC for Maintain table-1. Table-2, Table-3 and table-6
Focus on Work Orders timely execution
To prepare PO & Invoices against services & work order.
Management Experience
Monthly Meeting with Customer to improve Network.
Supervision of Daily, Weekly and monthly basis reporting.
3. 471 sites Resource management (staff of Field, NOC and Admin)
Co-Ordination and meetings with Customer regarding project for their satisfaction.
Strong technical support to field Engineers for Network services improvement.
Documentation of Network for the entire regional project.
Managing Work Orders generation, execution & WO Summary on monthly basis
Sites Audit for PM [Preventive Maintenance] and CM [Corrective Maintenance] to check out
the quality of Maintenance and give a better response to Customer.
Co-ordination with NOC for site status and then to guide field engineers.
Daily feedback to NOC for Maintain table-1.
Providing Technical support and expert suggestions to all regional team to meet CM pak
Quality standards.
Attend trouble ticket and take required action for resolving issues.
Rectification of Alcatle BTS software faults by doing Off-line commissioning.
Resolving Evolium BTS hardware faults by changing SUMA Card, TRE, Combiner, RI
Cable, Abis Cable, CSO3 jumper cable, CSO4 jumper cable, Alarm card, Network
Interfacing card, FSCB card, TFT Board and Shelf.
Removing RF cable issues by using Site Master like VSWR.
BTS Alarm patching.
Resoling Transmission related issues. Like E1 break, HiBer, LowBer and RSL
improvement.
Replace and Configure NEC iPassolink, Passolink NEO, Passolink Compect and
Passolink IDUs.
Changing E1 traffic from one media path to another.
Removing idu and odu alarm by resolving issues.
Supervise Power related issues resolving activities like ATS, DBX, Rectifier, genset ATS,
Alternator related faults.
I have good knowledge and worked at many kinds of Gensets NEQ 31KVA-27KVA,
OLYMPIAN-30-27-12.5KVA, POWER TECH 27-20-13KVA, SIEMENS32.5KVA,Mets
30KVA, Impac 27kva).
I have good knowledge and working experience at many kinds of ATS PANELS
(Ghadder duel PLC, single PLC, without PLC, Arena Tech, High Tech, allied Eng. Duel,
Combine Eng. Duel and Siemens made. Competent in Project Management,
Administration
Meet challenges and achieve target with in given time duration
Manpower training and development
Technical and management training
Feed back of timely and accurate information to the management such as
efficiency, loss time, earning & losses analysis, individual and group
performance.
Contributes to building a positive team spirit
NORTHERN Net
A Local subcontractor worked with ZTE technologies.
Dec 2006 to Aug 2007
Designation : BSS and MW Engineer
4. Project: Ufone and PTCL Project
Responsibilities
Installation and data configuration of Huawei GSM BTS, 3012, 3012AE.
Trouble Shooting and Maintenance of HUAWEI BTS
Diagnosis and rectification of major and minor fault in Huawei GSM.
Survey & installation Of new BTS (Indoor BTS)
Commissioning of new sites
Expansion of the existing sites
Commissioning and Integration of Microwave Links. Commissioning, Integration and
configuration of BTS. Complete Sweep Testing (VSWR, DTF and Return Loss Testing).
TRX Power Testing and E1 Testing
Bit Error Rate Test (BERT) and analysis,of Microwave Link
Broad Band (IP T V) Installation Hardware and Software
Training from UET (University of Engineering Technology) Three Month
UET (University of Engineering Technology) Training BTS and Microwave (HUAWEI)
Working in Broad Band IPTV Of PTCL
Rooter installation
Installation of Mobilink, Ufone, CM Pak MSC hang Installation of PDF and VOD PTCL
Exceing
InterSES Pvt Ltd
A Local subcontractor worked with Huawei technologies.
Sep 2005 to Dec 2006
Designation : MW Engineer
Project: Ufone, Motorolla and Warid
Responsibilities
Trouble Shooting and Maintenance of BTS. Installation & commissioning of NEC PDH &
SDH microwave transmission equipment with NORTEL for Ufone Ph-3 & PH-4
Expansion projects.
Installation of NEC Cnode & SMS150V multiplexers including 19 inch transmission &
ETSI racks.
Installation of Siemens PDH & SDH MW links for Telenor project.
Installation of NEC MW equipment for WARID, PAKTEL GSM & PTCL WLL project.
Installation of ZTE BTS equipment for PTCL WLL project.
Supervision of GSM antenna & feeder cable installation at BTS sites.
Conduct Line of sight (LOS), draft, panoramic & balloon surveys for MW paths.
Supervision of Cable laying, ODU & MW Antenna installation at towers.
Preparation of Survey reports.
Installation of Alcatel PDH Microwave link for Mobilink /Paktel projects.
MOTOROLLA/ WATEEN (WIMAX)
5. Worked as Regional Project Coordinator in InterSES for Motorola / Wateen WiMax
Project.
Fully conversant with Installation, Commissioning and Optimizing of Microwave
Transmission Equipment (Sagem IDU & ODU) and WiMax.
Performed Extensive Surveys for MW (Sagem IDU & ODU) and WiMax Equipment
(Motorola ULAP/DAPs and CMM/BCU) deployment on the Existing Warid Sites.
Performing Site Surveys (Providing Feasibility and proposals for Equipment deployment on
the site.)
Spectrum Solution Pvt Ltd
A Local subcontractor worked with Huawei, ZTE and Ericsson technologies.
Aug 2005 to Sep 2006
Designation : MW and BSS Engineer
Project: Warid Rollout Project
Responsibilities
Working on DXX Node-3 , Node-16 on Ericsson equipment for Warid project.
BTS Installation of ZTE for PAKTEL GSM.
Manage the Daily report, SMR and MR.
Commissioning and Integration of Microwave Links. Commissioning, Integration and
configuration of BTS. Complete Sweep Testing (VSWR, DTF and Return Loss Testing).
Creating BOQs for GSM Equipment
NCI Pvt Ltd
A Local subcontractor worked with Huawei, ZTE and Ericsson technologies.
Oct 2004 to Aug 2005
Designation : MW and BSS Engineer
Project: Warid Rollout Project
Responsibilities
Working on Ericsson Equipment Indoor/Outdoor for Warid Project (BTS and M/W)
Survey & installation Of new BTS (Indoor BTS)
ACADEMIC CAREER
UET Pakistan (2004)
BSC
Joharabad Digree Collage. (1995)
HSE ( 1st
Div)
Sargodha board of secondary Education. (1993)
6. Secondary School Certification (1st Div)
TECHNICAL TRAININGS
Huawei Training Centre UET Lahore
1st
Oct 2007 ---- 5 Oct 2007
5 days Training on Huawei GSM Equipments (BTS3012, BTS3012AE)
Huawei Training Centre UET Lahore
Jan 2007 ---- March 2007
3 Month Training on GSM Equipments and IPTV Rooter
Training of BSS of CDMA from HUAWEI at UET Lahore(3606,
3012AE,3012)
Training of Microwave from Huawei at UET , Lahore
Diploma in mobile communication from IET(6 months)
Training of BSS of GSM from HUAWEI(3900,3900A and DBS 3900)
Training of Quality Control of BSS from Huawei (Overall of Huawei)
PERSONAL INFORMATION
Father’s Name : Haji Aziz Ahmed
N.I.C. No : 61101-9922403-5
Date of Birth : 20-Aug-1976
Contact : +9233 3816-2405
Language : English , Urdu, Punjabi
Marital Status : Married
Nationality : Pakistani
7. Secondary School Certification (1st Div)
TECHNICAL TRAININGS
Huawei Training Centre UET Lahore
1st
Oct 2007 ---- 5 Oct 2007
5 days Training on Huawei GSM Equipments (BTS3012, BTS3012AE)
Huawei Training Centre UET Lahore
Jan 2007 ---- March 2007
3 Month Training on GSM Equipments and IPTV Rooter
Training of BSS of CDMA from HUAWEI at UET Lahore(3606,
3012AE,3012)
Training of Microwave from Huawei at UET , Lahore
Diploma in mobile communication from IET(6 months)
Training of BSS of GSM from HUAWEI(3900,3900A and DBS 3900)
Training of Quality Control of BSS from Huawei (Overall of Huawei)
PERSONAL INFORMATION
Father’s Name : Haji Aziz Ahmed
N.I.C. No : 61101-9922403-5
Date of Birth : 20-Aug-1976
Contact : +9233 3816-2405
Language : English , Urdu, Punjabi
Marital Status : Married
Nationality : Pakistani