Presentation 4: Flat roofs
Unit 101: Principles of building construction,
information and communication
© 2013 City and Guilds of London Institute. All rights reserved. 2 of 15
City & Guilds Construction
Aim
Introduce learners to flat roofs.
Objectives
• Identify at least two components of a flat roof.
• List the two methods of obtaining fall on a flat roof.
• State the level of degree that determines a flat roof.
• State two of the materials used in covering on a flat roof.
© 2013 City and Guilds of London Institute. All rights reserved. 3 of 15
City & Guilds Construction
What is a flat roof?
A flat roof is one of the three types of roof structure. It is generally used
on garages or small extensions, rather than a main house roof.
A flat roof has on average a life span of approximately 15 years.
The definition of a flat roof is any roof which has a slope of less than 10
degrees or a fall ratio of 1:6.
© 2013 City and Guilds of London Institute. All rights reserved. 4 of 15
City & Guilds Construction
Components of a flat roof
© 2013 City and Guilds of London Institute. All rights reserved. 5 of 15
City & Guilds Construction
Task
Sketch and label a flat roof.
© 2013 City and Guilds of London Institute. All rights reserved. 6 of 15
City & Guilds Construction
Fall on a flat roof
The direction of the slope of the roof is called the fall.
The fall of the roof will depend upon the:
• type of roof construction and its covering
• location of the building
• position of any surface water drain.
© 2013 City and Guilds of London Institute. All rights reserved. 7 of 15
City & Guilds Construction
Fall on a flat roof continued
The amount of fall should be enough to clear away any water and direct
it to the guttering.
If the fall is not enough, the water may form pools on top of the roof.
Water pools on the roof will increase the weight of the roof and can
lead to water penetration.
There are three basic methods of obtaining the fall of a flat roof. The
chosen method will depend upon the type and use of the building and
the internal ceiling finish required.
© 2013 City and Guilds of London Institute. All rights reserved. 8 of 15
City & Guilds Construction
Sloping roof joists
In this type of construction, the slope or fall is obtained by sloping the
roof joists. This type of construction is used where there is no level
ceiling required.
© 2013 City and Guilds of London Institute. All rights reserved. 9 of 15
City & Guilds Construction
Tapered firring pieces
In this type of construction, the slope or fall is obtained by attaching
tapered pieces of timber to the roof joists. This type of construction will
produce a level ceiling.
© 2013 City and Guilds of London Institute. All rights reserved. 10 of 15
City & Guilds Construction
Deepened joists (parallel fittings)
This type of construction involves parallel firring pieces. The firrings are
diminished section and are nailed at right angles to the fall of the roof.
© 2013 City and Guilds of London Institute. All rights reserved. 11 of 15
City & Guilds Construction
Roof joists
All the roof joists used in the construction of flat roofs must comply with
the requirements of current building regulations.
These regulations govern:
• the sectional sizes and grades of timber
• dead loads imposed upon sectional areas of roof
• maximum clear span for imposed loadings
• spacing of joists in relation to covering and imposed loads.
© 2013 City and Guilds of London Institute. All rights reserved. 12 of 15
City & Guilds Construction
Flat roof covering
When covering a flat roof, a sequence of events must take place:
• When the joists and firrings are installed, the chipboard sheets can be
cut and secured to the joists using annular ring nails.
• Once the boards are laid, the roof must be inspected for any sharp
edges/parts and swept.
• Hot bitumen is then poured onto
the roof and the underfelt is laid
in the same direction as the fall
of the roof.
Image courtesy of www.shutterstock.com. Reproduced with permission.
© 2013 City and Guilds of London Institute. All rights reserved. 13 of 15
City & Guilds Construction
Using underfelt
Once the fist layer of underfelt has cooled, the next layer of underfelt
can be laid using the same process as the first layer, but in the
opposite direction to the fall of the roof.
This ensures crossed joints and more strength.
Image courtesy of www.constructionphotography.com. Reproduced with permission.
Flashing providing waterproofing
© 2013 City and Guilds of London Institute. All rights reserved. 14 of 15
City & Guilds Construction
Using underfelt continued
When two layers of underfelt are
laid, the top layer, which is green
mineral felt can be laid, using the
same processes again but in the
same direction to the fall on the
roof.
The eaves of the felt are tucked
and doubled to create a drip which
directs water into the gutter. The
other edges are raised preventing
water from leaving the roof.
Flashing around a chimney
Image courtesy of www.shutterstock.com. Reproduced with permission.
© 2013 City and Guilds of London Institute. All rights reserved. 15 of 15
City & Guilds Construction
Any questions?

More Related Content

What's hot

unit 210 - capentry maintenance ppt 3
unit 210 - capentry maintenance ppt 3unit 210 - capentry maintenance ppt 3
unit 210 - capentry maintenance ppt 3kevin porter
 
6708 13 l1_123_presentation_3
6708 13 l1_123_presentation_36708 13 l1_123_presentation_3
6708 13 l1_123_presentation_3Robbie Blake
 
6710 127 l1_powerpoint_4
6710 127 l1_powerpoint_46710 127 l1_powerpoint_4
6710 127 l1_powerpoint_4Gordon Turner
 
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingkevin porter
 
Working Relationship between Bricks and Block Sand
Working Relationship between Bricks and Block SandWorking Relationship between Bricks and Block Sand
Working Relationship between Bricks and Block SandDjCurrie
 
6708 13 l1_123_presentation_2
6708 13 l1_123_presentation_26708 13 l1_123_presentation_2
6708 13 l1_123_presentation_2Robbie Blake
 
Ecological brick presentation 2013
Ecological brick presentation 2013Ecological brick presentation 2013
Ecological brick presentation 2013itrade_brazil
 
Working Materials
Working MaterialsWorking Materials
Working MaterialsDjCurrie
 

What's hot (13)

Tools
Tools Tools
Tools
 
unit 210 - capentry maintenance ppt 3
unit 210 - capentry maintenance ppt 3unit 210 - capentry maintenance ppt 3
unit 210 - capentry maintenance ppt 3
 
6708 13 l1_123_presentation_3
6708 13 l1_123_presentation_36708 13 l1_123_presentation_3
6708 13 l1_123_presentation_3
 
Disposal
Disposal Disposal
Disposal
 
6710 127 l1_powerpoint_4
6710 127 l1_powerpoint_46710 127 l1_powerpoint_4
6710 127 l1_powerpoint_4
 
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofing
 
Working Relationship between Bricks and Block Sand
Working Relationship between Bricks and Block SandWorking Relationship between Bricks and Block Sand
Working Relationship between Bricks and Block Sand
 
Session 1
Session 1Session 1
Session 1
 
Power point 2
Power point 2Power point 2
Power point 2
 
6708 13 l1_123_presentation_2
6708 13 l1_123_presentation_26708 13 l1_123_presentation_2
6708 13 l1_123_presentation_2
 
Session 3
Session 3Session 3
Session 3
 
Ecological brick presentation 2013
Ecological brick presentation 2013Ecological brick presentation 2013
Ecological brick presentation 2013
 
Working Materials
Working MaterialsWorking Materials
Working Materials
 

Similar to unit 101 ppt_4

unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingkevin porter
 
Construction u101 ppt_3
Construction u101 ppt_3Construction u101 ppt_3
Construction u101 ppt_3kevin porter
 
Unit 101, ppt 3, Principles of building, construction, information and commu...
Unit 101, ppt 3,  Principles of building, construction, information and commu...Unit 101, ppt 3,  Principles of building, construction, information and commu...
Unit 101, ppt 3, Principles of building, construction, information and commu...kevin porter
 
Set Out and Build Masonry Structures
Set Out and Build Masonry StructuresSet Out and Build Masonry Structures
Set Out and Build Masonry StructuresDjCurrie
 
Floor boarding and calculations 4
Floor boarding and calculations 4Floor boarding and calculations 4
Floor boarding and calculations 4michael mcewan
 
Basement construction report
Basement construction reportBasement construction report
Basement construction reportANKITAARORA85
 
Bricklaying: Step by Step
Bricklaying: Step by StepBricklaying: Step by Step
Bricklaying: Step by StepDjCurrie
 
Practical Equipment for Blocklaying
Practical Equipment for BlocklayingPractical Equipment for Blocklaying
Practical Equipment for BlocklayingDjCurrie
 
Blockwork Tools
Blockwork ToolsBlockwork Tools
Blockwork ToolsDjCurrie
 
Sustainable insulation materials 1
Sustainable insulation materials 1Sustainable insulation materials 1
Sustainable insulation materials 1michael mcewan
 
Unit 301: Principles of organising, planning and pricing construction work
Unit 301: Principles of organising, planning and pricing construction workUnit 301: Principles of organising, planning and pricing construction work
Unit 301: Principles of organising, planning and pricing construction workgsr101
 
Component of building
Component of buildingComponent of building
Component of buildingkajol panchal
 
Sin título 1 (copia)
Sin título 1 (copia)Sin título 1 (copia)
Sin título 1 (copia)Alex Ali Mesa
 

Similar to unit 101 ppt_4 (20)

unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofing
 
unit 101 ppt_3
unit 101 ppt_3unit 101 ppt_3
unit 101 ppt_3
 
Construction u101 ppt_3
Construction u101 ppt_3Construction u101 ppt_3
Construction u101 ppt_3
 
Unit 101, ppt 3, Principles of building, construction, information and commu...
Unit 101, ppt 3,  Principles of building, construction, information and commu...Unit 101, ppt 3,  Principles of building, construction, information and commu...
Unit 101, ppt 3, Principles of building, construction, information and commu...
 
Foundations 3
Foundations 3Foundations 3
Foundations 3
 
Set Out and Build Masonry Structures
Set Out and Build Masonry StructuresSet Out and Build Masonry Structures
Set Out and Build Masonry Structures
 
Floor boarding and calculations 4
Floor boarding and calculations 4Floor boarding and calculations 4
Floor boarding and calculations 4
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Materials
MaterialsMaterials
Materials
 
Bricklaying: Step by Step
Bricklaying: Step by StepBricklaying: Step by Step
Bricklaying: Step by Step
 
Roof Treatment
Roof TreatmentRoof Treatment
Roof Treatment
 
Practical Equipment for Blocklaying
Practical Equipment for BlocklayingPractical Equipment for Blocklaying
Practical Equipment for Blocklaying
 
Blockwork Tools
Blockwork ToolsBlockwork Tools
Blockwork Tools
 
Sustainable insulation materials 1
Sustainable insulation materials 1Sustainable insulation materials 1
Sustainable insulation materials 1
 
Solar_Thermal
Solar_ThermalSolar_Thermal
Solar_Thermal
 
Unit 301: Principles of organising, planning and pricing construction work
Unit 301: Principles of organising, planning and pricing construction workUnit 301: Principles of organising, planning and pricing construction work
Unit 301: Principles of organising, planning and pricing construction work
 
Component of building
Component of buildingComponent of building
Component of building
 
Power point 3
Power point 3Power point 3
Power point 3
 
Power point 3
Power point 3Power point 3
Power point 3
 
Sin título 1 (copia)
Sin título 1 (copia)Sin título 1 (copia)
Sin título 1 (copia)
 

More from kevin porter

202 principles of construction
202   principles of construction202   principles of construction
202 principles of constructionkevin porter
 
unit 210 - capentry maintenance ppt 5
unit 210 - capentry maintenance ppt 5unit 210 - capentry maintenance ppt 5
unit 210 - capentry maintenance ppt 5kevin porter
 
unit 210 - capentry maintenance ppt 4
unit 210 - capentry maintenance ppt 4unit 210 - capentry maintenance ppt 4
unit 210 - capentry maintenance ppt 4kevin porter
 
unit 210 - capentry maintenance ppt 1
unit 210 - capentry maintenance ppt 1unit 210 - capentry maintenance ppt 1
unit 210 - capentry maintenance ppt 1kevin porter
 
Construction u101 ppt_5
Construction u101 ppt_5Construction u101 ppt_5
Construction u101 ppt_5kevin porter
 
Construction u101 ppt_4
Construction u101 ppt_4Construction u101 ppt_4
Construction u101 ppt_4kevin porter
 
Construction u101 ppt_2
Construction u101 ppt_2Construction u101 ppt_2
Construction u101 ppt_2kevin porter
 

More from kevin porter (20)

unit 213 ppt 1
 unit 213 ppt 1 unit 213 ppt 1
unit 213 ppt 1
 
unit 213 ppt5
unit 213 ppt5unit 213 ppt5
unit 213 ppt5
 
unit 213 ppt 4
unit 213 ppt 4unit 213 ppt 4
unit 213 ppt 4
 
unit 213 ppt 3
unit 213 ppt 3unit 213 ppt 3
unit 213 ppt 3
 
unit 213 ppt 2
unit 213 ppt 2unit 213 ppt 2
unit 213 ppt 2
 
202 principles of construction
202   principles of construction202   principles of construction
202 principles of construction
 
unit 101 ppt_5
unit 101 ppt_5unit 101 ppt_5
unit 101 ppt_5
 
unit 101 ppt_2
unit 101 ppt_2unit 101 ppt_2
unit 101 ppt_2
 
unit 101 ppt_1
unit 101 ppt_1unit 101 ppt_1
unit 101 ppt_1
 
unit 211 PPT 5
unit 211 PPT 5unit 211 PPT 5
unit 211 PPT 5
 
unit 211 PPT 4
unit 211 PPT 4unit 211 PPT 4
unit 211 PPT 4
 
unit 211 PPT 3
unit 211 PPT 3unit 211 PPT 3
unit 211 PPT 3
 
unit 211 PPT 2
unit 211 PPT 2unit 211 PPT 2
unit 211 PPT 2
 
unit 211 PPT 1
unit 211 PPT 1unit 211 PPT 1
unit 211 PPT 1
 
unit 210 - capentry maintenance ppt 5
unit 210 - capentry maintenance ppt 5unit 210 - capentry maintenance ppt 5
unit 210 - capentry maintenance ppt 5
 
unit 210 - capentry maintenance ppt 4
unit 210 - capentry maintenance ppt 4unit 210 - capentry maintenance ppt 4
unit 210 - capentry maintenance ppt 4
 
unit 210 - capentry maintenance ppt 1
unit 210 - capentry maintenance ppt 1unit 210 - capentry maintenance ppt 1
unit 210 - capentry maintenance ppt 1
 
Construction u101 ppt_5
Construction u101 ppt_5Construction u101 ppt_5
Construction u101 ppt_5
 
Construction u101 ppt_4
Construction u101 ppt_4Construction u101 ppt_4
Construction u101 ppt_4
 
Construction u101 ppt_2
Construction u101 ppt_2Construction u101 ppt_2
Construction u101 ppt_2
 

Recently uploaded

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 

Recently uploaded (20)

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

unit 101 ppt_4

  • 1. © 2013 City and Guilds of London Institute. All rights reserved. 1 of 15 City & Guilds Construction PowerPointpresentation Presentation 4: Flat roofs Unit 101: Principles of building construction, information and communication
  • 2. © 2013 City and Guilds of London Institute. All rights reserved. 2 of 15 City & Guilds Construction Aim Introduce learners to flat roofs. Objectives • Identify at least two components of a flat roof. • List the two methods of obtaining fall on a flat roof. • State the level of degree that determines a flat roof. • State two of the materials used in covering on a flat roof.
  • 3. © 2013 City and Guilds of London Institute. All rights reserved. 3 of 15 City & Guilds Construction What is a flat roof? A flat roof is one of the three types of roof structure. It is generally used on garages or small extensions, rather than a main house roof. A flat roof has on average a life span of approximately 15 years. The definition of a flat roof is any roof which has a slope of less than 10 degrees or a fall ratio of 1:6.
  • 4. © 2013 City and Guilds of London Institute. All rights reserved. 4 of 15 City & Guilds Construction Components of a flat roof
  • 5. © 2013 City and Guilds of London Institute. All rights reserved. 5 of 15 City & Guilds Construction Task Sketch and label a flat roof.
  • 6. © 2013 City and Guilds of London Institute. All rights reserved. 6 of 15 City & Guilds Construction Fall on a flat roof The direction of the slope of the roof is called the fall. The fall of the roof will depend upon the: • type of roof construction and its covering • location of the building • position of any surface water drain.
  • 7. © 2013 City and Guilds of London Institute. All rights reserved. 7 of 15 City & Guilds Construction Fall on a flat roof continued The amount of fall should be enough to clear away any water and direct it to the guttering. If the fall is not enough, the water may form pools on top of the roof. Water pools on the roof will increase the weight of the roof and can lead to water penetration. There are three basic methods of obtaining the fall of a flat roof. The chosen method will depend upon the type and use of the building and the internal ceiling finish required.
  • 8. © 2013 City and Guilds of London Institute. All rights reserved. 8 of 15 City & Guilds Construction Sloping roof joists In this type of construction, the slope or fall is obtained by sloping the roof joists. This type of construction is used where there is no level ceiling required.
  • 9. © 2013 City and Guilds of London Institute. All rights reserved. 9 of 15 City & Guilds Construction Tapered firring pieces In this type of construction, the slope or fall is obtained by attaching tapered pieces of timber to the roof joists. This type of construction will produce a level ceiling.
  • 10. © 2013 City and Guilds of London Institute. All rights reserved. 10 of 15 City & Guilds Construction Deepened joists (parallel fittings) This type of construction involves parallel firring pieces. The firrings are diminished section and are nailed at right angles to the fall of the roof.
  • 11. © 2013 City and Guilds of London Institute. All rights reserved. 11 of 15 City & Guilds Construction Roof joists All the roof joists used in the construction of flat roofs must comply with the requirements of current building regulations. These regulations govern: • the sectional sizes and grades of timber • dead loads imposed upon sectional areas of roof • maximum clear span for imposed loadings • spacing of joists in relation to covering and imposed loads.
  • 12. © 2013 City and Guilds of London Institute. All rights reserved. 12 of 15 City & Guilds Construction Flat roof covering When covering a flat roof, a sequence of events must take place: • When the joists and firrings are installed, the chipboard sheets can be cut and secured to the joists using annular ring nails. • Once the boards are laid, the roof must be inspected for any sharp edges/parts and swept. • Hot bitumen is then poured onto the roof and the underfelt is laid in the same direction as the fall of the roof. Image courtesy of www.shutterstock.com. Reproduced with permission.
  • 13. © 2013 City and Guilds of London Institute. All rights reserved. 13 of 15 City & Guilds Construction Using underfelt Once the fist layer of underfelt has cooled, the next layer of underfelt can be laid using the same process as the first layer, but in the opposite direction to the fall of the roof. This ensures crossed joints and more strength. Image courtesy of www.constructionphotography.com. Reproduced with permission. Flashing providing waterproofing
  • 14. © 2013 City and Guilds of London Institute. All rights reserved. 14 of 15 City & Guilds Construction Using underfelt continued When two layers of underfelt are laid, the top layer, which is green mineral felt can be laid, using the same processes again but in the same direction to the fall on the roof. The eaves of the felt are tucked and doubled to create a drip which directs water into the gutter. The other edges are raised preventing water from leaving the roof. Flashing around a chimney Image courtesy of www.shutterstock.com. Reproduced with permission.
  • 15. © 2013 City and Guilds of London Institute. All rights reserved. 15 of 15 City & Guilds Construction Any questions?