Floor and flat roof components
Unit 202: Structural carpentry
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 2 of 28
Floor and flat roof components
• ‘First fix’ flooring and roofing is the name given to the structural
carpentry work which is to be done before a building is made
watertight.
• This type of work usually involves working at height.
• The site carpenter must draw upon a wide range of skills and
knowledge to safely complete these carpentry tasks.
• You must understand how these tasks link with the work of other
trades involved in this stage of construction.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 3 of 28
Timber floor construction
Suspended timber floors used on the ground floor are not as common
as they used to be.
Solid concrete floors are now they norm in new build construction,
although you will need to be familiar with timber floor components and
construction techniques, particularly with refurbishment type work.
The component names used to make up timber floors will be the same
whether they are to be used at ground floor, first floor or above.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 4 of 28
Types of joist
The names given to timber
joists will depend on their
location and use. The
following is a description of
each type and their location
within the floor structure.
1. Bridging or common joist: a
joist that spans from load-
bearing wall to load-bearing
wall.
2. Trimming joist: a joist that
spans in the same direction
as a bridging joist, and
supports the trimmer joist.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 5 of 28
Types of joists
3. Trimmer joist: a
joist that is placed
at right angles to
the trimming joist,
and supports the
cut end of the
trimmed joists.
4. Trimmed joist: a
bridging joist that
has been cut or
trimmed to form an
opening in the
floor, and is
supported by the
trimmer.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 6 of 28
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 7 of 28
Joists for floors and flat roofs
Joists are typically supported by the following methods:
• Built in
• Joist hangers
• Wall plates
• Sleeper walls
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 8 of 28
• Built-in joists
‒ Traditionally, joists were built into solid walls, which could
lead to dampness from the wall penetrating the ends of the
joists and causing rot and subsequent collapse, particularly
with solid wall construction which was widely used.
‒ Modern built-in methods incorporate the joist ends being built
into the inner leaf of the cavity wall, ensuring the joist ends do
not project into the cavity. The joist ends must be treated with
a timber preservative to protect the vulnerable timber from
dampness and rot.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 9 of 28
• Built-in joists
‒ As the building dries out, joists can shrink, leading to problems
such as heat, sound and air leakage around the ends of the joists.
To prevent this, as the joist is positioned, the end is placed in a
joist cap or shoe which is then built in.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 10 of 28
• Joist hangers
‒ A modern method of supporting
the ends of joists is to use
galvanised steel timber-to-wall
(TW) joist hangers.
‒ Advantages of this method are
that the joist end does not
penetrate into the wall cavity,
thereby not coming into contact
with any moisture present.
‒ It also means that joists can be
installed independently of the
walls being built.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 11 of 28
• Wall plates
‒ For timber ground floors and flat roofs, the joists are supported by a
wall plate bedded onto the top of the wall.
‒ This provides a level surface to which to fix the joist.
‒ Joists are fixed using framing anchors.
‒ Where joists from either side meet over a wall plate, they are nailed
together side by side, with both sides overlapping the wall plate by no
more than 150mm – any more overhang than this can lead to deflection
(bending) of the ends of the joists, creating an uneven surface for the
decking and ceiling.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 12 of 28
• Wall plates
‒ For timber ground floors and flat
roofs, the joists are supported by a
wall plate bedded onto the top of a
sleeper wall.
‒ This provides a level surface to which
to fix the joist. Joists are fixed using
framing anchors.
‒ Where joists from either side meet
over a wall plate, they are nailed
together side by side, with both sides
overlapping the wall plate by no more
than 150mm – any more overhang
than this can lead to deflection of the
ends of the joists, creating an uneven
surface for the decking and ceiling.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 13 of 28
• Sleeper walls
‒ Timber ground floors comprise of
dwarf sleeper walls that are built onto
the oversite concrete at about 1.8–2m
centres.
‒ The bricks in the wall are laid with a
50mm gap between them, allowing air
to circulate in the void under the floor.
‒ Airbricks are built into the outside
walls at ground floor level to enable
through ventilation.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 14 of 28
Alternative types of joist
 I-beams or eco joists
‒ These types of joist are now very common in new builds of both
traditional and timber frame construction.
‒ Their construction makes them very light and strong, and they are also
available in long lengths and can be spaced at greater centres than
solid timber joists.
‒ I-joists do not suffer problems such as shrinking, twisting, cupping and
bowing, all of which can occur with timber joists, and contribute to
squeaking floors.
‒ I-joists also have pre-stamped holes in the OSB (oriented strand
board) web for the installation of services (ie plumbing and wiring).
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 15 of 28
Alternative types of joist
I-beam or eco joist
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 16 of 28
Alternative types of joist
 Metal web joists
‒ These types of joist are also popular for new build construction. They are
constructed using stress graded timber flanges that are joined with v-shaped
galvanised steel webs.
‒ The webs are fixed through nail plates to the flanges.
‒ The construction of metal web joists makes them very strong and a lot lighter than
solid timber joists, with wide timber flanges allowing for easy fixing of decking.
They are available in long lengths, and again can be spaced at greater centres
than solid timber joists.
‒ Their reduced timber content means less shrinkage, which provides for a quieter
floor system and their open web design allows for easy installation of services.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 17 of 28
Alternative types of joists
Metal web joists
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 18 of 28
Types of strutting
• Deep floor joists are prone to twisting or buckling along their
length. A row, or rows, of struts must be fixed between the joists to
stiffen the floor and prevent this movement. The TRADA span
tables stipulate that joists that span 2.5–4.5m require one row
positioned at mid-span. Joists spanning over 4.5m require two
rows, at 1/3 span positions.
• The main types of strutting used are:
‒ Solid
‒ Herringbone
‒ Galvanised steel
• It is usual to fix strutting just prior to laying the flooring.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 19 of 28
• Solid strutting
‒ Timber struts should be at least 3/4 the depth of the joist, and at least
38mm thick, and are cut to fit tightly between each joist.
‒ They are secured by skew-nailing.
‒ The disadvantage of solid strutting is that as the joists shrink the struts
can become loose.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 20 of 28
• Herringbone strutting
‒ Timber battens of a minimum section size of 38 × 38mm are cut to fit
diagonally between the joists, and secured with nails.
‒ This method is considered the most effective, as the struts tighten as the
joists shrink.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 21 of 28
• Herringbone strutting can be fitted using the following method.
‒ Position and nail a temporary batten next to where the row of strutting is
to be fixed, to make sure the joists are maintained at the right centres.
This is important, as if struts are measured to the wrong centres then the
joists will be out of line, causing problems later on.
‒ Mark the centre-line of the row of strutting across the joists with a pencil
or chalk line. Measure the depth of the joists, and deduct 10mm. Take this
measurement and mark a line parallel to the centre-line (eg, if the joists
were 200mm, then 190mm would be the figure used). This measurement
ensures that when the struts are fixed, they will finish below the top of the
joist and above the bottom of the joist.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 22 of 28
‒ Place a length of strutting diagonally across two joists between the
parallel lines, and mark off the underside with a pencil.
‒ Cut the strut and test fit. If all joist centres are the same, the strutting will
be the same length, and this can be used as a template.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 23 of 28
‒ Fix the strutting to either side of the centre-line with nails, and fix the
struts together with a nail through the centre.
‒ After the strutting is fixed, solid blocking or folding wedges will be required
between the end joists and the wall to complete the stiffening of the joists.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 24 of 28
• Galvanised steel strutting
‒ This type of strutting is quick and easy to install.
‒ The disadvantage with steel strutting is that the struts are only available to
fit joists with centres of 400, 450 or 600mm.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 25 of 28
Service provision in joists
• Joists will usually require drilling or notching to accommodate pipes and
wires for services. When I-beams are being used only the pre-stamped
hole positions should be removed.
• For solid timber, the following requirements should be met:
‒ Notches should not be deeper than 0.125 of the depth of a joist and
should be positioned between 0.07 and 0.25 times the span from either
support.
‒ For example: span = 3.0m, joist depth = 150mm.
‒ Safe area for notching is between 0.07 x 3.0m = 210mm and 0.25 x 3.0m
= 750mm.
‒ The maximum depth of notch is 0.125 x 150mm = 19mm.
‒ So safe areas to notch are from 210 to 750mm from either wall, and up to
19mm deep.
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 26 of 28
Service provision in joists
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 27 of 28
Web link to floors
http://www.haringey.gov.uk/sites/haringeygovuk/files/note07_-
_domestic_timber_floors.pdf
Level 2 Technical Certificate in Site Carpentry
© 2017 City and Guilds of London Institute. All rights reserved. 28 of 28
Any questions?

More Related Content

Similar to 7906_20_l2_202_ppt_1.pptx

UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESVenkateswaran S
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSjagrutib22
 
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...ADNAN AHMAD
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
CTEP - UNIT - II - MASONRY
CTEP - UNIT - II - MASONRYCTEP - UNIT - II - MASONRY
CTEP - UNIT - II - MASONRYShankar Ramasamy
 
Floor and wall ties
Floor and wall tiesFloor and wall ties
Floor and wall tiesSaratMishra4
 
Tutor l1 the house
Tutor l1 the houseTutor l1 the house
Tutor l1 the houseLuke D'Arcy
 
Bhatar Method for Seismic Design
Bhatar Method for Seismic DesignBhatar Method for Seismic Design
Bhatar Method for Seismic DesignIRJET Journal
 
Tutor solid wall and arches
Tutor solid wall and archesTutor solid wall and arches
Tutor solid wall and archesLuke D'Arcy
 
LiveIn Quarters
LiveIn QuartersLiveIn Quarters
LiveIn Quartersclicknow
 
AintreeInfra Gypsum Block
AintreeInfra Gypsum BlockAintreeInfra Gypsum Block
AintreeInfra Gypsum BlockMerina Kunjumon
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concreteFrahim Akhtar
 
AAC Installation Guidelines
AAC Installation GuidelinesAAC Installation Guidelines
AAC Installation GuidelinesBENAY MUNDA
 
visual dictionary final project
visual dictionary final projectvisual dictionary final project
visual dictionary final projectAuburn University
 

Similar to 7906_20_l2_202_ppt_1.pptx (20)

UBS Client price list PDF
UBS Client price list PDFUBS Client price list PDF
UBS Client price list PDF
 
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
CTEP - UNIT - II - MASONRY
CTEP - UNIT - II - MASONRYCTEP - UNIT - II - MASONRY
CTEP - UNIT - II - MASONRY
 
Finishingworks.pptx
Finishingworks.pptxFinishingworks.pptx
Finishingworks.pptx
 
Floor and wall ties
Floor and wall tiesFloor and wall ties
Floor and wall ties
 
Tutor l1 the house
Tutor l1 the houseTutor l1 the house
Tutor l1 the house
 
Bhatar Method for Seismic Design
Bhatar Method for Seismic DesignBhatar Method for Seismic Design
Bhatar Method for Seismic Design
 
Tutor solid wall and arches
Tutor solid wall and archesTutor solid wall and arches
Tutor solid wall and arches
 
LiveIn Quarters
LiveIn QuartersLiveIn Quarters
LiveIn Quarters
 
the house
 the house the house
the house
 
AintreeInfra Gypsum Block
AintreeInfra Gypsum BlockAintreeInfra Gypsum Block
AintreeInfra Gypsum Block
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concrete
 
AAC Installation Guidelines
AAC Installation GuidelinesAAC Installation Guidelines
AAC Installation Guidelines
 
visual dictionary final project
visual dictionary final projectvisual dictionary final project
visual dictionary final project
 
visual dictionary
visual dictionaryvisual dictionary
visual dictionary
 
material ppt
material pptmaterial ppt
material ppt
 

Recently uploaded

Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 

Recently uploaded (20)

Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 

7906_20_l2_202_ppt_1.pptx

  • 1. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 1 of 28 PowerPoint presentation Floor and flat roof components Unit 202: Structural carpentry
  • 2. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 2 of 28 Floor and flat roof components • ‘First fix’ flooring and roofing is the name given to the structural carpentry work which is to be done before a building is made watertight. • This type of work usually involves working at height. • The site carpenter must draw upon a wide range of skills and knowledge to safely complete these carpentry tasks. • You must understand how these tasks link with the work of other trades involved in this stage of construction.
  • 3. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 3 of 28 Timber floor construction Suspended timber floors used on the ground floor are not as common as they used to be. Solid concrete floors are now they norm in new build construction, although you will need to be familiar with timber floor components and construction techniques, particularly with refurbishment type work. The component names used to make up timber floors will be the same whether they are to be used at ground floor, first floor or above.
  • 4. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 4 of 28 Types of joist The names given to timber joists will depend on their location and use. The following is a description of each type and their location within the floor structure. 1. Bridging or common joist: a joist that spans from load- bearing wall to load-bearing wall. 2. Trimming joist: a joist that spans in the same direction as a bridging joist, and supports the trimmer joist.
  • 5. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 5 of 28 Types of joists 3. Trimmer joist: a joist that is placed at right angles to the trimming joist, and supports the cut end of the trimmed joists. 4. Trimmed joist: a bridging joist that has been cut or trimmed to form an opening in the floor, and is supported by the trimmer.
  • 6. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 6 of 28
  • 7. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 7 of 28 Joists for floors and flat roofs Joists are typically supported by the following methods: • Built in • Joist hangers • Wall plates • Sleeper walls
  • 8. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 8 of 28 • Built-in joists ‒ Traditionally, joists were built into solid walls, which could lead to dampness from the wall penetrating the ends of the joists and causing rot and subsequent collapse, particularly with solid wall construction which was widely used. ‒ Modern built-in methods incorporate the joist ends being built into the inner leaf of the cavity wall, ensuring the joist ends do not project into the cavity. The joist ends must be treated with a timber preservative to protect the vulnerable timber from dampness and rot.
  • 9. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 9 of 28 • Built-in joists ‒ As the building dries out, joists can shrink, leading to problems such as heat, sound and air leakage around the ends of the joists. To prevent this, as the joist is positioned, the end is placed in a joist cap or shoe which is then built in.
  • 10. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 10 of 28 • Joist hangers ‒ A modern method of supporting the ends of joists is to use galvanised steel timber-to-wall (TW) joist hangers. ‒ Advantages of this method are that the joist end does not penetrate into the wall cavity, thereby not coming into contact with any moisture present. ‒ It also means that joists can be installed independently of the walls being built.
  • 11. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 11 of 28 • Wall plates ‒ For timber ground floors and flat roofs, the joists are supported by a wall plate bedded onto the top of the wall. ‒ This provides a level surface to which to fix the joist. ‒ Joists are fixed using framing anchors. ‒ Where joists from either side meet over a wall plate, they are nailed together side by side, with both sides overlapping the wall plate by no more than 150mm – any more overhang than this can lead to deflection (bending) of the ends of the joists, creating an uneven surface for the decking and ceiling.
  • 12. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 12 of 28 • Wall plates ‒ For timber ground floors and flat roofs, the joists are supported by a wall plate bedded onto the top of a sleeper wall. ‒ This provides a level surface to which to fix the joist. Joists are fixed using framing anchors. ‒ Where joists from either side meet over a wall plate, they are nailed together side by side, with both sides overlapping the wall plate by no more than 150mm – any more overhang than this can lead to deflection of the ends of the joists, creating an uneven surface for the decking and ceiling.
  • 13. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 13 of 28 • Sleeper walls ‒ Timber ground floors comprise of dwarf sleeper walls that are built onto the oversite concrete at about 1.8–2m centres. ‒ The bricks in the wall are laid with a 50mm gap between them, allowing air to circulate in the void under the floor. ‒ Airbricks are built into the outside walls at ground floor level to enable through ventilation.
  • 14. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 14 of 28 Alternative types of joist  I-beams or eco joists ‒ These types of joist are now very common in new builds of both traditional and timber frame construction. ‒ Their construction makes them very light and strong, and they are also available in long lengths and can be spaced at greater centres than solid timber joists. ‒ I-joists do not suffer problems such as shrinking, twisting, cupping and bowing, all of which can occur with timber joists, and contribute to squeaking floors. ‒ I-joists also have pre-stamped holes in the OSB (oriented strand board) web for the installation of services (ie plumbing and wiring).
  • 15. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 15 of 28 Alternative types of joist I-beam or eco joist
  • 16. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 16 of 28 Alternative types of joist  Metal web joists ‒ These types of joist are also popular for new build construction. They are constructed using stress graded timber flanges that are joined with v-shaped galvanised steel webs. ‒ The webs are fixed through nail plates to the flanges. ‒ The construction of metal web joists makes them very strong and a lot lighter than solid timber joists, with wide timber flanges allowing for easy fixing of decking. They are available in long lengths, and again can be spaced at greater centres than solid timber joists. ‒ Their reduced timber content means less shrinkage, which provides for a quieter floor system and their open web design allows for easy installation of services.
  • 17. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 17 of 28 Alternative types of joists Metal web joists
  • 18. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 18 of 28 Types of strutting • Deep floor joists are prone to twisting or buckling along their length. A row, or rows, of struts must be fixed between the joists to stiffen the floor and prevent this movement. The TRADA span tables stipulate that joists that span 2.5–4.5m require one row positioned at mid-span. Joists spanning over 4.5m require two rows, at 1/3 span positions. • The main types of strutting used are: ‒ Solid ‒ Herringbone ‒ Galvanised steel • It is usual to fix strutting just prior to laying the flooring.
  • 19. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 19 of 28 • Solid strutting ‒ Timber struts should be at least 3/4 the depth of the joist, and at least 38mm thick, and are cut to fit tightly between each joist. ‒ They are secured by skew-nailing. ‒ The disadvantage of solid strutting is that as the joists shrink the struts can become loose.
  • 20. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 20 of 28 • Herringbone strutting ‒ Timber battens of a minimum section size of 38 × 38mm are cut to fit diagonally between the joists, and secured with nails. ‒ This method is considered the most effective, as the struts tighten as the joists shrink.
  • 21. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 21 of 28 • Herringbone strutting can be fitted using the following method. ‒ Position and nail a temporary batten next to where the row of strutting is to be fixed, to make sure the joists are maintained at the right centres. This is important, as if struts are measured to the wrong centres then the joists will be out of line, causing problems later on. ‒ Mark the centre-line of the row of strutting across the joists with a pencil or chalk line. Measure the depth of the joists, and deduct 10mm. Take this measurement and mark a line parallel to the centre-line (eg, if the joists were 200mm, then 190mm would be the figure used). This measurement ensures that when the struts are fixed, they will finish below the top of the joist and above the bottom of the joist.
  • 22. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 22 of 28 ‒ Place a length of strutting diagonally across two joists between the parallel lines, and mark off the underside with a pencil. ‒ Cut the strut and test fit. If all joist centres are the same, the strutting will be the same length, and this can be used as a template.
  • 23. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 23 of 28 ‒ Fix the strutting to either side of the centre-line with nails, and fix the struts together with a nail through the centre. ‒ After the strutting is fixed, solid blocking or folding wedges will be required between the end joists and the wall to complete the stiffening of the joists.
  • 24. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 24 of 28 • Galvanised steel strutting ‒ This type of strutting is quick and easy to install. ‒ The disadvantage with steel strutting is that the struts are only available to fit joists with centres of 400, 450 or 600mm.
  • 25. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 25 of 28 Service provision in joists • Joists will usually require drilling or notching to accommodate pipes and wires for services. When I-beams are being used only the pre-stamped hole positions should be removed. • For solid timber, the following requirements should be met: ‒ Notches should not be deeper than 0.125 of the depth of a joist and should be positioned between 0.07 and 0.25 times the span from either support. ‒ For example: span = 3.0m, joist depth = 150mm. ‒ Safe area for notching is between 0.07 x 3.0m = 210mm and 0.25 x 3.0m = 750mm. ‒ The maximum depth of notch is 0.125 x 150mm = 19mm. ‒ So safe areas to notch are from 210 to 750mm from either wall, and up to 19mm deep.
  • 26. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 26 of 28 Service provision in joists
  • 27. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 27 of 28 Web link to floors http://www.haringey.gov.uk/sites/haringeygovuk/files/note07_- _domestic_timber_floors.pdf
  • 28. Level 2 Technical Certificate in Site Carpentry © 2017 City and Guilds of London Institute. All rights reserved. 28 of 28 Any questions?