Rig Name/#: BENNEVIS JSA Number : MA 007 Person Approving JSA:
Work Activity (Job): I Installing Mooring Ropes on Legs Date Raised :
Work Team (Crew Members): BM / ABM / Roustabouts / Crane-Operator / Radio-Operator Date Last Amended :
Sequence of Basic Job Steps Potential Accidents or Hazards
Recommendation to Eliminate or Reduce Potential
Hazards
Who?
Initials
1. Hold pre-job meeting – Work-permit 1. Procedures not known or not understood by crew members-
Persons involved in task becoming injured by incorrect procedure
compliance
1. Take time to read correctly JSA . Be sure everything is
understood. If not ask your Supervisor
Supervisor
BM
2 . Prepare and inspect work basket – Work
vests – Fall arrestors – Harness - Tools -
Crane
2. Work basket in bad condition – Sling damaged – Shackle
loosed – Work vests , Harness & Fall arrestor in bad condition –
Failure on crane equipment
2. Work basket maintenance – Regular inspection of safety
equipments – Daily checks & maintenance on cranes
BM - ABM
Roustabouts
Crane Op
Mechanic
3. Going down on leg bracing by leg ladder 3. Damage on leg ladder ( steps missing ) - Falling from ladder –
Bad weather – Falling in water – Sinking
3. Be sure leg ladder is in good condition – Go down slowly –
Be sure fall-arrestor is working correctly & and harness is in
safe condition – Put work vest and fix it correctly – Check
sea condition – Inform Radio operator & Stand-by boat when
operation start
BM - ABM
Roustabouts
Crane OP
Radio Op
4. Lowering mooring rope – shackle & tools 4. Tools falling from top – Mooring rope falling during operation –
Wrong signals to crane operator – Falling in water - sinking
4. Learn crane signals – Only one person doing signals to
crane operator – Tie tools and send them down inside a
bucket – Be sure mooring rope is connected correctly on
crane hook – Operate the crane slowly – Fix correctly work-
vest and harness
BM - ABM
Roustabouts
Crane Op
Uncontrolled When Printed Page 1 of 2
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
5. Securing mooring rope on main-deck
handrails & connecting rope on bracing leg
5. Mooring rope falling from top – Falling in water – Sinking –
Pinch points . Working basket capsizing caught by something
5. Secure correctly the mooring rope with strong rope on
main-deck handrails – Fix correctly work vest & harness –
Secure tools – Only one person making signals to the crane
operator.
BM – ABM
Roustabouts
Crane Op
6. End of operation – Coming up from leg
bracing by leg ladder – Working basket
storage
6. Same as step # 3 – Tools falling down – Basket capsizing
caught or trapped by something
6. Same as step # 3 – Go up slowly – Use tag line to control
basket – Only one person making signals to the crane
operator – Basket storage area free – Inform Radio operator
& Stand-by boat when job is completed
BM – ABM
Roustabouts
Crane Op
Radio Op
Safety Equipment To Do This Job(
Hard Hats x Gloves x Face Shield Fire Extinguishers
Safety Boots x Work Vest x Goggles x Lockout/Tagout
Safety Glasses x Safety Harness x Barriers Work Permit Required x
Uncontrolled When Printed Page 2 of 2
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2

More Related Content

What's hot

Crane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas ArlingtonCrane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas ArlingtonAtlantic Training, LLC.
 
Truck crane training bill brown
Truck crane training bill brownTruck crane training bill brown
Truck crane training bill brownBill Brown
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile CranesMihajlo Stupar
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting OperationsJames McCann
 
Lifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sitesLifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sitesSimon Faulkner-Duke
 
Construction Truck Crane 2009
Construction Truck Crane 2009Construction Truck Crane 2009
Construction Truck Crane 2009vtsiri
 
Ssd information stonehouse crane
Ssd information   stonehouse craneSsd information   stonehouse crane
Ssd information stonehouse craneAlan Bassett
 
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputCrane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputGaurav Singh Rajput
 
Basic load out methodologies introduction
Basic load out methodologies introductionBasic load out methodologies introduction
Basic load out methodologies introductionBruce nguyen
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rulesytcrane
 
Crane safety by abidnadeemkhan
Crane safety by abidnadeemkhanCrane safety by abidnadeemkhan
Crane safety by abidnadeemkhanguest3d4fa4
 
few word abour crane..pdf
few word abour crane..pdffew word abour crane..pdf
few word abour crane..pdfconstruction
 
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetySafe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetyAtlantic Training, LLC.
 

What's hot (20)

Crane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas ArlingtonCrane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas Arlington
 
Truck crane training bill brown
Truck crane training bill brownTruck crane training bill brown
Truck crane training bill brown
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 
CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK
 
Pick carry-cranes-risk-assessment
Pick carry-cranes-risk-assessmentPick carry-cranes-risk-assessment
Pick carry-cranes-risk-assessment
 
Lifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sitesLifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sites
 
Construction Truck Crane 2009
Construction Truck Crane 2009Construction Truck Crane 2009
Construction Truck Crane 2009
 
Ssd information stonehouse crane
Ssd information   stonehouse craneSsd information   stonehouse crane
Ssd information stonehouse crane
 
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputCrane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
 
Cranes ppt
Cranes pptCranes ppt
Cranes ppt
 
2009 Face Conference Orosha Cranes Wooley
2009 Face Conference Orosha Cranes Wooley2009 Face Conference Orosha Cranes Wooley
2009 Face Conference Orosha Cranes Wooley
 
Basic load out methodologies introduction
Basic load out methodologies introductionBasic load out methodologies introduction
Basic load out methodologies introduction
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rules
 
SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1
 
Crane safety by abidnadeemkhan
Crane safety by abidnadeemkhanCrane safety by abidnadeemkhan
Crane safety by abidnadeemkhan
 
few word abour crane..pdf
few word abour crane..pdffew word abour crane..pdf
few word abour crane..pdf
 
Rigging
RiggingRigging
Rigging
 
Crane Incident Handbook
Crane Incident Handbook Crane Incident Handbook
Crane Incident Handbook
 
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetySafe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
 

Viewers also liked

Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmYousif Fikry
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatYousif Fikry
 
Ma 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsMa 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsYousif Fikry
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repairYousif Fikry
 
Ma 006 transfer by personnel basket
Ma 006  transfer by personnel basketMa 006  transfer by personnel basket
Ma 006 transfer by personnel basketYousif Fikry
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basketYousif Fikry
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneYousif Fikry
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenanceYousif Fikry
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatYousif Fikry
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brushYousif Fikry
 
Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringYousif Fikry
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackYousif Fikry
 
Ma 09 crane wire replacement ( boom )
Ma 09 crane wire replacement ( boom )Ma 09 crane wire replacement ( boom )
Ma 09 crane wire replacement ( boom )Yousif Fikry
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deckYousif Fikry
 
BHP-RISK ASSESSMENT - DALF R1
BHP-RISK ASSESSMENT - DALF R1BHP-RISK ASSESSMENT - DALF R1
BHP-RISK ASSESSMENT - DALF R1Dennis J Morgan
 
JSA Aerial Lift (english) KWW
JSA Aerial Lift (english) KWWJSA Aerial Lift (english) KWW
JSA Aerial Lift (english) KWWKelly Weaver
 
Tower Project HSE Presentation
Tower Project HSE PresentationTower Project HSE Presentation
Tower Project HSE PresentationIshtiaq Hashmi
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessmentSimba Zhao
 

Viewers also liked (20)

Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
 
Origami Crane
Origami CraneOrigami Crane
Origami Crane
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
 
Ma 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsMa 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodations
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
 
Ma 006 transfer by personnel basket
Ma 006  transfer by personnel basketMa 006  transfer by personnel basket
Ma 006 transfer by personnel basket
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basket
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t crane
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
 
Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load lowering
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rack
 
Ma 09 crane wire replacement ( boom )
Ma 09 crane wire replacement ( boom )Ma 09 crane wire replacement ( boom )
Ma 09 crane wire replacement ( boom )
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deck
 
BHP-RISK ASSESSMENT - DALF R1
BHP-RISK ASSESSMENT - DALF R1BHP-RISK ASSESSMENT - DALF R1
BHP-RISK ASSESSMENT - DALF R1
 
JSA Aerial Lift (english) KWW
JSA Aerial Lift (english) KWWJSA Aerial Lift (english) KWW
JSA Aerial Lift (english) KWW
 
Hira
HiraHira
Hira
 
Tower Project HSE Presentation
Tower Project HSE PresentationTower Project HSE Presentation
Tower Project HSE Presentation
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 

Similar to Installing Mooring Ropes

Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boatYousif Fikry
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranesYousif Fikry
 
Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )Yousif Fikry
 
Ma 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaMa 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaYousif Fikry
 
Ma 010 crane wire replacement ( whip line )
Ma 010  crane wire replacement ( whip line )Ma 010  crane wire replacement ( whip line )
Ma 010 crane wire replacement ( whip line )Yousif Fikry
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsulesYousif Fikry
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wiresYousif Fikry
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanksYousif Fikry
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenanceYousif Fikry
 
Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspectionYousif Fikry
 
Ma 004 paint jobs inside tanks
Ma 004  paint jobs inside tanksMa 004  paint jobs inside tanks
Ma 004 paint jobs inside tanksYousif Fikry
 
Ma 002 welding in tanks
Ma 002  welding in tanksMa 002  welding in tanks
Ma 002 welding in tanksYousif Fikry
 
Failure of hook assemblies causing fatal / serious injuries
Failure of hook assemblies causing fatal / serious injuries Failure of hook assemblies causing fatal / serious injuries
Failure of hook assemblies causing fatal / serious injuries Bimal Chandra Das
 

Similar to Installing Mooring Ropes (15)

Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
 
Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )
 
Ma 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaMa 020 launching lifeboats to sea
Ma 020 launching lifeboats to sea
 
Ma 010 crane wire replacement ( whip line )
Ma 010  crane wire replacement ( whip line )Ma 010  crane wire replacement ( whip line )
Ma 010 crane wire replacement ( whip line )
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsules
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanks
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
 
Ma 022 preloading
Ma 022 preloadingMa 022 preloading
Ma 022 preloading
 
Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspection
 
Ma 004 paint jobs inside tanks
Ma 004  paint jobs inside tanksMa 004  paint jobs inside tanks
Ma 004 paint jobs inside tanks
 
Ma 002 welding in tanks
Ma 002  welding in tanksMa 002  welding in tanks
Ma 002 welding in tanks
 
Failure of hook assemblies causing fatal / serious injuries
Failure of hook assemblies causing fatal / serious injuries Failure of hook assemblies causing fatal / serious injuries
Failure of hook assemblies causing fatal / serious injuries
 
Job safety analysis
Job safety analysisJob safety analysis
Job safety analysis
 

More from Yousif Fikry

Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick setYousif Fikry
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveYousif Fikry
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachestYousif Fikry
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatYousif Fikry
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachestYousif Fikry
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deckYousif Fikry
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casingYousif Fikry
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladderYousif Fikry
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk systemYousif Fikry
 

More from Yousif Fikry (10)

Welding operation
Welding operationWelding operation
Welding operation
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick set
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valve
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deck
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casing
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
 

Installing Mooring Ropes

  • 1. Rig Name/#: BENNEVIS JSA Number : MA 007 Person Approving JSA: Work Activity (Job): I Installing Mooring Ropes on Legs Date Raised : Work Team (Crew Members): BM / ABM / Roustabouts / Crane-Operator / Radio-Operator Date Last Amended : Sequence of Basic Job Steps Potential Accidents or Hazards Recommendation to Eliminate or Reduce Potential Hazards Who? Initials 1. Hold pre-job meeting – Work-permit 1. Procedures not known or not understood by crew members- Persons involved in task becoming injured by incorrect procedure compliance 1. Take time to read correctly JSA . Be sure everything is understood. If not ask your Supervisor Supervisor BM 2 . Prepare and inspect work basket – Work vests – Fall arrestors – Harness - Tools - Crane 2. Work basket in bad condition – Sling damaged – Shackle loosed – Work vests , Harness & Fall arrestor in bad condition – Failure on crane equipment 2. Work basket maintenance – Regular inspection of safety equipments – Daily checks & maintenance on cranes BM - ABM Roustabouts Crane Op Mechanic 3. Going down on leg bracing by leg ladder 3. Damage on leg ladder ( steps missing ) - Falling from ladder – Bad weather – Falling in water – Sinking 3. Be sure leg ladder is in good condition – Go down slowly – Be sure fall-arrestor is working correctly & and harness is in safe condition – Put work vest and fix it correctly – Check sea condition – Inform Radio operator & Stand-by boat when operation start BM - ABM Roustabouts Crane OP Radio Op 4. Lowering mooring rope – shackle & tools 4. Tools falling from top – Mooring rope falling during operation – Wrong signals to crane operator – Falling in water - sinking 4. Learn crane signals – Only one person doing signals to crane operator – Tie tools and send them down inside a bucket – Be sure mooring rope is connected correctly on crane hook – Operate the crane slowly – Fix correctly work- vest and harness BM - ABM Roustabouts Crane Op Uncontrolled When Printed Page 1 of 2 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2
  • 2. 5. Securing mooring rope on main-deck handrails & connecting rope on bracing leg 5. Mooring rope falling from top – Falling in water – Sinking – Pinch points . Working basket capsizing caught by something 5. Secure correctly the mooring rope with strong rope on main-deck handrails – Fix correctly work vest & harness – Secure tools – Only one person making signals to the crane operator. BM – ABM Roustabouts Crane Op 6. End of operation – Coming up from leg bracing by leg ladder – Working basket storage 6. Same as step # 3 – Tools falling down – Basket capsizing caught or trapped by something 6. Same as step # 3 – Go up slowly – Use tag line to control basket – Only one person making signals to the crane operator – Basket storage area free – Inform Radio operator & Stand-by boat when job is completed BM – ABM Roustabouts Crane Op Radio Op Safety Equipment To Do This Job( Hard Hats x Gloves x Face Shield Fire Extinguishers Safety Boots x Work Vest x Goggles x Lockout/Tagout Safety Glasses x Safety Harness x Barriers Work Permit Required x Uncontrolled When Printed Page 2 of 2 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2