Ma 023 change out butter fly valve for bulk system
Ma 021 backload flare boom on supply-boat
1. Rig Name/#: BENNEVIS JSA Number : MA 021 Person Approving JSA: H.M
Work Activity (Job): Backload
Flare boom on supply-boat Date Raised :
Work Team (Crew Members):
BE – ABE – Roustabouts –
Crane Operator Date Last Amended : None
Page 1 of 2
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
2. Safety Equipment To Do This Job(
Hard Hats x Cotton Gloves x Face Shield Fire Extinguishers
Safety Boots x Work Vest x Goggles x Lockout/Tagout
Safety Glasses x Safety Harness x Barricades x Work Permit Required x
Page 2 of 2
Sequence of Basic Job Steps Potential Accidents or Hazards
Recommendation to Eliminate or Reduce Potential
Hazards
Who?
Initials
1. Hold pre-job meeting – Work-permit 1. Procedures not known or not understood by crew members-
Persons involved in task becoming injured by incorrect procedure
compliance
1. Take time to read correctly JSA . Be sure everything is
understood. If not ask your Supervisor
Supervisors
2. Prepare slings on main-hook & Connect
them on flare-boom
2. Crane failure – Hands or fingers injuries – Slings in bad
condition – Inadequate slings SWL – People hit by slings
2. Check crane condition before operation & report if there
is any problem - Operate crane slowly – Check slings
condition and SWL – Check color code & slings certificates –
Watch hands position when connecting – Do not stay around
slings – Use tag lines
BE – ABE
CraneOperator
Roustabouts
3. Shift flare-booml from main-deck with
crane
3. Crane failure – Hands or fingers injuries – Equipment
damaged by flare-booml – Swinging out of control – Boom crane
damaged – Flare-booml falling down on deck
3. Crane inspection to be done before operation – Check
slings condition & SWL – Check color code & slings
certificates – Operate crane very slowly – Only 1 qualified
person making crane signals – Use tag-lines ( same length )
Special care of boom radius angle – Watch hands placement
Do not stay below load – Ensure there is enough deck space
area free
CraneOperator
BE – ABE
Roustabouts
4. Backload flare-boom on supply boat &
Disconnect slings
5. Crane failure – Hands injuries – Equipment damaged by flare-
boom –Swinging out of control – Boom crane damaged – Crew
boat people struck between flare-boom and other equipment
5.Crane inspection to be done before operation - Operate
the crane very slowly – Only 1 qualified person making crane
signals – Use tag lines – Do not stay below load- Watch
hands placement – Ensure there is enough deck space on
boat – Special care of boom radius angle – Backload only if
weather is ok
CraneOperator
BE – ABE -
Roustabouts
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2