SlideShare a Scribd company logo
1 of 18
Download to read offline
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
Pre-Mobilization On Location
LONG COTTER PINS CREATE SNAG
POINT
SERVICE TECHS 3 3 9 PLACE COTTER PINS ON THE "INSIDE" OF SHACKLE SHOP FOREMAN SERVICE TECH DVN-DLF-MIR-03 3 2 6
SUSPENDED LOADS ENTIRE CREW 3 3 9
REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC
RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE
THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER
ACCOMPANYING EQUIPMENT.
RIG CREW
SERVICE TECH /
RIG CREW
DVN-DLF-MIR-03 3 2 6
FALLING OBJECTS ENTIRE CREW 5 3 15
PREMOBILIZATION CHECK LISTS (DVN-DLF-MIC-07); DEBRIS
CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER
PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE,
ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF
SERVICE.
SHOP
FOREMAN
SERVICE TECH DVN-DLF-MIC-07 4 2 8
BROKEN HYDRAULIC
CONNECTIONS AND HOSES
RIG CREW /
SERVICE TECHS
3 4 12
INSPECT ALL HYDRAULIC HOSES VISUALLY FOR WORN, SPLIT,
CUT, CRACKED HOSES AND/OR LEAKS. INSPECT VISUALLY ALL
CONNECTION ENDS FOR CRACKS, WORN, SEPARATION FROM
HOSES, AND/OR LEAKS (DVN-HOS-MIP-02)
SHOP
FOREMAN
RIG CREW /
SERVICE TECH
DVN-DLF-MIC-
07, DVN-HOS-
MIP-07
3 2 6
SLING FAILURE CAN RESULT IN
DROPPED EQUIPMENT AS IT IS
BEING LIFTED
ENTIRE CREW 5 2 10
NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL
INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES.
SHOP
FOREMAN /
TPI
SERVICE TECH DVN-DLF-MIR-03 3 2 6
DUAL ARTICULATING LIFT FRAME (DALF)
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
Assessor's signature: ____________________________________________ 1 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
LONG COTTER PINS CREATE SNAG
POINT
SERVICE TECHS 3 3 9 PLACE COTTER PINS ON THE "INSIDE" OF SHACKLE SHOP FOREMAN SERVICE TECH DVN-BAS-MIR-03 3 2 6
SUSPENDED LOADS ENTIRE CREW 3 3 9
REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC
RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE
THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER
ACCOMPANYING EQUIPMENT
RIG CREW
SERVICE TECH /
RIG CREW
DVN-BAS-MIP-02 3 2 6
FALLING OBJECTS ENTIRE CREW 5 3 15
PREMOBILIZATION CHECK LISTS (DVN-BAL-PRD-04); DEBRIS
CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER
PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE,
ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF
SERVICE;
SHOP
FOREMAN
SERVICE TECH DVN-BAS-PRD-05 4 2 8
BROKEN HYDRAULIC
CONNECTIONS AND HOSES
RIG CREW /
SERVICE TECHS
3 4 12
INSPECT ALL HYDRAULIC AND FUEL HOSES VISUALLY FOR
WORN, SPLIT, CUT, CRACKED HOSES AND/OR LEAKS. INSPECT
VISUALLY ALL CONNECTION ENDS FOR CRACKS, WORN,
SEPARATION FROM HOSES, AND/OR LEAKS. (DVN-HOS-MIP-
02)
SHOP
FOREMAN
RIG CREW /
SERVICE TECH
DVN-HPU-MIR-
02,DVN-HOS-
MIP-02
3 2 6
SLING FAILURE CAN RESULT IN
DROPPED EQUIPMENT AS IT IS
BEING LIFTED
ENTIRE CREW 5 2 10
NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL
INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES
SHOP
FOREMAN /
TPI
SERVICE TECH BHP QCP REV. 3 4 2 8
BAIL ASSEMBLY SPREADER SYSTEM (BASS)
Assessor's signature: ____________________________________________ 2 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
SUSPENDED LOADS ENTIRE CREW 3 3 9
REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC
RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE
THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER
ACCOMPANYING EQUIPMENT
SHOP
FOREMAN
SERVICE TECH /
RIG CREW
DVN-DLF-MIP-
02; JSA
3 2 6
FALLING OBJECTS ENTIRE CREW 5 3 15
DEBRIS CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE
COTTER PINS ARE "WRAPPED" AROUND THE RESPECTIVE
SHACKLE, ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED,
I.E. OUT OF SERVICE;
SHOP
FOREMAN
SERVICE TECH JSA; HSE COORD. 5 2 10
LOAD SHIFT IN EQUIPMENT
BASKET - CAN CAUSE EQUIPMENT
DAMAGES, LEAKS, POTENTIAL
ENERGY
SERVICE TECHS 3 4 12
ENSURE LOAD IS SECURED IN BASKET; HAVE MSDS ON ALL
CHEMICALS FOR QUICK AND PROPER CLEAN UP RESPONSE;
THIRD PARTY REVIEW OF LOAD OUT; SECURE ITEMS WITH
STRAPS;
SHOP
FOREMAN
SERVICE TECH /
RIG CREW
MSDS;TECH
COMPETENCY
RECORD
3 2 6
SLING FAILURE CAN RESULT IN
DROPPED EQUIPMENT AS IT IS
BEING LIFTED
ENTIRE CREW 5 2 10
NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL
INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES
SHOP
FOREMAN /
TPI
SERVICE TECH BHP QCP REV. 3 4 2 8
EQUIPMENT BASKET (BAILS, ELEVATORS, CONTROL PANEL,
HOSES)
Assessor's signature: ____________________________________________ 3 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
LONG COTTER PINS CREATE SNAG
POINT
SERVICE TECHS 3 3 9 PLACE COTTER PINS ON THE "INSIDE" OF SHACKLE
SHOP
FOREMAN
SERVICE TECH
DVN-HPU-MIR-
02
3 2 6
SUSPENDED LOADS ENTIRE CREW 3 3 9
REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC
RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE
THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER
ACCOMPANYING EQUIPMENT
SHOP
FOREMAN
SERVICE TECH /
RIG CREW
DVN-HPU-MIR-
02
3 2 6
FALLING OBJECTS ENTIRE CREW 5 3 15
PREMOBILIZATION CHECK LISTS (DVN-HPU-PRD-06); DEBRIS
CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER
PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE,
ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF
SERVICE;
SHOP
FOREMAN
SERVICE TECH
DVN-HPU-PRD-
06
5 2 10
(IF APPLICABLE) LOAD SHIFT HPU
SKID - CAN CAUSE EQUIPMENT
DAMAGES, HYDRAULIC FLUID
LEAKS FROM HOSES.
SERVICE TECHS 3 4 12
ENSURE LOAD IS SECURED IN BASKET AND THREAD CAPS ARE
SECURED; HAVE MSDS ON ALL CHEMICALS FOR QUICK AND
PROPER CLEAN UP RESPONSE; THIRD PARTY REVIEW OF
LOAD OUT; NOV DEVIN PREMOB CHECK LIST(DVN-HPU-PRD-
06); SECURE ITEMS WITH STRAPS;
SHOP
FOREMAN
SERVICE TECH /
RIG CREW
DVN-HPU-PRD-
06
3 2 6
SLING FAILURE CAN RESULT IN
DROPPED EQUIPMENT AS IT IS
BEING LIFTED
ENTIRE CREW 5 2 10
NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL
INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES
SHOP
FOREMAN /
TPI
SERVICE TECH BHP QCP REV.3 4 2 8
BROKEN HYDRAULIC
CONNECTIONS AND HOSES
RIG CREW /
SERVICE TECHS
3 4 12
INSPECT ALL HYDRAULIC AND FUEL HOSES VISUALLY FOR
WORN, SPLIT, CUT, CRACKED HOSES AND/OR LEAKS. INSPECT
VISUALLY ALL CONNECTION ENDS FOR CRACKS, WORN,
SEPARATION FROM HOSES, AND/OR LEAKS. (DVN-HOS-MIP-
02)
SHOP
FOREMAN
RIG CREW /
SERVICE TECH
DVN-HPU-MIR-
02, DVN-HOS-
MIP-02
3 2 6
HYDRAULIC POWER UNIT (HPU)
Assessor's signature: ____________________________________________ 4 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
STRUCK BY ENTIRE CREW 4 3 12
LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR
LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK
LAYOUT
ENTIRE CREW ENTIRE CREW JSA 4 1 4
CAUGHT BETWEEN SUSPENDED
LOADS AND STRUCTURES
SERVICE TECHS
AND RIG CREW
5 3 15
HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE
OBJECTS; HAND AND BODY POSITIONING
ENTIRE CREW
SERVICE TECH /
RIG CREW
DVN-DLF-MIR-
03; JSA
5 2 10
LATCHING ELEVATORS -
POTENTIAL USE OF INCORRECT
ELEVATORS
SERVICE TECHS
AND RIG CREW
4 4 16
HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY
PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA;
UNDERSTANDING TOP DRIVE; NOV DEVIN CONFIRMATION
OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC
TONNAGE ELEVATORS; NOV/DEVIN PREMOB CHECKLIST;
COMPETENCY TRANING
SERVICE TECH SERVICE TECH
DVN-DLF-MIP-
02; JSA
4 3 12
USING SKATE OR CRANE TO LATCH
BAILS (TOP DRIVE AND/OR BAIL
PINS)
SERVICE TECHS
AND RIG CREW
3 3 9
LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION
WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS
BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE
RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE)
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
DVN-DLF-MIP-
02; JSA
2 3 6
PINCH POINTS - LATCHING
ELEVATORS, BAILS, MAKING UP
BAIL PINS; RIG UP MINI TRACK
SERVICE TECHS
AND RIG CREW
5 4 20
JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED
EQUIPMENT; PROPER HAND AND BODY POSITIONING;
IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50
LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI
TRACK PLACEMENT IN CTLF;
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
DVN-DLF-MIP-
02; JSA
5 3 15
PUNCTURE POINTS ON HYDRAULIC
POWER UNIT HYDRAULIC AND
FUEL TANKS - NO ENCLOSED CAGE
SERVICE TECHS 4 2 8
UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS;
DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS
OBSTRUCTIONS; MSDS
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
DVN-HPU-PRD-
06; BHP QCP
REV. 3
4 1 4
2. LIFT EQUIPMENT FROM DECK TO DERRICK (RIG
UP/EQUIPMENT PLACEMENT)
DUAL ARTICULATING LIFT FRAME (DALF)
Assessor's signature: ____________________________________________ 5 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
TRIP HAZARDS ON DECK - CAUSE
ABRASIONS, SPRAINS
ENTIRE CREW 3 3 9
SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER
HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE
COORDINATOR
ENTIRE CREW ENTIRE CREW JSA 2 2 4
STORED PRESSURE IN HYDRAULIC
OR AIR LINES - CAN CAUSE
RUPTURES, SPILLS, IMPACT TO
PERSONNEL
ENTIRE CREW 3 3 9
HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB
TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS
INSTALLED; MSDS
ENTIRE CREW ENTIRE CREW
DVN-DLF-MIP-
02;DVN-HOS-
MIP-02 JSA
3 2 6
INSTABILITY OF DALF FROM TOP
DISCONNECTING SLINGS FROM
CRANE
SERVICE TECH
AND RIG CREW
3 2 6 JSA; PROCEDUAL REVIEW
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
DVN-DLF-MIP-
02; JSA
3 1 3
HOSE ENTANGLEMENT SERVICE TECH 3 2 6
DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO
KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES
ARE NOT SNAGGED PRIOR TO LIFTING
SERVICE TECH SERVICE TECH
DVN-HOS-MIP-
02;JSA
2 1 2
DUAL ARTICULATING LIFT FRAME (DALF) (Cont.)
Assessor's signature: ____________________________________________ 6 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
STRUCK BY ENTIRE CREW 4 3 12
LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR
LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK
LAYOUT
ENTIRE CREW ENTIRE CREW
JSA; BHP QCP
Rev.3
4 1 4
CAUGHT BETWEEN SUSPENDED
LOADS AND STRUCTURES
SERVICE TECHS
AND RIG CREW
5 3 15
HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE
OBJECTS; HAND AND BODY POSITIONING
ENTIRE CREW
SERVICE TECH /
RIG CREW
JSA 5 2 10
LATCHING ELEVATORS -
POTENTIAL USE OF INCORRECT
ELEVATORS (IF APPLICABLE)
SERVICE TECHS
AND RIG CREW
4 4 16
HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY
PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA;
UNDERSTANDING TOP DRIVE; NOV/DEVIN CONFIRMATION
OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC
TONNAGE ELEVATORS; NOV/DEVIN PREMOB CHECKLIST;
COMPETENCY TRAINING
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
JSA; DVN-ELE-
MIP-01
4 3 12
USING SKATE OR CRANE TO LATCH
BAILS (TOP DRIVE AND/OR BAIL
PINS)
SERVICE TECHS
AND RIG CREW
3 3 9
LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION
WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS
BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE
RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE)
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
JSA; BHP QCP
Rev.3
3 3 9
PINCH POINTS - LATCHING
ELEVATORS, BAILS, MAKING UP
BAIL PINS; RIG UP MINI TRACK
SERVICE TECHS
AND RIG CREW
5 4 20
JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED
EQUIPMENT; PROPER HAND AND BODY POSITIONING;
IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50
LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI
TRACK PLACEMENT IN CTLF;
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
JSA; DVN-BAL-
MIP-01
5 3 15
TRIP HAZARDS ON DECK - CAUSE
ABRASIONS, SPRAINS
ENTIRE CREW 3 3 9
SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER
HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE
COORDINATOR
ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 4
STORED PRESSURE IN HYDRAULIC
OR AIR LINES - CAN CAUSE
RUPTURES, SPILLS, IMPACT TO
PERSONNEL
ENTIRE CREW 3 3 9
HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB
TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS
INSTALLED; MSDS
ENTIRE CREW ENTIRE CREW
MSDS; DVN-BAS-
IOP-01; DVN-
HOS-MIP-02
3 2 6
HOSE ENTAGLEMENT SERVICE TECH 3 2 6
DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO
KINKS IN LINE PRIOR TO APPLYING PRESSURE (DVN-HOS-MIP-
02); ASSURE HOSES ARE NOT SNAGGED PRIOR TO LIFTING
SERVICE TECH SERVICE TECH
JSA; DVN-BAS-
IOP-01;DVN-HOS-
MIP-02
2 1 3
BAIL ASSEMBLY SPREADER SYSTEM (BASS)
Assessor's signature: ____________________________________________ 7 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
STRUCK BY ENTIRE CREW 4 3 12
LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR
LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK
LAYOUT
ENTIRE CREW ENTIRE CREW JSA 4 1 4
CAUGHT BETWEEN SUSPENDED
LOADS AND STRUCTURES
SERVICE TECHS
AND RIG CREW
5 3 15
HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE
OBJECTS; HAND AND BODY POSITIONING
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
JSA 5 2 10
LATCHING ELEVATORS -
POTENTIAL USE OF INCORRECT
ELEVATORS
SERVICE TECHS
AND RIG CREW
4 4 16
HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY
PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA;
UNDERSTANDING TOP DRIVE; NOV DEVIN CONFIRMATION
OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC
SERVICE TECH
SERVICE TECH /
RIG CREW
JSA; DVN-ELE-
MIP-01
4 3 12
USING SKATE OR CRANE TO LATCH
BAILS (TOP DRIVE AND/OR BAIL
PINS)
SERVICE TECHS
AND RIG CREW
3 3 9
LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION
WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS
BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE
RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE)
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
JSA; BHP QCP
Rev.3
3 2 6
PINCH POINTS - LATCHING
ELEVATORS, BAILS, MAKING UP
BAIL PINS; RIG UP MINI TRACK
SERVICE TECHS
AND RIG CREW
5 4 20
JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED
EQUIPMENT; PROPER HAND AND BODY POSITIONING;
IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50
LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI
TRACK PLACEMENT IN CTLF;
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
JSA; DVN-BAL-
MIP-01
5 3 15
TRIP HAZARDS ON DECK - CAUSE
ABRASIONS, SPRAINS
ENTIRE CREW 3 3 9
SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER
HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE
COORDINATOR
ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 4
BAILS
Assessor's signature: ____________________________________________ 8 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
STRUCK BY ENTIRE CREW 4 3 12
LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR
LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK
LAYOUT
ENTIRE CREW ENTIRE CREW JSA 4 1 4
CAUGHT BETWEEN SUSPENDED
LOADS AND STRUCTURES
SERVICE TECHS
AND RIG CREW
5 3 15
HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE
OBJECTS; HAND AND BODY POSITIONING
ENTIRE CREW ENTIRE CREW JSA 5 2 10
(IF APPLICABLE) LATCHING
ELEVATORS - POTENTIAL USE OF
INCORRECT ELEVATORS
SERVICE TECHS
AND RIG CREW
4 4 16
HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY
PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA;
UNDERSTANDING TOP DRIVE; NOV/DEVIN CONFIRMATION
OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC
TONNAGE ELEVATORS; NOV DEVIN PREMOB CHECKLIST;
COMPETENCY TRANING
SERVICE TECH
SERVICE TECH /
RIG CREW
JSA; DVN-ELE-
MIP-01
4 3 12
USING SKATE OR CRANE TO LATCH
BAILS (TOP DRIVE AND/OR BAIL
PINS)
SERVICE TECHS
AND RIG CREW
3 3 9
LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION
WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS
BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE
RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE)
SERVICE TECH
SERVICE TECH /
RIG CREW
JSA; BHP QCP
Rev.3
3 2 6
PINCH POINTS - LATCHING
ELEVATORS, BAILS, MAKING UP
BAIL PINS; RIG UP MINI TRACK
SERVICE TECHS
AND RIG CREW
5 4 20
JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED
EQUIPMENT; PROPER HAND AND BODY POSITIONING;
IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50
LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI
TRACK PLACEMENT IN CTLF;
SERVICE TECH
SERVICE TECH /
RIG CREW
JSA; DVN-ELE-
MIP-01
5 3 15
TRIP HAZARDS ON DECK - CAUSE
ABRASIONS, SPRAINS
ENTIRE CREW 3 3 9
SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER
HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE
COORDINATOR
ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 4
ELEVATORS
Assessor's signature: ____________________________________________ 9 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
STRUCK BY ENTIRE CREW 4 3 12
LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR
LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK
LAYOUT
ENTIRE CREW ENTIRE CREW JSA 4 1 4
CAUGHT BETWEEN SUSPENDED
LOADS AND STRUCTURES
SERVICE TECHS
AND RIG CREW
5 3 15
HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE
OBJECTS; HAND AND BODY POSITIONING
ENTIRE CREW ENTIRE CREW JSA 5 2 10
PUNCTURE POINTS ON HYDRAULIC
POWER UNIT HYDRAULIC AND
FUEL TANKS - NO INCLOSED CAGE
SERVICE TECHS 4 2 8
UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS;
DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS
OBSTRUCTIONS; MSDS
SERVICE TECH
SERVICE TECH /
RIG CREW
JSA; DVN-HPU-
MIR-02
4 1 4
TRIP HAZARDS ON DECK - CAUSE
ABRASIONS, SPRAINS
ENTIRE CREW 3 3 9
SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER
HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE
COORDINATOR
SERVICE TECH
SERVICE TECH /
RIG CREW
JSA; BHP QCP
Rev.3
2 2 4
STORED PRESSURE IN HYDRALIC
OR AIR LINES - CAN CAUSE
RUPTURES, SPILLS, IMPACT TO
PERSONNEL
ENTIRE CREW 3 3 9
HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB
TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS
INSTALLED; MSDS
SERVICE TECH ENTIRE CREW
JSA; DVN-HPU-
MIR-02;DVN-
HOS-MIP-02
3 2 6
HOSE ENTAGLEMENT SERVICE TECH 3 2 6
DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO
KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES
ARE NOT SNAGGED PRIOR TO LIFTING
SERVICE TECH SERVICE TECH
JSA; DVN-HPU-
SOP-05;DVN-
HOS-MIP-02
2 1 2
CONTROL PANELS
Assessor's signature: ____________________________________________ 10 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
STRUCK BY ENTIRE CREW 4 3 12
LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR
LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK
LAYOUT
ENTIRE CREW ENTIRE CREW JSA 4 1 4
PUNCTURE POINTS ON HYDRAULIC
POWER UNIT HYDRAULIC AND
FUEL TANKS - NO INCLOSED CAGE
SERVICE TECHS 4 2 8
UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS;
DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS
OBSTRUCTIONS; MSDS
SERVICE TECH SERVICE TECH JSA 4 1 4
TRIP HAZARDS ON DECK - CAUSE
ABRASIONS, SPRAINS
ENTIRE CREW 3 3 9
SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER
HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE
COORDINATOR
ENTIRE CREW ENTIRE CREW
JSA; BHP QCP
Rev.3
2 2 6
STORED PRESSURE IN HYDRALIC
OR AIR LINES - CAN CAUSE
RUPTURES, SPILLS, IMPACT TO
PERSONNEL
ENTIRE CREW 3 3 9
HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB
TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS
INSTALLED; MSDS
ENTIRE CREW ENTIRE CREW
JSA; DVN-HPU-
MIR-02;DVN-
HOS-MIP-
02;MSDS
3 2 2
HOSE ENTAGLEMENT SERVICE TECH 3 2 6
DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO
KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES
ARE NOT SNAGGED PRIOR TO LIFTING
SERVICE TECH SERVICE TECH
JSA; DVN-HPU-
SOP-05;DVN-
HOS-MIP-02
2 1 4
HOSES
Assessor's signature: ____________________________________________ 11 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
STRUCK BY ENTIRE CREW 4 3 12
LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR
LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK
LAYOUT
ENTIRE CREW ENTIRE CREW JSA; 4 1 10
CAUGHT BETWEEN SUSPENDED
LOADS AND STRUCTURES
SERVICE TECHS
AND RIG CREW
5 3 15
HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE
OBJECTS; HAND AND BODY POSITIONING
ENTIRE CREW ENTIRE CREW JSA 5 2 10
USING SKATE OR CRANE TO LATCH
BAILS (TOP DRIVE AND/OR BAIL
PINS)
SERVICE TECHS
AND RIG CREW
3 3 9
LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION
WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS
BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE
RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE)
SERVICE TECH
SERVICE TECH /
RIG CREW
JSA 3 2 6
PUNCTURE POINTS ON HYDRAULIC
POWER UNIT HYDRAULIC AND
FUEL TANKS - NO ENCLOSED CAGE
SERVICE TECHS 4 2 8
UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS;
DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS
OBSTRUCTIONS; MSDS
SERVICE TECH SERVICE TECH
JSA; DVN-HPU-
SOP-05
4 1 4
TRIP HAZARDS ON DECK - CAUSE
ABRASIONS, SPRAINS
ENTIRE CREW 3 3 9
SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER
HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE
COORDINATOR
ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 6
STORED PRESSURE IN HYDRALIC
OR AIR LINES - CAN CAUSE
RUPTURES, SPILLS, IMPACT TO
ENTIRE CREW 3 3 9
HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB
TESTING; ADHERING TO HOSE SHELF LIFE (DVN-HOS-MIP-
O2); WHIPCHECKS INSTALLED; MSDS
ENTIRE CREW ENTIRE CREW
JSA; DVN-HPU-
MIR-02;DVN-
HOS-MIP-02;
3 2 2
HOSE ENTAGLEMENT SERVICE TECH 3 2 6
DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO
KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES
ARE NOT SNAGGED PRIOR TO LIFTING
SERVICE TECH SERVICE TECH
JSA; DVN-HPU-
SOP-05;DVN-
HOS-MIP-02
2 1 2
HYDRAULIC POWER UNIT (HPU)
Assessor's signature: ____________________________________________ 12 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
DALF HOIST FUNCTION
HYDRAULIC LINE CONNECTION
FAILURE, HOIST LINE CERTIFICATE
SERVICE TECH 4 3 12
MIR#;NOV DEVIN/OPERATOR SPECFIC QUALITY PLAN; WHIP
CHECKS;PREMOBILIZATION CHECK LIST; PREMOB FUNCTION
TEST LIST; 2 YEAR FULL MAINTENANCE
ENTIRE CREW ENTIRE CREW
JSA; DVN-CLF-
MIR-03
3 2 6
DALF ARTICULATION - PULLING
TOP PINS (TOP PINS ARE NOT
LOAD BEARING), SLING
"STINGERS" FOR ARTICULATION;
OPENING ELEVATOR DOOR
SERVICE TECHS
AND RIG CREW
5 4 20
JSA;PROCEDURAL REVIEW;EQUIPMENT REVIEW; NOV/DEVIN
COMPETENCY TRAINING.
ENTIRE CREW
SERVICE TECH /
RIG CREW
JSA; DVN-CLF-
MIR-03
5 2 10
DALF WIRELINE HANG OFF -
UNDERRATED DEAD MAN PAD EYE
SERVICE TECHS
AND RIG CREW
5 3 15
NOV/DEVIN PROCEDURE;NOVDEVIN DATA BOOK AND
ANALYSIS FOR DEAD MAN PAD EYE.
SERVICE TECH SERVICE TECH
JSA; DVN-CLF-
MIR-03
5 1 5
DROPPED OBJECTS WHEN
PERSONNEL IN MAN
ENTIRE CREW 4 3 12
LANYARDS FOR TOOLS, TOOL BAG ATTACHED TO TECH WITH
CARABINER;
ENTIRE CREW ENTIRE CREW
JSA; DVN-CLF-
MIR-03
4 1 4
PRESSURIZED EQUIPMENT -
POTENTIAL ENERGY, HOSE
CONNECTIONS, VALVES
ENTIRE CREW 4 2 8
HOSE MANAGEMENT;WHIPCHECKS INSTALLED;PRESSURE
TESTED PRIOR TO USE;JSA (DVN-HOS-MIP-02); PREMOB
PRESSURE TESTING PROCEDURE;NOV/DEVIN COMPETENCY
TRAINING
ENTIRE CREW ENTIRE CREW
JSA; DVN-CLF-
MIR-03;DVN-
HOS-MIP-02
4 1 4
HOIST FAILURE SERVICE TECH 3 2 6
TWO YEARS FULL MAINTENANCE;FUNCTION
TEST;NOV/DEVIN PROCEDURE
SERVICE TECH SERVICE TECH
COM-SHO-SMP-
14
2 1 2
DUAL ARTIFICIAL LIFT FRAME (DALF)
3. OPERATION/FUNCTION
Assessor's signature: ____________________________________________ 13 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
ELEVATOR DOORS OPEN AND
CLOSE. PINCH POINT-LATCHING.
FIT TEST ON LIFT SUB WHEN
APPLICABLE
SERVICE TECH 5 4 20
JSA-PROCEDURAL REVIEW- FULL BODY INSPECTION TPI, PER
BHP. PROPER HAND AND BODY POSITIONING;IMPACT
GLOVES;TWO PERSONNEL FOR LIFTS OVER 50 LBS.
SERVICE TECH SERVICE TECH DEV-ELE-MAS-04 5 3 15
SEIZED ELEVATOR (WILL NOT
OPEN)
SERVICE TECH
AND RIG CREW
3 2 6 MIR; PROCEDURE REVIEW SERVICE TECH
SERVICE TECH /
RIG CREW
DVN-ELE-MIR-02 3 1 3
INCORRECT ELEVATOR ENTIRE CREW 4 2 8 FIT TEST;DATA BOOK CHECKS
SHOP
FOREMAN
SERVICE TECH
BHP QCP;
TPI,DVN-ELE-MIR-
02
4 1 4
DROPPED OBJECTS WHEN
PERSONNEL IN MAN
BASKET/RIDING BELT
ENTIRE CREW 4 3 12
LANYARDS FOR TOOLS; TOOL BAGS ATTACHED TO TECH
WITH CARABINER;
ENTIRE CREW ENTIRE CREW DVN-ELE-MIR-02 3 3 9
BASS HOIST FUNCTION -
HYDRAULIC LINE CONNECTION
FAILURE, CONTROL PANEL
FAILURE, HOIST LINE CERTIFICATE
SERVICE TECH 4 3 12
NOV DEVIN/OPERATOR SPECIFIC QUALITY PLAN; WHIP
CHECKS; PREMOBILIZATION CHECK LIST; PREMOB FUNCTION
TEST LIST;
SHOP
FOREMAN
SERVICE TECH /
RIG CREW
BHP QCP REV.3;
DVN-BAS-IOP-01
3 2 6
BASS WIRELINE HANG OFF -
UNDERRATED DEAD MAN PAD EYE
SERVICE TECH
AND RIG CREW
5 3 15
NOV/DEVIN PROCEDURE; NOV/DEVIN DATA BOOK AND
ANALYSIS FOR DEAD MAN PAD EYE;
SHOP
FOREMAN
SERVICE TECH
DVN-BAS-IOP-01,
MTR
5 1 5
DROPPED OBJECTS WHEN
PERSONNEL IN MAN
BASKET/RIDING BELT
ENTIRE CREW 4 3 12
LANYARDS FOR TOOLS; TOOL BAGS ATTACHED TO TECH
WITH CARABINER;
ENTIRE CREW ENTIRE CREW JSA 4 1 4
PRESSURIZED EQUIPMENT -
POTENTIAL ENERGY, HOSE
CONNECTIONS, VALVES
ENTIRE CREW 4 2 8
HOSE MANAGEMENT; WHIPCHECKS INSTALLED; PRESSURE
TESTED PRIOR TO USE (DVN-HOS-MIP-02); JSA; PREMOB
PRESSURE TESTING PROCEDURE; NOV/DEVIN COMPETENCY
TRAINING
ENTIRE CREW ENTIRE CREW
JSA; DVN-BAS-
IOP-01;DVN-HOS-
MIP-02
4 1 4
ELEVATORS
BAIL ASSEMBLY SPREADER SYSTEM (BASS)
Assessor's signature: ____________________________________________ 14 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
BASS AND DALF HOIST FUNCTION -
HYDRAULIC LINE CONNECTION
FAILURE, CONTROL PANEL
FAILURE, HOIST LINE CERTIFICATE
SERVICE TECH 4 3 12
NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; WHIP
CHECKS; PREMOBILIZATION CHECKLIST; PREMOB FUNCTION
TEST LIST;
SHOP
FOREMAN
SERVICE TECH
BHO QCP REV.3;
DVN-BAS-IOP-01
3 2 6
HYDRAULIC POWER
UNITS/CONTROL PANEL - SPILLS,
NONRESPONSIVE UNIT; HOSE
CONNECTIONS
SERVICE TECH 3 3 9
WHIP CHECKS; DEVIN CREATED TROUBLE SHOOTING GUIDE;
DEVIN PREMOB CHECKLIST; SPARE COMPONENTS ON
LOCATION
SHOP
FOREMAN
SERVICE TECH
JSA; DVN-HPU-
MIR-02, MSDS
3 2 6
DROPPED OBJECTS WHEN
PERSONNEL IN MAN
BASKET/RIDING BELT (DALF OR
BASS RIG-UP)
ENTIRE CREW 4 3 12
LANYARDS FOR TOOLS; TOOL BAGS ATTACHED TO TECH
WITH CARABINER;
ENTIRE CREW ENTIRE CREW JSA; 4 1 4
PRESSURIZED EQUIPMENT -
POTENTIAL ENERGY, HOSE
CONNECTIONS, VALVES
ENTIRE CREW 4 2 8
HOSE MANAGEMENT; WHIPCHECKS INSTALLED; PRESSURE
TESTED PRIOR TO USE; JSA; PREMOB PRESSURE TESTING
PROCEDURE; NOV DEVIN COMPETENCY TRAINING
ENTIRE CREW ENTIRE CREW
JSA; DVN-BAS-
IOP-01;DVN-HOS-
MIP-02
4 1 4
HYDRAULIC POWER
UNITS/CONTROL PANEL - SPILLS,
NONRESPONSIVE UNIT; HOSE
CONNECTIONS
SERVICE TECH 3 3 9
WHIP CHECKS; NOV/DEVIN CREATED TROUBLE SHOOTING
GUIDE; NOV/DEVIN PREMOB CHECKLIST; SPARE
COMPONENTS ON LOCATION
SERVICE TECH SERVICE TECH
JSA; DVN-HPU-
MIR-02, MSDS
3 2 8
STARTING/OPERATING HYDRAULIC
POWER UNIT - HAND PLACEMENT;
HEAT FROM EXHAUST;
SERVICE TECH 4 3 12
NOV/DEVIN COMPETENCY TRAINING; INCORPORATE MESH
GUARD BEHIND SWINGING DOOR
SERVICE TECH SERVICE TECH
TECH COMPETENCY
RECORDS
4 2 8
LOW FUEL LEVEL SERVICE TECH 2 3 6 PREMOB; PRETOWER
SHOP
FOREMAN
SERVICE TECH
DVN-HPU-MIR-
02
2 2 4
PRESSURIZED EQUIPMENT -
POTENTIAL ENERGY, HOSE
CONNECTIONS, VALVES
ENTIRE CREW 4 2 8
HOSE MANAGEMENT; WHIPCHECKS INSTALLED; PRESSURE
TESTED PRIOR TO USE (DVN-HOS-MIP-02); JSA; PREMOB
PRESSURE TESTING PROCEDURE; NOV DEVIN COMPETENCY
TRAINING
ENTIRE CREW ENTIRE CREW
JSA; DVN-BAS-
IOP-01
4 1 4
HOSES
HYDRAULIC POWER UNIT (HPU)
Assessor's signature: ____________________________________________ 15 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
HAPHAZARD RIG DOWN DALF -
FALLING OF OBJECTS, HOSE
PRESSURE, DROPPED OBJECTS
SERVICE TECH
AND RIG CREW
4 3 12
NOV/DEVIN PROCEDURE; JSA; STANDARD PPE; RELEIVE HOSE
PRESSURE;
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
DVN-DLF-MIR-
03;DVN-HOS-
MIP-02;JSA
4 2 5
INCORRECT PLACEMENT OF DALF
ON SHIPPING STANDS (IF MINI
TRACK IS INSTALLED)
SERVICE TECH
AND RIG CREW
5 2 10
CAUTION TAPE ON PINCH POINT AREAS; PROPER HAND
PLACEMENT; PREDETERMINED DISTANCE FOR STANDS;
MARKINGS ON DALF FOR PLACEMENT; PEC CORE FOR HAND
SAFETY
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
JSA; HSE COORD. 5 1 6
INCORRECT EQUIPMENT
PLACEMENT IN BASKET
SERVICE TECH 3 4 12 ALLOTED SPACE FOR ALL COMPONENTS SERVICE TECH
SERVICE TECH /
RIG CREW
DVN-DLF-MIR-03 3 2 4
HAND PLACEMENT; BACK
LOADING FRAME TO STANDS (IF
APPLICABLE)
SERVICE TECH
AND RIG CREW
5 4 20 TRAINING;JSA;TIGER STRIPPING TAPE IN HAND AREA
SERVICE TECH
/ RIG CREW
ENTIRE CREW
TRAINING DOC;
JSA; HSE
COORD.;DVN-
ADM-RA-01
5 2 10
BACK LOAD TO BOAT - SLING AND
SHACKLE CONNECTIVITY
ENTIRE CREW 4 3 12
VISUAL CHECKS FOR ALL FASTENED COMPONENTS; COTTER
PINS
ENTIRE CREW ENTIRE CREW DVN-DLF-MIR-03 4 1 4
DUAL ARTICULATING LIFT FRAME (DALF)
RIG DOWN/BACK LOAD TO BOAT
Assessor's signature: ____________________________________________ 16 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
INCORRECT EQUIPMENT
PLACEMENT IN BASKET
SERVICE TECH 3 4 12 ALLOTED SPACE FOR ALL COMPONENTS SERVICE TECH
SERVICE TECH /
RIG CREW
DVN-BAS-MIR-03 3 2 4
HAND PLACEMENT; BACK
LOADING FRAME TO STANDS (IF
APPLICABLE)
SERVICE TECH
AND RIG CREW
5 3 15 PROPER TRAINING ON MOCK RIG UPS SERVICE TECH
SERVICE TECH /
RIG CREW
DVN-BAS-MIR-
03;DVN-ADM-RA-
01
5 2 10
BACK LOAD TO BOAT - SLING AND
SHACKLE CONNECTIVITY
ENTIRE CREW 4 3 12
VISUAL CHECKS FOR ALL FASTENED COMPONENTS; COTTER
PINS
ENTIRE CREW ENTIRE CREW DVN-BAS-MIR-03 4 1 4
SUSPENDED LOADS ENTIRE CREW 3 3 9
REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC
RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE
THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER
ACCOMPANYING EQUIPMENT
ENTIRE CREW ENTIRE CREW
DVN-DLF-MIP-
02; JSA
3 2 6
FALLING OBJECTS ENTIRE CREW 5 3 15
DEBRIS CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE
COTTER PINS ARE "WRAPPED" AROUND THE RESPECTIVE
SHACKLE, ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED,
I.E. OUT OF SERVICE;
ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 5 2 10
LOAD SHIFT IN EQUIPMENT
BASKET - CAN CAUSE EQUIPMENT
DAMAGES, LEAKS, POTENTIAL
ENERGY
SERVICE TECHS 3 4 12
ENSURE LOAD IS SECURED IN BASKET; HAVE MSDS ON ALL
CHEMICALS FOR QUICK AND PROPER CLEAN UP RESPONSE;
THIRD PARTY REVIEW OF LOAD OUT; SECURE ITEMS WITH
STRAPS;
SERVICE TECH
/ RIG CREW
SERVICE TECH /
RIG CREW
MSDS; TECH
COMPETENCY
RECORD
3 2 6
HAND PLACEMENT; BACK
LOADING FRAME TO STANDS (IF
APPLICABLE)
SERVICE TECH
AND RIG CREW
5 3 15 PROPER TRAINING SERVICE TECH
SERVICE TECH /
RIG CREW
MSDS; TECH
COMPETENCY
RECORD;DVN-ADM-
RA-01
4 2 8
SLING FAILURE CAN RESULT IN
DROPPED EQUIPMENT AS IT IS
BEING LIFTED
ENTIRE CREW 5 2 10
NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL
INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES
ENTIRE CREW ENTIRE CREW BHP QCP REV.3 5 2 10
EQUIPMENT BASKET (BAILS, ELEVATORS, CONTROL PANEL,
HOSES)
BAIL ASSEMBLY SPREADER SYSTEM
Assessor's signature: ____________________________________________ 17 of 18
TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER:
Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK
Describe all hazards identified and
their effects for each task (from
Hazard ID checklist and based on
observations and experience).
Note: Additional hazards may be
caused by interaction with other work
Name personnel at
risk.
From matrix,
identify severity
with no controls
in place for each
hazard.
From matrix, identify
likelihood with no controls
in place for each hazard.
Classify risk
rating from
matrix for
each hazard
Describe fully all controls applicable for each hazard eg if PPE is
used as a control, it must be specifically described.
If a control can only be verified by documentation then it must be
available.
All controls must be valid in that they reduce severity, likelihood or
both.
Indicate what
document or
procedure that
shall be used to
mitigate the
hazard.
From matrix
identify severity
with controls in
place for each
hazard.
From matrix, identify
likelihood with
controls in place for
each hazard.
Classify risk rating
from matrix for
each hazard.
INITIAL RISK
Risk
Rating
List all Controls Required
Reference
Document
Responsible Party
1. LIFTING EQUIPMENT FROM BOAT TO RIG
Separate the job into individual tasks and record in sequence
Define the person or party
who will be handling the
situation as stated should a
Hazard / Risk occur.
Likelihood of
Occurrence
Risk Rating
Job Steps
RESIDUAL RISK
COM-OPE-SOP-17
CONTROLS
Hazard Description
Population at
Risk
Hazard
Severity
Likelihood of
Occurrence
HAZARD
Hazard
Severity
INCORRECT EQUIPMENT
PLACEMENT IN BASKET
SERVICE TECH 3 4 12 ALLOTED SPACE FOR ALL COMPONENTS SERVICE TECH SERVICE TECH
DVN-HPU-PRD-
06
3 2 4
FUEL LEVELS TO HIGH CAUSING
SPILLS - NO CAPS ON
CONNECTIONS
SERVICE TECH 4 3 12
VISUAL CHECKS FOR PROPER FILL; MSDS ON ALL CHEMICALS
FOR QUICK RESPONSE AND CLEAN UP RESPONSE; VISUAL
INSPECT FOR ALL CAP CONNECTIONS
SERVICE TECH
SERVICE TECH /
RIG CREW
DVN-HPU-PRD-
06
4 2 8
BACK LOAD TO BOAT - SLING AND
SHACKLE CONNECTIVITY
ENTIRE CREW 4 3 12
VISUAL CHECKS FOR ALL FASTENED COMPONENTS; COTTER
PINS
ENTIRE CREW ENTIRE CREW
DVN-HPU-PRD-
06
4 1 4
DVN-DLF-MIC-O7
DVN-DLF-MIR-03
DVN-HOS-MIP-07
DVN-BAS-MIR-03
DVN-BAS-MIP-02
DVN-BAS-PRD-05
DVN-HPU-MIR-02
DVN-BAL-PSD-04
DVN-DLF-MIP-02
DVN-HPU-PRD-06
DVN-ELE-MIP-01
DVN-BAS-IOP-01
DVN-BAL-MIP-01
DVN-HPU-SOP-05
DVN-CLF-MIR-03
COM-SHO-SMP-14
DVN-ELE-MAS-04
DVN-ELE-MIR-02
DVN-ADM-RA-01
Elevator Maintenance, Inspection and Repair
Risk Assessment Training Record
Bail Link Maintenance and Inspection Procedure
Hydraulic Power Unit Standard Operating Procedure
Coil Tubing Lift Frame Maintenance, Inspection and Repair
Disassembly/Reassembly of DALF
Elevator Master Survey
Bail Link Pre Dispatch
DALF Test and Maintenace Procedure
Hydraulic Power Unit Pre Dispatch
Elevator Maintenance, and Inspcetion Procedure
Bail Assembly Spreader System Installation and Operation Procedure
Hose Maintenance and Inspection Procedure
Bail Assembly Spreader System Maintenance and Inspection Procedure
Bail Assembly Spreader System Pre Dispatch
Bail Assembly Spreader System Maintenance, Inspection, and Repair
Hydraulic Power Unit Maintenance, Inspection and Repair
Procedural References Description
Dual Articulating Lift Frame Maintenance and Inspection Checklist
DALF Maintenance and Fuction Test Checklist
HYDRAULIC POWER UNIT (HPU)
Assessor's signature: ____________________________________________ 18 of 18

More Related Content

What's hot

training near miss program
training near miss programtraining near miss program
training near miss programoscar anell
 
Fire safety training presentation.ppt
Fire safety training presentation.pptFire safety training presentation.ppt
Fire safety training presentation.pptZhacky Zacarias
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template mediaJade0livia
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment Nidhin Sajeevan
 
Near Miss-Fall From Height
Near Miss-Fall From HeightNear Miss-Fall From Height
Near Miss-Fall From HeightAlan Bassett
 
HSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDURE
HSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDUREHSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDURE
HSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDUREDwarika Bhushan Sharma
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templatesDwarika Bhushan Sharma
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdfRafiullahKhan88
 
Comprehensive Employee Safety Orientation Presentation
Comprehensive Employee Safety Orientation PresentationComprehensive Employee Safety Orientation Presentation
Comprehensive Employee Safety Orientation PresentationBedazzled Media
 
JSA FOR Radiography work.docx
JSA FOR Radiography work.docxJSA FOR Radiography work.docx
JSA FOR Radiography work.docxbobby939082
 
4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templatesDwarika Bhushan Sharma
 

What's hot (20)

Near Miss Reporting
Near Miss ReportingNear Miss Reporting
Near Miss Reporting
 
training near miss program
training near miss programtraining near miss program
training near miss program
 
Fire safety training presentation.ppt
Fire safety training presentation.pptFire safety training presentation.ppt
Fire safety training presentation.ppt
 
Near miss
Near missNear miss
Near miss
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template media
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment
 
Near Miss-Fall From Height
Near Miss-Fall From HeightNear Miss-Fall From Height
Near Miss-Fall From Height
 
HSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDURE
HSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDUREHSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDURE
HSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDURE
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates
 
Working Safety With Forklift Stacker
Working Safety With Forklift StackerWorking Safety With Forklift Stacker
Working Safety With Forklift Stacker
 
scaffold tags
scaffold tagsscaffold tags
scaffold tags
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdf
 
Comprehensive Employee Safety Orientation Presentation
Comprehensive Employee Safety Orientation PresentationComprehensive Employee Safety Orientation Presentation
Comprehensive Employee Safety Orientation Presentation
 
FORKLIFT SAFETY
FORKLIFT SAFETYFORKLIFT SAFETY
FORKLIFT SAFETY
 
JSA FOR Radiography work.docx
JSA FOR Radiography work.docxJSA FOR Radiography work.docx
JSA FOR Radiography work.docx
 
Aerial Lift Safety Course 2014
Aerial Lift Safety Course 2014Aerial Lift Safety Course 2014
Aerial Lift Safety Course 2014
 
4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates
 

Similar to BHP-RISK ASSESSMENT - DALF R1

ECAST Meeting - 04 Jun 2013 - Reliability Data Sharing
ECAST Meeting - 04 Jun 2013 - Reliability Data SharingECAST Meeting - 04 Jun 2013 - Reliability Data Sharing
ECAST Meeting - 04 Jun 2013 - Reliability Data SharingCranfield University
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templatesDwarika Bhushan Sharma
 
Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Helmy ismail
 
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docxDanielLove24
 
Working at Height - Risk Assessment Template
Working at Height - Risk Assessment Template Working at Height - Risk Assessment Template
Working at Height - Risk Assessment Template Jay Linehan
 
1. safety instrumented systems
1. safety instrumented systems1. safety instrumented systems
1. safety instrumented systemsSaiful Chowdhury
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Yuvraj Shrivastava
 
Tank Overfill Protection Minimizing Insurance Risk
Tank Overfill Protection Minimizing Insurance RiskTank Overfill Protection Minimizing Insurance Risk
Tank Overfill Protection Minimizing Insurance RiskM.S. Jacobs & Associates
 
AHA Template for a Job Hazard Analysis Form
AHA Template for a Job Hazard Analysis FormAHA Template for a Job Hazard Analysis Form
AHA Template for a Job Hazard Analysis FormWesleyHerron2
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment Julian Kalac P.Eng
 
1 Guide to use Risk Assessment Templates.docx
1 Guide to use  Risk Assessment Templates.docx1 Guide to use  Risk Assessment Templates.docx
1 Guide to use Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Aesolutions_Understanding_Overpressure_Scenarios_and_RAGAGEP.pdf
Aesolutions_Understanding_Overpressure_Scenarios_and_RAGAGEP.pdfAesolutions_Understanding_Overpressure_Scenarios_and_RAGAGEP.pdf
Aesolutions_Understanding_Overpressure_Scenarios_and_RAGAGEP.pdfERICKMARTINEZAGUIRRE
 
Methods of determining_safety_integrity_level
Methods of determining_safety_integrity_levelMethods of determining_safety_integrity_level
Methods of determining_safety_integrity_levelMowaten Masry
 
Sample risk assessment report for dcc safety students
Sample risk assessment report for dcc safety studentsSample risk assessment report for dcc safety students
Sample risk assessment report for dcc safety studentsMuizz Anibire
 
1 guide to use risk assessment templates
1 guide to use  risk assessment templates1 guide to use  risk assessment templates
1 guide to use risk assessment templatesDwarika Bhushan Sharma
 

Similar to BHP-RISK ASSESSMENT - DALF R1 (20)

ECAST Meeting - 04 Jun 2013 - Reliability Data Sharing
ECAST Meeting - 04 Jun 2013 - Reliability Data SharingECAST Meeting - 04 Jun 2013 - Reliability Data Sharing
ECAST Meeting - 04 Jun 2013 - Reliability Data Sharing
 
Fmea
FmeaFmea
Fmea
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates
 
Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9
 
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
 
HIPPS
HIPPSHIPPS
HIPPS
 
Working at Height - Risk Assessment Template
Working at Height - Risk Assessment Template Working at Height - Risk Assessment Template
Working at Height - Risk Assessment Template
 
1. safety instrumented systems
1. safety instrumented systems1. safety instrumented systems
1. safety instrumented systems
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
 
Fallas Múltiples
Fallas MúltiplesFallas Múltiples
Fallas Múltiples
 
Tank Overfill Protection Minimizing Insurance Risk
Tank Overfill Protection Minimizing Insurance RiskTank Overfill Protection Minimizing Insurance Risk
Tank Overfill Protection Minimizing Insurance Risk
 
AHA Template for a Job Hazard Analysis Form
AHA Template for a Job Hazard Analysis FormAHA Template for a Job Hazard Analysis Form
AHA Template for a Job Hazard Analysis Form
 
R002
R002R002
R002
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
1 Guide to use Risk Assessment Templates.docx
1 Guide to use  Risk Assessment Templates.docx1 Guide to use  Risk Assessment Templates.docx
1 Guide to use Risk Assessment Templates.docx
 
Aesolutions_Understanding_Overpressure_Scenarios_and_RAGAGEP.pdf
Aesolutions_Understanding_Overpressure_Scenarios_and_RAGAGEP.pdfAesolutions_Understanding_Overpressure_Scenarios_and_RAGAGEP.pdf
Aesolutions_Understanding_Overpressure_Scenarios_and_RAGAGEP.pdf
 
Methods of determining_safety_integrity_level
Methods of determining_safety_integrity_levelMethods of determining_safety_integrity_level
Methods of determining_safety_integrity_level
 
Sample risk assessment report for dcc safety students
Sample risk assessment report for dcc safety studentsSample risk assessment report for dcc safety students
Sample risk assessment report for dcc safety students
 
Sil 1 (1)1
Sil 1 (1)1Sil 1 (1)1
Sil 1 (1)1
 
1 guide to use risk assessment templates
1 guide to use  risk assessment templates1 guide to use  risk assessment templates
1 guide to use risk assessment templates
 

More from Dennis J Morgan

Office Manager Recommendation
Office Manager RecommendationOffice Manager Recommendation
Office Manager RecommendationDennis J Morgan
 
Joe Miller VP recommendation
Joe Miller VP recommendationJoe Miller VP recommendation
Joe Miller VP recommendationDennis J Morgan
 
Sales, Does It Really Make Sense, Part VII
Sales, Does It Really Make Sense, Part VIISales, Does It Really Make Sense, Part VII
Sales, Does It Really Make Sense, Part VIIDennis J Morgan
 
Sales, Does It Make Sense, Part VI
Sales, Does It Make Sense, Part VISales, Does It Make Sense, Part VI
Sales, Does It Make Sense, Part VIDennis J Morgan
 
Sales, Does It Really Make Sense, Part V
Sales, Does It Really Make Sense, Part VSales, Does It Really Make Sense, Part V
Sales, Does It Really Make Sense, Part VDennis J Morgan
 
Sales, Does It Really Make Sense, Part IV
Sales, Does It Really Make Sense, Part IVSales, Does It Really Make Sense, Part IV
Sales, Does It Really Make Sense, Part IVDennis J Morgan
 
Sales, Does It Really Make Sense, Part III
Sales, Does It Really Make Sense, Part IIISales, Does It Really Make Sense, Part III
Sales, Does It Really Make Sense, Part IIIDennis J Morgan
 
Sales, Does It Really Make Sense - Part II
Sales, Does It Really Make Sense - Part IISales, Does It Really Make Sense - Part II
Sales, Does It Really Make Sense - Part IIDennis J Morgan
 
Sales, Does It Really Make Sense, Part 1
Sales, Does It Really Make Sense, Part 1Sales, Does It Really Make Sense, Part 1
Sales, Does It Really Make Sense, Part 1Dennis J Morgan
 
"Don't Reinvent the Wheel, Just Realign It."
"Don't Reinvent the Wheel, Just Realign It.""Don't Reinvent the Wheel, Just Realign It."
"Don't Reinvent the Wheel, Just Realign It."Dennis J Morgan
 
Supplier Requirements Specifications (SRS) Presentation
Supplier Requirements Specifications (SRS) PresentationSupplier Requirements Specifications (SRS) Presentation
Supplier Requirements Specifications (SRS) PresentationDennis J Morgan
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management SystemDennis J Morgan
 
Example BHP QCP Revision 3
Example BHP QCP Revision 3 Example BHP QCP Revision 3
Example BHP QCP Revision 3 Dennis J Morgan
 
EXXON-Deepwater Champion EB946
EXXON-Deepwater Champion EB946EXXON-Deepwater Champion EB946
EXXON-Deepwater Champion EB946Dennis J Morgan
 

More from Dennis J Morgan (20)

Manager+resume+ii
Manager+resume+iiManager+resume+ii
Manager+resume+ii
 
Josh recommendation
Josh recommendationJosh recommendation
Josh recommendation
 
Office Manager Recommendation
Office Manager RecommendationOffice Manager Recommendation
Office Manager Recommendation
 
Joe Miller VP recommendation
Joe Miller VP recommendationJoe Miller VP recommendation
Joe Miller VP recommendation
 
Time is an Illusion
Time is an IllusionTime is an Illusion
Time is an Illusion
 
Sales, Does It Really Make Sense, Part VII
Sales, Does It Really Make Sense, Part VIISales, Does It Really Make Sense, Part VII
Sales, Does It Really Make Sense, Part VII
 
Sales, Does It Make Sense, Part VI
Sales, Does It Make Sense, Part VISales, Does It Make Sense, Part VI
Sales, Does It Make Sense, Part VI
 
Sales, Does It Really Make Sense, Part V
Sales, Does It Really Make Sense, Part VSales, Does It Really Make Sense, Part V
Sales, Does It Really Make Sense, Part V
 
Sales, Does It Really Make Sense, Part IV
Sales, Does It Really Make Sense, Part IVSales, Does It Really Make Sense, Part IV
Sales, Does It Really Make Sense, Part IV
 
Sales, Does It Really Make Sense, Part III
Sales, Does It Really Make Sense, Part IIISales, Does It Really Make Sense, Part III
Sales, Does It Really Make Sense, Part III
 
Sales, Does It Really Make Sense - Part II
Sales, Does It Really Make Sense - Part IISales, Does It Really Make Sense - Part II
Sales, Does It Really Make Sense - Part II
 
Sales, Does It Really Make Sense, Part 1
Sales, Does It Really Make Sense, Part 1Sales, Does It Really Make Sense, Part 1
Sales, Does It Really Make Sense, Part 1
 
"Don't Reinvent the Wheel, Just Realign It."
"Don't Reinvent the Wheel, Just Realign It.""Don't Reinvent the Wheel, Just Realign It."
"Don't Reinvent the Wheel, Just Realign It."
 
Great job
Great jobGreat job
Great job
 
Supplier Requirements Specifications (SRS) Presentation
Supplier Requirements Specifications (SRS) PresentationSupplier Requirements Specifications (SRS) Presentation
Supplier Requirements Specifications (SRS) Presentation
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
Mad Dog
Mad DogMad Dog
Mad Dog
 
Example BHP QCP Revision 3
Example BHP QCP Revision 3 Example BHP QCP Revision 3
Example BHP QCP Revision 3
 
DCR Presentation
DCR PresentationDCR Presentation
DCR Presentation
 
EXXON-Deepwater Champion EB946
EXXON-Deepwater Champion EB946EXXON-Deepwater Champion EB946
EXXON-Deepwater Champion EB946
 

BHP-RISK ASSESSMENT - DALF R1

  • 1. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. Pre-Mobilization On Location LONG COTTER PINS CREATE SNAG POINT SERVICE TECHS 3 3 9 PLACE COTTER PINS ON THE "INSIDE" OF SHACKLE SHOP FOREMAN SERVICE TECH DVN-DLF-MIR-03 3 2 6 SUSPENDED LOADS ENTIRE CREW 3 3 9 REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER ACCOMPANYING EQUIPMENT. RIG CREW SERVICE TECH / RIG CREW DVN-DLF-MIR-03 3 2 6 FALLING OBJECTS ENTIRE CREW 5 3 15 PREMOBILIZATION CHECK LISTS (DVN-DLF-MIC-07); DEBRIS CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE, ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF SERVICE. SHOP FOREMAN SERVICE TECH DVN-DLF-MIC-07 4 2 8 BROKEN HYDRAULIC CONNECTIONS AND HOSES RIG CREW / SERVICE TECHS 3 4 12 INSPECT ALL HYDRAULIC HOSES VISUALLY FOR WORN, SPLIT, CUT, CRACKED HOSES AND/OR LEAKS. INSPECT VISUALLY ALL CONNECTION ENDS FOR CRACKS, WORN, SEPARATION FROM HOSES, AND/OR LEAKS (DVN-HOS-MIP-02) SHOP FOREMAN RIG CREW / SERVICE TECH DVN-DLF-MIC- 07, DVN-HOS- MIP-07 3 2 6 SLING FAILURE CAN RESULT IN DROPPED EQUIPMENT AS IT IS BEING LIFTED ENTIRE CREW 5 2 10 NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES. SHOP FOREMAN / TPI SERVICE TECH DVN-DLF-MIR-03 3 2 6 DUAL ARTICULATING LIFT FRAME (DALF) INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity Assessor's signature: ____________________________________________ 1 of 18
  • 2. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity LONG COTTER PINS CREATE SNAG POINT SERVICE TECHS 3 3 9 PLACE COTTER PINS ON THE "INSIDE" OF SHACKLE SHOP FOREMAN SERVICE TECH DVN-BAS-MIR-03 3 2 6 SUSPENDED LOADS ENTIRE CREW 3 3 9 REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER ACCOMPANYING EQUIPMENT RIG CREW SERVICE TECH / RIG CREW DVN-BAS-MIP-02 3 2 6 FALLING OBJECTS ENTIRE CREW 5 3 15 PREMOBILIZATION CHECK LISTS (DVN-BAL-PRD-04); DEBRIS CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE, ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF SERVICE; SHOP FOREMAN SERVICE TECH DVN-BAS-PRD-05 4 2 8 BROKEN HYDRAULIC CONNECTIONS AND HOSES RIG CREW / SERVICE TECHS 3 4 12 INSPECT ALL HYDRAULIC AND FUEL HOSES VISUALLY FOR WORN, SPLIT, CUT, CRACKED HOSES AND/OR LEAKS. INSPECT VISUALLY ALL CONNECTION ENDS FOR CRACKS, WORN, SEPARATION FROM HOSES, AND/OR LEAKS. (DVN-HOS-MIP- 02) SHOP FOREMAN RIG CREW / SERVICE TECH DVN-HPU-MIR- 02,DVN-HOS- MIP-02 3 2 6 SLING FAILURE CAN RESULT IN DROPPED EQUIPMENT AS IT IS BEING LIFTED ENTIRE CREW 5 2 10 NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES SHOP FOREMAN / TPI SERVICE TECH BHP QCP REV. 3 4 2 8 BAIL ASSEMBLY SPREADER SYSTEM (BASS) Assessor's signature: ____________________________________________ 2 of 18
  • 3. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity SUSPENDED LOADS ENTIRE CREW 3 3 9 REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER ACCOMPANYING EQUIPMENT SHOP FOREMAN SERVICE TECH / RIG CREW DVN-DLF-MIP- 02; JSA 3 2 6 FALLING OBJECTS ENTIRE CREW 5 3 15 DEBRIS CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE, ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF SERVICE; SHOP FOREMAN SERVICE TECH JSA; HSE COORD. 5 2 10 LOAD SHIFT IN EQUIPMENT BASKET - CAN CAUSE EQUIPMENT DAMAGES, LEAKS, POTENTIAL ENERGY SERVICE TECHS 3 4 12 ENSURE LOAD IS SECURED IN BASKET; HAVE MSDS ON ALL CHEMICALS FOR QUICK AND PROPER CLEAN UP RESPONSE; THIRD PARTY REVIEW OF LOAD OUT; SECURE ITEMS WITH STRAPS; SHOP FOREMAN SERVICE TECH / RIG CREW MSDS;TECH COMPETENCY RECORD 3 2 6 SLING FAILURE CAN RESULT IN DROPPED EQUIPMENT AS IT IS BEING LIFTED ENTIRE CREW 5 2 10 NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES SHOP FOREMAN / TPI SERVICE TECH BHP QCP REV. 3 4 2 8 EQUIPMENT BASKET (BAILS, ELEVATORS, CONTROL PANEL, HOSES) Assessor's signature: ____________________________________________ 3 of 18
  • 4. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity LONG COTTER PINS CREATE SNAG POINT SERVICE TECHS 3 3 9 PLACE COTTER PINS ON THE "INSIDE" OF SHACKLE SHOP FOREMAN SERVICE TECH DVN-HPU-MIR- 02 3 2 6 SUSPENDED LOADS ENTIRE CREW 3 3 9 REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER ACCOMPANYING EQUIPMENT SHOP FOREMAN SERVICE TECH / RIG CREW DVN-HPU-MIR- 02 3 2 6 FALLING OBJECTS ENTIRE CREW 5 3 15 PREMOBILIZATION CHECK LISTS (DVN-HPU-PRD-06); DEBRIS CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE, ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF SERVICE; SHOP FOREMAN SERVICE TECH DVN-HPU-PRD- 06 5 2 10 (IF APPLICABLE) LOAD SHIFT HPU SKID - CAN CAUSE EQUIPMENT DAMAGES, HYDRAULIC FLUID LEAKS FROM HOSES. SERVICE TECHS 3 4 12 ENSURE LOAD IS SECURED IN BASKET AND THREAD CAPS ARE SECURED; HAVE MSDS ON ALL CHEMICALS FOR QUICK AND PROPER CLEAN UP RESPONSE; THIRD PARTY REVIEW OF LOAD OUT; NOV DEVIN PREMOB CHECK LIST(DVN-HPU-PRD- 06); SECURE ITEMS WITH STRAPS; SHOP FOREMAN SERVICE TECH / RIG CREW DVN-HPU-PRD- 06 3 2 6 SLING FAILURE CAN RESULT IN DROPPED EQUIPMENT AS IT IS BEING LIFTED ENTIRE CREW 5 2 10 NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES SHOP FOREMAN / TPI SERVICE TECH BHP QCP REV.3 4 2 8 BROKEN HYDRAULIC CONNECTIONS AND HOSES RIG CREW / SERVICE TECHS 3 4 12 INSPECT ALL HYDRAULIC AND FUEL HOSES VISUALLY FOR WORN, SPLIT, CUT, CRACKED HOSES AND/OR LEAKS. INSPECT VISUALLY ALL CONNECTION ENDS FOR CRACKS, WORN, SEPARATION FROM HOSES, AND/OR LEAKS. (DVN-HOS-MIP- 02) SHOP FOREMAN RIG CREW / SERVICE TECH DVN-HPU-MIR- 02, DVN-HOS- MIP-02 3 2 6 HYDRAULIC POWER UNIT (HPU) Assessor's signature: ____________________________________________ 4 of 18
  • 5. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity STRUCK BY ENTIRE CREW 4 3 12 LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK LAYOUT ENTIRE CREW ENTIRE CREW JSA 4 1 4 CAUGHT BETWEEN SUSPENDED LOADS AND STRUCTURES SERVICE TECHS AND RIG CREW 5 3 15 HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING ENTIRE CREW SERVICE TECH / RIG CREW DVN-DLF-MIR- 03; JSA 5 2 10 LATCHING ELEVATORS - POTENTIAL USE OF INCORRECT ELEVATORS SERVICE TECHS AND RIG CREW 4 4 16 HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA; UNDERSTANDING TOP DRIVE; NOV DEVIN CONFIRMATION OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC TONNAGE ELEVATORS; NOV/DEVIN PREMOB CHECKLIST; COMPETENCY TRANING SERVICE TECH SERVICE TECH DVN-DLF-MIP- 02; JSA 4 3 12 USING SKATE OR CRANE TO LATCH BAILS (TOP DRIVE AND/OR BAIL PINS) SERVICE TECHS AND RIG CREW 3 3 9 LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE) SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW DVN-DLF-MIP- 02; JSA 2 3 6 PINCH POINTS - LATCHING ELEVATORS, BAILS, MAKING UP BAIL PINS; RIG UP MINI TRACK SERVICE TECHS AND RIG CREW 5 4 20 JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED EQUIPMENT; PROPER HAND AND BODY POSITIONING; IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50 LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI TRACK PLACEMENT IN CTLF; SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW DVN-DLF-MIP- 02; JSA 5 3 15 PUNCTURE POINTS ON HYDRAULIC POWER UNIT HYDRAULIC AND FUEL TANKS - NO ENCLOSED CAGE SERVICE TECHS 4 2 8 UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS; DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS OBSTRUCTIONS; MSDS SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW DVN-HPU-PRD- 06; BHP QCP REV. 3 4 1 4 2. LIFT EQUIPMENT FROM DECK TO DERRICK (RIG UP/EQUIPMENT PLACEMENT) DUAL ARTICULATING LIFT FRAME (DALF) Assessor's signature: ____________________________________________ 5 of 18
  • 6. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity TRIP HAZARDS ON DECK - CAUSE ABRASIONS, SPRAINS ENTIRE CREW 3 3 9 SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE COORDINATOR ENTIRE CREW ENTIRE CREW JSA 2 2 4 STORED PRESSURE IN HYDRAULIC OR AIR LINES - CAN CAUSE RUPTURES, SPILLS, IMPACT TO PERSONNEL ENTIRE CREW 3 3 9 HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS INSTALLED; MSDS ENTIRE CREW ENTIRE CREW DVN-DLF-MIP- 02;DVN-HOS- MIP-02 JSA 3 2 6 INSTABILITY OF DALF FROM TOP DISCONNECTING SLINGS FROM CRANE SERVICE TECH AND RIG CREW 3 2 6 JSA; PROCEDUAL REVIEW SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW DVN-DLF-MIP- 02; JSA 3 1 3 HOSE ENTANGLEMENT SERVICE TECH 3 2 6 DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES ARE NOT SNAGGED PRIOR TO LIFTING SERVICE TECH SERVICE TECH DVN-HOS-MIP- 02;JSA 2 1 2 DUAL ARTICULATING LIFT FRAME (DALF) (Cont.) Assessor's signature: ____________________________________________ 6 of 18
  • 7. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity STRUCK BY ENTIRE CREW 4 3 12 LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK LAYOUT ENTIRE CREW ENTIRE CREW JSA; BHP QCP Rev.3 4 1 4 CAUGHT BETWEEN SUSPENDED LOADS AND STRUCTURES SERVICE TECHS AND RIG CREW 5 3 15 HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING ENTIRE CREW SERVICE TECH / RIG CREW JSA 5 2 10 LATCHING ELEVATORS - POTENTIAL USE OF INCORRECT ELEVATORS (IF APPLICABLE) SERVICE TECHS AND RIG CREW 4 4 16 HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA; UNDERSTANDING TOP DRIVE; NOV/DEVIN CONFIRMATION OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC TONNAGE ELEVATORS; NOV/DEVIN PREMOB CHECKLIST; COMPETENCY TRAINING SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW JSA; DVN-ELE- MIP-01 4 3 12 USING SKATE OR CRANE TO LATCH BAILS (TOP DRIVE AND/OR BAIL PINS) SERVICE TECHS AND RIG CREW 3 3 9 LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE) SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW JSA; BHP QCP Rev.3 3 3 9 PINCH POINTS - LATCHING ELEVATORS, BAILS, MAKING UP BAIL PINS; RIG UP MINI TRACK SERVICE TECHS AND RIG CREW 5 4 20 JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED EQUIPMENT; PROPER HAND AND BODY POSITIONING; IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50 LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI TRACK PLACEMENT IN CTLF; SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW JSA; DVN-BAL- MIP-01 5 3 15 TRIP HAZARDS ON DECK - CAUSE ABRASIONS, SPRAINS ENTIRE CREW 3 3 9 SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE COORDINATOR ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 4 STORED PRESSURE IN HYDRAULIC OR AIR LINES - CAN CAUSE RUPTURES, SPILLS, IMPACT TO PERSONNEL ENTIRE CREW 3 3 9 HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS INSTALLED; MSDS ENTIRE CREW ENTIRE CREW MSDS; DVN-BAS- IOP-01; DVN- HOS-MIP-02 3 2 6 HOSE ENTAGLEMENT SERVICE TECH 3 2 6 DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO KINKS IN LINE PRIOR TO APPLYING PRESSURE (DVN-HOS-MIP- 02); ASSURE HOSES ARE NOT SNAGGED PRIOR TO LIFTING SERVICE TECH SERVICE TECH JSA; DVN-BAS- IOP-01;DVN-HOS- MIP-02 2 1 3 BAIL ASSEMBLY SPREADER SYSTEM (BASS) Assessor's signature: ____________________________________________ 7 of 18
  • 8. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity STRUCK BY ENTIRE CREW 4 3 12 LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK LAYOUT ENTIRE CREW ENTIRE CREW JSA 4 1 4 CAUGHT BETWEEN SUSPENDED LOADS AND STRUCTURES SERVICE TECHS AND RIG CREW 5 3 15 HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW JSA 5 2 10 LATCHING ELEVATORS - POTENTIAL USE OF INCORRECT ELEVATORS SERVICE TECHS AND RIG CREW 4 4 16 HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA; UNDERSTANDING TOP DRIVE; NOV DEVIN CONFIRMATION OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC SERVICE TECH SERVICE TECH / RIG CREW JSA; DVN-ELE- MIP-01 4 3 12 USING SKATE OR CRANE TO LATCH BAILS (TOP DRIVE AND/OR BAIL PINS) SERVICE TECHS AND RIG CREW 3 3 9 LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE) SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW JSA; BHP QCP Rev.3 3 2 6 PINCH POINTS - LATCHING ELEVATORS, BAILS, MAKING UP BAIL PINS; RIG UP MINI TRACK SERVICE TECHS AND RIG CREW 5 4 20 JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED EQUIPMENT; PROPER HAND AND BODY POSITIONING; IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50 LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI TRACK PLACEMENT IN CTLF; SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW JSA; DVN-BAL- MIP-01 5 3 15 TRIP HAZARDS ON DECK - CAUSE ABRASIONS, SPRAINS ENTIRE CREW 3 3 9 SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE COORDINATOR ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 4 BAILS Assessor's signature: ____________________________________________ 8 of 18
  • 9. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity STRUCK BY ENTIRE CREW 4 3 12 LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK LAYOUT ENTIRE CREW ENTIRE CREW JSA 4 1 4 CAUGHT BETWEEN SUSPENDED LOADS AND STRUCTURES SERVICE TECHS AND RIG CREW 5 3 15 HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING ENTIRE CREW ENTIRE CREW JSA 5 2 10 (IF APPLICABLE) LATCHING ELEVATORS - POTENTIAL USE OF INCORRECT ELEVATORS SERVICE TECHS AND RIG CREW 4 4 16 HAND AND BODY PLACEMENT; ASSURE ELEVATOR SAFETY PIN IS INSTALLED; REVIEW PROCEDURES; CONDUCT JSA; UNDERSTANDING TOP DRIVE; NOV/DEVIN CONFIRMATION OF CUSTOMER NEED; KNOWING CONSTRAINTS OF SPECIFIC TONNAGE ELEVATORS; NOV DEVIN PREMOB CHECKLIST; COMPETENCY TRANING SERVICE TECH SERVICE TECH / RIG CREW JSA; DVN-ELE- MIP-01 4 3 12 USING SKATE OR CRANE TO LATCH BAILS (TOP DRIVE AND/OR BAIL PINS) SERVICE TECHS AND RIG CREW 3 3 9 LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE) SERVICE TECH SERVICE TECH / RIG CREW JSA; BHP QCP Rev.3 3 2 6 PINCH POINTS - LATCHING ELEVATORS, BAILS, MAKING UP BAIL PINS; RIG UP MINI TRACK SERVICE TECHS AND RIG CREW 5 4 20 JSA; PROCEDURAL REVIEW; EQUIPMENT REVIEW; SECURED EQUIPMENT; PROPER HAND AND BODY POSITIONING; IMPACT GLOVES; TWO PERSONNEL USED FOR LIFTS OVER 50 LBS.; STACK UP DRAWING REVIEW TO UNDERSTAND MINI TRACK PLACEMENT IN CTLF; SERVICE TECH SERVICE TECH / RIG CREW JSA; DVN-ELE- MIP-01 5 3 15 TRIP HAZARDS ON DECK - CAUSE ABRASIONS, SPRAINS ENTIRE CREW 3 3 9 SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE COORDINATOR ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 4 ELEVATORS Assessor's signature: ____________________________________________ 9 of 18
  • 10. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity STRUCK BY ENTIRE CREW 4 3 12 LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK LAYOUT ENTIRE CREW ENTIRE CREW JSA 4 1 4 CAUGHT BETWEEN SUSPENDED LOADS AND STRUCTURES SERVICE TECHS AND RIG CREW 5 3 15 HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING ENTIRE CREW ENTIRE CREW JSA 5 2 10 PUNCTURE POINTS ON HYDRAULIC POWER UNIT HYDRAULIC AND FUEL TANKS - NO INCLOSED CAGE SERVICE TECHS 4 2 8 UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS; DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS OBSTRUCTIONS; MSDS SERVICE TECH SERVICE TECH / RIG CREW JSA; DVN-HPU- MIR-02 4 1 4 TRIP HAZARDS ON DECK - CAUSE ABRASIONS, SPRAINS ENTIRE CREW 3 3 9 SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE COORDINATOR SERVICE TECH SERVICE TECH / RIG CREW JSA; BHP QCP Rev.3 2 2 4 STORED PRESSURE IN HYDRALIC OR AIR LINES - CAN CAUSE RUPTURES, SPILLS, IMPACT TO PERSONNEL ENTIRE CREW 3 3 9 HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS INSTALLED; MSDS SERVICE TECH ENTIRE CREW JSA; DVN-HPU- MIR-02;DVN- HOS-MIP-02 3 2 6 HOSE ENTAGLEMENT SERVICE TECH 3 2 6 DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES ARE NOT SNAGGED PRIOR TO LIFTING SERVICE TECH SERVICE TECH JSA; DVN-HPU- SOP-05;DVN- HOS-MIP-02 2 1 2 CONTROL PANELS Assessor's signature: ____________________________________________ 10 of 18
  • 11. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity STRUCK BY ENTIRE CREW 4 3 12 LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK LAYOUT ENTIRE CREW ENTIRE CREW JSA 4 1 4 PUNCTURE POINTS ON HYDRAULIC POWER UNIT HYDRAULIC AND FUEL TANKS - NO INCLOSED CAGE SERVICE TECHS 4 2 8 UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS; DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS OBSTRUCTIONS; MSDS SERVICE TECH SERVICE TECH JSA 4 1 4 TRIP HAZARDS ON DECK - CAUSE ABRASIONS, SPRAINS ENTIRE CREW 3 3 9 SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE COORDINATOR ENTIRE CREW ENTIRE CREW JSA; BHP QCP Rev.3 2 2 6 STORED PRESSURE IN HYDRALIC OR AIR LINES - CAN CAUSE RUPTURES, SPILLS, IMPACT TO PERSONNEL ENTIRE CREW 3 3 9 HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB TESTING; ADHERING TO HOSE SHELF LIFE; WHIPCHECKS INSTALLED; MSDS ENTIRE CREW ENTIRE CREW JSA; DVN-HPU- MIR-02;DVN- HOS-MIP- 02;MSDS 3 2 2 HOSE ENTAGLEMENT SERVICE TECH 3 2 6 DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES ARE NOT SNAGGED PRIOR TO LIFTING SERVICE TECH SERVICE TECH JSA; DVN-HPU- SOP-05;DVN- HOS-MIP-02 2 1 4 HOSES Assessor's signature: ____________________________________________ 11 of 18
  • 12. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity STRUCK BY ENTIRE CREW 4 3 12 LIFT PLAN; HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING; DECK LAYOUT ENTIRE CREW ENTIRE CREW JSA; 4 1 10 CAUGHT BETWEEN SUSPENDED LOADS AND STRUCTURES SERVICE TECHS AND RIG CREW 5 3 15 HARD HAT; FOOT PROTECTION; INSPECTION FOR LOOSE OBJECTS; HAND AND BODY POSITIONING ENTIRE CREW ENTIRE CREW JSA 5 2 10 USING SKATE OR CRANE TO LATCH BAILS (TOP DRIVE AND/OR BAIL PINS) SERVICE TECHS AND RIG CREW 3 3 9 LIFTING PLAN; PROPER LIFTING; JSA; COMMUNICATION WITH RIG CREW; PREDETERMINE ORIENTATION OF BAILS BEFORE RIG UP; ASSURE ;PROPER BALANCE BEFORE CRANE RELEASES BAILS (I.E. NOT TOP HEAVY ON SKATE) SERVICE TECH SERVICE TECH / RIG CREW JSA 3 2 6 PUNCTURE POINTS ON HYDRAULIC POWER UNIT HYDRAULIC AND FUEL TANKS - NO ENCLOSED CAGE SERVICE TECHS 4 2 8 UPDATE DESIGN TO ENCLOSE HYDRAULIC AND FUEL TANKS; DESIGN LIFT PLAN AND DECK PLACEMENT AROUND OBVIOUS OBSTRUCTIONS; MSDS SERVICE TECH SERVICE TECH JSA; DVN-HPU- SOP-05 4 1 4 TRIP HAZARDS ON DECK - CAUSE ABRASIONS, SPRAINS ENTIRE CREW 3 3 9 SLIP RESISTENT STEEL TOED FOOTWEAR; PROPER HOUSEKEEPING; CAUTION TAPE; BRINGING HAZARD TO HSE COORDINATOR ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 2 2 6 STORED PRESSURE IN HYDRALIC OR AIR LINES - CAN CAUSE RUPTURES, SPILLS, IMPACT TO ENTIRE CREW 3 3 9 HOSE MANAGEMENT SYSTEM TO ASSURE PROPER PREMOB TESTING; ADHERING TO HOSE SHELF LIFE (DVN-HOS-MIP- O2); WHIPCHECKS INSTALLED; MSDS ENTIRE CREW ENTIRE CREW JSA; DVN-HPU- MIR-02;DVN- HOS-MIP-02; 3 2 2 HOSE ENTAGLEMENT SERVICE TECH 3 2 6 DEDICATED SPOTTER FOR HOSE RIG UP; JSA; ASSURE NO KINKS IN LINE PRIOR TO APPLYING PRESSURE; ASSURE HOSES ARE NOT SNAGGED PRIOR TO LIFTING SERVICE TECH SERVICE TECH JSA; DVN-HPU- SOP-05;DVN- HOS-MIP-02 2 1 2 HYDRAULIC POWER UNIT (HPU) Assessor's signature: ____________________________________________ 12 of 18
  • 13. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity DALF HOIST FUNCTION HYDRAULIC LINE CONNECTION FAILURE, HOIST LINE CERTIFICATE SERVICE TECH 4 3 12 MIR#;NOV DEVIN/OPERATOR SPECFIC QUALITY PLAN; WHIP CHECKS;PREMOBILIZATION CHECK LIST; PREMOB FUNCTION TEST LIST; 2 YEAR FULL MAINTENANCE ENTIRE CREW ENTIRE CREW JSA; DVN-CLF- MIR-03 3 2 6 DALF ARTICULATION - PULLING TOP PINS (TOP PINS ARE NOT LOAD BEARING), SLING "STINGERS" FOR ARTICULATION; OPENING ELEVATOR DOOR SERVICE TECHS AND RIG CREW 5 4 20 JSA;PROCEDURAL REVIEW;EQUIPMENT REVIEW; NOV/DEVIN COMPETENCY TRAINING. ENTIRE CREW SERVICE TECH / RIG CREW JSA; DVN-CLF- MIR-03 5 2 10 DALF WIRELINE HANG OFF - UNDERRATED DEAD MAN PAD EYE SERVICE TECHS AND RIG CREW 5 3 15 NOV/DEVIN PROCEDURE;NOVDEVIN DATA BOOK AND ANALYSIS FOR DEAD MAN PAD EYE. SERVICE TECH SERVICE TECH JSA; DVN-CLF- MIR-03 5 1 5 DROPPED OBJECTS WHEN PERSONNEL IN MAN ENTIRE CREW 4 3 12 LANYARDS FOR TOOLS, TOOL BAG ATTACHED TO TECH WITH CARABINER; ENTIRE CREW ENTIRE CREW JSA; DVN-CLF- MIR-03 4 1 4 PRESSURIZED EQUIPMENT - POTENTIAL ENERGY, HOSE CONNECTIONS, VALVES ENTIRE CREW 4 2 8 HOSE MANAGEMENT;WHIPCHECKS INSTALLED;PRESSURE TESTED PRIOR TO USE;JSA (DVN-HOS-MIP-02); PREMOB PRESSURE TESTING PROCEDURE;NOV/DEVIN COMPETENCY TRAINING ENTIRE CREW ENTIRE CREW JSA; DVN-CLF- MIR-03;DVN- HOS-MIP-02 4 1 4 HOIST FAILURE SERVICE TECH 3 2 6 TWO YEARS FULL MAINTENANCE;FUNCTION TEST;NOV/DEVIN PROCEDURE SERVICE TECH SERVICE TECH COM-SHO-SMP- 14 2 1 2 DUAL ARTIFICIAL LIFT FRAME (DALF) 3. OPERATION/FUNCTION Assessor's signature: ____________________________________________ 13 of 18
  • 14. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity ELEVATOR DOORS OPEN AND CLOSE. PINCH POINT-LATCHING. FIT TEST ON LIFT SUB WHEN APPLICABLE SERVICE TECH 5 4 20 JSA-PROCEDURAL REVIEW- FULL BODY INSPECTION TPI, PER BHP. PROPER HAND AND BODY POSITIONING;IMPACT GLOVES;TWO PERSONNEL FOR LIFTS OVER 50 LBS. SERVICE TECH SERVICE TECH DEV-ELE-MAS-04 5 3 15 SEIZED ELEVATOR (WILL NOT OPEN) SERVICE TECH AND RIG CREW 3 2 6 MIR; PROCEDURE REVIEW SERVICE TECH SERVICE TECH / RIG CREW DVN-ELE-MIR-02 3 1 3 INCORRECT ELEVATOR ENTIRE CREW 4 2 8 FIT TEST;DATA BOOK CHECKS SHOP FOREMAN SERVICE TECH BHP QCP; TPI,DVN-ELE-MIR- 02 4 1 4 DROPPED OBJECTS WHEN PERSONNEL IN MAN BASKET/RIDING BELT ENTIRE CREW 4 3 12 LANYARDS FOR TOOLS; TOOL BAGS ATTACHED TO TECH WITH CARABINER; ENTIRE CREW ENTIRE CREW DVN-ELE-MIR-02 3 3 9 BASS HOIST FUNCTION - HYDRAULIC LINE CONNECTION FAILURE, CONTROL PANEL FAILURE, HOIST LINE CERTIFICATE SERVICE TECH 4 3 12 NOV DEVIN/OPERATOR SPECIFIC QUALITY PLAN; WHIP CHECKS; PREMOBILIZATION CHECK LIST; PREMOB FUNCTION TEST LIST; SHOP FOREMAN SERVICE TECH / RIG CREW BHP QCP REV.3; DVN-BAS-IOP-01 3 2 6 BASS WIRELINE HANG OFF - UNDERRATED DEAD MAN PAD EYE SERVICE TECH AND RIG CREW 5 3 15 NOV/DEVIN PROCEDURE; NOV/DEVIN DATA BOOK AND ANALYSIS FOR DEAD MAN PAD EYE; SHOP FOREMAN SERVICE TECH DVN-BAS-IOP-01, MTR 5 1 5 DROPPED OBJECTS WHEN PERSONNEL IN MAN BASKET/RIDING BELT ENTIRE CREW 4 3 12 LANYARDS FOR TOOLS; TOOL BAGS ATTACHED TO TECH WITH CARABINER; ENTIRE CREW ENTIRE CREW JSA 4 1 4 PRESSURIZED EQUIPMENT - POTENTIAL ENERGY, HOSE CONNECTIONS, VALVES ENTIRE CREW 4 2 8 HOSE MANAGEMENT; WHIPCHECKS INSTALLED; PRESSURE TESTED PRIOR TO USE (DVN-HOS-MIP-02); JSA; PREMOB PRESSURE TESTING PROCEDURE; NOV/DEVIN COMPETENCY TRAINING ENTIRE CREW ENTIRE CREW JSA; DVN-BAS- IOP-01;DVN-HOS- MIP-02 4 1 4 ELEVATORS BAIL ASSEMBLY SPREADER SYSTEM (BASS) Assessor's signature: ____________________________________________ 14 of 18
  • 15. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity BASS AND DALF HOIST FUNCTION - HYDRAULIC LINE CONNECTION FAILURE, CONTROL PANEL FAILURE, HOIST LINE CERTIFICATE SERVICE TECH 4 3 12 NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; WHIP CHECKS; PREMOBILIZATION CHECKLIST; PREMOB FUNCTION TEST LIST; SHOP FOREMAN SERVICE TECH BHO QCP REV.3; DVN-BAS-IOP-01 3 2 6 HYDRAULIC POWER UNITS/CONTROL PANEL - SPILLS, NONRESPONSIVE UNIT; HOSE CONNECTIONS SERVICE TECH 3 3 9 WHIP CHECKS; DEVIN CREATED TROUBLE SHOOTING GUIDE; DEVIN PREMOB CHECKLIST; SPARE COMPONENTS ON LOCATION SHOP FOREMAN SERVICE TECH JSA; DVN-HPU- MIR-02, MSDS 3 2 6 DROPPED OBJECTS WHEN PERSONNEL IN MAN BASKET/RIDING BELT (DALF OR BASS RIG-UP) ENTIRE CREW 4 3 12 LANYARDS FOR TOOLS; TOOL BAGS ATTACHED TO TECH WITH CARABINER; ENTIRE CREW ENTIRE CREW JSA; 4 1 4 PRESSURIZED EQUIPMENT - POTENTIAL ENERGY, HOSE CONNECTIONS, VALVES ENTIRE CREW 4 2 8 HOSE MANAGEMENT; WHIPCHECKS INSTALLED; PRESSURE TESTED PRIOR TO USE; JSA; PREMOB PRESSURE TESTING PROCEDURE; NOV DEVIN COMPETENCY TRAINING ENTIRE CREW ENTIRE CREW JSA; DVN-BAS- IOP-01;DVN-HOS- MIP-02 4 1 4 HYDRAULIC POWER UNITS/CONTROL PANEL - SPILLS, NONRESPONSIVE UNIT; HOSE CONNECTIONS SERVICE TECH 3 3 9 WHIP CHECKS; NOV/DEVIN CREATED TROUBLE SHOOTING GUIDE; NOV/DEVIN PREMOB CHECKLIST; SPARE COMPONENTS ON LOCATION SERVICE TECH SERVICE TECH JSA; DVN-HPU- MIR-02, MSDS 3 2 8 STARTING/OPERATING HYDRAULIC POWER UNIT - HAND PLACEMENT; HEAT FROM EXHAUST; SERVICE TECH 4 3 12 NOV/DEVIN COMPETENCY TRAINING; INCORPORATE MESH GUARD BEHIND SWINGING DOOR SERVICE TECH SERVICE TECH TECH COMPETENCY RECORDS 4 2 8 LOW FUEL LEVEL SERVICE TECH 2 3 6 PREMOB; PRETOWER SHOP FOREMAN SERVICE TECH DVN-HPU-MIR- 02 2 2 4 PRESSURIZED EQUIPMENT - POTENTIAL ENERGY, HOSE CONNECTIONS, VALVES ENTIRE CREW 4 2 8 HOSE MANAGEMENT; WHIPCHECKS INSTALLED; PRESSURE TESTED PRIOR TO USE (DVN-HOS-MIP-02); JSA; PREMOB PRESSURE TESTING PROCEDURE; NOV DEVIN COMPETENCY TRAINING ENTIRE CREW ENTIRE CREW JSA; DVN-BAS- IOP-01 4 1 4 HOSES HYDRAULIC POWER UNIT (HPU) Assessor's signature: ____________________________________________ 15 of 18
  • 16. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity HAPHAZARD RIG DOWN DALF - FALLING OF OBJECTS, HOSE PRESSURE, DROPPED OBJECTS SERVICE TECH AND RIG CREW 4 3 12 NOV/DEVIN PROCEDURE; JSA; STANDARD PPE; RELEIVE HOSE PRESSURE; SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW DVN-DLF-MIR- 03;DVN-HOS- MIP-02;JSA 4 2 5 INCORRECT PLACEMENT OF DALF ON SHIPPING STANDS (IF MINI TRACK IS INSTALLED) SERVICE TECH AND RIG CREW 5 2 10 CAUTION TAPE ON PINCH POINT AREAS; PROPER HAND PLACEMENT; PREDETERMINED DISTANCE FOR STANDS; MARKINGS ON DALF FOR PLACEMENT; PEC CORE FOR HAND SAFETY SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW JSA; HSE COORD. 5 1 6 INCORRECT EQUIPMENT PLACEMENT IN BASKET SERVICE TECH 3 4 12 ALLOTED SPACE FOR ALL COMPONENTS SERVICE TECH SERVICE TECH / RIG CREW DVN-DLF-MIR-03 3 2 4 HAND PLACEMENT; BACK LOADING FRAME TO STANDS (IF APPLICABLE) SERVICE TECH AND RIG CREW 5 4 20 TRAINING;JSA;TIGER STRIPPING TAPE IN HAND AREA SERVICE TECH / RIG CREW ENTIRE CREW TRAINING DOC; JSA; HSE COORD.;DVN- ADM-RA-01 5 2 10 BACK LOAD TO BOAT - SLING AND SHACKLE CONNECTIVITY ENTIRE CREW 4 3 12 VISUAL CHECKS FOR ALL FASTENED COMPONENTS; COTTER PINS ENTIRE CREW ENTIRE CREW DVN-DLF-MIR-03 4 1 4 DUAL ARTICULATING LIFT FRAME (DALF) RIG DOWN/BACK LOAD TO BOAT Assessor's signature: ____________________________________________ 16 of 18
  • 17. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity INCORRECT EQUIPMENT PLACEMENT IN BASKET SERVICE TECH 3 4 12 ALLOTED SPACE FOR ALL COMPONENTS SERVICE TECH SERVICE TECH / RIG CREW DVN-BAS-MIR-03 3 2 4 HAND PLACEMENT; BACK LOADING FRAME TO STANDS (IF APPLICABLE) SERVICE TECH AND RIG CREW 5 3 15 PROPER TRAINING ON MOCK RIG UPS SERVICE TECH SERVICE TECH / RIG CREW DVN-BAS-MIR- 03;DVN-ADM-RA- 01 5 2 10 BACK LOAD TO BOAT - SLING AND SHACKLE CONNECTIVITY ENTIRE CREW 4 3 12 VISUAL CHECKS FOR ALL FASTENED COMPONENTS; COTTER PINS ENTIRE CREW ENTIRE CREW DVN-BAS-MIR-03 4 1 4 SUSPENDED LOADS ENTIRE CREW 3 3 9 REVIEW CRANE CHECK LISTS REGARDING THE SPECIFIC RIGGING USED; FUNCTION CRANE "HOOK LATCH;" ASSURE THAT NO SLINGS ARE SNAGGED OR CRUSHED UNDER ACCOMPANYING EQUIPMENT ENTIRE CREW ENTIRE CREW DVN-DLF-MIP- 02; JSA 3 2 6 FALLING OBJECTS ENTIRE CREW 5 3 15 DEBRIS CHECKS; USE OF NORD LOCKS; HARD HAT; ASSURE COTTER PINS ARE "WRAPPED" AROUND THE RESPECTIVE SHACKLE, ETC.; MAKE SURE COTTER PINS ARE NOT RUSTED, I.E. OUT OF SERVICE; ENTIRE CREW ENTIRE CREW JSA; HSE COORD. 5 2 10 LOAD SHIFT IN EQUIPMENT BASKET - CAN CAUSE EQUIPMENT DAMAGES, LEAKS, POTENTIAL ENERGY SERVICE TECHS 3 4 12 ENSURE LOAD IS SECURED IN BASKET; HAVE MSDS ON ALL CHEMICALS FOR QUICK AND PROPER CLEAN UP RESPONSE; THIRD PARTY REVIEW OF LOAD OUT; SECURE ITEMS WITH STRAPS; SERVICE TECH / RIG CREW SERVICE TECH / RIG CREW MSDS; TECH COMPETENCY RECORD 3 2 6 HAND PLACEMENT; BACK LOADING FRAME TO STANDS (IF APPLICABLE) SERVICE TECH AND RIG CREW 5 3 15 PROPER TRAINING SERVICE TECH SERVICE TECH / RIG CREW MSDS; TECH COMPETENCY RECORD;DVN-ADM- RA-01 4 2 8 SLING FAILURE CAN RESULT IN DROPPED EQUIPMENT AS IT IS BEING LIFTED ENTIRE CREW 5 2 10 NOV/DEVIN // OPERATOR SPECIFIC QUALITY PLAN; VISUAL INSPECTIONS ON ALL LIFTING GEAR; CERTIFIED SHAKLES ENTIRE CREW ENTIRE CREW BHP QCP REV.3 5 2 10 EQUIPMENT BASKET (BAILS, ELEVATORS, CONTROL PANEL, HOSES) BAIL ASSEMBLY SPREADER SYSTEM Assessor's signature: ____________________________________________ 17 of 18
  • 18. TRA NUMBER: DVN-RA-01-17 PROCEDURE NUMBER: Job Description: RIG-UP/RIG-DOWN, OPERATION OF THE BASS, DALF, HPU, HANDLING EQUIPMENT MINI TRACK Describe all hazards identified and their effects for each task (from Hazard ID checklist and based on observations and experience). Note: Additional hazards may be caused by interaction with other work Name personnel at risk. From matrix, identify severity with no controls in place for each hazard. From matrix, identify likelihood with no controls in place for each hazard. Classify risk rating from matrix for each hazard Describe fully all controls applicable for each hazard eg if PPE is used as a control, it must be specifically described. If a control can only be verified by documentation then it must be available. All controls must be valid in that they reduce severity, likelihood or both. Indicate what document or procedure that shall be used to mitigate the hazard. From matrix identify severity with controls in place for each hazard. From matrix, identify likelihood with controls in place for each hazard. Classify risk rating from matrix for each hazard. INITIAL RISK Risk Rating List all Controls Required Reference Document Responsible Party 1. LIFTING EQUIPMENT FROM BOAT TO RIG Separate the job into individual tasks and record in sequence Define the person or party who will be handling the situation as stated should a Hazard / Risk occur. Likelihood of Occurrence Risk Rating Job Steps RESIDUAL RISK COM-OPE-SOP-17 CONTROLS Hazard Description Population at Risk Hazard Severity Likelihood of Occurrence HAZARD Hazard Severity INCORRECT EQUIPMENT PLACEMENT IN BASKET SERVICE TECH 3 4 12 ALLOTED SPACE FOR ALL COMPONENTS SERVICE TECH SERVICE TECH DVN-HPU-PRD- 06 3 2 4 FUEL LEVELS TO HIGH CAUSING SPILLS - NO CAPS ON CONNECTIONS SERVICE TECH 4 3 12 VISUAL CHECKS FOR PROPER FILL; MSDS ON ALL CHEMICALS FOR QUICK RESPONSE AND CLEAN UP RESPONSE; VISUAL INSPECT FOR ALL CAP CONNECTIONS SERVICE TECH SERVICE TECH / RIG CREW DVN-HPU-PRD- 06 4 2 8 BACK LOAD TO BOAT - SLING AND SHACKLE CONNECTIVITY ENTIRE CREW 4 3 12 VISUAL CHECKS FOR ALL FASTENED COMPONENTS; COTTER PINS ENTIRE CREW ENTIRE CREW DVN-HPU-PRD- 06 4 1 4 DVN-DLF-MIC-O7 DVN-DLF-MIR-03 DVN-HOS-MIP-07 DVN-BAS-MIR-03 DVN-BAS-MIP-02 DVN-BAS-PRD-05 DVN-HPU-MIR-02 DVN-BAL-PSD-04 DVN-DLF-MIP-02 DVN-HPU-PRD-06 DVN-ELE-MIP-01 DVN-BAS-IOP-01 DVN-BAL-MIP-01 DVN-HPU-SOP-05 DVN-CLF-MIR-03 COM-SHO-SMP-14 DVN-ELE-MAS-04 DVN-ELE-MIR-02 DVN-ADM-RA-01 Elevator Maintenance, Inspection and Repair Risk Assessment Training Record Bail Link Maintenance and Inspection Procedure Hydraulic Power Unit Standard Operating Procedure Coil Tubing Lift Frame Maintenance, Inspection and Repair Disassembly/Reassembly of DALF Elevator Master Survey Bail Link Pre Dispatch DALF Test and Maintenace Procedure Hydraulic Power Unit Pre Dispatch Elevator Maintenance, and Inspcetion Procedure Bail Assembly Spreader System Installation and Operation Procedure Hose Maintenance and Inspection Procedure Bail Assembly Spreader System Maintenance and Inspection Procedure Bail Assembly Spreader System Pre Dispatch Bail Assembly Spreader System Maintenance, Inspection, and Repair Hydraulic Power Unit Maintenance, Inspection and Repair Procedural References Description Dual Articulating Lift Frame Maintenance and Inspection Checklist DALF Maintenance and Fuction Test Checklist HYDRAULIC POWER UNIT (HPU) Assessor's signature: ____________________________________________ 18 of 18