SlideShare a Scribd company logo
1 of 4
MOHAMMAD ATHAR MALIK
Mobile: +91-9721455388/ +91-9415946863 ~ E-Mail:athar80_28@yahoo.com
MANAGEMENT PROFESSIONAL: Possesses over 9 years of experience in
Telecom Passive Infra Operations and OFC (Project and O&M)
 Currently working with Rajeev Enterprises as Project Manager (For RJIL and NFS Project) Fiber Roll out 2500 K.M.
and 700 Node Connectivity from Oct. 15 to till date. Responsible for Providing Technical support for planning of fiber
allocation, duct design (PVC) and Route design. Training new staff for installation and configuration of OFC and
FDMS.FTTH/GPON Network Planning, Estimation, Route Selection, OSP Planning, Fiber Manage ment, Fiber link power
Budgeting.
 Over 9 years of experience with various Telecommunication Companies of Fiber Optic experience (deployment,
distribution networks, understanding of OFC theory and design, testing, troubleshoot fiber optic issues.) and passive
infra of cell sites, Project Planning, Project coordination & Execution, Planning & Control, Quality Assurance, Technical
Support, Expertise in Developing System & Procedures for Infrastructure Projects .
 Area of Expertise in OFC &HDPE Laying Project Rollout: Expertise in Corporate strategy, Quality Assurance,
Link Test, Project Planning, Completion of projects on time and on budget, Monitoring and Controlling, Contract
Negotiation, Vendor Development and Government Liasioning.Duct laying/ OFC laying/blowing in laid duct, installation
of Joint/route marker, Construction of manhole/Joint Chambers, providing protection to the duct pipe whenever
required as per specifications with DWC/RCC pipes & GI Pipes etc, installation of electronic m arker etc.
 As a part of O&M – Managing SME Uptime Report—were Field technicians log complaints for support required for their
respective sites (DG, Battery Bank, Fuel, Etc) take –up those complaints with respective vendors and get it closed.
 As a part of Quality Assurance -Prepare quality plan, ITP, Work method statements & test formats as per the standard
way. As directed, develop and execute a Project with Quality for the Project phase. Monitor and measure effectiveness
of the Quality of work.
 Sound exposure to:
o Build Infrastructure of Wire-line domain in Telecom, Networking, Fibre Connectivity, and Tower
Installations& System Integrity with E2E Implementation.
o Optical Fibre Cable Transmission Planning & Network Architecture Design with quality assurance, Splicing,
Testing & Analysis, Installation and Commissioning, Quality Acceptance, Network Management.
 Exceptional team building, organisational and analytical skills coupled with demonstrated relationship management
and communication abilities.
CORE COMPETENCIES
 Handling project activities involving working out various requirements with respect to
utilities, equipment & manpower and monitoring overall project operations for ensuring
timely completion. Also handled the projects of O&M implementation (All TOC Objectives,
Processes, and Operation & Technology for building TOC with the Help of Vendor).
 Obtaining ROW permission, coordination & liaison for already surveyed work
 Prepare quality plan, ITP, Work method statements & test formats as per the standard
way. As directed, develop and execute a Project with Quality for the Project phase. Monitor
and measure effectiveness of the Quality of work.
 Operating & maintaining the facilities involving corrective & preventive maintenance
for trouble-free operations with maximum machine up-time & efficiency, while curtailing
the costs / expenses. Maintenance of BSC/HUB/Strategic/High dependency Sites.
 Proficient in working on Software of Alarm Monitoring; possess accountability for RFS
& RFAI of the sites; gained sound expertise in the Detection of Alarms, DG Alarm Testing
and Power Plant Alarm Testing.
 Supervising network planning, designing & implementation / maintenance of
communications links, trial run and testing activities.
 Conducting cost benefit analysis of the projects including feasibility studies, assessment
of requirements, adaptation, interface, testing and commissioning.
 Making & presenting reports & proposals on network related problems, presenting the
reports as an analysis of various faults. Directing, leading & motivating workforce and
imparting continuous on job training for accomplishing greater operational effectiveness /
efficiency.
 Coordination and supporting the Field Engineer for timely output.Management of the
manpower working in respective shift & solving problem of Team. Coordination within the
project team and the Vendor team, taking reports on daily basis and setting targets for
them.
CAREER RECITAL
Project Management
Quality Assurance
Operations &
Maintenance
Networking
Installation &
Commissioning
Customer Service
Team Management
HFCL (RJIL) Lucknow/Bhopal
Oct’12 – Oct’15 Project Engineer
Key Deliverables
 Planning: OFC route survey, SLD with GPS.
 Managing all work from planning to hand over the Route to O&M.
 Fiber testing- Using OTDR, Optical Power Meter& Laser Source.
 Installation of FDMS, Splicing/Jointing and testing.
 Link testing (with OTDR & Power meter, etc) and commissioning.
 Quality checking and Supervise all the technical work.
 Responsible for the high-performing team for deployment of fiber optic cables.
 Create and implement technical inspection and quality assurance procedures.
 Ensure material dispatch & commissioning and the replaced material to be deposit at warehouse.
 Experience in Liaison with government agencies for ROW issues during Projects.
 Route Survey, SLD and ABD Preparation of BOQ.
 Monitoring and supervision of fiber route maintain MTTR & minimize the fiber cuts.
 Testing & rectification of fibers.
 Supervision of trenching, ducting, cabling, termination & end-to-end testing for operations job.
 Vendor management, meetings with contractors on daily basis to reduce faults.
 Responsible for the material using for project roll out.
 Maintaining the DPR and regularly tracking of daily outputs.
 Responsible for billing and all data maintaining.
 Site survey for both GBT & RTT tower
 Foundation procedure for Tower (GBT &RTT), D.G & Shelter;Erection of Tower & shelter.
 Internal electrical work is done under my supervision according to drawing.
 Auditing skills, analytical skills, problem solving, decision making, assertiveness.
 Project Liasioning: To liaison to obtain statuary clearances from regulatory bodies, statutory bodies such as highway
authority, municipality, Public Works department, and Electrical utilities, forest department, gas authorities etc, on
behalf of company.
Reshma Enterprises (Reliance communication Ltd), Lucknow
Oct’11 – Oct’12 Technical Manager
Growth Path
Oct’11 – March’12 Project engineer
March’12 – Oct’12 Technical manager
I was working with OFC rollout for intra-city&NLD and O&M of 700 cell sites and 400 KM fiber route both for
Reliance communication.
Key Deliverables
 Handled various activities for start Work:
- Survey of routes, Preparation of SLD.
- Planning for required machinery, manpower and Material.
 Route Survey, SLD and ABD Preparation of BOQ
 Ensuring smooth operation and maintenance of the communication networks by providing operational support to team
members and vendors & Coordinate with team members, Project Engineers & Vendors.
 Involved from the conceptualization to final completion of sites, i.e. Civil work, Tower erection, Electrical work,
installation of BTS, RF work, SEB work etc.
 Resolving Right of Way (ROW) Liaisons for Various Departments.
 Handling of contractors and performance monitoring.
 Quality control of Built network.
 Trenching, ducting, micro ducting and OFC laying, IBD work.
 Fiber Planning, splicing and Link testing
 Splicing Diagram preparation and troubleshooting.
 Acceptance testing of all work.
 Fiber testing Using OTDR, Power Meter, Splicing M/C, talk set,
 Provide Brad band connectively to customer.
 All work related High value customer Required.
 Operations Management: To manage the Workforce, to work closely for executing the Project to achieve the
scheduled delivery dates. To monitor the project Management in terms of deliverables, quality, sales, marketing, project
management, procurement, scheduling, client meeting, coordination and resources management.
 Strategy Planning: To Develop Policies, Procedure and systems for the Project Management System. To formulate set
of guidelines, regulations, rules, shared values and frame work for accomplishing the process by abidi ng those.
 Project Coordination: To Liaise with various official and functional departments for sharing information, for obtaining
approvals, for getting supports in terms of finance & resources as per schedule. To execute specific projects / Tasks as
directed by Vice-president and Directors at Head office. Manage the delivery of projects in accordance with the agreed
time frames and as per clients expectations, mentioned in their agreement.
Note--: Survey of visibility link and fiber.
Oct’08 – Oct’11 with Indus Towers, Lucknow
Growth Path
Oct’08 – Dec’09 WFM Engineer
Jan’10 – Oct’11 O&M Engineer/ Project Team lead
Key Deliverables
 Involved in the maintenance & supervision of:
- Cell Sites; Sites to keep them in proper functioning condition.
- Designed & Rollout IUTR (Infra Uptime Report).
- Carry out preventive/corrective maintenance for cell sites.
- Sites down due to power failure.
 Monitored:
- Alarms and rectifying them.
- Ensuring the timely MIS reports to all concerns.
- Daily Monitoring on Site Outages & Analysis, trend analysis on OPEX savings & other initiatives .
- Generating of the reports on halted sites and down sites.
 Ascertained:
- Escalation of the alarms as per Indus Escalation Matrix; conducting of the auditing of the alarm termination
for sample sites.
- Closure of the TT after ground feedback. And Database maintenance of the TTs raised.
 Handled activities pertaining to:
- Detection of alarms, DG Alarm Testing, Power Plant Alarm Testing; generation of Trouble Ticket for Critical
Alarms and Outages; support installation of all electrical equipment.
- Addition of new sites rolled-out on Surveillance Terminals; alarm troubleshooting and rectification;
escalation of down site as well as external alarms to the concerned field engineers and Cluster M. via Click
Schedule.
 Worked on the WFM Applications i.e. administered as well as resolved the escalations regarding external alarms &
outage and acquired reasons from field engineers in case of Outage & Cluster Manager’s in case of major incidence.
 Adept in troubleshooting & problem resolution, train and supervise technicians in quality, adherence to work order
specifications and equipment maintenance.
 Taking care of preventive/corrective maintenance for cell sites. Daily Operation activity progress relating with
Preventive Maintenance and Corrective Maintenance services.
 Worked on various software like:
- Citrix Software.
- Reflection.
- MML Command.
- I- Navigator & I-Propeller.
~ Major Projects Handled ~
 Operation Shine
- Generates & Closed TT’s of faulty equipment and different type of problem of site.
- Management of the manpower working in respective shift& solving problem of Team.
- Overall responsibility of maintenance of site.
 DC Energy Meter Project.
- Punching Reading in DCEM Portal.
- Observation of accuracy of readings.
- Maintenance & supervision of installation of DCEM.
- Coordinate with Warehouse for replacement of Faulty DCEMs.
 Tower Consolidation Project
- Consolidate & Termination Site as per Corporate.
- Coordination within the project team and the Vendor team, taking reports on daily basis and setting targets
for them.
- Consolidation of nearby site to one single site by upgrading the infra and getting the OPCO to shift at other
site.
- Tracking and Coordinating for the Material and also reconciliation of material for the Implementation of
Consolidate& Termination Sites.
- Preparation of BOQ for Consolidate & Termination Site.
- Coordinate with TSP and Deployment Team.
- Closure of All O&M Punch Point.
Notable Highlights
 Functioned as WFM Engineer of UP East having responsibility of all Indus Towers owned towers of Circle spread over
twelve Clusters with 8525 sites and 13500 tenancies.
 As a part of O&M – Managing SME Uptime Report—were Field technicians log complaints for support required for their
respective sites (DG, Battery Bank, Fuel, Etc) take –up those complaints with respective vendors and get it closed.
A.K Construction (Bharti Airtel Limited), Lucknow
Jul’07 – Oct’08 D.S.L. Engineer
Key Deliverables
 Handled various activities pertaining to:
- Configuration of DSL Connection; troubleshooting of problems with the Technician Team.
- Administration of the link & DSL.
 Provided high speed Internet access to customer with Digital Subscriber Line (DSL) over ordinary telephone lines.
 Worked on the detection of the fault at the customer’s end.
 Ensured total customer satisfaction.
 Sorted out various problems from customer end.
 Maintenance & supervision of OFC . / splicing, / testing, / cable lying / budgeting of fiber optics. / projects: mainly
working on the project of optic fiber access network for Bharti Airtel Limited spread all over Lucknow.
 Duct laying/ OFC laying/blowing in laid duct, installation of Joint/route marker, Construction of manhole/Joint Chambers,
providing protection to the duct pipe whenever required as per specifications with DWC/RCC pipes & GI Pipes etc.,
installation of electronic marker etc.
 Site accusation work, civil renovation works, installation of commercial power, survey & installation of indoor & outdoor
onus.
ACADEMIA
2007 B.Tech. From Institute of Engineering &Technology, Bundelkhand University, Jhansi. Secured 65%
IT Proficiency
Operating System : MS-DOS, Windows 9x, NT, 2x, ME, XP.
Application Software : MS Word, MS Excel, MS PowerPoint
Language : C, C++, Dot Net, SQL Server.
Database : MS-Access, SQL Server.
MAJOR ACADEMIC PROJECT HANDLED
Title : Office Communication System
Duration : 6 Months
Team Size : 2
TRAINING & WORKSHOP
 Undergone training for the Certificate in Summer Training in operation & maintenance of telephone Switching Exchange
in July 2006 from BSNL, Lakhimpur.
 Actively participated in Entrepreneurship Awareness Campaign organized by Govt. of India in association with
Entrepreneurship Development Institute (2006).
BEYOND CURRICULUM
 Actively participated in games at District level and secured 3rd
position.
ACHIEVEMENTS
 Secured:
- 1st
Rank in District Level Science Exhibition.
- 1st
Prize in Seminar Titled Thin Client Server.
- 2nd
Prize in All India Engineering Project Contest organized by I.E.T., BundelkhandUniversity, Jhansi.
PERSONAL SCAN
Permanent Address : C-1, Insaf Nagar, Indra Nagar, Lucknow – 226016
Date of Birth : 28th
September, 1980
Passport Number : K1545530
Languages Known : English, Hindi and Urdu

More Related Content

What's hot (20)

ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 
Nagendra(2)
Nagendra(2)Nagendra(2)
Nagendra(2)
 
MAIN RESUME
MAIN RESUMEMAIN RESUME
MAIN RESUME
 
zakaria atta
zakaria attazakaria atta
zakaria atta
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
 
m.berna.resume-draft-2.1
m.berna.resume-draft-2.1m.berna.resume-draft-2.1
m.berna.resume-draft-2.1
 
ELV Engineer
ELV EngineerELV Engineer
ELV Engineer
 
Arnab-Ganguly cv RF Optimization
Arnab-Ganguly cv RF OptimizationArnab-Ganguly cv RF Optimization
Arnab-Ganguly cv RF Optimization
 
Kiran -cv
Kiran -cvKiran -cv
Kiran -cv
 
Resume Bodhi
Resume BodhiResume Bodhi
Resume Bodhi
 
Resume (S.Saravanan)
Resume (S.Saravanan)Resume (S.Saravanan)
Resume (S.Saravanan)
 
Resume (cv) Naeem Ahmad ELV Engineer
Resume (cv) Naeem Ahmad ELV EngineerResume (cv) Naeem Ahmad ELV Engineer
Resume (cv) Naeem Ahmad ELV Engineer
 
RAJ PATIL
RAJ PATILRAJ PATIL
RAJ PATIL
 
FPL RESUME1115
FPL RESUME1115FPL RESUME1115
FPL RESUME1115
 
RAJESH KUMAR SRIVASTAVABBNL
RAJESH KUMAR SRIVASTAVABBNLRAJESH KUMAR SRIVASTAVABBNL
RAJESH KUMAR SRIVASTAVABBNL
 
deFluiter Resume Final 122914b
deFluiter Resume Final 122914bdeFluiter Resume Final 122914b
deFluiter Resume Final 122914b
 
Rakesh cv updated
Rakesh cv updatedRakesh cv updated
Rakesh cv updated
 

Viewers also liked

úLtimos avances tecnológicos
úLtimos avances tecnológicosúLtimos avances tecnológicos
úLtimos avances tecnológicospecesalagua
 
Alleiah R Keeley CV 2017
Alleiah R Keeley CV 2017Alleiah R Keeley CV 2017
Alleiah R Keeley CV 2017Alleiah Keeley
 
OtelApp - Features -New-22.01.17
OtelApp - Features -New-22.01.17OtelApp - Features -New-22.01.17
OtelApp - Features -New-22.01.17carl D'Mello
 
UPS Compite Globalmente con la Tecnología de La Información
UPS Compite Globalmente con la Tecnología de La InformaciónUPS Compite Globalmente con la Tecnología de La Información
UPS Compite Globalmente con la Tecnología de La InformaciónMelissa Romero
 

Viewers also liked (9)

Nelly carvajal
Nelly carvajalNelly carvajal
Nelly carvajal
 
úLtimos avances tecnológicos
úLtimos avances tecnológicosúLtimos avances tecnológicos
úLtimos avances tecnológicos
 
Alleiah R Keeley CV 2017
Alleiah R Keeley CV 2017Alleiah R Keeley CV 2017
Alleiah R Keeley CV 2017
 
Nelly carvajal
Nelly carvajalNelly carvajal
Nelly carvajal
 
Nelly carvajal
Nelly carvajalNelly carvajal
Nelly carvajal
 
OtelApp - Features -New-22.01.17
OtelApp - Features -New-22.01.17OtelApp - Features -New-22.01.17
OtelApp - Features -New-22.01.17
 
Facedecimoa
FacedecimoaFacedecimoa
Facedecimoa
 
Chuyukh fadani
Chuyukh fadaniChuyukh fadani
Chuyukh fadani
 
UPS Compite Globalmente con la Tecnología de La Información
UPS Compite Globalmente con la Tecnología de La InformaciónUPS Compite Globalmente con la Tecnología de La Información
UPS Compite Globalmente con la Tecnología de La Información
 

Similar to Mobile Project Management Professional

Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)sanjer jilani
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Ali Omar
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yMasood Dar
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama,PMP
 
Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016Anand Rao
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,IQBAL KHAN
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
manoj_resume__1_
manoj_resume__1_manoj_resume__1_
manoj_resume__1_Manoj Kumar
 
Lakhdeep Singh CV
Lakhdeep Singh CVLakhdeep Singh CV
Lakhdeep Singh CVlucky singh
 

Similar to Mobile Project Management Professional (20)

Resume_Mohammad Shahadat Hossain
Resume_Mohammad Shahadat HossainResume_Mohammad Shahadat Hossain
Resume_Mohammad Shahadat Hossain
 
Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
 
Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016
 
Saeed Ahmed Siddiqui - CV
Saeed Ahmed Siddiqui - CVSaeed Ahmed Siddiqui - CV
Saeed Ahmed Siddiqui - CV
 
Alaba Adedayo CV
Alaba Adedayo CVAlaba Adedayo CV
Alaba Adedayo CV
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,
 
Shivayogayya Hiremath
Shivayogayya HiremathShivayogayya Hiremath
Shivayogayya Hiremath
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 
manoj_resume__1_
manoj_resume__1_manoj_resume__1_
manoj_resume__1_
 
Lakhdeep Singh CV
Lakhdeep Singh CVLakhdeep Singh CV
Lakhdeep Singh CV
 
CV_SANDEEP_PROF
CV_SANDEEP_PROFCV_SANDEEP_PROF
CV_SANDEEP_PROF
 
Archana Mishra Resume
Archana Mishra ResumeArchana Mishra Resume
Archana Mishra Resume
 
Bala electl engineer-cv
Bala electl engineer-cvBala electl engineer-cv
Bala electl engineer-cv
 
Sukanta_CV
Sukanta_CVSukanta_CV
Sukanta_CV
 

Recently uploaded

Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 

Recently uploaded (20)

Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 

Mobile Project Management Professional

  • 1. MOHAMMAD ATHAR MALIK Mobile: +91-9721455388/ +91-9415946863 ~ E-Mail:athar80_28@yahoo.com MANAGEMENT PROFESSIONAL: Possesses over 9 years of experience in Telecom Passive Infra Operations and OFC (Project and O&M)  Currently working with Rajeev Enterprises as Project Manager (For RJIL and NFS Project) Fiber Roll out 2500 K.M. and 700 Node Connectivity from Oct. 15 to till date. Responsible for Providing Technical support for planning of fiber allocation, duct design (PVC) and Route design. Training new staff for installation and configuration of OFC and FDMS.FTTH/GPON Network Planning, Estimation, Route Selection, OSP Planning, Fiber Manage ment, Fiber link power Budgeting.  Over 9 years of experience with various Telecommunication Companies of Fiber Optic experience (deployment, distribution networks, understanding of OFC theory and design, testing, troubleshoot fiber optic issues.) and passive infra of cell sites, Project Planning, Project coordination & Execution, Planning & Control, Quality Assurance, Technical Support, Expertise in Developing System & Procedures for Infrastructure Projects .  Area of Expertise in OFC &HDPE Laying Project Rollout: Expertise in Corporate strategy, Quality Assurance, Link Test, Project Planning, Completion of projects on time and on budget, Monitoring and Controlling, Contract Negotiation, Vendor Development and Government Liasioning.Duct laying/ OFC laying/blowing in laid duct, installation of Joint/route marker, Construction of manhole/Joint Chambers, providing protection to the duct pipe whenever required as per specifications with DWC/RCC pipes & GI Pipes etc, installation of electronic m arker etc.  As a part of O&M – Managing SME Uptime Report—were Field technicians log complaints for support required for their respective sites (DG, Battery Bank, Fuel, Etc) take –up those complaints with respective vendors and get it closed.  As a part of Quality Assurance -Prepare quality plan, ITP, Work method statements & test formats as per the standard way. As directed, develop and execute a Project with Quality for the Project phase. Monitor and measure effectiveness of the Quality of work.  Sound exposure to: o Build Infrastructure of Wire-line domain in Telecom, Networking, Fibre Connectivity, and Tower Installations& System Integrity with E2E Implementation. o Optical Fibre Cable Transmission Planning & Network Architecture Design with quality assurance, Splicing, Testing & Analysis, Installation and Commissioning, Quality Acceptance, Network Management.  Exceptional team building, organisational and analytical skills coupled with demonstrated relationship management and communication abilities. CORE COMPETENCIES  Handling project activities involving working out various requirements with respect to utilities, equipment & manpower and monitoring overall project operations for ensuring timely completion. Also handled the projects of O&M implementation (All TOC Objectives, Processes, and Operation & Technology for building TOC with the Help of Vendor).  Obtaining ROW permission, coordination & liaison for already surveyed work  Prepare quality plan, ITP, Work method statements & test formats as per the standard way. As directed, develop and execute a Project with Quality for the Project phase. Monitor and measure effectiveness of the Quality of work.  Operating & maintaining the facilities involving corrective & preventive maintenance for trouble-free operations with maximum machine up-time & efficiency, while curtailing the costs / expenses. Maintenance of BSC/HUB/Strategic/High dependency Sites.  Proficient in working on Software of Alarm Monitoring; possess accountability for RFS & RFAI of the sites; gained sound expertise in the Detection of Alarms, DG Alarm Testing and Power Plant Alarm Testing.  Supervising network planning, designing & implementation / maintenance of communications links, trial run and testing activities.  Conducting cost benefit analysis of the projects including feasibility studies, assessment of requirements, adaptation, interface, testing and commissioning.  Making & presenting reports & proposals on network related problems, presenting the reports as an analysis of various faults. Directing, leading & motivating workforce and imparting continuous on job training for accomplishing greater operational effectiveness / efficiency.  Coordination and supporting the Field Engineer for timely output.Management of the manpower working in respective shift & solving problem of Team. Coordination within the project team and the Vendor team, taking reports on daily basis and setting targets for them. CAREER RECITAL Project Management Quality Assurance Operations & Maintenance Networking Installation & Commissioning Customer Service Team Management
  • 2. HFCL (RJIL) Lucknow/Bhopal Oct’12 – Oct’15 Project Engineer Key Deliverables  Planning: OFC route survey, SLD with GPS.  Managing all work from planning to hand over the Route to O&M.  Fiber testing- Using OTDR, Optical Power Meter& Laser Source.  Installation of FDMS, Splicing/Jointing and testing.  Link testing (with OTDR & Power meter, etc) and commissioning.  Quality checking and Supervise all the technical work.  Responsible for the high-performing team for deployment of fiber optic cables.  Create and implement technical inspection and quality assurance procedures.  Ensure material dispatch & commissioning and the replaced material to be deposit at warehouse.  Experience in Liaison with government agencies for ROW issues during Projects.  Route Survey, SLD and ABD Preparation of BOQ.  Monitoring and supervision of fiber route maintain MTTR & minimize the fiber cuts.  Testing & rectification of fibers.  Supervision of trenching, ducting, cabling, termination & end-to-end testing for operations job.  Vendor management, meetings with contractors on daily basis to reduce faults.  Responsible for the material using for project roll out.  Maintaining the DPR and regularly tracking of daily outputs.  Responsible for billing and all data maintaining.  Site survey for both GBT & RTT tower  Foundation procedure for Tower (GBT &RTT), D.G & Shelter;Erection of Tower & shelter.  Internal electrical work is done under my supervision according to drawing.  Auditing skills, analytical skills, problem solving, decision making, assertiveness.  Project Liasioning: To liaison to obtain statuary clearances from regulatory bodies, statutory bodies such as highway authority, municipality, Public Works department, and Electrical utilities, forest department, gas authorities etc, on behalf of company. Reshma Enterprises (Reliance communication Ltd), Lucknow Oct’11 – Oct’12 Technical Manager Growth Path Oct’11 – March’12 Project engineer March’12 – Oct’12 Technical manager I was working with OFC rollout for intra-city&NLD and O&M of 700 cell sites and 400 KM fiber route both for Reliance communication. Key Deliverables  Handled various activities for start Work: - Survey of routes, Preparation of SLD. - Planning for required machinery, manpower and Material.  Route Survey, SLD and ABD Preparation of BOQ  Ensuring smooth operation and maintenance of the communication networks by providing operational support to team members and vendors & Coordinate with team members, Project Engineers & Vendors.  Involved from the conceptualization to final completion of sites, i.e. Civil work, Tower erection, Electrical work, installation of BTS, RF work, SEB work etc.  Resolving Right of Way (ROW) Liaisons for Various Departments.  Handling of contractors and performance monitoring.  Quality control of Built network.  Trenching, ducting, micro ducting and OFC laying, IBD work.  Fiber Planning, splicing and Link testing  Splicing Diagram preparation and troubleshooting.  Acceptance testing of all work.
  • 3.  Fiber testing Using OTDR, Power Meter, Splicing M/C, talk set,  Provide Brad band connectively to customer.  All work related High value customer Required.  Operations Management: To manage the Workforce, to work closely for executing the Project to achieve the scheduled delivery dates. To monitor the project Management in terms of deliverables, quality, sales, marketing, project management, procurement, scheduling, client meeting, coordination and resources management.  Strategy Planning: To Develop Policies, Procedure and systems for the Project Management System. To formulate set of guidelines, regulations, rules, shared values and frame work for accomplishing the process by abidi ng those.  Project Coordination: To Liaise with various official and functional departments for sharing information, for obtaining approvals, for getting supports in terms of finance & resources as per schedule. To execute specific projects / Tasks as directed by Vice-president and Directors at Head office. Manage the delivery of projects in accordance with the agreed time frames and as per clients expectations, mentioned in their agreement. Note--: Survey of visibility link and fiber. Oct’08 – Oct’11 with Indus Towers, Lucknow Growth Path Oct’08 – Dec’09 WFM Engineer Jan’10 – Oct’11 O&M Engineer/ Project Team lead Key Deliverables  Involved in the maintenance & supervision of: - Cell Sites; Sites to keep them in proper functioning condition. - Designed & Rollout IUTR (Infra Uptime Report). - Carry out preventive/corrective maintenance for cell sites. - Sites down due to power failure.  Monitored: - Alarms and rectifying them. - Ensuring the timely MIS reports to all concerns. - Daily Monitoring on Site Outages & Analysis, trend analysis on OPEX savings & other initiatives . - Generating of the reports on halted sites and down sites.  Ascertained: - Escalation of the alarms as per Indus Escalation Matrix; conducting of the auditing of the alarm termination for sample sites. - Closure of the TT after ground feedback. And Database maintenance of the TTs raised.  Handled activities pertaining to: - Detection of alarms, DG Alarm Testing, Power Plant Alarm Testing; generation of Trouble Ticket for Critical Alarms and Outages; support installation of all electrical equipment. - Addition of new sites rolled-out on Surveillance Terminals; alarm troubleshooting and rectification; escalation of down site as well as external alarms to the concerned field engineers and Cluster M. via Click Schedule.  Worked on the WFM Applications i.e. administered as well as resolved the escalations regarding external alarms & outage and acquired reasons from field engineers in case of Outage & Cluster Manager’s in case of major incidence.  Adept in troubleshooting & problem resolution, train and supervise technicians in quality, adherence to work order specifications and equipment maintenance.  Taking care of preventive/corrective maintenance for cell sites. Daily Operation activity progress relating with Preventive Maintenance and Corrective Maintenance services.  Worked on various software like: - Citrix Software. - Reflection. - MML Command. - I- Navigator & I-Propeller. ~ Major Projects Handled ~  Operation Shine - Generates & Closed TT’s of faulty equipment and different type of problem of site. - Management of the manpower working in respective shift& solving problem of Team. - Overall responsibility of maintenance of site.  DC Energy Meter Project. - Punching Reading in DCEM Portal. - Observation of accuracy of readings. - Maintenance & supervision of installation of DCEM. - Coordinate with Warehouse for replacement of Faulty DCEMs.  Tower Consolidation Project - Consolidate & Termination Site as per Corporate. - Coordination within the project team and the Vendor team, taking reports on daily basis and setting targets for them. - Consolidation of nearby site to one single site by upgrading the infra and getting the OPCO to shift at other site. - Tracking and Coordinating for the Material and also reconciliation of material for the Implementation of Consolidate& Termination Sites.
  • 4. - Preparation of BOQ for Consolidate & Termination Site. - Coordinate with TSP and Deployment Team. - Closure of All O&M Punch Point. Notable Highlights  Functioned as WFM Engineer of UP East having responsibility of all Indus Towers owned towers of Circle spread over twelve Clusters with 8525 sites and 13500 tenancies.  As a part of O&M – Managing SME Uptime Report—were Field technicians log complaints for support required for their respective sites (DG, Battery Bank, Fuel, Etc) take –up those complaints with respective vendors and get it closed. A.K Construction (Bharti Airtel Limited), Lucknow Jul’07 – Oct’08 D.S.L. Engineer Key Deliverables  Handled various activities pertaining to: - Configuration of DSL Connection; troubleshooting of problems with the Technician Team. - Administration of the link & DSL.  Provided high speed Internet access to customer with Digital Subscriber Line (DSL) over ordinary telephone lines.  Worked on the detection of the fault at the customer’s end.  Ensured total customer satisfaction.  Sorted out various problems from customer end.  Maintenance & supervision of OFC . / splicing, / testing, / cable lying / budgeting of fiber optics. / projects: mainly working on the project of optic fiber access network for Bharti Airtel Limited spread all over Lucknow.  Duct laying/ OFC laying/blowing in laid duct, installation of Joint/route marker, Construction of manhole/Joint Chambers, providing protection to the duct pipe whenever required as per specifications with DWC/RCC pipes & GI Pipes etc., installation of electronic marker etc.  Site accusation work, civil renovation works, installation of commercial power, survey & installation of indoor & outdoor onus. ACADEMIA 2007 B.Tech. From Institute of Engineering &Technology, Bundelkhand University, Jhansi. Secured 65% IT Proficiency Operating System : MS-DOS, Windows 9x, NT, 2x, ME, XP. Application Software : MS Word, MS Excel, MS PowerPoint Language : C, C++, Dot Net, SQL Server. Database : MS-Access, SQL Server. MAJOR ACADEMIC PROJECT HANDLED Title : Office Communication System Duration : 6 Months Team Size : 2 TRAINING & WORKSHOP  Undergone training for the Certificate in Summer Training in operation & maintenance of telephone Switching Exchange in July 2006 from BSNL, Lakhimpur.  Actively participated in Entrepreneurship Awareness Campaign organized by Govt. of India in association with Entrepreneurship Development Institute (2006). BEYOND CURRICULUM  Actively participated in games at District level and secured 3rd position. ACHIEVEMENTS  Secured: - 1st Rank in District Level Science Exhibition. - 1st Prize in Seminar Titled Thin Client Server. - 2nd Prize in All India Engineering Project Contest organized by I.E.T., BundelkhandUniversity, Jhansi. PERSONAL SCAN Permanent Address : C-1, Insaf Nagar, Indra Nagar, Lucknow – 226016 Date of Birth : 28th September, 1980 Passport Number : K1545530 Languages Known : English, Hindi and Urdu