This document provides an overview of a UX design bootcamp. It begins with introductions from the instructor, Jacklyn Burgan. The bootcamp will cover the basics of UX design through building a mobile grocery shopping app, including competitive analysis, user research, wireframing, and user testing. Key topics that will be covered include defining UX design and usability, discussing the UX process and lean UX, conducting user interviews and analyzing research findings to create personas. Challenges with personas and an introduction to wireframing are also summarized.