Ma 023 change out butter fly valve for bulk system
Ma 040 emergency lowering of personnel lifting
1. Rig Name/#: Bennevis JSA Number : MA 040 Person Approving JSA: H.M
Work Activity (Job): Emergency lowering of personnel lifting Date Raised :
Work Team (Crew Members): ABM / Roustabouts Date Last Amended :
Sequence of Basic Job
Steps
Potential Accidents or Hazards Recommendation to Eliminate or Reduce Potential Hazards
Who?
Initials
1. Hold pre-job meeting –
Work-permit
1. Procedures not known or not understood by crew
members- Persons involved in task becoming injured
by incorrect procedure compliance
1. Take time to read correctly JSA . Be sure everything is understood. If not ask your
Supervisor
Supervisor
2 . Prepare and inspect
personnel basket – Life
jackets -
2. Personnel Basket in bad condition – Sling
damaged – Shackle loosed – Life jackets in bad
condition
2. Personnel basket maintenance – Regular inspection of life jackets – Store
personnel basket in such a place that it can be kept in good condition
ABE –
Roustabouts
– Crane Op
3. Transferring personnel 3. Falling from basket – Swinging out of control –
Wrong crane signals done to Crane operator – Bad
weather – Sinking – Basket capsizing , caught or
trapped by something
Crane power loss
3. Maximum 4 persons in the basket - Follow transfer position procedure to use
basket ( outer rim of the net , facing inward and grabbing firmly the net ) – Use tag-
lines to keep basket steady – Learn crane signals – Only one person doing crane
signals – Put correctly your life jacket – Check weather condition – Landing areas
must be kept free
In the event of power loss the load may be lowered manually – this accomplished by:
1.remove plug in top of brake actuation cylinder
2. Install special ¾ - NC all thread bolt with nut and flat washer
by screwing it into the hydraulic piston thru port in top of the cylinder
3. Turn the nut & washer down against the top of the brake actuation cylinder by
hand
Caution
4.Slowly tighten the nut against the brake actuation cylinder top until the
Hoist starts to pay out
The hoist may be stopped by backing off (loosing ) this nut
5.remove bolt &replace plug before resuming power operation
ABE-
Roustabouts
Crane OP
-All involved
4. Store basket 3. Basket caught or trapped by something . Pinch 4. Storage area free – Learn crane signals – Only one person doing signals – Crane ABE –
Page 1 of 2
PYRAMID DRILLING Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
12 Dec 2009
Revision No.
0
Revision Date
12 Dec 2009
Prepared By
QA/HSE
Approved By
HM
Level No.
2
2. points . Damaged equipment must be operate with care Roustabouts
Crane Op
Safety Equipment To Do This Job(
Hard Hats x Gloves x Face Shield Fire Extinguishers
Safety Boots x Work Vest x Goggles x Lockout/Tagout
Safety Glasses x Safety Harness x Barriers Work Permit Required x
Page 2 of 2
PYRAMID DRILLING Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
12 Dec 2009
Revision No.
0
Revision Date
12 Dec 2009
Prepared By
QA/HSE
Approved By
HM
Level No.
2