1. Curriculum Vitae1 / 5
BAMBANG Widiyanto
PERSON IN CHARGE DISCIPLINES
ELECTRICAL & INSTRUMENT SUPERVISOR
Address Perum Papan Mas Block A10 No 06 Rt 06 Rw 04, Setia Mekar – Bekasi,
West Java
Phone +628125595346 or +6282111898346 Indonesia
E-Mail Bambangwidianto58@yahoo.co.id
National Indonesian nationality
Passport No
Expire
- A 1702018
- Nov 2016
Language - English
- Indonesian
STUDIES
01 July, 1987 Diploma / Academic seaman ship
02
June 1979
Senior High School
COURSES ATTENDED
2013 • November 26 “ SWING ROPES “ Training by PT Bina Nusantara for
Client TOTAL INDONESIE
2013 • July 4/5 “ BOSIET “ Training By PT Indosafe Pratama for Client TOTAL
INDONESIE
• August 14 “ ELECTRICAL ABILITY PERMIT TRAINING For Level LR,
L2V, H2 By TOTAL INDONESIE
PROFFESIONAL SKILLS
Project Supervisor Electrical & Instrument.
`
o Offering comprehensive experience and expertise in the following area of responsibility Capable to
develop Company works concept, to distribute duty and responsibility between subcontractor and
subordinate. Experience in extensive planning, organizing, schedule evaluating, and follow up varied
responsibilities in a timely and completed manners. Proficient in developing excellent relationship with
client and consultants. Experience in knowledge provision analyses and policies in Order to decide
eligible benefit. Skilled at organizing work and resolving problem, which arise in daily activities.
PROFESSIONAL EXPERIENCE
01
March 2014 – April
2014
Person in charge Disciplines: Electrical Commissioning Supervisor with SCHNEIDER Indonesia
Project: Renewal - Indocement Palimanan
Cleint : Schneider
Duties and
Responcibility
Work under the direction of the Lead Electrical Commissioning Engineer to
assure timely, appropriate and demonstrable commissioning of the facilities
with due regard to the Environment and Health and Safety of Personnel in
His or Her discipline
Apply and share with team members experience and lessons learned from
previous Projects
Input of relevant information to the Completions Management System for the
Electrical discipline
2. Curriculum Vitae2 / 5
Be conversant with check sheet Completion and Management
Develop supporting Commissioning documentation and conversant with IT
application.
Liaise with construction during completion to ensure the facilities are handover
in accordance with specifications and with the minimal quantity of punch list
items.
Ensure commissioning safety and that any incidents and near misses are
reported
Ensure commissioning activities are implemented in accordance with the
project’s Operations Permit to Work system.
Prepare daily reports re: progress and commissioning / materials / logistics
issues.
Verify commissioning is completed and documented in accordance with
approved Commissioning procedures
Perform all Pre-Commissioning and Commissioning function tests relevant to
the Mechanical discipline
Interface with other discipline Commissioning Engineers to commission
systems as required
Liaise with Operations on issues of commissioning implementation
Raise permits to work prior to submission to Permit Controller
Verify mechanical completion, pre-commissioning and commissioning
activities
Assist with Preparation of all certification documents for completion and hand-
over To Operations.
Ensure commissioning is in accordance with approved commissioning
procedures.
02
March 2013 - 18 Dec
2013
Person in charge Disciplines: E&I Supervisor with PT.Prima Langkah Pratama
Project : Sisi nubi WPN3, WPS2 and SWPJ
Cleint : Total E&P Indonesie
Duties and
Responcibility
Supervised Contractor/Sub Contractor for their activities on site.
Inspected Installation as per standard and carried out functional testing
Commissioning for all equipment as : Motors, Transformer, UPS, Lighting
System,Grounding system, LV / HV Switchgear, HVAC system, PCV, PSV
etc.
. Arrange/record the test on Pre-commissioning / Commissioning Dossier
Supervised & Performing Erection work, Connection Cable, Install Cubicle,
Instrument device.
Report to E & I Superintendent and Company Site Representative (CSR) for all
Electrical & Instrument activities at site.
03
Augst 2011 - Nov
2012
Person in charge Disciplines: E&I Supervisor with PT. Spei Energy Service.
Project : Peciko 7B Extention Project Brown Field.
Cleint : Total E & P Indonesie
Duties and
Responcibility
Supervised Contractor/Sub Contractor for their activities on site.
Inspected Installation as per standard and carried out functional testing
Commissioning for all Equipmentas : Lighting System,Grounding System,LV
Switchboard, PCV, PSV etc.
Arrange/record the test on Pre-commissioning / Commissioning Dossier
Supervised & Performing Erection work, Connection Cable, Install Cubicle,
Instrument device.
Report to E & I Superintendent and Company Site Representative (CSR) for all
Electrical&Instrument activities at site.
04
Des 2010 – April
2011
Person in charge Disciplines : E&Isupervisorwith PT Surveyor Indonesia
Project : CPP, AUP AND LIVING QUARTER PROJECT.
Cleint : Amerelda HESS
3. Curriculum Vitae3 / 5
Duties and
Responcibility
Supervised Contractor/Sub Contractor for their activities on site.
Inspected Installation as per standard and carrieoutfunctionaltesting
Commissioning for all equipment as : Motors, Transformer, UPS, Lighting
system,Grounding system LV / HV Switchgear, HVAC system, PCV, PSV etc.
Pre-commissioning and commissioning of electrical items such as: Power and
Control Cables, Cable Trays, Wiring, Lighting, Motors, Relay/Limit Switches,
Switch Gear, Control Panels.
Coordination with representatives E&I of the Customer & final Customer for
all activities E&I of the Project.
Preparation, implementation, control, review and update of specific
documentation E&I of the project ( procedures, plane of quality control…) in
coordination with supervisors E&I and the personnel of Construction.
Coordination with the Site Manager/the persons in charge disciplines and
inspectors QC for the Inspections and the tests.
Direction of supervisors E&I (20 people) for the realization of work and the
inspections during the various training courses of the project.
Control and followed performance of the subcontractors with the requirements
quality.
Checking and review of the corrective actions and preventive concerning
internal Nonconformities of the Customer.
To ensure that work is completed according to the plans and estimate of the
project.
To ensure that the working methods and the quality of the finished product are
according to code's of practice.
To ensure that work is completed safely.
To ensure that work is completed inside the deadlines and of the budget,
without generating the additional costs.
To prepare the daily progress report.
Insurance of the maintenance and the calibration of the instruments of the
project
Compilation of the File final Manufacturer of the project.
05
April 2010-Nov 2010 Person in charge Disciplines : E&I Supervisorwith PT Inamco Indonesia
Project : Bekapai De Bottle Necking ( Extention Project ) Brown field
Cleint : Total E&P Indonesie
Duties and
Responcibility
Supervised Contractor/Sub Contractor for their activities on site.
Inspected Installation as per standard and carried out functional testing
Commissioning for all equipmentas:Lightingsystem,Groundingsystem,LV
Switchboard PCV, PSV etc.
Arrange/record the test on Pre-commissioning / Commissioning Dossier
Supervised & Performing Erection work, Connection Cable, Install Cubicle,
Instrument device
Report to E&I Superintendent and Company Site Representative(CSR)for all
Electrical & Instrument activities at site.
06
May 2007 – Dec 2009 Person in charge Disciplines : E&I Supervisorwith PT Ideal Patra Indonesi
Project : OWT Tunu tambora.
PECIKO 6 Prosess Area Control, Power Distribution and Facilities
Senipah Project.
Cleint : Total E&P Indonesie
Duties and
Responcibility
Supervised Contractor/Sub Contractor for their activities on site.
Inspected Installation as per standard and carried out functional testing
Commissioning for all equipment as : Motors,Transformer,UPS, Lighting
System,Grounding system, LV / HV Switchgear, HVAC system, PCV, PSV
etc.
Arrange/record the test on Pre-commissioning / Commissioning Dossier
Supervised & Performing Erection work, Connection Cable, Install Cubicle,
4. Curriculum Vitae4 / 5
Instrument device, fiber optic, FG and Telecom.
Report to E & I Superintendent and Company Site Representative (CSR) for all
Electrical&Instrument activities at site.
07
May2001 – April2006 Person in charge Disciplines : Electrical Commissioning with PT CEGELEC / Indokomas
Project : NCP Tunu 8 Tambora, Peciko 3&4 Prosess Area Control, Power Distribution and
Facilities
Cleint : Total E & P Indonesie
Duties and
Responcibility
To ensure HSE requirements are met during the execution of all pre-
commissioning and commissioning activities.
To review all Pre-commissioning and Commissioning Dossiers before Sub-
System acceptance.
To validate electrical and instrument check sheets and functional test sheets.
To oversee electrical and instrument equipment suppliers’ and vendors’ test
sheets.
To review and validate vendor electrical and instrument reports.
To consolidate electrical and instrument pre-commissioning and
commissioning progress.
To perform follow-up of electrical and instrument punch lists and be proactive
in the Punch List Clearance process.
To perform follow-up of required electrical and instrument tools, consumables
and Spare parts.
To validate any technical change or modification for electrical and instrument
Equipment.
To ensure proper preservation of electrical and instrument equipment.
Any other work of a similar nature as may be requested by COMPANY.
08
June 1989 – April 2000 Person in charge Disciplines : Electrical Supervisorwith PT CEGELEC / Indokomas
Project : British Petroleum Fire & Gas Protection Project – Java Sea.
Chevron Geothermal Project.
Semen tonasa biringkasi Shiplaoder Project.
Amoseas Geothermal Project.
Arun LNG/NSO Project.
Inalum Indonesia Modification 510 of pot control Panel Project.
UP V Pertamina Up Grade Project
Alcatel Telecomunication Cross Sumatra Project
Duties and
Responcibility
Oversee all activities of members, starting from the preparation work equipment,
materials until the whole installation of electrical or electronic Equipment.
As :
MCC switchgear installation (Schneider)
Installation of cables tray
Cables glanding &termination.
Installation of earthing system.
Electrical equipment installation (junction box, lighting, electrical
Switchboard,pumps…)
Instrument cable pulling and termination.
Report all activities to Site Manager.
09 June1984 – April 1989 PT. Kartika Satya Engineering
5. Curriculum Vitae5 / 5
Position : Electrician Foreman
Project : SLIPI JAYA PLAZA Construction Project,
MATA HARI PLAZA Construction Project - Jakarta.
10
June 1982– April 1984 PT. Kaefer Isolier Technic
Position : Electrician
Project : Train IV & V Project, ARUN LNG Lhokseumawe, North Aceh
Indonesia
11
September 1979 –
April1982
PT. Jaya Tehnik Indonesia
Position: CRAFMAN
Project : ICCO Project, Pulo Gadung, Jakarta
SUMMARY OF COMPETENCES
Electric & Instrumentation:
installation of cables tray
Cables glanding&termination.
Installation of earthing system.
Electrical equipment installation (junction box, lighting, electrical switchboard, pumps…)
instrumentation Calibration
instrumentation Installation (instruments, cables, tubing,…)
Inspection of the loops (Loop Check)Planning and preparation of works E&I.
OTHERS
Driving licence (since 2012)
Centers of interests: Sports, Reading (History)
I declare that the above data properly described me, My Experiences and My Qualifications, and that I am
Employed as declared above.