SlideShare a Scribd company logo
1 of 3
Download to read offline
AMJAD MASOOD DAR
: +966 565678131 
: amdar58@hotmail.com k.madani@mobily.com.sa
Objective
Highly competent individual who has 15 years of experience in planning, implementation, monitoring, managing and
directing both large and small project in telecommunication field of IBS for 2G/3G/4G/LTE network Green Field/ Roof
top and COW sites. Preferably in Jeddah_Makkah_Taif _Abaha_Baha (WR) Saudi Arabia
Experience
Dynamic professional offering 15 years of rich experience in:
~ Project Management ~ Operations & Maintenance ~ Installation & Commissioning
~ Client Relationship Management ~ Team Management ~ Testing & Inspection
~ Network Roll-Out Management ~ Reporting & Documentation ~ Project Implementation
 Expertise in implementing maintenance schedules and carrying out
periodic checks to ensure performance of various equipment and
maintaining requisite documents with experience in Active & Passive
solutions
 Hands on experience in project management activities including
project scoping, estimation, planning, finalization of technical
specifications, resource administration and quality management
 Skilled in showing quality performance and assuring timely deliveries
of IBS Projects within agreed time frame & KPI’s
 Adept in executing the detail study of purchase process, preparation
of technical requirements and evaluation of technical bids for the IBS
projects
 Skilled in handling project activities with accountability of working out
various requirements with respect to utilities, machines, manpower
and monitoring overall project operations for ensuring timely
completion
 A result –oriented individual with excellent planning, time
management & problem solving skills
Experience
 Mobily (Etihad Etisalat) Jeddah Saudi Arabia:
 Specialist Manager Antenna System (Market specialist in Iqama) Aug-2006 - Jul-2015
 Mobily (Etihad Etisalat) Jeddah Saudi Arabia:
 AE/MS/Antenna System Feb-2005-July 2006 2nd
GSM project KSA under Etisalat UAE HO (Transfer)
 Etisalat United Arab Emirate (UAE) Abu Dhabi HO:
 Aerial Engineer Feb-2001- Feb-2005 United Arab Emirate with Etisalat Head Office.
 Etisalat Karachi Pakistan SH Zaid Bin Sultan Palace:
 GSM Installation Team Leader of IBS VVIP Highness SH Zaid Bin Sultan Palace at 2001.
 Sultan of Oman SH Khalifa Bin Zaid Palace:
 Team Leader of GSM Installation of IBS VVIP Highness SH Khalifa Bin Zaid Palace at 2000 in Suhar - Oman.
 Tanzania Zantel GSM Project:
 May 1999 Under Etisalat Abu Dhabi Head Office VVIP Highness SH Zaid project.
 Etisalat United Arab Emirate (UAE) Abu Dhabi HO:
 Radio, MOI & TV Microwave Link (NEC, Sumitomo) Balfour Beatty Limited-UK 1986 - 1988
 Sri Lanka:
 Line Man Power Transmission overhead lines. Balfour Beatty Limited-UK 132KV 220KV 1985-1986
Role:
 Leading the project implementation team as well as co-ordinating all activities needed to bring an equipment/
system to service, etc.
 Estimating the project equipment cost, field & engineering effort, training and other data for the Capital
Expenditure Request documentation
 Creating Statement of Work, modifying the appropriate standard installation instructions and Acceptance Test
Instructions
 Offering technical support, interfacing with Internal Depts. for finalization of projects in time and following
checklist, Punch point’s clearance, etc.
 Preparing daily progress report & sending the same to Indoor contactors for the proper follow up
 Monitoring 3 Indoor contractors (Aces, Adeed, Huawei) including Vendors (Ericsson, Huawei) which includes
Installation Supervisors, BSS Engineers, RF Engineers, Site Engineers & Quality Engineers
 Assuring detailed engineering drawing, material estimation, material handling & technical discussions material
for IBS
 Monitoring Acceptance Schedules with Indoor contractors & Ericsson Quality Team and Managed Services as per
the requirements
 Worked on different Active Solution vendors like Andrew, Power wave, Huawei, Rosenberger etc.
 Successfully Implemented & handed over to Mobily Optimization more than 100 IBS projects for Western region
 Looking after the commercial requirements for P.O, FIS & Invoicing for indoor contractors & Vendors
 Looking after the Successful process of different claims from Mobily Vendors & contractors for
o First approver for SDN, RFS, PAC, FAC Performa Invoices for all Indoor contractor under West region
Aug-2006 to July-2015:
Mobily (Etihad Etisalat) Jeddah, KSA as MRN implementation Specialist Manger of Antenna System.
Role:
 Managing the issuance of sites arrangements, sites BOQ, budget, preliminary schedules and determination of
project requirements for IBS sites
 Review and approve the final design, Drawings, link budget, BOQ and technical specifications performed by
design department and discuss it with Indoor contactors
 Follow and monitor all the field activities of indoor contractors (Site Acquisition, Materials preparing and
Installation) and discuss the updates in regular meetings with them.
 Manage project time & prioritize activities, monitor day to day implementation team's activities and reports to
guarantee projects progress in accordance with the project schedule & KPI.
 Review & process RF Technical Site Surveys (TSS) for the In-Building design.
 Review & approval of RF Technical Design Proposal (TDP) by Indoor contractors for In-Building Solutions to
meet the Mobily KPI’s Coverage Design plan.
 Checking the calculation of Link Budget (EIRP) and reviewing of the schematic diagram for IBC solutions
submitted by Indoor contactors if IBS projects
 Once RF equipment is installed, perform RF data collection to ensure that the quality of service meets RF design
specifications such as Rx Level, Rx Qual, Handover, parameter verification.
 Verify macro, micro and In-building coverage plans to meet quality specifications.
 Extend the technical support needed to the IBS contractors for all installations (Feeders, Antennas, Splitters,
Triplexes, Combiners, Base station, indoor transmission unites, MW and Radio unit).
 Control and archiving the project documents (daily reports, as Built documents, Acceptance and Invoices Doc.,
Auto CAD drawings and VSWR results).
 Supervise and coordinate with indoor contractor’s engineers progress for electromechanical drawings and
installations (cable trays, HVAC, AC, MDB, Fire systems, External alarms and power cables connectivity)
 Lead the implementation process in urgent cases if required.
 Use project scheduling and control tools to monitor the sites progress
 Following Implementation Designing & handover to Optimization for IBS & Large venues Networks based on
UMTS, GSM, CDMA, LTE, and Public Safety
 Worked on different solutions like Active, Passive, Hybrid, Direct node B & repeater solutions for single &
multiple operators.
 Suggest and implement Network Parameters changes for reducing call drops and better coverage and
analysis of impact after changing of parameters.
Feb-2005 Jul-2006: Aerial Engineer
Role:
 Assists in Technical site survey for GSM/UMTS In-Building Solutions (IBS) in Abu Dhabi HO, Dubai, and
Sharjah, in UAE with Alcatle, AT&T and Motorola.
 Assists in the Preparation of antenna and cabling layout with RF designer.
 Perform the task given by the Senior RF Engineer.
• Checking in building installations of macro, micro and make sure quality level is maintained.
 Supervising (Site Master) Sweep Test report of feeders and jumper’s cables with antennas.
o Microwave Systems of Ericsson (Mini Link), NEC, Andrew and Sumitomo survey and implementation.
TRAININGS AND SEMINARS ATTENDED:
Technical trainings:
 LTE Multiple Antenna Techniques from Apis - Stockholm, Sweden-2011
 Andrew Active Solution training from Andrew Jeddah, KSA 2014
 IBS Active solution workshop from Huawei- Jeddah, KSA
 GSM RBS 6201 Field Maintenance Ericsson Academy –KSA 2013
 GSM RBS 6000 Overview Ericsson-KSA, 2010, 2013
 LTE Overview Training, LTE Air Interface, eNode B LTE Product Description 2011
 GSM system Survey from Ericsson-Jeddah, KSA
 Andrew connector Attachment Training:
 Abu Dhabi UAE, sep-1998, Apr-1999, May-1999, Nov-1999, Sep-2000, May-2002
 TATWEER-UK Quality Awareness: Abu Dhabi UAE, Apr- 1999
 RFS Germany Assembly of Coaxial: Advance Cellflex-R Product Training Abu Dhabi UAE, Nov-1999, Sep-
2002, Sep-2003
 Anritsu USA: Site Master Operational Training Abu Dhabi UAE, May-1999
 SALA UK: Fall Arrest & Safety Rescue System Training Abu Dhabi UAE, Apr-2003
Education
1983 2 years Bachelor of Arts (B.A) University of Punjab (Lahore-Pakistan)
1979 2 years Intermediate Govt. Islamia Collage (Gujranwala Pakistan)
1977 2 year SSC from Govt. High School Ahmed Nager (Gujranwala Pakistan)
Personal Details
Date of Birth : 16 Jan 1961
Address : Gujranwala Pakistan
Languages Known : English, Arabic, & Urdu, Panjabi,
Nationality : Pakistan
Marital Status : Married
No. of Dependants : 3
Driving License : KSA, UAE, Pakistan
Visa Status : Residence Visa/ Transferable Iqama (Market specialist)
Passport Details : AM 7999482 (Expiry Date: 2025)

More Related Content

What's hot (20)

Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
 
CHANDER PRAKASH
CHANDER PRAKASHCHANDER PRAKASH
CHANDER PRAKASH
 
Reden_CV
Reden_CVReden_CV
Reden_CV
 
Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2
 
said bacha cv
said bacha cvsaid bacha cv
said bacha cv
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
AHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DTAHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DT
 
Niraj (RF)
Niraj (RF)Niraj (RF)
Niraj (RF)
 
CV_Abhishek singh Parihar
CV_Abhishek singh PariharCV_Abhishek singh Parihar
CV_Abhishek singh Parihar
 
CV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANYCV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANY
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
Arnab-Ganguly cv RF Optimization
Arnab-Ganguly cv RF OptimizationArnab-Ganguly cv RF Optimization
Arnab-Ganguly cv RF Optimization
 
CV_HAFIZ_FAROOQ
CV_HAFIZ_FAROOQCV_HAFIZ_FAROOQ
CV_HAFIZ_FAROOQ
 
Alaa Mahmoud' CV
Alaa Mahmoud' CVAlaa Mahmoud' CV
Alaa Mahmoud' CV
 
Internship report 2013 (Sri Wawadsan Sdn.Bhd)
Internship report 2013 (Sri Wawadsan Sdn.Bhd)Internship report 2013 (Sri Wawadsan Sdn.Bhd)
Internship report 2013 (Sri Wawadsan Sdn.Bhd)
 
Gross, Alex
Gross, AlexGross, Alex
Gross, Alex
 
pravendra -cv
pravendra -cvpravendra -cv
pravendra -cv
 
Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 

Similar to Amjad Dar_ CV pic Mobily 15y

Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission EngineerEsrar Khan
 
Amjad Resume Mar 2015
Amjad Resume Mar 2015Amjad Resume Mar 2015
Amjad Resume Mar 2015Amjad Bashir
 
Abid CURRICULUM 15112016
Abid CURRICULUM 15112016Abid CURRICULUM 15112016
Abid CURRICULUM 15112016ABID KAMAL
 
Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh
 
BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]Bassem Kamel
 
Mohammad.shafi_Aap_Khan.
Mohammad.shafi_Aap_Khan.Mohammad.shafi_Aap_Khan.
Mohammad.shafi_Aap_Khan.Mohammad Shafi
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Ali Omar
 
Jacob Louwaert - Resume - 08.04.15
Jacob Louwaert - Resume - 08.04.15Jacob Louwaert - Resume - 08.04.15
Jacob Louwaert - Resume - 08.04.15Jacob Louwaert
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama,PMP
 
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECTCV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECTNarendra Rawat
 
6+ Years experience in telecom Ratnadip_Chatterjee
6+ Years experience in telecom Ratnadip_Chatterjee6+ Years experience in telecom Ratnadip_Chatterjee
6+ Years experience in telecom Ratnadip_ChatterjeeRatnadip Chatterjee
 
Eng Raeed Senior Security System Engineer
Eng Raeed Senior Security System EngineerEng Raeed Senior Security System Engineer
Eng Raeed Senior Security System EngineerEngineering Rule
 

Similar to Amjad Dar_ CV pic Mobily 15y (20)

M.athar malik
M.athar malikM.athar malik
M.athar malik
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
Amjad Resume Mar 2015
Amjad Resume Mar 2015Amjad Resume Mar 2015
Amjad Resume Mar 2015
 
Abid CURRICULUM 15112016
Abid CURRICULUM 15112016Abid CURRICULUM 15112016
Abid CURRICULUM 15112016
 
Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh_22062015
Chandan Singh_22062015
 
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
 
Saeed Ahmed Siddiqui - CV
Saeed Ahmed Siddiqui - CVSaeed Ahmed Siddiqui - CV
Saeed Ahmed Siddiqui - CV
 
BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
Divaker resume updated
Divaker resume updatedDivaker resume updated
Divaker resume updated
 
Resume of Saddam Hossain Robin
Resume of Saddam Hossain RobinResume of Saddam Hossain Robin
Resume of Saddam Hossain Robin
 
CV of Saad
CV of SaadCV of Saad
CV of Saad
 
Mohammad.shafi_Aap_Khan.
Mohammad.shafi_Aap_Khan.Mohammad.shafi_Aap_Khan.
Mohammad.shafi_Aap_Khan.
 
SAHEEM CV
SAHEEM CVSAHEEM CV
SAHEEM CV
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
Jacob Louwaert - Resume - 08.04.15
Jacob Louwaert - Resume - 08.04.15Jacob Louwaert - Resume - 08.04.15
Jacob Louwaert - Resume - 08.04.15
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
 
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECTCV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
 
6+ Years experience in telecom Ratnadip_Chatterjee
6+ Years experience in telecom Ratnadip_Chatterjee6+ Years experience in telecom Ratnadip_Chatterjee
6+ Years experience in telecom Ratnadip_Chatterjee
 
Eng Raeed Senior Security System Engineer
Eng Raeed Senior Security System EngineerEng Raeed Senior Security System Engineer
Eng Raeed Senior Security System Engineer
 

Amjad Dar_ CV pic Mobily 15y

  • 1. AMJAD MASOOD DAR : +966 565678131  : amdar58@hotmail.com k.madani@mobily.com.sa Objective Highly competent individual who has 15 years of experience in planning, implementation, monitoring, managing and directing both large and small project in telecommunication field of IBS for 2G/3G/4G/LTE network Green Field/ Roof top and COW sites. Preferably in Jeddah_Makkah_Taif _Abaha_Baha (WR) Saudi Arabia Experience Dynamic professional offering 15 years of rich experience in: ~ Project Management ~ Operations & Maintenance ~ Installation & Commissioning ~ Client Relationship Management ~ Team Management ~ Testing & Inspection ~ Network Roll-Out Management ~ Reporting & Documentation ~ Project Implementation  Expertise in implementing maintenance schedules and carrying out periodic checks to ensure performance of various equipment and maintaining requisite documents with experience in Active & Passive solutions  Hands on experience in project management activities including project scoping, estimation, planning, finalization of technical specifications, resource administration and quality management  Skilled in showing quality performance and assuring timely deliveries of IBS Projects within agreed time frame & KPI’s  Adept in executing the detail study of purchase process, preparation of technical requirements and evaluation of technical bids for the IBS projects  Skilled in handling project activities with accountability of working out various requirements with respect to utilities, machines, manpower and monitoring overall project operations for ensuring timely completion  A result –oriented individual with excellent planning, time management & problem solving skills Experience  Mobily (Etihad Etisalat) Jeddah Saudi Arabia:  Specialist Manager Antenna System (Market specialist in Iqama) Aug-2006 - Jul-2015  Mobily (Etihad Etisalat) Jeddah Saudi Arabia:  AE/MS/Antenna System Feb-2005-July 2006 2nd GSM project KSA under Etisalat UAE HO (Transfer)  Etisalat United Arab Emirate (UAE) Abu Dhabi HO:  Aerial Engineer Feb-2001- Feb-2005 United Arab Emirate with Etisalat Head Office.  Etisalat Karachi Pakistan SH Zaid Bin Sultan Palace:  GSM Installation Team Leader of IBS VVIP Highness SH Zaid Bin Sultan Palace at 2001.  Sultan of Oman SH Khalifa Bin Zaid Palace:  Team Leader of GSM Installation of IBS VVIP Highness SH Khalifa Bin Zaid Palace at 2000 in Suhar - Oman.  Tanzania Zantel GSM Project:  May 1999 Under Etisalat Abu Dhabi Head Office VVIP Highness SH Zaid project.  Etisalat United Arab Emirate (UAE) Abu Dhabi HO:  Radio, MOI & TV Microwave Link (NEC, Sumitomo) Balfour Beatty Limited-UK 1986 - 1988  Sri Lanka:
  • 2.  Line Man Power Transmission overhead lines. Balfour Beatty Limited-UK 132KV 220KV 1985-1986 Role:  Leading the project implementation team as well as co-ordinating all activities needed to bring an equipment/ system to service, etc.  Estimating the project equipment cost, field & engineering effort, training and other data for the Capital Expenditure Request documentation  Creating Statement of Work, modifying the appropriate standard installation instructions and Acceptance Test Instructions  Offering technical support, interfacing with Internal Depts. for finalization of projects in time and following checklist, Punch point’s clearance, etc.  Preparing daily progress report & sending the same to Indoor contactors for the proper follow up  Monitoring 3 Indoor contractors (Aces, Adeed, Huawei) including Vendors (Ericsson, Huawei) which includes Installation Supervisors, BSS Engineers, RF Engineers, Site Engineers & Quality Engineers  Assuring detailed engineering drawing, material estimation, material handling & technical discussions material for IBS  Monitoring Acceptance Schedules with Indoor contractors & Ericsson Quality Team and Managed Services as per the requirements  Worked on different Active Solution vendors like Andrew, Power wave, Huawei, Rosenberger etc.  Successfully Implemented & handed over to Mobily Optimization more than 100 IBS projects for Western region  Looking after the commercial requirements for P.O, FIS & Invoicing for indoor contractors & Vendors  Looking after the Successful process of different claims from Mobily Vendors & contractors for o First approver for SDN, RFS, PAC, FAC Performa Invoices for all Indoor contractor under West region Aug-2006 to July-2015: Mobily (Etihad Etisalat) Jeddah, KSA as MRN implementation Specialist Manger of Antenna System. Role:  Managing the issuance of sites arrangements, sites BOQ, budget, preliminary schedules and determination of project requirements for IBS sites  Review and approve the final design, Drawings, link budget, BOQ and technical specifications performed by design department and discuss it with Indoor contactors  Follow and monitor all the field activities of indoor contractors (Site Acquisition, Materials preparing and Installation) and discuss the updates in regular meetings with them.  Manage project time & prioritize activities, monitor day to day implementation team's activities and reports to guarantee projects progress in accordance with the project schedule & KPI.  Review & process RF Technical Site Surveys (TSS) for the In-Building design.  Review & approval of RF Technical Design Proposal (TDP) by Indoor contractors for In-Building Solutions to meet the Mobily KPI’s Coverage Design plan.  Checking the calculation of Link Budget (EIRP) and reviewing of the schematic diagram for IBC solutions submitted by Indoor contactors if IBS projects  Once RF equipment is installed, perform RF data collection to ensure that the quality of service meets RF design specifications such as Rx Level, Rx Qual, Handover, parameter verification.  Verify macro, micro and In-building coverage plans to meet quality specifications.  Extend the technical support needed to the IBS contractors for all installations (Feeders, Antennas, Splitters, Triplexes, Combiners, Base station, indoor transmission unites, MW and Radio unit).  Control and archiving the project documents (daily reports, as Built documents, Acceptance and Invoices Doc., Auto CAD drawings and VSWR results).  Supervise and coordinate with indoor contractor’s engineers progress for electromechanical drawings and installations (cable trays, HVAC, AC, MDB, Fire systems, External alarms and power cables connectivity)  Lead the implementation process in urgent cases if required.  Use project scheduling and control tools to monitor the sites progress  Following Implementation Designing & handover to Optimization for IBS & Large venues Networks based on UMTS, GSM, CDMA, LTE, and Public Safety  Worked on different solutions like Active, Passive, Hybrid, Direct node B & repeater solutions for single & multiple operators.  Suggest and implement Network Parameters changes for reducing call drops and better coverage and
  • 3. analysis of impact after changing of parameters. Feb-2005 Jul-2006: Aerial Engineer Role:  Assists in Technical site survey for GSM/UMTS In-Building Solutions (IBS) in Abu Dhabi HO, Dubai, and Sharjah, in UAE with Alcatle, AT&T and Motorola.  Assists in the Preparation of antenna and cabling layout with RF designer.  Perform the task given by the Senior RF Engineer. • Checking in building installations of macro, micro and make sure quality level is maintained.  Supervising (Site Master) Sweep Test report of feeders and jumper’s cables with antennas. o Microwave Systems of Ericsson (Mini Link), NEC, Andrew and Sumitomo survey and implementation. TRAININGS AND SEMINARS ATTENDED: Technical trainings:  LTE Multiple Antenna Techniques from Apis - Stockholm, Sweden-2011  Andrew Active Solution training from Andrew Jeddah, KSA 2014  IBS Active solution workshop from Huawei- Jeddah, KSA  GSM RBS 6201 Field Maintenance Ericsson Academy –KSA 2013  GSM RBS 6000 Overview Ericsson-KSA, 2010, 2013  LTE Overview Training, LTE Air Interface, eNode B LTE Product Description 2011  GSM system Survey from Ericsson-Jeddah, KSA  Andrew connector Attachment Training:  Abu Dhabi UAE, sep-1998, Apr-1999, May-1999, Nov-1999, Sep-2000, May-2002  TATWEER-UK Quality Awareness: Abu Dhabi UAE, Apr- 1999  RFS Germany Assembly of Coaxial: Advance Cellflex-R Product Training Abu Dhabi UAE, Nov-1999, Sep- 2002, Sep-2003  Anritsu USA: Site Master Operational Training Abu Dhabi UAE, May-1999  SALA UK: Fall Arrest & Safety Rescue System Training Abu Dhabi UAE, Apr-2003 Education 1983 2 years Bachelor of Arts (B.A) University of Punjab (Lahore-Pakistan) 1979 2 years Intermediate Govt. Islamia Collage (Gujranwala Pakistan) 1977 2 year SSC from Govt. High School Ahmed Nager (Gujranwala Pakistan) Personal Details Date of Birth : 16 Jan 1961 Address : Gujranwala Pakistan Languages Known : English, Arabic, & Urdu, Panjabi, Nationality : Pakistan Marital Status : Married No. of Dependants : 3 Driving License : KSA, UAE, Pakistan Visa Status : Residence Visa/ Transferable Iqama (Market specialist) Passport Details : AM 7999482 (Expiry Date: 2025)