● Mobile cranes are indispensable assistants in lifting heavy loads in the industry. They are
primarily used for lifting, lowering and transporting loads.
● Mobile cranes moved loads horizontally by swinging or traveling. Most of them consist of a
carrier and superstructure equipped with a boom, jib (optional) and hook.
● There are mechanical and hydraulic types of mobile cranes.
● Mechanical mobile cranes are also referred to as "conventional" crane and they have greater
capacity.
● Hydraulic cranes have greater mobility and require less setup time.
BASIC DEFINITIONS
● Crane – consist of a rotating structure for lifting and lowering horizontally structure on
rubber tires or crawler treads.
● Hoist – used to lift and lower load.
● Boom – an inclined spar, strut, or other long member supporting the hoisting tackle.
● Boom stops – a device used to limit the angle of the boom at its highest position.
● Brake – to slow or stop motion by friction or power.
● Block – sheaves or grooved pulleys in a frame with hook, eye and strap.
● Jib – extension attached to the boom point to provide added boom lenght for lifting
specified loads.
● Radius – horizontal distance from center of rotation to the hook.
CRANE CAPACITY
● Crane capacity is controlled by its operating radius.
● Capacity depends on: position of boom with respect to the carrier (over the front or over the
rear or sides), amount and configuration of the counterweight.
● Crane manufacturers provide lifting data that includes: range diagram, load rating charts,
PCSA rating class, miscellaneous notes and dimensions.
● Safety regulations limit maximum crane load to a percentage of the tipping load (load that
will cause the crane to actually begin to tip).
● Notice that hook blocks, slings, spreader bars, and other load-handling devices are
considered part of the load and their weight must be included in the maximum safe load
capacity calculation.
● Electronic load indicators are available that measure the actual load on the crane and
provide a warning if the safe capacity is being exceed.
● Lifting capacities are based on ≤ 85 % of tipping load on outriggers and on ≤ 75 % of tipping
load on crawlers.
● A standard method of rating the capacity of mobile cranes has been adopted by The PCSA
Bureau of The Construction Industry Manufactures Association (CIMA).
● The key to lifting a maximum capacity load is the outriggers. They provide a solid platform
for the crane safety operations. Statistic show that at least 50 % of crane incidents occur
because crane or outriggers are not set-up properly.
LIEBHERR LTM 11200-9.1 – ONE OF THE
BIGGEST MOBILE CRANE IN THE WORLD
● Lifting capacities:
● 1200 t on 2.5 m radius – with heavy lift boom and additional equipment.
● 140 t on 20 m radius, 33.5 t on 50 m radius, etc.
TEREX CC 8800-1 – ONE OF THE BIGGEST
CRAWLER CRANE IN THE WORLD
● Lifting capacities:
● 1558 t on 10 m radius, 873 t on 30 m radius, 334.5 t on 60 m radius, etc.
● Crawler crane can move with load. Ofcourse, for this operation you must have very good
ground conditions.
RESPONSIBILITIES, CONDITONS
● Have the right crane for the job.
● Assure operator is adequately
trained.
● Assure riggers are competent.
● Ensure crane is in safe
operating condition.
● Know the weight of the load.
● Know where the center of
gravity is.
RESPONSIBILITIES, CONDITONS
● Know the rated capacities of rigging.
● Reduce capacities as sling angles increase.
● Know how hitches affect sling capacities.
● Use proper sling sets for the load.
● Protect slings from sharp surfaces.
● Test lift uneven loads for balance.
● Inspect all slings, chains, hooks, etc.
● Stay clear of raised loads.
RESPONSIBILITIES, CONDITONS
● Provide overhead protection for other workers.
● Provide proper working area.
● Maintain clearance with overhead power lines.
● Assure adequate ground stability – as load
leverage increases, pressure increases nearest
the load.
EQUIPMENT FOR BINDING
● Slings are rated for vertical hitch.
● Chocker hitches can reduce capacities by
half.
● Basket hitches can increase capacity by 2
for straight vertical basket.
● If sling / chain angles are too shallow, the
slings / chains could slip.
● Shallow angles also can over stress slings /
chains.
Chocker Basket
EQUIPMENT FOR BINDING
● Slings / chains must be inspected before
each use. They should have tags that
indicates capacities.
● Slings are safer then chains, because on
slings you can see initial damage much
easier.
● Immediately remove damaged or
defective slings from service!!!
TENSION IN A SLING LEG
T – tension in a single leg.
WL – weight of load.
N – number of sling legs.
L – lenght of sling leg.
V – vertical distance between hook and load.
● The sling stress is proportional to the
angle of the sling.
SLING ANGLE AND CAPACITY
87 % 70 % 50 %
● Rated capacities must be reduced as sling ahgle increases.
● Slings should be set at a minimum of 60 degree angle.
CAUSES OF CRANE ACCIDENTS
● The main causes of crane accidents are:
● lack of planing and supervision,
● incorrect siting or setup cranes,
● failure to cerrectly calculate or estimate the
load,
● failure of personel to carry out the correct
procedures,
● use of wrong liftinting gears,
● lack of proper maintenance,
● careless and complacent,
● faulty device or machines.
SELECTING THE CRANE
● Cranes should always be selected to
handle the maximum anticipated load with
capacity to spare.
● Other consideration for the selection of
the crane are the nature of lift, ground
condition, site constraints, etc.
THE CRANE OPERATOR
● Make sure the crane operator can see the:
● Rated load capacities,
● Operating speeds,
● Special hazard warning and
instruction.
● The crane shall only be operated
by a trained, health and competent
operator, with cooperation of
trained lifting supervisor, trained
riggers and trained signalman.
DOCUMENTS FOR THE CRANE
When the crane arrives on site, the following
documents should come along with the crane
for inspection and review when requested:
● a vaild Certificate for the mobile crane,
● Valid certificates for all lifting gears that
comes with the crane,
● The log book or log sheet for the
recording of the operational tests carried
out by the operator before the start of
every workshift.
If the operator is unable to produce the
above documents, the crane supplier
should be contacted and the documents
obtained before the machine is put into
use. It is advisable to state that the
production of these documents will be
required when the crane is hired.
SITING OF CRANE
● The stability of the crane depends heavily on te proper siting and setting of the crane.
● Unless stated by the manufacturer, the crane should have its outriggers fully extended
with the wheels off the ground.
● The ground should be level and capable of supporting the full weight of the crane and its
load.
● In addition, sufficient and suitable packing in the form of steel or plastic plates or timber
mats should be placed under the outriggers to evenly distribute the weight. Surface of
these plates or mats should be at least twice bigger then surface of outriggers which is
above.
● The crane should also be positioned so that:
● The operator has a clear view of the operation as far as practicable,
● There is sufficient operating space,
● It is well away from edges of excavation and fixed structures which people
may be trapped by the moving parts such as counterweights, etc.
● Fully extend all outriggers for maximum capacity.
Proper outrigger setup
Not recommended outrigger setup. In this
situation load should be on the other side
of the crane, then the maximum pressure
will not be on this outrigger.
Improper outrigger setupPoor outrigger setup
No comment...
WORK NEAR POWER LINES
● Who is at risk –
● Operators are normally safe if they stay in the cabin.
● Ground personnel are over 8 times more likely to be killed.
PLANNING AND SUPERVISION
● All lifting operations should be properly planned by a competent person before the actual
execution and not left solely to the crane operator.
● Investigation into crane accidents revealed that one of the root causes of these accidents
was due to lack of proper planning and supervision. This is particularly so for simple
routine lifts. All contractors are advised not to be complacent during any lifting
operation, and to plan and supervise the operation carefully.
● Site constraints that would have an impact on the safe operation of the lifting should be
considered before the execution on the lift. Examples of such constraints are:
● lifting next to or over an excavation pit,
● materials or machines placed along the access way thereby reducing the
available space to extend the outriggers,
● site is located nearby busy traffic, or existing building or structures.
● Careful planning is especially critical for difficult lifts such as pick up and carry
operations, tandem lifting and tilt-up operation.
LOAD RADIUS INDICATOR
● The mandatory load radius indicator gives the
safe working load at the configuration that the
crane has been set, and gives a warning signal
when the radius is unsafe.
● The indicator:
● must be calibrated regulary,
● must be configured for both main and
auxiliary hooks (when both hooks
are used),
● the operator must be trained to use /
set the indicator correctly to tally
with the actual configuration
adopted.
● It is important to note that the load radius
indicator served primarily as an operational aid.
Although the indicator can warm the operator of
an impending overload, it should not be used as
the only tool to test the stability limit of the crane
during operations.
CHECKS AND MAINTANCE
● The crane should be in good working
condition when it arrives on site and before
the start of the workshift. In addition to
regulary inspections, the manufacture's
recommendation on the inspection and
maintance regime should also be followed
closely.
BASIC RADIO COMANDS HAND SIGNALS
● Use load line.
● Use wipline.
● Boom up – boom down.
● Boom up and hold the load.
● Boom down and hold the load.
● Swing right – swing left.
● Take the load up – down with the load.
● Extend boom – retract boom.
● Etc...
In these 2 accidents nobody
has died, but material
damage is very high, as you
can see on the pictures...
Why these accidents
happened?
Failure of operators to
carry out the correct
procedures...
T A K E C A R E , B E S A F E ;-)T A K E C A R E , B E S A F E ;-)

More Related Content

What's hot (20)

Rigging and lifting
Rigging and liftingRigging and lifting
Rigging and lifting
 
Lifting Sling Safety
Lifting Sling SafetyLifting Sling Safety
Lifting Sling Safety
 
Rigging Presentation by Pipeweldrig
Rigging Presentation by PipeweldrigRigging Presentation by Pipeweldrig
Rigging Presentation by Pipeweldrig
 
Basics of crane
Basics of craneBasics of crane
Basics of crane
 
Types of cranes
Types of cranesTypes of cranes
Types of cranes
 
Cranes -
Cranes - Cranes -
Cranes -
 
Basic Rigging
Basic RiggingBasic Rigging
Basic Rigging
 
Lifting practices for engineers
Lifting practices for engineersLifting practices for engineers
Lifting practices for engineers
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&I
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at work
 
Rigging Presentation
Rigging PresentationRigging Presentation
Rigging Presentation
 
Basic riggingworkbook
Basic riggingworkbookBasic riggingworkbook
Basic riggingworkbook
 
Crane safety
Crane safetyCrane safety
Crane safety
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
Cranes ppt
Cranes pptCranes ppt
Cranes ppt
 
Below the hook
Below the hook Below the hook
Below the hook
 
Basic rigging training manual
Basic rigging training manualBasic rigging training manual
Basic rigging training manual
 
Crane Incident Handbook
Crane Incident Handbook Crane Incident Handbook
Crane Incident Handbook
 
Safe Rigging Training
Safe Rigging TrainingSafe Rigging Training
Safe Rigging Training
 
Crane Rigging Safety by HF & C
Crane Rigging Safety by HF & CCrane Rigging Safety by HF & C
Crane Rigging Safety by HF & C
 

Viewers also liked

SAFE USE OF LIFTING EQUIPMENT LEEA
SAFE USE OF LIFTING EQUIPMENT LEEASAFE USE OF LIFTING EQUIPMENT LEEA
SAFE USE OF LIFTING EQUIPMENT LEEAANA ISABEL R.R.
 
5 Essential Tips for Safe Mobile Crane Operations
5 Essential Tips for Safe Mobile Crane Operations5 Essential Tips for Safe Mobile Crane Operations
5 Essential Tips for Safe Mobile Crane OperationsDeborah Davis
 
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANESBs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANESANA ISABEL R.R.
 
Crane Engineering - Celebrating 75 Years
Crane Engineering - Celebrating 75 YearsCrane Engineering - Celebrating 75 Years
Crane Engineering - Celebrating 75 YearsCrane Engineering
 
NCSO Power point presentation
NCSO Power point presentationNCSO Power point presentation
NCSO Power point presentationJacques Lajoie
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training PresentationFAIZ FAREED
 
NIOSH Lifting Equation Slides
NIOSH Lifting Equation SlidesNIOSH Lifting Equation Slides
NIOSH Lifting Equation SlidesErgonomics Plus
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead craneWina Indah
 
Crane operator safety procedure
Crane operator safety procedureCrane operator safety procedure
Crane operator safety procedureAbdul Shukur
 
Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training  Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training BILL Bill Brown
 
Amit crane ppt
Amit crane pptAmit crane ppt
Amit crane pptamits2280
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist Rahmat Mohamed
 
Tower crane Basics
Tower crane BasicsTower crane Basics
Tower crane Basicsrama24x7
 
Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Riggingfcarlson
 

Viewers also liked (20)

SAFE USE OF LIFTING EQUIPMENT LEEA
SAFE USE OF LIFTING EQUIPMENT LEEASAFE USE OF LIFTING EQUIPMENT LEEA
SAFE USE OF LIFTING EQUIPMENT LEEA
 
5 Essential Tips for Safe Mobile Crane Operations
5 Essential Tips for Safe Mobile Crane Operations5 Essential Tips for Safe Mobile Crane Operations
5 Essential Tips for Safe Mobile Crane Operations
 
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANESBs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
 
Operating practices
Operating practicesOperating practices
Operating practices
 
Crane Engineering - Celebrating 75 Years
Crane Engineering - Celebrating 75 YearsCrane Engineering - Celebrating 75 Years
Crane Engineering - Celebrating 75 Years
 
NCSO Power point presentation
NCSO Power point presentationNCSO Power point presentation
NCSO Power point presentation
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
 
Safety know your crane
Safety   know your craneSafety   know your crane
Safety know your crane
 
Crane safety technical
Crane safety   technicalCrane safety   technical
Crane safety technical
 
NIOSH Lifting Equation Slides
NIOSH Lifting Equation SlidesNIOSH Lifting Equation Slides
NIOSH Lifting Equation Slides
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead crane
 
Crane operator safety procedure
Crane operator safety procedureCrane operator safety procedure
Crane operator safety procedure
 
Crane 123
Crane 123Crane 123
Crane 123
 
Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
 
Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training  Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training
 
Amit crane ppt
Amit crane pptAmit crane ppt
Amit crane ppt
 
Keselamatan crane
Keselamatan crane Keselamatan crane
Keselamatan crane
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist
 
Tower crane Basics
Tower crane BasicsTower crane Basics
Tower crane Basics
 
Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Rigging
 

Similar to Safe use of Mobile Cranes

Crawler crane introduction
Crawler crane   introductionCrawler crane   introduction
Crawler crane introductionBhushan Goyal
 
Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptxAizazFarhat3
 
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLift Events
 
2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sitesPrastowo Priyatmoko
 
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptapm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptLeandroGonzlezDeCecc
 
Crawler Mounted crane
Crawler Mounted craneCrawler Mounted crane
Crawler Mounted craneAxay Sharma
 
www.scanrent.com.au
www.scanrent.com.au www.scanrent.com.au
www.scanrent.com.au Ghazanfar Ali
 
Crane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdfCrane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdfManoj Kumar
 
selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...swaroop k s
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rulesytcrane
 
apm-et13e-chapter-18-powered-industrial-trucks.ppt
apm-et13e-chapter-18-powered-industrial-trucks.pptapm-et13e-chapter-18-powered-industrial-trucks.ppt
apm-et13e-chapter-18-powered-industrial-trucks.pptharikumarmech
 
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاالروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاOsamaAbdelbaset2
 
Equipment Operation, Skid Loader
Equipment Operation, Skid LoaderEquipment Operation, Skid Loader
Equipment Operation, Skid LoaderStarkParks
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...AhmedAliKhan38
 
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetySafe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetyAtlantic Training, LLC.
 

Similar to Safe use of Mobile Cranes (20)

Crawler crane introduction
Crawler crane   introductionCrawler crane   introduction
Crawler crane introduction
 
Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptx
 
Crane safety
Crane safetyCrane safety
Crane safety
 
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites
 
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptapm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
 
Crawler Mounted crane
Crawler Mounted craneCrawler Mounted crane
Crawler Mounted crane
 
www.scanrent.com.au
www.scanrent.com.au www.scanrent.com.au
www.scanrent.com.au
 
Crane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdfCrane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdf
 
selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rules
 
Construction safety VI
Construction safety VIConstruction safety VI
Construction safety VI
 
apm-et13e-chapter-18-powered-industrial-trucks.ppt
apm-et13e-chapter-18-powered-industrial-trucks.pptapm-et13e-chapter-18-powered-industrial-trucks.ppt
apm-et13e-chapter-18-powered-industrial-trucks.ppt
 
safe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUESsafe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUES
 
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاالروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
 
Tower crane
Tower craneTower crane
Tower crane
 
Equipment Operation, Skid Loader
Equipment Operation, Skid LoaderEquipment Operation, Skid Loader
Equipment Operation, Skid Loader
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetySafe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
 

Safe use of Mobile Cranes

  • 1. SAFE USE OF MOBILE CRANES Author: Mihajlo Stupar HSE Manager PRO Lifting Solutions Ltd Republic of Serbia February 2016.
  • 2. ● Mobile cranes are indispensable assistants in lifting heavy loads in the industry. They are primarily used for lifting, lowering and transporting loads. ● Mobile cranes moved loads horizontally by swinging or traveling. Most of them consist of a carrier and superstructure equipped with a boom, jib (optional) and hook. ● There are mechanical and hydraulic types of mobile cranes. ● Mechanical mobile cranes are also referred to as "conventional" crane and they have greater capacity. ● Hydraulic cranes have greater mobility and require less setup time.
  • 3. BASIC DEFINITIONS ● Crane – consist of a rotating structure for lifting and lowering horizontally structure on rubber tires or crawler treads. ● Hoist – used to lift and lower load. ● Boom – an inclined spar, strut, or other long member supporting the hoisting tackle. ● Boom stops – a device used to limit the angle of the boom at its highest position. ● Brake – to slow or stop motion by friction or power. ● Block – sheaves or grooved pulleys in a frame with hook, eye and strap. ● Jib – extension attached to the boom point to provide added boom lenght for lifting specified loads. ● Radius – horizontal distance from center of rotation to the hook.
  • 4. CRANE CAPACITY ● Crane capacity is controlled by its operating radius. ● Capacity depends on: position of boom with respect to the carrier (over the front or over the rear or sides), amount and configuration of the counterweight. ● Crane manufacturers provide lifting data that includes: range diagram, load rating charts, PCSA rating class, miscellaneous notes and dimensions. ● Safety regulations limit maximum crane load to a percentage of the tipping load (load that will cause the crane to actually begin to tip). ● Notice that hook blocks, slings, spreader bars, and other load-handling devices are considered part of the load and their weight must be included in the maximum safe load capacity calculation. ● Electronic load indicators are available that measure the actual load on the crane and provide a warning if the safe capacity is being exceed. ● Lifting capacities are based on ≤ 85 % of tipping load on outriggers and on ≤ 75 % of tipping load on crawlers. ● A standard method of rating the capacity of mobile cranes has been adopted by The PCSA Bureau of The Construction Industry Manufactures Association (CIMA). ● The key to lifting a maximum capacity load is the outriggers. They provide a solid platform for the crane safety operations. Statistic show that at least 50 % of crane incidents occur because crane or outriggers are not set-up properly.
  • 5.
  • 6.
  • 7. LIEBHERR LTM 11200-9.1 – ONE OF THE BIGGEST MOBILE CRANE IN THE WORLD ● Lifting capacities: ● 1200 t on 2.5 m radius – with heavy lift boom and additional equipment. ● 140 t on 20 m radius, 33.5 t on 50 m radius, etc.
  • 8. TEREX CC 8800-1 – ONE OF THE BIGGEST CRAWLER CRANE IN THE WORLD ● Lifting capacities: ● 1558 t on 10 m radius, 873 t on 30 m radius, 334.5 t on 60 m radius, etc. ● Crawler crane can move with load. Ofcourse, for this operation you must have very good ground conditions.
  • 9. RESPONSIBILITIES, CONDITONS ● Have the right crane for the job. ● Assure operator is adequately trained. ● Assure riggers are competent. ● Ensure crane is in safe operating condition. ● Know the weight of the load. ● Know where the center of gravity is.
  • 10. RESPONSIBILITIES, CONDITONS ● Know the rated capacities of rigging. ● Reduce capacities as sling angles increase. ● Know how hitches affect sling capacities. ● Use proper sling sets for the load. ● Protect slings from sharp surfaces. ● Test lift uneven loads for balance. ● Inspect all slings, chains, hooks, etc. ● Stay clear of raised loads.
  • 11. RESPONSIBILITIES, CONDITONS ● Provide overhead protection for other workers. ● Provide proper working area. ● Maintain clearance with overhead power lines. ● Assure adequate ground stability – as load leverage increases, pressure increases nearest the load.
  • 12. EQUIPMENT FOR BINDING ● Slings are rated for vertical hitch. ● Chocker hitches can reduce capacities by half. ● Basket hitches can increase capacity by 2 for straight vertical basket. ● If sling / chain angles are too shallow, the slings / chains could slip. ● Shallow angles also can over stress slings / chains. Chocker Basket
  • 13. EQUIPMENT FOR BINDING ● Slings / chains must be inspected before each use. They should have tags that indicates capacities. ● Slings are safer then chains, because on slings you can see initial damage much easier. ● Immediately remove damaged or defective slings from service!!!
  • 14. TENSION IN A SLING LEG T – tension in a single leg. WL – weight of load. N – number of sling legs. L – lenght of sling leg. V – vertical distance between hook and load. ● The sling stress is proportional to the angle of the sling.
  • 15. SLING ANGLE AND CAPACITY 87 % 70 % 50 % ● Rated capacities must be reduced as sling ahgle increases. ● Slings should be set at a minimum of 60 degree angle.
  • 16. CAUSES OF CRANE ACCIDENTS ● The main causes of crane accidents are: ● lack of planing and supervision, ● incorrect siting or setup cranes, ● failure to cerrectly calculate or estimate the load, ● failure of personel to carry out the correct procedures, ● use of wrong liftinting gears, ● lack of proper maintenance, ● careless and complacent, ● faulty device or machines.
  • 17. SELECTING THE CRANE ● Cranes should always be selected to handle the maximum anticipated load with capacity to spare. ● Other consideration for the selection of the crane are the nature of lift, ground condition, site constraints, etc.
  • 18. THE CRANE OPERATOR ● Make sure the crane operator can see the: ● Rated load capacities, ● Operating speeds, ● Special hazard warning and instruction. ● The crane shall only be operated by a trained, health and competent operator, with cooperation of trained lifting supervisor, trained riggers and trained signalman.
  • 19. DOCUMENTS FOR THE CRANE When the crane arrives on site, the following documents should come along with the crane for inspection and review when requested: ● a vaild Certificate for the mobile crane, ● Valid certificates for all lifting gears that comes with the crane, ● The log book or log sheet for the recording of the operational tests carried out by the operator before the start of every workshift. If the operator is unable to produce the above documents, the crane supplier should be contacted and the documents obtained before the machine is put into use. It is advisable to state that the production of these documents will be required when the crane is hired.
  • 20. SITING OF CRANE ● The stability of the crane depends heavily on te proper siting and setting of the crane. ● Unless stated by the manufacturer, the crane should have its outriggers fully extended with the wheels off the ground. ● The ground should be level and capable of supporting the full weight of the crane and its load. ● In addition, sufficient and suitable packing in the form of steel or plastic plates or timber mats should be placed under the outriggers to evenly distribute the weight. Surface of these plates or mats should be at least twice bigger then surface of outriggers which is above. ● The crane should also be positioned so that: ● The operator has a clear view of the operation as far as practicable, ● There is sufficient operating space, ● It is well away from edges of excavation and fixed structures which people may be trapped by the moving parts such as counterweights, etc. ● Fully extend all outriggers for maximum capacity.
  • 21. Proper outrigger setup Not recommended outrigger setup. In this situation load should be on the other side of the crane, then the maximum pressure will not be on this outrigger.
  • 22. Improper outrigger setupPoor outrigger setup No comment...
  • 23. WORK NEAR POWER LINES ● Who is at risk – ● Operators are normally safe if they stay in the cabin. ● Ground personnel are over 8 times more likely to be killed.
  • 24. PLANNING AND SUPERVISION ● All lifting operations should be properly planned by a competent person before the actual execution and not left solely to the crane operator. ● Investigation into crane accidents revealed that one of the root causes of these accidents was due to lack of proper planning and supervision. This is particularly so for simple routine lifts. All contractors are advised not to be complacent during any lifting operation, and to plan and supervise the operation carefully. ● Site constraints that would have an impact on the safe operation of the lifting should be considered before the execution on the lift. Examples of such constraints are: ● lifting next to or over an excavation pit, ● materials or machines placed along the access way thereby reducing the available space to extend the outriggers, ● site is located nearby busy traffic, or existing building or structures. ● Careful planning is especially critical for difficult lifts such as pick up and carry operations, tandem lifting and tilt-up operation.
  • 25.
  • 26. LOAD RADIUS INDICATOR ● The mandatory load radius indicator gives the safe working load at the configuration that the crane has been set, and gives a warning signal when the radius is unsafe. ● The indicator: ● must be calibrated regulary, ● must be configured for both main and auxiliary hooks (when both hooks are used), ● the operator must be trained to use / set the indicator correctly to tally with the actual configuration adopted. ● It is important to note that the load radius indicator served primarily as an operational aid. Although the indicator can warm the operator of an impending overload, it should not be used as the only tool to test the stability limit of the crane during operations.
  • 27. CHECKS AND MAINTANCE ● The crane should be in good working condition when it arrives on site and before the start of the workshift. In addition to regulary inspections, the manufacture's recommendation on the inspection and maintance regime should also be followed closely.
  • 28. BASIC RADIO COMANDS HAND SIGNALS ● Use load line. ● Use wipline. ● Boom up – boom down. ● Boom up and hold the load. ● Boom down and hold the load. ● Swing right – swing left. ● Take the load up – down with the load. ● Extend boom – retract boom. ● Etc...
  • 29. In these 2 accidents nobody has died, but material damage is very high, as you can see on the pictures... Why these accidents happened? Failure of operators to carry out the correct procedures...