Main Engine Failure
This is a very dangerous situation as it results in immobilisation of the vessel.
It is further dangerous if the vessel is under maneuvering or in restricted
area or facing a rough weather.
It can be divided into various categories which forms emergencies such
as Scavange fire, Uptake fire, crankcase explosion, Automation failure etc
Immediate Action -
1. Duty engineer/ Duty officer should take necessary steps to stop the
engine if not engineer already stopped. should Duty officer should
observe traffic situation whereas duty engineer prepare systems for
stoppage. i.e firing of boiler, starting additional Aux Engine
2. Inform Chief Engineer and Master about stoppage and sound Engineer's
alarm Events must be logged and damage contained to the minimum.
Follow up Action
These will be done by two man teams .The Chief Engineer will lead Engine
Room team whereas Master will lead Bridge team.
Bridge Response
 Inform Duty Engineer if not alerted by Engineer’s Alarm system.
 Call Master and Chief Engineer.
 Appraise prevalent navigational situation and take any necessary action to
improve safety margins.
 Check own vessel’s position, check for local dangers and assess risk.
 Hand over the Engine Control to Engine room as requested.
 Engage Hand Steering and start second steering motor. Maintain original
course or alter towards navigational safety. As the speed reduces, ensure that
the helmsman is using sufficient helm to maintain course - once the ships head
starts to drift it may not be possible to restore desired course.
 Depending on the navigational situation, it might be necessary to:
1. ¬ Transmit a Security Message on VHF DSC and VHF Ch 16.
1. ¬ Display necessary shapes/lights /sound signals as required
2. ¬ Post additional look outs
3. ¬ Call for Emergency Anchor stations and head for Emergency anchorage
if needed.
4. ¬ Advice relevant authorities if in coastal/port waters.
5. ¬ Log down events in the Deck log book.
Engine Room team
1. Ascertain the cause of stoppage or failure of ME, by studying the order in
which alarms are received; feed backs from duty engineer etc.
2. Stop leakage of oil /water if generated during the incident.
3. Commence damage assessment and arrive to logical estimate of time
of stoppage.
4. Communicate the stoppage duration to Master and Bridge team to enable
them to decide the safe place for anchoring.
5. Ascertain whether spares are available on board to carryout repairs
necessary either of temporary or permanent nature and also whetherthey
can be carried out by ship staff .
6. Carryout repairs with prior information to bridge & Master and with
proper consideration to safety & pollution aspect.
7. Retain damaged parts on board for further investigation if required .
Incident Reporting :-Once the repairs have been successfully carried
out. a detailed report should be prepared in the appropriate format of the
Company
This will include but not limited to the following:
1. Time & date of incident
2. Exact position of ship, distance from nearest land, port etc
3. Details of damaged machinery, extent of damage.
4. Cause of damage in CE's opinion
5. Repair adopted, details of repairs done if they are not done as methods
per maker's instructions.
6. If further shore assistance is required
7. whether the vessel is able to proceed with normal speed or reduced speed
either to next port of call or port of refuge
8. Any further investigation to be done or further analysis to be carried out
to investigate in more detail, the causes of stoppage

More Related Content

Similar to Documented procedures under Emergency preparedness- Main engine failure.docx

Southern Transport Service SOP
Southern Transport Service SOPSouthern Transport Service SOP
Southern Transport Service SOPRichard Gibbens
 
Psc pocket checklist
Psc pocket checklistPsc pocket checklist
Psc pocket checklistTevay Sayha
 
CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...
CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...
CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...sailorizzhere
 
RISK ASSESSMENT FOR CROSSING TSS MAIN SINGAPORE STRAIT -
RISK ASSESSMENT FOR CROSSING TSS MAIN SINGAPORE STRAIT - RISK ASSESSMENT FOR CROSSING TSS MAIN SINGAPORE STRAIT -
RISK ASSESSMENT FOR CROSSING TSS MAIN SINGAPORE STRAIT - Capt. Persobi Waldemar
 
Marine engineering department
Marine engineering department Marine engineering department
Marine engineering department twahiru
 
Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5Paulo P
 
Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5Paulo P
 
Ovid newsletter may 2014
Ovid newsletter  may 2014Ovid newsletter  may 2014
Ovid newsletter may 2014OCIMF OVID
 
Joel B NMIF Operations Team Lead
Joel B NMIF Operations Team LeadJoel B NMIF Operations Team Lead
Joel B NMIF Operations Team LeadJoel Balahadia
 
OVIQ Sample Master
OVIQ Sample Master OVIQ Sample Master
OVIQ Sample Master OCIMF OVID
 
Laid up vessel reactivation guide- West of England
Laid up vessel reactivation guide- West of EnglandLaid up vessel reactivation guide- West of England
Laid up vessel reactivation guide- West of EnglandDeva RG
 

Similar to Documented procedures under Emergency preparedness- Main engine failure.docx (20)

Vetting of ships
Vetting of shipsVetting of ships
Vetting of ships
 
Southern Transport Service SOP
Southern Transport Service SOPSouthern Transport Service SOP
Southern Transport Service SOP
 
Psc pocket checklist
Psc pocket checklistPsc pocket checklist
Psc pocket checklist
 
CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...
CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...
CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...
 
Emergency precaution 01
Emergency precaution 01Emergency precaution 01
Emergency precaution 01
 
Merchant Navy
Merchant NavyMerchant Navy
Merchant Navy
 
RISK ASSESSMENT FOR CROSSING TSS MAIN SINGAPORE STRAIT -
RISK ASSESSMENT FOR CROSSING TSS MAIN SINGAPORE STRAIT - RISK ASSESSMENT FOR CROSSING TSS MAIN SINGAPORE STRAIT -
RISK ASSESSMENT FOR CROSSING TSS MAIN SINGAPORE STRAIT -
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Work n rest hours & olb
Work n rest hours  & olbWork n rest hours  & olb
Work n rest hours & olb
 
Marine engineering department
Marine engineering department Marine engineering department
Marine engineering department
 
Oral questions
  Oral questions  Oral questions
Oral questions
 
Imsbc
ImsbcImsbc
Imsbc
 
Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5
 
Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5
 
Emergency response
Emergency responseEmergency response
Emergency response
 
Ovid newsletter may 2014
Ovid newsletter  may 2014Ovid newsletter  may 2014
Ovid newsletter may 2014
 
CS Offshore Project
CS Offshore ProjectCS Offshore Project
CS Offshore Project
 
Joel B NMIF Operations Team Lead
Joel B NMIF Operations Team LeadJoel B NMIF Operations Team Lead
Joel B NMIF Operations Team Lead
 
OVIQ Sample Master
OVIQ Sample Master OVIQ Sample Master
OVIQ Sample Master
 
Laid up vessel reactivation guide- West of England
Laid up vessel reactivation guide- West of EnglandLaid up vessel reactivation guide- West of England
Laid up vessel reactivation guide- West of England
 

Recently uploaded

"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)Samir Dash
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc
 
Modernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using BallerinaModernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using BallerinaWSO2
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....rightmanforbloodline
 
Decarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational PerformanceDecarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational PerformanceIES VE
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMKumar Satyam
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...caitlingebhard1
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseWSO2
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 

Recently uploaded (20)

"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
Modernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using BallerinaModernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using Ballerina
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
 
Decarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational PerformanceDecarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational Performance
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern Enterprise
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 

Documented procedures under Emergency preparedness- Main engine failure.docx

  • 1. Documented procedures under Emergency preparedness- Main engine failure Main Engine Failure This is a very dangerous situation as it results in immobilisation of the vessel. It is further dangerous if the vessel is under maneuvering or in restricted area or facing a rough weather. It can be divided into various categories which forms emergencies such as Scavange fire, Uptake fire, crankcase explosion, Automation failure etc Immediate Action - 1. Duty engineer/ Duty officer should take necessary steps to stop the engine if not engineer already stopped. should Duty officer should observe traffic situation whereas duty engineer prepare systems for stoppage. i.e firing of boiler, starting additional Aux Engine
  • 2. 2. Inform Chief Engineer and Master about stoppage and sound Engineer's alarm Events must be logged and damage contained to the minimum. Follow up Action These will be done by two man teams .The Chief Engineer will lead Engine Room team whereas Master will lead Bridge team. Bridge Response  Inform Duty Engineer if not alerted by Engineer’s Alarm system.  Call Master and Chief Engineer.  Appraise prevalent navigational situation and take any necessary action to improve safety margins.  Check own vessel’s position, check for local dangers and assess risk.  Hand over the Engine Control to Engine room as requested.  Engage Hand Steering and start second steering motor. Maintain original course or alter towards navigational safety. As the speed reduces, ensure that
  • 3. the helmsman is using sufficient helm to maintain course - once the ships head starts to drift it may not be possible to restore desired course.  Depending on the navigational situation, it might be necessary to: 1. ¬ Transmit a Security Message on VHF DSC and VHF Ch 16. 1. ¬ Display necessary shapes/lights /sound signals as required 2. ¬ Post additional look outs 3. ¬ Call for Emergency Anchor stations and head for Emergency anchorage if needed. 4. ¬ Advice relevant authorities if in coastal/port waters. 5. ¬ Log down events in the Deck log book.
  • 4. Engine Room team 1. Ascertain the cause of stoppage or failure of ME, by studying the order in which alarms are received; feed backs from duty engineer etc. 2. Stop leakage of oil /water if generated during the incident. 3. Commence damage assessment and arrive to logical estimate of time of stoppage. 4. Communicate the stoppage duration to Master and Bridge team to enable them to decide the safe place for anchoring. 5. Ascertain whether spares are available on board to carryout repairs necessary either of temporary or permanent nature and also whetherthey can be carried out by ship staff . 6. Carryout repairs with prior information to bridge & Master and with proper consideration to safety & pollution aspect. 7. Retain damaged parts on board for further investigation if required .
  • 5. Incident Reporting :-Once the repairs have been successfully carried out. a detailed report should be prepared in the appropriate format of the Company This will include but not limited to the following: 1. Time & date of incident 2. Exact position of ship, distance from nearest land, port etc 3. Details of damaged machinery, extent of damage. 4. Cause of damage in CE's opinion 5. Repair adopted, details of repairs done if they are not done as methods per maker's instructions. 6. If further shore assistance is required 7. whether the vessel is able to proceed with normal speed or reduced speed either to next port of call or port of refuge
  • 6. 8. Any further investigation to be done or further analysis to be carried out to investigate in more detail, the causes of stoppage