INTRODUCTION
• This Project is basically concerned with the
RESERVATION SYSTEM of the RAILWAY TICKETS
to the passengers.
• In this Project, We are
discussing about the
Reservation Process
that how the reservation
is done.
• We also discuss about the
rules and regulations for
a reservation.
CONTENTs
• In this Project we are going to include all the
entities related to the RESERVATION.
• Railway Employees.
• Passengers.
• Stations.
• Trains and their types
(like Rajdhani, Shatabdi)
Ticket.
• Class.
EMPLOYEES
• According to 2014 survey in Indian Railways the
Employees are 1.334 million.
• In this part, we are covering all the details relate to the
Employee. Which are: -
• Name
• Employee Id
• Address
• Gender
• Mobile No
• Joining Date
• Designation
• Shift
• Station where he/she works.
PASSENGER
• In this part we are covering all the details
related to the passenger required for
Reservation.
• Name.
• IRCTC Id.
• Address.
• Age.
• Gender.
• Mobile No.
• Authorized ID Proof.
STATIONS
• In this part we are covering the details of the various
Stations.
• Station Name
• Station ID
• No. Of Platforms
and Railway Tracks.
• Station City and State.
• No. of Trains passes
the station everyday.
• No. of Employees.
TRAINS AND THEIR TYPES
• In this part we are covering all the details related to the
trains.
• Train Name.
• Train No.
• Train Type.
• Schedule and Root.
• No. of Employees of Train.
• Capacity.
TICKET
• In this part we are covering the Ticket details and the
Class which is chosen by the Passenger. It contains: -
• PNR No.
• Ticket NO.
• Boarding Station and Destination Station.
• Class (General, Sleeper, AC etc.)
• Fare.
• Seat No.
• Coach No.
• Train Name, Train No., Train Type.
Class
• In this part we are covering the different types
of classes.
• General Class
• Sleeper Class
• 1st A.C.
• 2nd A.C.
• 3rd A.C.
Presentation on Railway Management System

Presentation on Railway Management System

  • 2.
    INTRODUCTION • This Projectis basically concerned with the RESERVATION SYSTEM of the RAILWAY TICKETS to the passengers. • In this Project, We are discussing about the Reservation Process that how the reservation is done. • We also discuss about the rules and regulations for a reservation.
  • 3.
    CONTENTs • In thisProject we are going to include all the entities related to the RESERVATION. • Railway Employees. • Passengers. • Stations. • Trains and their types (like Rajdhani, Shatabdi) Ticket. • Class.
  • 4.
    EMPLOYEES • According to2014 survey in Indian Railways the Employees are 1.334 million. • In this part, we are covering all the details relate to the Employee. Which are: - • Name • Employee Id • Address • Gender • Mobile No • Joining Date • Designation • Shift • Station where he/she works.
  • 5.
    PASSENGER • In thispart we are covering all the details related to the passenger required for Reservation. • Name. • IRCTC Id. • Address. • Age. • Gender. • Mobile No. • Authorized ID Proof.
  • 6.
    STATIONS • In thispart we are covering the details of the various Stations. • Station Name • Station ID • No. Of Platforms and Railway Tracks. • Station City and State. • No. of Trains passes the station everyday. • No. of Employees.
  • 7.
    TRAINS AND THEIRTYPES • In this part we are covering all the details related to the trains. • Train Name. • Train No. • Train Type. • Schedule and Root. • No. of Employees of Train. • Capacity.
  • 8.
    TICKET • In thispart we are covering the Ticket details and the Class which is chosen by the Passenger. It contains: - • PNR No. • Ticket NO. • Boarding Station and Destination Station. • Class (General, Sleeper, AC etc.) • Fare. • Seat No. • Coach No. • Train Name, Train No., Train Type.
  • 9.
    Class • In thispart we are covering the different types of classes. • General Class • Sleeper Class • 1st A.C. • 2nd A.C. • 3rd A.C.