SlideShare a Scribd company logo
1 of 40
Pakistan Railways
(implementation of quality management)
Group A
•Tahmeena Batool
•Anam Zafar
• Nouman Riaz(03334071113)
•Adnan Saddique
The Journey So far…
Pakistan Railways
Sequence
• Introduction
• Problem Identification (evaluation of issues
regarding stability)
• Problem Criteria (implementation of quality
management)
• Benchmark Japan and Indian models
• Applying Kei-Zen methodology
• Conclusion
Introduction
• State own rail transport service
• Head quartered in Lahore
• Stretched over 8000 km
• Important mode of transport
• Administer under federal Gov. ministry of railways
Vision
• Making Pakistan Railways the preferred
means of passenger travel and goods
movement for majority of Pakistani
population by providing them a safe,
efficient, reliable, comfortable and
affordable means of transportation by
modernizing its services, rationalizing its
operations and efficiently managing its
resources
Current operational problems
• Shortage of locomotives
• Burdensomeness of out of order locomotives
• Lack of freight trains
• Track is over aged
• Encroachments on the property of PR
• Deficient duty hours of parcel/cargo
trains
• Negligent treatment with time management
Problem criteria (2008-Till now)
• Negligence by the last government during
2008-2013 has led the Pakistan Railways down
rapidly. As of mid-2012, it was decided to stop
all goods train haulage due to severe shortage
of locomotives and fuel.
• This problem gets longer till now and remedies
to ignore DE stability of PR are not 100%
implemented.
Shortage of locomotives
• 70 per cent carriages are out of service.
• Passengers train as well as freight and cargo
trains are spare due to shortage of locomotives.
A bit change has been seen(2014) as:
Duty hours of Badami bagh cargo train has
increased up to 6 days a week and 3700000/day
revenue is generated.
Lack of freight trains
• The bulk of railways earnings are drawn from
freight services which are not being accorded
the priority they deserve.
Over aged Track
• Maximum Speed of trains in Pakistan
Railways is 120 km/h.
• While only some sections of Karachi-Lahore
main railway line allow 120 km/h speed.
Worthless time management and
cleanness
• There is no time management due to which
consumer is not satisfy.
• Most of the complaints are about extremely
low quality of services provided although
management claims to maintain the quality but
there are certain gaps.
Now, “Identification of
problem is 50 % of solution”
What is remaining
50%?
BENCHMARKING
To Fix Problems And For Best Practices.
We suggest to benchmark Japan and Indian
railway models.
What is benchmarking?
• The process of learning, adapting, and
measuring outstanding practices and processes
from any organization to improve performance
Why benchmark?
To
From
Why Benchmark?
• Identify opportunities to improve performance
• Learn from others’ experiences
• Set realistic but ambitious targets
• Better prioritize and allocate resources
Which kind of benchmarking will be
implemented?
Competitive benchmarking
• A comparison against a specific
competitor for the product, service or
function of interest.
• Product/service and process are directly
comparable.
Process For bench marking
1. Decide what to benchmark
2. Understand current performance
3. Plan
4. Study others
5. Learn from data
6. Use the findings
As we decided and knew
current performance so
we’ll go for study the
information from India
and Japan.
Indian Railway
Adequate locomotives through
Domestic production
• Railways has 7500 engines,38000 coaches &
about 2.5 lakh of wagons
• runs about 14,300 train daily.
• Locomotives are manufactured at Chittaranjan
Locomotive works, Chittaranjan. (locomotives
are manufactured domestically)
Focus on Freight and Hospitality
• Over 951 million tonnes of freight annually
(2013)
• Indian Railways have also focused on
providing Hospitality to its travellers.
i.e. Food, hospitality and cleanliness
World class luxury
• Providing luxury to accumulate revenue from
rich Indians.
i.e. The Golden Chariot
Commercializing property
• Indian Railway also owns and operates two
railway hotels at Ranchi and Pori
(To utilize and commercialize the spare property
and to provide hospitality to their citizens)
• trains can run at maximum speed of 140 km/h.
(active time management)
Public concerns
• Public concerns are taken seriously by Indian
railway
i.e.
• Availability of Reservation
• Internet booking
• information for passengers on internet
Tree plantation
• Railway plant about 20 lakhs tree
every year
(more trees are planted in thirst areas, a
wise use of spare property and a better
step to reduce the spoilage of track)
Japan Model
• In 2013, 337 million ton freight were carried
on railways in Japan
• The railway companies are accountable to
manage the stations and commercial zones
around the stations.
i.e.
JR East has built office buildings and hotels
around Tokyo Station.
Cont.
• The Japanese government is promoting the
improvement of the urban railways, up
gradation of tracks to achieve efficiency.
Applying Kaizen methodology
What is Kaizen ?
(KY-Zen)
“Continual Improvement”
Kai = Change
Zen = Good (for the
Better)
Increasing the value without paying out money but using the wisdom to.
Kaizen and innovation
The Japanese make a distinction between Kaizen and
innovation:
Kaizen Innovation
gradual, uses small
steps, conventional
know-how and a lot
of common sense
is viewed as being
more radical
because it comes
in big steps.
Kaizen forces to:
Improve several aspects of business
for value addition towards
customers.・New technology
development
・Groundbreaking
material
development
・Moves of
competitors
・Costumer needs
・Legal regulations
Kaizen
reality and
Constraints
corresponding
Kaizen mind
• No Excuses
• No Waste
• Just Do It!
• quick to act
• fast results
No excuses..
• Past negligence of previous govt. is not an
appropriate justification of current
unsatisfactory performance of PR
No waste, also refers to Muda (in
Japanese means work without a product or effort
wasted)
• Spare passenger trains due to shortage of
locomotives must become operational
• Freight awaiting trains are going toward
deterioration. Put them to work.
• Enhance the duty hours of cargo/parcel
trains.
• Commercialize the trash property of PR
to generate revenue.
Mura means unevenness in the
flow of work.
• Proper time management add value
toward customer’s perception.
• Railway management must assure
passengers about their on time arrivals.
• Formulate strategy for easy reservation
E- ticketing
All information available on website
Just do it..
• Start launching the appropriate processes
on emergent basis to get fastest results.
Pakistan railway project (tqm)
Pakistan railway project (tqm)

More Related Content

What's hot

introduction to Transportation
introduction to Transportationintroduction to Transportation
introduction to TransportationAbdul Majid
 
Pia change management sucess trap
Pia change management sucess trapPia change management sucess trap
Pia change management sucess trapSaddam Riaz
 
Maintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysMaintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysSwapnil Pawar
 
Online railway reservation system
Online railway reservation systemOnline railway reservation system
Online railway reservation systemPIYUSH Dubey
 
Training and development @Delhi metro
Training and development @Delhi metroTraining and development @Delhi metro
Training and development @Delhi metroGurparvesh kaur
 
Documentation of railway reservation system
Documentation of railway reservation systemDocumentation of railway reservation system
Documentation of railway reservation systemSandip Murari
 
indian railways Presentation .
 indian railways Presentation . indian railways Presentation .
indian railways Presentation .Akash Gupta
 
HRM in Automotive Industry - Capita selecta
HRM in Automotive Industry - Capita selectaHRM in Automotive Industry - Capita selecta
HRM in Automotive Industry - Capita selectaDimitrios Kordas
 
Vehicle management system
Vehicle management systemVehicle management system
Vehicle management systemMohd Saddam
 
Railway reservation system
Railway reservation systemRailway reservation system
Railway reservation systemKOYELMAJUMDAR1
 
The great indian railways
The great indian railwaysThe great indian railways
The great indian railwaysKashyap Shah
 
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)Muhammad Awais
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railwayKhusro_khan
 
AJAY CHAUHAN ppt
AJAY CHAUHAN pptAJAY CHAUHAN ppt
AJAY CHAUHAN pptAjay Kumar
 
Indian railway history ppt
Indian railway history pptIndian railway history ppt
Indian railway history pptRajesh Kumar
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentationahmedalvi01
 
Role of information technology in indian railway
Role of information technology in indian railwayRole of information technology in indian railway
Role of information technology in indian railwayNitesh Patil
 

What's hot (20)

introduction to Transportation
introduction to Transportationintroduction to Transportation
introduction to Transportation
 
TCS ppt
TCS pptTCS ppt
TCS ppt
 
Pia change management sucess trap
Pia change management sucess trapPia change management sucess trap
Pia change management sucess trap
 
Maintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysMaintenance and Manufacturing of Railways
Maintenance and Manufacturing of Railways
 
Online railway reservation system
Online railway reservation systemOnline railway reservation system
Online railway reservation system
 
Training and development @Delhi metro
Training and development @Delhi metroTraining and development @Delhi metro
Training and development @Delhi metro
 
Documentation of railway reservation system
Documentation of railway reservation systemDocumentation of railway reservation system
Documentation of railway reservation system
 
indian railways Presentation .
 indian railways Presentation . indian railways Presentation .
indian railways Presentation .
 
Metro project
Metro project Metro project
Metro project
 
HRM in Automotive Industry - Capita selecta
HRM in Automotive Industry - Capita selectaHRM in Automotive Industry - Capita selecta
HRM in Automotive Industry - Capita selecta
 
Vehicle management system
Vehicle management systemVehicle management system
Vehicle management system
 
Railway reservation system
Railway reservation systemRailway reservation system
Railway reservation system
 
The great indian railways
The great indian railwaysThe great indian railways
The great indian railways
 
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railway
 
AJAY CHAUHAN ppt
AJAY CHAUHAN pptAJAY CHAUHAN ppt
AJAY CHAUHAN ppt
 
Project report on Health & Safety
Project report on Health & Safety Project report on Health & Safety
Project report on Health & Safety
 
Indian railway history ppt
Indian railway history pptIndian railway history ppt
Indian railway history ppt
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentation
 
Role of information technology in indian railway
Role of information technology in indian railwayRole of information technology in indian railway
Role of information technology in indian railway
 

Viewers also liked

Pakistan railways.ppt 2003 (1)
Pakistan railways.ppt 2003 (1)Pakistan railways.ppt 2003 (1)
Pakistan railways.ppt 2003 (1)Daniyal Aziz
 
Pakistan Railways: Challenges and Response
Pakistan Railways: Challenges and ResponsePakistan Railways: Challenges and Response
Pakistan Railways: Challenges and ResponseShahid Hussain Raja
 
PAKISTAN RAILWAYS DECLINE
PAKISTAN RAILWAYS DECLINEPAKISTAN RAILWAYS DECLINE
PAKISTAN RAILWAYS DECLINEfaizyelectrical
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenenceGhanashyam Prajapati
 
Pakistan railways
Pakistan railwaysPakistan railways
Pakistan railways0wais777
 
Types of tracks in pakistan
Types of tracks in pakistanTypes of tracks in pakistan
Types of tracks in pakistanAYAZ AHMAD
 
D ch58
D ch58D ch58
D ch58rodolv
 
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...ayishairshad
 
Railwaypcyby K R Thanki
Railwaypcyby K R ThankiRailwaypcyby K R Thanki
Railwaypcyby K R ThankiKrunal Thanki
 
Pakistan railways پاکستان ریلویز ‎(final)
Pakistan railways پاکستان ریلویز ‎(final)Pakistan railways پاکستان ریلویز ‎(final)
Pakistan railways پاکستان ریلویز ‎(final)Jinnah University for Women
 
Fauji fertilizers
Fauji fertilizersFauji fertilizers
Fauji fertilizerszaraahmad22
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringLatif Hyder Wadho
 
MAJOR IMPORTS AND EXPORTS OF PAKISTAN
MAJOR IMPORTS  AND EXPORTS OF PAKISTANMAJOR IMPORTS  AND EXPORTS OF PAKISTAN
MAJOR IMPORTS AND EXPORTS OF PAKISTANuniversity of sindh
 
Transportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPTTransportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPTABDUL SAMAD
 

Viewers also liked (20)

Pakistan railways.ppt 2003 (1)
Pakistan railways.ppt 2003 (1)Pakistan railways.ppt 2003 (1)
Pakistan railways.ppt 2003 (1)
 
Pakistan Railways: Challenges and Response
Pakistan Railways: Challenges and ResponsePakistan Railways: Challenges and Response
Pakistan Railways: Challenges and Response
 
Railway pakistan
Railway pakistanRailway pakistan
Railway pakistan
 
PAKISTAN RAILWAYS DECLINE
PAKISTAN RAILWAYS DECLINEPAKISTAN RAILWAYS DECLINE
PAKISTAN RAILWAYS DECLINE
 
Electrical Safety Training by ISRI
Electrical Safety Training by ISRIElectrical Safety Training by ISRI
Electrical Safety Training by ISRI
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Pakistan railways
Pakistan railwaysPakistan railways
Pakistan railways
 
Types of tracks in pakistan
Types of tracks in pakistanTypes of tracks in pakistan
Types of tracks in pakistan
 
D ch58
D ch58D ch58
D ch58
 
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
 
Contract law
Contract lawContract law
Contract law
 
Railwaypcyby K R Thanki
Railwaypcyby K R ThankiRailwaypcyby K R Thanki
Railwaypcyby K R Thanki
 
Pakistan railways پاکستان ریلویز ‎(final)
Pakistan railways پاکستان ریلویز ‎(final)Pakistan railways پاکستان ریلویز ‎(final)
Pakistan railways پاکستان ریلویز ‎(final)
 
Pakistan railways
Pakistan railwaysPakistan railways
Pakistan railways
 
Fauji fertilizers
Fauji fertilizersFauji fertilizers
Fauji fertilizers
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
 
MAJOR IMPORTS AND EXPORTS OF PAKISTAN
MAJOR IMPORTS  AND EXPORTS OF PAKISTANMAJOR IMPORTS  AND EXPORTS OF PAKISTAN
MAJOR IMPORTS AND EXPORTS OF PAKISTAN
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
Transportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPTTransportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPT
 

Similar to Pakistan railway project (tqm)

Indian railways by Meet Patel
Indian railways by Meet PatelIndian railways by Meet Patel
Indian railways by Meet PatelMeet Patel
 
Indian railway and tourism.
Indian railway and tourism.Indian railway and tourism.
Indian railway and tourism.Urvashi Baghel
 
The great indian railways
The great indian railwaysThe great indian railways
The great indian railwaysVrinda Jain
 
new Dp world intermodal
new Dp world intermodalnew Dp world intermodal
new Dp world intermodalQamar-ul-zaman
 
New Policy Changes in the road sector.pdf
New Policy Changes in the road sector.pdfNew Policy Changes in the road sector.pdf
New Policy Changes in the road sector.pdfFunpal1
 
Indian Railways_Joshuaa_Lenus_IND_ECON.pptx
Indian Railways_Joshuaa_Lenus_IND_ECON.pptxIndian Railways_Joshuaa_Lenus_IND_ECON.pptx
Indian Railways_Joshuaa_Lenus_IND_ECON.pptxjoshuaa14
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed RailwaysNabh Agrawal
 
Presentation on br
Presentation on brPresentation on br
Presentation on brrashedobc
 
Budget Plans 2012
Budget Plans 2012Budget Plans 2012
Budget Plans 2012Lam Yuan
 
Demand & motivation for tourism travel
Demand & motivation for tourism travelDemand & motivation for tourism travel
Demand & motivation for tourism travelNazmul Alam
 
Indian railways commercialisation
Indian railways commercialisationIndian railways commercialisation
Indian railways commercialisationUjjwal 'Shanu'
 
Indian railways lifeline to nation
Indian railways lifeline to nationIndian railways lifeline to nation
Indian railways lifeline to nationIndrabhaskar Mishra
 
Transport marketing
Transport marketingTransport marketing
Transport marketingdeepu2000
 
5-Role-Importance-of-Containers-in-Multimodal-Transport.ppt
5-Role-Importance-of-Containers-in-Multimodal-Transport.ppt5-Role-Importance-of-Containers-in-Multimodal-Transport.ppt
5-Role-Importance-of-Containers-in-Multimodal-Transport.pptMadeEs1
 

Similar to Pakistan railway project (tqm) (20)

Indian railways by Meet Patel
Indian railways by Meet PatelIndian railways by Meet Patel
Indian railways by Meet Patel
 
Scm g 8-ir case
Scm g 8-ir caseScm g 8-ir case
Scm g 8-ir case
 
Indian railway and tourism.
Indian railway and tourism.Indian railway and tourism.
Indian railway and tourism.
 
The great indian railways
The great indian railwaysThe great indian railways
The great indian railways
 
new Dp world intermodal
new Dp world intermodalnew Dp world intermodal
new Dp world intermodal
 
New Policy Changes in the road sector.pdf
New Policy Changes in the road sector.pdfNew Policy Changes in the road sector.pdf
New Policy Changes in the road sector.pdf
 
Indian Railways_Joshuaa_Lenus_IND_ECON.pptx
Indian Railways_Joshuaa_Lenus_IND_ECON.pptxIndian Railways_Joshuaa_Lenus_IND_ECON.pptx
Indian Railways_Joshuaa_Lenus_IND_ECON.pptx
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed Railways
 
Presentation on br
Presentation on brPresentation on br
Presentation on br
 
Budget Plans 2012
Budget Plans 2012Budget Plans 2012
Budget Plans 2012
 
Group 3 (1).doc
Group 3 (1).docGroup 3 (1).doc
Group 3 (1).doc
 
Demand & motivation for tourism travel
Demand & motivation for tourism travelDemand & motivation for tourism travel
Demand & motivation for tourism travel
 
Indian railways commercialisation
Indian railways commercialisationIndian railways commercialisation
Indian railways commercialisation
 
Monorail-Maglev Tecnology Review
Monorail-Maglev Tecnology ReviewMonorail-Maglev Tecnology Review
Monorail-Maglev Tecnology Review
 
Indian railway services
Indian railway servicesIndian railway services
Indian railway services
 
Indian railways lifeline to nation
Indian railways lifeline to nationIndian railways lifeline to nation
Indian railways lifeline to nation
 
Transport marketing
Transport marketingTransport marketing
Transport marketing
 
Indian Railways
Indian RailwaysIndian Railways
Indian Railways
 
5-Role-Importance-of-Containers-in-Multimodal-Transport.ppt
5-Role-Importance-of-Containers-in-Multimodal-Transport.ppt5-Role-Importance-of-Containers-in-Multimodal-Transport.ppt
5-Role-Importance-of-Containers-in-Multimodal-Transport.ppt
 
Railways
RailwaysRailways
Railways
 

More from Sufi Nouman Riaz

Best Specializations in MBA
Best Specializations in MBABest Specializations in MBA
Best Specializations in MBASufi Nouman Riaz
 
Thematic analysis in qualitative research Explained with Example
Thematic analysis in qualitative research Explained with ExampleThematic analysis in qualitative research Explained with Example
Thematic analysis in qualitative research Explained with ExampleSufi Nouman Riaz
 
ON PAGE SEO || Keyword Research
ON PAGE SEO || Keyword ResearchON PAGE SEO || Keyword Research
ON PAGE SEO || Keyword ResearchSufi Nouman Riaz
 
How to create a WordPress Website / Blog
How to create a WordPress Website / BlogHow to create a WordPress Website / Blog
How to create a WordPress Website / BlogSufi Nouman Riaz
 
Health and Education System of China
Health and Education System of ChinaHealth and Education System of China
Health and Education System of ChinaSufi Nouman Riaz
 
Governance System of China
Governance System of ChinaGovernance System of China
Governance System of ChinaSufi Nouman Riaz
 
Communist party of china, its structure and how does it work
Communist party of china, its structure and how does it workCommunist party of china, its structure and how does it work
Communist party of china, its structure and how does it workSufi Nouman Riaz
 
Brief introduction to history of china and its administrative divisions
Brief introduction to history of china and its administrative divisionsBrief introduction to history of china and its administrative divisions
Brief introduction to history of china and its administrative divisionsSufi Nouman Riaz
 
Online Earning - On Demand Economy - Freelancer Ship -lec 01
Online Earning - On Demand Economy - Freelancer Ship -lec 01Online Earning - On Demand Economy - Freelancer Ship -lec 01
Online Earning - On Demand Economy - Freelancer Ship -lec 01Sufi Nouman Riaz
 
Introduction to Social Research (Business Research) Lecture # 1
Introduction to Social Research (Business Research) Lecture # 1Introduction to Social Research (Business Research) Lecture # 1
Introduction to Social Research (Business Research) Lecture # 1Sufi Nouman Riaz
 
Critical review on punjab youth policy (2012)
Critical review on punjab youth policy (2012)Critical review on punjab youth policy (2012)
Critical review on punjab youth policy (2012)Sufi Nouman Riaz
 
Impact of Motivation on Job Performance in Public Sector By Nouman, Khurram a...
Impact of Motivation on Job Performance in Public Sector By Nouman, Khurram a...Impact of Motivation on Job Performance in Public Sector By Nouman, Khurram a...
Impact of Motivation on Job Performance in Public Sector By Nouman, Khurram a...Sufi Nouman Riaz
 
Basic concepts in chemistry
Basic concepts in chemistryBasic concepts in chemistry
Basic concepts in chemistrySufi Nouman Riaz
 
Law and Parliamentary affairs department, punjab.
Law and Parliamentary affairs department, punjab.Law and Parliamentary affairs department, punjab.
Law and Parliamentary affairs department, punjab.Sufi Nouman Riaz
 
Job analysis and performance evaluation- JAPEA
Job analysis and performance evaluation- JAPEAJob analysis and performance evaluation- JAPEA
Job analysis and performance evaluation- JAPEASufi Nouman Riaz
 
Strategic Human Resource Management.
Strategic Human Resource Management.Strategic Human Resource Management.
Strategic Human Resource Management.Sufi Nouman Riaz
 
Electrical substation (grid station)
Electrical substation (grid station)Electrical substation (grid station)
Electrical substation (grid station)Sufi Nouman Riaz
 
Return on Training Investment.
Return on Training Investment.Return on Training Investment.
Return on Training Investment.Sufi Nouman Riaz
 
Global Strategy (MNC's in China, Russia , UK, Srilanka)
Global Strategy (MNC's in China, Russia , UK, Srilanka)Global Strategy (MNC's in China, Russia , UK, Srilanka)
Global Strategy (MNC's in China, Russia , UK, Srilanka)Sufi Nouman Riaz
 
Compensation plan for a small hospital (csd project)
Compensation plan for a small hospital (csd project)Compensation plan for a small hospital (csd project)
Compensation plan for a small hospital (csd project)Sufi Nouman Riaz
 

More from Sufi Nouman Riaz (20)

Best Specializations in MBA
Best Specializations in MBABest Specializations in MBA
Best Specializations in MBA
 
Thematic analysis in qualitative research Explained with Example
Thematic analysis in qualitative research Explained with ExampleThematic analysis in qualitative research Explained with Example
Thematic analysis in qualitative research Explained with Example
 
ON PAGE SEO || Keyword Research
ON PAGE SEO || Keyword ResearchON PAGE SEO || Keyword Research
ON PAGE SEO || Keyword Research
 
How to create a WordPress Website / Blog
How to create a WordPress Website / BlogHow to create a WordPress Website / Blog
How to create a WordPress Website / Blog
 
Health and Education System of China
Health and Education System of ChinaHealth and Education System of China
Health and Education System of China
 
Governance System of China
Governance System of ChinaGovernance System of China
Governance System of China
 
Communist party of china, its structure and how does it work
Communist party of china, its structure and how does it workCommunist party of china, its structure and how does it work
Communist party of china, its structure and how does it work
 
Brief introduction to history of china and its administrative divisions
Brief introduction to history of china and its administrative divisionsBrief introduction to history of china and its administrative divisions
Brief introduction to history of china and its administrative divisions
 
Online Earning - On Demand Economy - Freelancer Ship -lec 01
Online Earning - On Demand Economy - Freelancer Ship -lec 01Online Earning - On Demand Economy - Freelancer Ship -lec 01
Online Earning - On Demand Economy - Freelancer Ship -lec 01
 
Introduction to Social Research (Business Research) Lecture # 1
Introduction to Social Research (Business Research) Lecture # 1Introduction to Social Research (Business Research) Lecture # 1
Introduction to Social Research (Business Research) Lecture # 1
 
Critical review on punjab youth policy (2012)
Critical review on punjab youth policy (2012)Critical review on punjab youth policy (2012)
Critical review on punjab youth policy (2012)
 
Impact of Motivation on Job Performance in Public Sector By Nouman, Khurram a...
Impact of Motivation on Job Performance in Public Sector By Nouman, Khurram a...Impact of Motivation on Job Performance in Public Sector By Nouman, Khurram a...
Impact of Motivation on Job Performance in Public Sector By Nouman, Khurram a...
 
Basic concepts in chemistry
Basic concepts in chemistryBasic concepts in chemistry
Basic concepts in chemistry
 
Law and Parliamentary affairs department, punjab.
Law and Parliamentary affairs department, punjab.Law and Parliamentary affairs department, punjab.
Law and Parliamentary affairs department, punjab.
 
Job analysis and performance evaluation- JAPEA
Job analysis and performance evaluation- JAPEAJob analysis and performance evaluation- JAPEA
Job analysis and performance evaluation- JAPEA
 
Strategic Human Resource Management.
Strategic Human Resource Management.Strategic Human Resource Management.
Strategic Human Resource Management.
 
Electrical substation (grid station)
Electrical substation (grid station)Electrical substation (grid station)
Electrical substation (grid station)
 
Return on Training Investment.
Return on Training Investment.Return on Training Investment.
Return on Training Investment.
 
Global Strategy (MNC's in China, Russia , UK, Srilanka)
Global Strategy (MNC's in China, Russia , UK, Srilanka)Global Strategy (MNC's in China, Russia , UK, Srilanka)
Global Strategy (MNC's in China, Russia , UK, Srilanka)
 
Compensation plan for a small hospital (csd project)
Compensation plan for a small hospital (csd project)Compensation plan for a small hospital (csd project)
Compensation plan for a small hospital (csd project)
 

Recently uploaded

Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxNetapsFoundationAdmi
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
The Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and UncertaintyThe Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and Uncertaintycapivisgroup
 
Chapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a TreasuryChapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a TreasurySarunChhetri1
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...CIO Look Magazine
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accountshttps://localsmmshop.com/
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsYourLegal Accounting
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingYourLegal Accounting
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfHolger Mueller
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsCaitlinCummins3
 
Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497dipikakk482
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckHajeJanKamps
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwadimosmejiaslendon
 

Recently uploaded (20)

Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di MalangObat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
The Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and UncertaintyThe Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and Uncertainty
 
Obat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di Bandung
Obat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di BandungObat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di Bandung
Obat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di Bandung
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
Chapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a TreasuryChapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a Treasury
 
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di SurabayaObat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
Obat Aborsi Surabaya 0851\7696\3835 Jual Obat Cytotec Di Surabaya
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA Firms
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic Accounting
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497
 
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
 

Pakistan railway project (tqm)

  • 1.
  • 2. Pakistan Railways (implementation of quality management) Group A •Tahmeena Batool •Anam Zafar • Nouman Riaz(03334071113) •Adnan Saddique
  • 3. The Journey So far…
  • 4. Pakistan Railways Sequence • Introduction • Problem Identification (evaluation of issues regarding stability) • Problem Criteria (implementation of quality management) • Benchmark Japan and Indian models • Applying Kei-Zen methodology • Conclusion
  • 5. Introduction • State own rail transport service • Head quartered in Lahore • Stretched over 8000 km • Important mode of transport • Administer under federal Gov. ministry of railways
  • 6. Vision • Making Pakistan Railways the preferred means of passenger travel and goods movement for majority of Pakistani population by providing them a safe, efficient, reliable, comfortable and affordable means of transportation by modernizing its services, rationalizing its operations and efficiently managing its resources
  • 7.
  • 8. Current operational problems • Shortage of locomotives • Burdensomeness of out of order locomotives • Lack of freight trains • Track is over aged • Encroachments on the property of PR • Deficient duty hours of parcel/cargo trains • Negligent treatment with time management
  • 9. Problem criteria (2008-Till now) • Negligence by the last government during 2008-2013 has led the Pakistan Railways down rapidly. As of mid-2012, it was decided to stop all goods train haulage due to severe shortage of locomotives and fuel. • This problem gets longer till now and remedies to ignore DE stability of PR are not 100% implemented.
  • 10. Shortage of locomotives • 70 per cent carriages are out of service. • Passengers train as well as freight and cargo trains are spare due to shortage of locomotives. A bit change has been seen(2014) as: Duty hours of Badami bagh cargo train has increased up to 6 days a week and 3700000/day revenue is generated.
  • 11. Lack of freight trains • The bulk of railways earnings are drawn from freight services which are not being accorded the priority they deserve.
  • 12. Over aged Track • Maximum Speed of trains in Pakistan Railways is 120 km/h. • While only some sections of Karachi-Lahore main railway line allow 120 km/h speed.
  • 13. Worthless time management and cleanness • There is no time management due to which consumer is not satisfy. • Most of the complaints are about extremely low quality of services provided although management claims to maintain the quality but there are certain gaps.
  • 14. Now, “Identification of problem is 50 % of solution” What is remaining 50%?
  • 15. BENCHMARKING To Fix Problems And For Best Practices. We suggest to benchmark Japan and Indian railway models.
  • 16. What is benchmarking? • The process of learning, adapting, and measuring outstanding practices and processes from any organization to improve performance
  • 18. Why Benchmark? • Identify opportunities to improve performance • Learn from others’ experiences • Set realistic but ambitious targets • Better prioritize and allocate resources
  • 19. Which kind of benchmarking will be implemented? Competitive benchmarking • A comparison against a specific competitor for the product, service or function of interest. • Product/service and process are directly comparable.
  • 20. Process For bench marking 1. Decide what to benchmark 2. Understand current performance 3. Plan 4. Study others 5. Learn from data 6. Use the findings
  • 21. As we decided and knew current performance so we’ll go for study the information from India and Japan.
  • 23. Adequate locomotives through Domestic production • Railways has 7500 engines,38000 coaches & about 2.5 lakh of wagons • runs about 14,300 train daily. • Locomotives are manufactured at Chittaranjan Locomotive works, Chittaranjan. (locomotives are manufactured domestically)
  • 24. Focus on Freight and Hospitality • Over 951 million tonnes of freight annually (2013) • Indian Railways have also focused on providing Hospitality to its travellers. i.e. Food, hospitality and cleanliness
  • 25. World class luxury • Providing luxury to accumulate revenue from rich Indians. i.e. The Golden Chariot
  • 26. Commercializing property • Indian Railway also owns and operates two railway hotels at Ranchi and Pori (To utilize and commercialize the spare property and to provide hospitality to their citizens) • trains can run at maximum speed of 140 km/h. (active time management)
  • 27. Public concerns • Public concerns are taken seriously by Indian railway i.e. • Availability of Reservation • Internet booking • information for passengers on internet
  • 28. Tree plantation • Railway plant about 20 lakhs tree every year (more trees are planted in thirst areas, a wise use of spare property and a better step to reduce the spoilage of track)
  • 29. Japan Model • In 2013, 337 million ton freight were carried on railways in Japan • The railway companies are accountable to manage the stations and commercial zones around the stations. i.e. JR East has built office buildings and hotels around Tokyo Station.
  • 30. Cont. • The Japanese government is promoting the improvement of the urban railways, up gradation of tracks to achieve efficiency.
  • 31. Applying Kaizen methodology What is Kaizen ? (KY-Zen) “Continual Improvement” Kai = Change Zen = Good (for the Better) Increasing the value without paying out money but using the wisdom to.
  • 32. Kaizen and innovation The Japanese make a distinction between Kaizen and innovation: Kaizen Innovation gradual, uses small steps, conventional know-how and a lot of common sense is viewed as being more radical because it comes in big steps.
  • 33. Kaizen forces to: Improve several aspects of business for value addition towards customers.・New technology development ・Groundbreaking material development ・Moves of competitors ・Costumer needs ・Legal regulations Kaizen reality and Constraints corresponding
  • 34. Kaizen mind • No Excuses • No Waste • Just Do It! • quick to act • fast results
  • 35. No excuses.. • Past negligence of previous govt. is not an appropriate justification of current unsatisfactory performance of PR
  • 36. No waste, also refers to Muda (in Japanese means work without a product or effort wasted) • Spare passenger trains due to shortage of locomotives must become operational • Freight awaiting trains are going toward deterioration. Put them to work. • Enhance the duty hours of cargo/parcel trains. • Commercialize the trash property of PR to generate revenue.
  • 37. Mura means unevenness in the flow of work. • Proper time management add value toward customer’s perception. • Railway management must assure passengers about their on time arrivals. • Formulate strategy for easy reservation E- ticketing All information available on website
  • 38. Just do it.. • Start launching the appropriate processes on emergent basis to get fastest results.