1. Rig #: BENNEVIS PIC Signature Approving JSA:
Work Activity (Job): MA 036 CHECK BALLAST DECHARGE VALVE
Work Team (Crew Members):
Sequence of Basic Job Steps Potential Accidents or Hazards
Recommendation to Eliminate or Reduce Potential
Hazards
Who?
Initials
- CHECK THAT BALLAST PUMPS
ARE OFF
- WATER COULD SPLASH OUT INTO FACE - DOUBLE CHECK THE SWITCHES TO SEE
THAT THE PUMPS ARE OFF
B T
- REMOVE BOLTS
- REMOVE VALVE
- PINCH FINGERS
- WATER TRAPPED IN VALVE OR PIPE LINE
- USE TOOLS CORRECTLY AND SAFELY
- REMOVE SLOWLY AND CAREFULLY
B T
- REPLACE VALVE - PINCH FINGERS - USE TOOLS CORRECTLY AND SAFELY B T
Safety Equipment To Do This Job
Hard Hats X Cotton Gloves ( Face Shield ( Fire Extinguishers (
Safety Boots X Work Vest ( Goggles ( Lockout/Tagout (
Safety Glasses X Safety Harness ( Barricades ( Work Permit Required X
Uncontrolled When Printed Page 1
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM