RE: Week 9 Discussion
Top of Form
Good day Dr. Kimble and classmates,
I will not blame my project sponsor if she admits she has no
idea what EVM and its concepts mean. These factors of project
management could be quite challenging to comprehend but are
very important. While educating my project sponsor on what
EVM and its concepts are, I will do a step-by-step description,
so she does not get overwhelmed or confused. The steps below
contain information I will use in educating her.
· Earned Value Management (EVM) is a key concept used to
assess current performance and to predict final costs and
completion dates (Larson and Gray, 1). EVM combines scope,
schedule, and resource measurements to assess project
performance and progress. It predicts the future and enables
project managers to act accordingly. The basic principle of
EVM is that the value of the piece of work is equal to the
amount of funds budgeted to complete it.
EVM has several benefits, which include the follow ing:
- It provides more information than normal project tracking.
-It gives a more accurate description of the project's progress
and helps with the calculation of its successful completion.
-It provides a clear communication of the activities involved
and improves project visibility and accountability (APMG,2).
EVM also has its disadvantage, which is the fact that it does not
have any tool which shows customer satisfaction and the quality
of the project. If the quality of the product or service is poor
and customers are not satisfied, then there is a serious problem.
EVM has three metrics, which include the following:
i)Planned Value (PV): This is the value of the budget which has
been assigned to accomplish a work schedule. Planned value can
be cumulative or current. Cumulative PV is the budget which
has been authorized for certain tasks performed within the
estimated date. It is also known as Performance Measurement
Baseline (PMB). Current PV is the budget that has been
authorized for the completion of certain tasks within scheduled
dates, weeks, or months. Another name for Planned Value is
Budget Cost of Work Schedule (BCWS) (Thakur, 3).
ii)Earned Value (EV): This refers to the value of tasks that have
been performed in terms of the approved budget. It is also
known as the Budgeted Cost of Work Performed or BCWP.
iii)Actual Cost (AC): Actual cost refers to the value of actual
cost which has been acquired for executing certain tasks of a
project, during a specific period. Actual Cost is also known as
the Actual Cost of Work Performed (ACWP). When Planned
Value and Earned Value are compared, the project manager can
determine whether the project is moving according to schedule.
The following indicators are required for the description of
project performance and cost schedule with EVM:
·
Schedule Variance (SV): This is the difference between
work that has been accomplished and, the work which was
scheduled. It is calculated by subtracting the Project Planned
Value from the Project Earned Value (SP=EV-PV).
·
Cost Variance (CV): This shows whether the project is
within budget or not and measures the difference between the
budget amount that was approved, and the actual cost used to
perform the task. CV is calculated by subtracting Actual cost
from Earned value (CV = EV-AC).
·
Schedule Performance Index (SPI): This is the ratio of
earned value to planned value, which is calculated by dividing
Earned Value by Planned Value (SPI=EV/PV).
·
Cost Performance Index (CPI): It provides an early
warning signal to cost overruns so that adjustments can be made
to the budget or scope of a project (Larson and Gray, 3). It is
calculated by dividing Earned Value by Actual Cost
(CPI=EV/AC).
I chose the topics above because they are the key concepts of
EVM and, describing each of them will help my project manager
understand the roles they play in project performance and
progress.
Sources
1)Erik Larson, Clifford Gray. 2021. Project Management (The
Managerial Process)
2)APMG International (No Author). 2021. What is EVM and
Why is it Important?
https://apmg-international.com/article/what-earned-value-
management-and-why-it-important
3)Madhuri Thakur. 2022. EVM System
https://www.educba.com/earned-value-management-system/
Bottom of Form

More Related Content

Similar to 1 day ago Brigitte Moffah RE Week 9 Discussion Top of Form

2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1
reddvise
 
INFORMATION SYTEMS .docx
INFORMATION SYTEMS                                                .docxINFORMATION SYTEMS                                                .docx
INFORMATION SYTEMS .docx
pauline234567
 
07.cost management updated
07.cost management updated07.cost management updated
07.cost management updated
Shraddha PMP
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
Asa Chan
 

Similar to 1 day ago Brigitte Moffah RE Week 9 Discussion Top of Form (20)

Mark blum ubc tool box execution - powerpoint presentation
Mark blum   ubc tool box execution - powerpoint presentationMark blum   ubc tool box execution - powerpoint presentation
Mark blum ubc tool box execution - powerpoint presentation
 
EVA - Metrics.ppt
EVA - Metrics.pptEVA - Metrics.ppt
EVA - Metrics.ppt
 
Earned value management
Earned value managementEarned value management
Earned value management
 
COST CONTROL AND TRACKING OF A BUILDING BY EARNED VALUE METHOD
COST CONTROL AND TRACKING OF A BUILDING BY EARNED VALUE METHODCOST CONTROL AND TRACKING OF A BUILDING BY EARNED VALUE METHOD
COST CONTROL AND TRACKING OF A BUILDING BY EARNED VALUE METHOD
 
2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1
 
INFORMATION SYTEMS .docx
INFORMATION SYTEMS                                                .docxINFORMATION SYTEMS                                                .docx
INFORMATION SYTEMS .docx
 
Project Planning and Excution chapter 4.ppt
Project Planning and Excution chapter 4.pptProject Planning and Excution chapter 4.ppt
Project Planning and Excution chapter 4.ppt
 
formation.docx
formation.docxformation.docx
formation.docx
 
Chap05_Project Monitoring and Control.pdf
Chap05_Project Monitoring and Control.pdfChap05_Project Monitoring and Control.pdf
Chap05_Project Monitoring and Control.pdf
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
07.cost management updated
07.cost management updated07.cost management updated
07.cost management updated
 
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSISPROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
 
03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf
 
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
 
PMP M Charles_Spring2019_Week3_Chapter7
PMP M Charles_Spring2019_Week3_Chapter7PMP M Charles_Spring2019_Week3_Chapter7
PMP M Charles_Spring2019_Week3_Chapter7
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
CPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdfCPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdf
 
CPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdfCPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdf
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)
 

More from AbbyWhyte974

1. Use Postman” to test API at  httpspostman-echo.coma. Use
1. Use Postman” to test API at  httpspostman-echo.coma. Use1. Use Postman” to test API at  httpspostman-echo.coma. Use
1. Use Postman” to test API at  httpspostman-echo.coma. Use
AbbyWhyte974
 
1. Use the rubric to complete the assignment and pay attention t
1. Use the rubric to complete the assignment and pay attention t1. Use the rubric to complete the assignment and pay attention t
1. Use the rubric to complete the assignment and pay attention t
AbbyWhyte974
 
1. True or false. Unlike a merchandising business, a manufacturing
1. True or false. Unlike a merchandising business, a manufacturing1. True or false. Unlike a merchandising business, a manufacturing
1. True or false. Unlike a merchandising business, a manufacturing
AbbyWhyte974
 
1. Top hedge fund manager Sally Buffit believes that a stock with
1. Top hedge fund manager Sally Buffit believes that a stock with 1. Top hedge fund manager Sally Buffit believes that a stock with
1. Top hedge fund manager Sally Buffit believes that a stock with
AbbyWhyte974
 
1. This question is on the application of the Binomial option
1. This question is on the application of the Binomial option1. This question is on the application of the Binomial option
1. This question is on the application of the Binomial option
AbbyWhyte974
 
1. Tiktaalik httpswww.palaeocast.comtiktaalikW
1. Tiktaalik        httpswww.palaeocast.comtiktaalikW1. Tiktaalik        httpswww.palaeocast.comtiktaalikW
1. Tiktaalik httpswww.palaeocast.comtiktaalikW
AbbyWhyte974
 
1. This week, we learned about the balanced scorecard and dashboar
1. This week, we learned about the balanced scorecard and dashboar1. This week, we learned about the balanced scorecard and dashboar
1. This week, we learned about the balanced scorecard and dashboar
AbbyWhyte974
 
1. The company I chose was Amazon2.3.4.1) Keep i
1. The company I chose was Amazon2.3.4.1) Keep i1. The company I chose was Amazon2.3.4.1) Keep i
1. The company I chose was Amazon2.3.4.1) Keep i
AbbyWhyte974
 
1. Think about a persuasive speech that you would like to present
1. Think about a persuasive speech that you would like to present 1. Think about a persuasive speech that you would like to present
1. Think about a persuasive speech that you would like to present
AbbyWhyte974
 
1. The two properties about a set of measurements of a dependent v
1. The two properties about a set of measurements of a dependent v1. The two properties about a set of measurements of a dependent v
1. The two properties about a set of measurements of a dependent v
AbbyWhyte974
 
1. The Danube River flows through 10 countries. Name them in the s
1. The Danube River flows through 10 countries. Name them in the s1. The Danube River flows through 10 countries. Name them in the s
1. The Danube River flows through 10 countries. Name them in the s
AbbyWhyte974
 
1. The 3 genes that you will compare at listed below. Take a look.
1. The 3 genes that you will compare at listed below. Take a look.1. The 3 genes that you will compare at listed below. Take a look.
1. The 3 genes that you will compare at listed below. Take a look.
AbbyWhyte974
 
1. Student and trainer detailsStudent details Full nameStu
1. Student and trainer detailsStudent details  Full nameStu1. Student and trainer detailsStudent details  Full nameStu
1. Student and trainer detailsStudent details Full nameStu
AbbyWhyte974
 
1. Student uses MS Excel to calculate income tax expense or refund
1. Student uses MS Excel to calculate income tax expense or refund1. Student uses MS Excel to calculate income tax expense or refund
1. Student uses MS Excel to calculate income tax expense or refund
AbbyWhyte974
 
1. Socrates - In your view, what was it about Socrates’ teachings
1. Socrates - In your view, what was it about Socrates’ teachings 1. Socrates - In your view, what was it about Socrates’ teachings
1. Socrates - In your view, what was it about Socrates’ teachings
AbbyWhyte974
 
1. Select a patient” (friend or family member) on whom to perform
1. Select a patient” (friend or family member) on whom to perform1. Select a patient” (friend or family member) on whom to perform
1. Select a patient” (friend or family member) on whom to perform
AbbyWhyte974
 
1. Respond to your classmates’ question and post. Submission to y
1. Respond to your classmates’ question and post.  Submission to y1. Respond to your classmates’ question and post.  Submission to y
1. Respond to your classmates’ question and post. Submission to y
AbbyWhyte974
 
1. Review the HCAPHS survey document, by clicking on the hyperlink
1. Review the HCAPHS survey document, by clicking on the hyperlink1. Review the HCAPHS survey document, by clicking on the hyperlink
1. Review the HCAPHS survey document, by clicking on the hyperlink
AbbyWhyte974
 
1. Reference is ch. 5 in the e-text, or ch. 2 in paper text...plea
1. Reference is ch. 5 in the e-text, or ch. 2 in paper text...plea1. Reference is ch. 5 in the e-text, or ch. 2 in paper text...plea
1. Reference is ch. 5 in the e-text, or ch. 2 in paper text...plea
AbbyWhyte974
 

More from AbbyWhyte974 (20)

1. Use Postman” to test API at  httpspostman-echo.coma. Use
1. Use Postman” to test API at  httpspostman-echo.coma. Use1. Use Postman” to test API at  httpspostman-echo.coma. Use
1. Use Postman” to test API at  httpspostman-echo.coma. Use
 
1. Use the rubric to complete the assignment and pay attention t
1. Use the rubric to complete the assignment and pay attention t1. Use the rubric to complete the assignment and pay attention t
1. Use the rubric to complete the assignment and pay attention t
 
1. True or false. Unlike a merchandising business, a manufacturing
1. True or false. Unlike a merchandising business, a manufacturing1. True or false. Unlike a merchandising business, a manufacturing
1. True or false. Unlike a merchandising business, a manufacturing
 
1. Top hedge fund manager Sally Buffit believes that a stock with
1. Top hedge fund manager Sally Buffit believes that a stock with 1. Top hedge fund manager Sally Buffit believes that a stock with
1. Top hedge fund manager Sally Buffit believes that a stock with
 
1. This question is on the application of the Binomial option
1. This question is on the application of the Binomial option1. This question is on the application of the Binomial option
1. This question is on the application of the Binomial option
 
1. Tiktaalik httpswww.palaeocast.comtiktaalikW
1. Tiktaalik        httpswww.palaeocast.comtiktaalikW1. Tiktaalik        httpswww.palaeocast.comtiktaalikW
1. Tiktaalik httpswww.palaeocast.comtiktaalikW
 
1. This week, we learned about the balanced scorecard and dashboar
1. This week, we learned about the balanced scorecard and dashboar1. This week, we learned about the balanced scorecard and dashboar
1. This week, we learned about the balanced scorecard and dashboar
 
1. The company I chose was Amazon2.3.4.1) Keep i
1. The company I chose was Amazon2.3.4.1) Keep i1. The company I chose was Amazon2.3.4.1) Keep i
1. The company I chose was Amazon2.3.4.1) Keep i
 
1. Think about a persuasive speech that you would like to present
1. Think about a persuasive speech that you would like to present 1. Think about a persuasive speech that you would like to present
1. Think about a persuasive speech that you would like to present
 
1. The two properties about a set of measurements of a dependent v
1. The two properties about a set of measurements of a dependent v1. The two properties about a set of measurements of a dependent v
1. The two properties about a set of measurements of a dependent v
 
1. The Danube River flows through 10 countries. Name them in the s
1. The Danube River flows through 10 countries. Name them in the s1. The Danube River flows through 10 countries. Name them in the s
1. The Danube River flows through 10 countries. Name them in the s
 
1. The 3 genes that you will compare at listed below. Take a look.
1. The 3 genes that you will compare at listed below. Take a look.1. The 3 genes that you will compare at listed below. Take a look.
1. The 3 genes that you will compare at listed below. Take a look.
 
1. Student and trainer detailsStudent details Full nameStu
1. Student and trainer detailsStudent details  Full nameStu1. Student and trainer detailsStudent details  Full nameStu
1. Student and trainer detailsStudent details Full nameStu
 
1. Student uses MS Excel to calculate income tax expense or refund
1. Student uses MS Excel to calculate income tax expense or refund1. Student uses MS Excel to calculate income tax expense or refund
1. Student uses MS Excel to calculate income tax expense or refund
 
1. Socrates - In your view, what was it about Socrates’ teachings
1. Socrates - In your view, what was it about Socrates’ teachings 1. Socrates - In your view, what was it about Socrates’ teachings
1. Socrates - In your view, what was it about Socrates’ teachings
 
1. Select a patient” (friend or family member) on whom to perform
1. Select a patient” (friend or family member) on whom to perform1. Select a patient” (friend or family member) on whom to perform
1. Select a patient” (friend or family member) on whom to perform
 
1. Respond to your classmates’ question and post. Submission to y
1. Respond to your classmates’ question and post.  Submission to y1. Respond to your classmates’ question and post.  Submission to y
1. Respond to your classmates’ question and post. Submission to y
 
1. Review the HCAPHS survey document, by clicking on the hyperlink
1. Review the HCAPHS survey document, by clicking on the hyperlink1. Review the HCAPHS survey document, by clicking on the hyperlink
1. Review the HCAPHS survey document, by clicking on the hyperlink
 
1. Saint Leo Portal loginUser ID[email protected]
1. Saint Leo Portal loginUser ID[email protected]          1. Saint Leo Portal loginUser ID[email protected]
1. Saint Leo Portal loginUser ID[email protected]
 
1. Reference is ch. 5 in the e-text, or ch. 2 in paper text...plea
1. Reference is ch. 5 in the e-text, or ch. 2 in paper text...plea1. Reference is ch. 5 in the e-text, or ch. 2 in paper text...plea
1. Reference is ch. 5 in the e-text, or ch. 2 in paper text...plea
 

Recently uploaded

Neurulation and the formation of the neural tube
Neurulation and the formation of the neural tubeNeurulation and the formation of the neural tube
Neurulation and the formation of the neural tube
SaadHumayun7
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
Avinash Rai
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
heathfieldcps1
 

Recently uploaded (20)

Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
 
B.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdfB.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdf
 
Gyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptxGyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptx
 
Neurulation and the formation of the neural tube
Neurulation and the formation of the neural tubeNeurulation and the formation of the neural tube
Neurulation and the formation of the neural tube
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resources
 
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdfPost Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
The Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. HenryThe Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. Henry
 
Advances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdfAdvances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdf
 
An Overview of the Odoo 17 Discuss App.pptx
An Overview of the Odoo 17 Discuss App.pptxAn Overview of the Odoo 17 Discuss App.pptx
An Overview of the Odoo 17 Discuss App.pptx
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Post Exam Fun(da) Intra UEM General Quiz - Finals.pdf
Post Exam Fun(da) Intra UEM General Quiz - Finals.pdfPost Exam Fun(da) Intra UEM General Quiz - Finals.pdf
Post Exam Fun(da) Intra UEM General Quiz - Finals.pdf
 
Benefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational ResourcesBenefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational Resources
 
How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
 

1 day ago Brigitte Moffah RE Week 9 Discussion Top of Form

  • 1. 1 day ago Brigitte Moffah RE: Week 9 Discussion Top of Form Good day Dr. Kimble and classmates, I will not blame my project sponsor if she admits she has no idea what EVM and its concepts mean. These factors of project management could be quite challenging to comprehend but are very important. While educating my project sponsor on what EVM and its concepts are, I will do a step-by-step description, so she does not get overwhelmed or confused. The steps below contain information I will use in educating her. · Earned Value Management (EVM) is a key concept used to assess current performance and to predict final costs and completion dates (Larson and Gray, 1). EVM combines scope, schedule, and resource measurements to assess project performance and progress. It predicts the future and enables project managers to act accordingly. The basic principle of EVM is that the value of the piece of work is equal to the amount of funds budgeted to complete it. EVM has several benefits, which include the follow ing: - It provides more information than normal project tracking. -It gives a more accurate description of the project's progress and helps with the calculation of its successful completion. -It provides a clear communication of the activities involved and improves project visibility and accountability (APMG,2). EVM also has its disadvantage, which is the fact that it does not have any tool which shows customer satisfaction and the quality of the project. If the quality of the product or service is poor and customers are not satisfied, then there is a serious problem. EVM has three metrics, which include the following: i)Planned Value (PV): This is the value of the budget which has been assigned to accomplish a work schedule. Planned value can
  • 2. be cumulative or current. Cumulative PV is the budget which has been authorized for certain tasks performed within the estimated date. It is also known as Performance Measurement Baseline (PMB). Current PV is the budget that has been authorized for the completion of certain tasks within scheduled dates, weeks, or months. Another name for Planned Value is Budget Cost of Work Schedule (BCWS) (Thakur, 3). ii)Earned Value (EV): This refers to the value of tasks that have been performed in terms of the approved budget. It is also known as the Budgeted Cost of Work Performed or BCWP. iii)Actual Cost (AC): Actual cost refers to the value of actual cost which has been acquired for executing certain tasks of a project, during a specific period. Actual Cost is also known as the Actual Cost of Work Performed (ACWP). When Planned Value and Earned Value are compared, the project manager can determine whether the project is moving according to schedule. The following indicators are required for the description of project performance and cost schedule with EVM: · Schedule Variance (SV): This is the difference between work that has been accomplished and, the work which was scheduled. It is calculated by subtracting the Project Planned Value from the Project Earned Value (SP=EV-PV). · Cost Variance (CV): This shows whether the project is within budget or not and measures the difference between the budget amount that was approved, and the actual cost used to perform the task. CV is calculated by subtracting Actual cost from Earned value (CV = EV-AC).
  • 3. · Schedule Performance Index (SPI): This is the ratio of earned value to planned value, which is calculated by dividing Earned Value by Planned Value (SPI=EV/PV). · Cost Performance Index (CPI): It provides an early warning signal to cost overruns so that adjustments can be made to the budget or scope of a project (Larson and Gray, 3). It is calculated by dividing Earned Value by Actual Cost (CPI=EV/AC). I chose the topics above because they are the key concepts of EVM and, describing each of them will help my project manager understand the roles they play in project performance and progress. Sources 1)Erik Larson, Clifford Gray. 2021. Project Management (The Managerial Process) 2)APMG International (No Author). 2021. What is EVM and Why is it Important? https://apmg-international.com/article/what-earned-value- management-and-why-it-important 3)Madhuri Thakur. 2022. EVM System https://www.educba.com/earned-value-management-system/ Bottom of Form