This document discusses floor coverings and fixings for the Level 2 Diploma in Site Carpentry. It covers different types of flooring materials like chipboard and tongue-and-grooved flooring. It also provides guidance on properly fixing floors, including using nails that are 21⁄2 times the thickness of the floorboard and seeking permission for the "secret nails" method. The document notes that floorboards can also be screwed down to reduce noise. It concludes by advising that electrical wires should run through the middle of joists while pipework is generally notched on top of joists when installing services under the floor.