me/ BENNEVIS JSA Number : MA 019 Person Approving JSA: H.M
ctivity (Job): Preloads
valves Maintenance Date Raised :
eam (Crew Members):
BE – Roustabouts Date Last Amended :
Safety Equipment To Do This Job(
Hard Hats x Cotton Gloves x Face Shield Fire Extinguishers
Safety Boots x Work Vest Goggles x Lockout/Tagout
Safety Glasses x Safety Harness Barricades Work Permit Required x
Uncontrolled When Printed Page 1 of 2
Sequence of Basic Job Steps Potential Accidents or Hazards
Recommendation to Eliminate or Reduce Potential
Hazards
Who?
Initials
1. Hold pre-job meeting – Work-permit 1. Procedures not known or not understood by crew members-
Persons involved in task becoming injured by incorrect procedure
compliance
1. Take time to read correctly JSA . Be sure everything is
understood . If not ask your Supervisor
Supervisors
2. Prepare tools & Ligths – Gas detection 2. Tools falling down in tank & on people – Wrong voltage
lighting equipment ( electric shock ) – People falling down in
tank – Poor atmospheric condition
2. Secure tools correctly before send them into preloads –
Do not stay below tools if you are inside tank – Be sure tank
is completely dry – Use 24volts lighting only – Be sure that
tank has no gas concentration before going inside
BE - ABE
Roustabouts
Electrician
3. Enter into tank – Dump-valve
maintenance
3 . Falling from ladder – Pinch point – Hand or feet injuries
when removing & reinstalling valve – Lighting problem ( no
visibility ) – Using wrong tools
3. Use fall arrestor & harness – Be sure lighting equipment is
in good condition of work – Use adequate tools – Watch
hands & feet placement during valve maintenance
BE – ABE -
Roustabouts
4. Recover tools & exit tank 4. Tools falling down – Falling from ladder – Tools left out into
the tank creating hazards
4. Use fall arrestor & harness to go out from tank – Recover
all tools when job is completed
BE – ABE -
Roustabouts
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Form No.: PRIDE-02-02-102-F001
Issue Date
4th-Apr-2002
Revision No.
1
Revision Date
11-June-2006
Prepared By
QA/HSE
Approved By
FC
Level No.
2
Uncontrolled When Printed Page 2 of 2
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Form No.: PRIDE-02-02-102-F001
Issue Date
4th-Apr-2002
Revision No.
1
Revision Date
11-June-2006
Prepared By
QA/HSE
Approved By
FC
Level No.
2

More Related Content

Similar to Ma 019 preloads dump valves maintenance

Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspectionYousif Fikry
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanksYousif Fikry
 
Ma 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsMa 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsYousif Fikry
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basketYousif Fikry
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wiresYousif Fikry
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boatYousif Fikry
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatYousif Fikry
 
Ma 006 transfer by personnel basket
Ma 006  transfer by personnel basketMa 006  transfer by personnel basket
Ma 006 transfer by personnel basketYousif Fikry
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenanceYousif Fikry
 
Ma 040 emergency lowering of personnel lifting
Ma 040  emergency lowering of personnel liftingMa 040  emergency lowering of personnel lifting
Ma 040 emergency lowering of personnel liftingYousif Fikry
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deckYousif Fikry
 
Ma 004 paint jobs inside tanks
Ma 004  paint jobs inside tanksMa 004  paint jobs inside tanks
Ma 004 paint jobs inside tanksYousif Fikry
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repairYousif Fikry
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranesYousif Fikry
 
Ma 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legsMa 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legsYousif Fikry
 
Ma 010 crane wire replacement ( whip line )
Ma 010  crane wire replacement ( whip line )Ma 010  crane wire replacement ( whip line )
Ma 010 crane wire replacement ( whip line )Yousif Fikry
 
Dr047 confined space entry
Dr047 confined space entryDr047 confined space entry
Dr047 confined space entryYousif Fikry
 
Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )Yousif Fikry
 

Similar to Ma 019 preloads dump valves maintenance (20)

Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspection
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanks
 
Ma 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsMa 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodations
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basket
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boat
 
Ma 006 transfer by personnel basket
Ma 006  transfer by personnel basketMa 006  transfer by personnel basket
Ma 006 transfer by personnel basket
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
 
Ma 040 emergency lowering of personnel lifting
Ma 040  emergency lowering of personnel liftingMa 040  emergency lowering of personnel lifting
Ma 040 emergency lowering of personnel lifting
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
 
Ma 022 preloading
Ma 022 preloadingMa 022 preloading
Ma 022 preloading
 
Ma 004 paint jobs inside tanks
Ma 004  paint jobs inside tanksMa 004  paint jobs inside tanks
Ma 004 paint jobs inside tanks
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
 
Ma 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legsMa 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legs
 
JSA for Hydrotesting.pdf
JSA for Hydrotesting.pdfJSA for Hydrotesting.pdf
JSA for Hydrotesting.pdf
 
Ma 010 crane wire replacement ( whip line )
Ma 010  crane wire replacement ( whip line )Ma 010  crane wire replacement ( whip line )
Ma 010 crane wire replacement ( whip line )
 
Dr047 confined space entry
Dr047 confined space entryDr047 confined space entry
Dr047 confined space entry
 
Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )
 

More from Yousif Fikry

Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringYousif Fikry
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick setYousif Fikry
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brushYousif Fikry
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveYousif Fikry
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachestYousif Fikry
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deckYousif Fikry
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackYousif Fikry
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatYousif Fikry
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatYousif Fikry
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneYousif Fikry
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatYousif Fikry
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachestYousif Fikry
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deckYousif Fikry
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmYousif Fikry
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casingYousif Fikry
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladderYousif Fikry
 

More from Yousif Fikry (16)

Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load lowering
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick set
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valve
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deck
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rack
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t crane
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deck
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casing
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
 

Ma 019 preloads dump valves maintenance

  • 1. me/ BENNEVIS JSA Number : MA 019 Person Approving JSA: H.M ctivity (Job): Preloads valves Maintenance Date Raised : eam (Crew Members): BE – Roustabouts Date Last Amended : Safety Equipment To Do This Job( Hard Hats x Cotton Gloves x Face Shield Fire Extinguishers Safety Boots x Work Vest Goggles x Lockout/Tagout Safety Glasses x Safety Harness Barricades Work Permit Required x Uncontrolled When Printed Page 1 of 2 Sequence of Basic Job Steps Potential Accidents or Hazards Recommendation to Eliminate or Reduce Potential Hazards Who? Initials 1. Hold pre-job meeting – Work-permit 1. Procedures not known or not understood by crew members- Persons involved in task becoming injured by incorrect procedure compliance 1. Take time to read correctly JSA . Be sure everything is understood . If not ask your Supervisor Supervisors 2. Prepare tools & Ligths – Gas detection 2. Tools falling down in tank & on people – Wrong voltage lighting equipment ( electric shock ) – People falling down in tank – Poor atmospheric condition 2. Secure tools correctly before send them into preloads – Do not stay below tools if you are inside tank – Be sure tank is completely dry – Use 24volts lighting only – Be sure that tank has no gas concentration before going inside BE - ABE Roustabouts Electrician 3. Enter into tank – Dump-valve maintenance 3 . Falling from ladder – Pinch point – Hand or feet injuries when removing & reinstalling valve – Lighting problem ( no visibility ) – Using wrong tools 3. Use fall arrestor & harness – Be sure lighting equipment is in good condition of work – Use adequate tools – Watch hands & feet placement during valve maintenance BE – ABE - Roustabouts 4. Recover tools & exit tank 4. Tools falling down – Falling from ladder – Tools left out into the tank creating hazards 4. Use fall arrestor & harness to go out from tank – Recover all tools when job is completed BE – ABE - Roustabouts Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Form No.: PRIDE-02-02-102-F001 Issue Date 4th-Apr-2002 Revision No. 1 Revision Date 11-June-2006 Prepared By QA/HSE Approved By FC Level No. 2
  • 2. Uncontrolled When Printed Page 2 of 2 Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Form No.: PRIDE-02-02-102-F001 Issue Date 4th-Apr-2002 Revision No. 1 Revision Date 11-June-2006 Prepared By QA/HSE Approved By FC Level No. 2