McKenney’s updated the HVAC system controls and Building Management System (BMS) floor plan amid renovations at a Georgia hospital. For more info visit http://www.mckenneys.com.
Jason Ward is seeking a leadership position that utilizes his 9 years of experience in heavy industrial electrical maintenance and 6 years of experience managing maintenance crews. He has a bachelor's degree in organizational leadership and supervision from Purdue University North Central and is currently working as a structural inspection team leader/manager at United States Steel, where he develops and implements inspection programs and manages crews of 2-10 people. Previously he worked as an industrial electrician crew leader at United States Steel, managing crews of 5-10 people performing mechanical and electrical repairs on cranes. He has extensive experience in troubleshooting electrical systems, substation maintenance, and following all relevant safety standards.
Ryan Crawford is seeking a new position and has experience as an electrician, brake press operator, and in sanitation. He has worked as an electrician for Worlds Finest Shows where he executed daily operations and maintenance of electrical equipment. Crawford also worked as a brake press operator for Windsor Management and in sanitation for Aladdin Janitorial. He completed his OSSD at Ursuline College Chatham in 2003.
Bruce Feldhusen is a senior energy technician with over 20 years of experience in energy efficiency operations. He has delivered significant cost savings through innovative energy management plans and programs. Currently, he is the Lead EMS Technician at Arizona State University where he ensures the performance of research facilities while achieving considerable energy savings. Feldhusen has extensive experience programming and servicing building automation systems from various employers.
Derek Mixon has over 6 years of experience in technical roles including as a gas turbine technician in the Navy and electronics technician. He is dedicated and thrives in team environments, as shown through his leadership organizing maintenance teams. Currently he volunteers at Vets Pets, where he helps care for animals and ensures customers find suitable products.
This document is a resume for Brandan R. Lara seeking an Analyzer Technician position. It outlines his education including an Associates Degree in Biomedical Equipment Technician from Texas State Technical College. It details his work experience since 2009 in various technician roles maintaining and repairing medical equipment, instrumentation, and analyzers. His skills include analytical problem solving, following procedures safely, and maintaining equipment documentation. References are provided.
Andrew Ramos is a dedicated Operations and Maintenance Technician with over 10 years of experience maintaining solar, coal, and natural gas power plants. He possesses cross-functional expertise in electrical, mechanical, welding and safety. Currently he operates and maintains a 89 megawatt solar power plant, performing repairs, preventative maintenance, and overseeing contractors. Previously he maintained equipment at a 108 megawatt coal plant and apprenticed as an electrician. He has extensive safety training and certifications in welding, power plant operations, and emergency response.
McKenney’s updated the HVAC system controls and Building Management System (BMS) floor plan amid renovations at a Georgia hospital. For more info visit http://www.mckenneys.com.
Jason Ward is seeking a leadership position that utilizes his 9 years of experience in heavy industrial electrical maintenance and 6 years of experience managing maintenance crews. He has a bachelor's degree in organizational leadership and supervision from Purdue University North Central and is currently working as a structural inspection team leader/manager at United States Steel, where he develops and implements inspection programs and manages crews of 2-10 people. Previously he worked as an industrial electrician crew leader at United States Steel, managing crews of 5-10 people performing mechanical and electrical repairs on cranes. He has extensive experience in troubleshooting electrical systems, substation maintenance, and following all relevant safety standards.
Ryan Crawford is seeking a new position and has experience as an electrician, brake press operator, and in sanitation. He has worked as an electrician for Worlds Finest Shows where he executed daily operations and maintenance of electrical equipment. Crawford also worked as a brake press operator for Windsor Management and in sanitation for Aladdin Janitorial. He completed his OSSD at Ursuline College Chatham in 2003.
Bruce Feldhusen is a senior energy technician with over 20 years of experience in energy efficiency operations. He has delivered significant cost savings through innovative energy management plans and programs. Currently, he is the Lead EMS Technician at Arizona State University where he ensures the performance of research facilities while achieving considerable energy savings. Feldhusen has extensive experience programming and servicing building automation systems from various employers.
Derek Mixon has over 6 years of experience in technical roles including as a gas turbine technician in the Navy and electronics technician. He is dedicated and thrives in team environments, as shown through his leadership organizing maintenance teams. Currently he volunteers at Vets Pets, where he helps care for animals and ensures customers find suitable products.
This document is a resume for Brandan R. Lara seeking an Analyzer Technician position. It outlines his education including an Associates Degree in Biomedical Equipment Technician from Texas State Technical College. It details his work experience since 2009 in various technician roles maintaining and repairing medical equipment, instrumentation, and analyzers. His skills include analytical problem solving, following procedures safely, and maintaining equipment documentation. References are provided.
Andrew Ramos is a dedicated Operations and Maintenance Technician with over 10 years of experience maintaining solar, coal, and natural gas power plants. He possesses cross-functional expertise in electrical, mechanical, welding and safety. Currently he operates and maintains a 89 megawatt solar power plant, performing repairs, preventative maintenance, and overseeing contractors. Previously he maintained equipment at a 108 megawatt coal plant and apprenticed as an electrician. He has extensive safety training and certifications in welding, power plant operations, and emergency response.
At the 2016 ACE Summit, Array's Adrian Hagerty discussed adaptive reuse in healthcare design. His presentation covers cost & time savings, planning approaches and more.
The document provides an overview of the Healthcare Licensing and Surveys (HLS) division of the Wyoming Department of Health. It discusses HLS personnel, the statutes and regulations they operate under, and their policies and procedures for reviewing construction projects and inspecting healthcare facilities. Specifically, it outlines HLS's project review queue system, which aims to manage workload by reviewing plans in the order received and prioritizing those impacting facilities' certification status.
Houston Area Revit User Group January Presentationpchan925
This document summarizes a presentation about creating custom families in Revit. It discusses the pros and cons of using free downloaded families versus creating customized families. The presentation provides rules for building effective families and examines case studies of complex family types like exterior shading devices and vertical trash chute systems. The speaker is a Revit specialist who provides their contact information and recommends additional learning resources for working with families in Revit.
- The document discusses using nested profile families in Revit to create more robust and parametric families.
- It provides three exercises demonstrating how to use nested profiles to control rotation, void visibility, and exposed structural beams in families.
- Nested profiles allow families to be driven by linked parameters, reducing the need for constraints and enabling more complex geometries.
Based on the problems of working with Revit rooms and Room Data Sheets, this presentation will cover many aspects of typical workflows seen in architecture and interiors, discuss where the difficulties are and investigate better, more integrated solutions.
1st Qatar BIM User Day Business processes supported by BIM methodology, part 1BIM User Day
Speaker: Chris Brown, HOK
-Design creation and coordination
About the Qatar BIM User Day:
Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
More information: www.bimuserday.com
Follow BUD on Twitter @bimuserday
This document provides guidance on how to structure instructions or a tutorial. It recommends including a title page with a descriptive title, an introduction establishing context and scope, prerequisites for any required background knowledge, a list of required equipment and supplies, and warnings about any dangers or cautions. It also provides examples of well-structured instruction introductions and sources for more information.
This document discusses how building information modeling (BIM) can shift interior design workflows from CAD to a more collaborative BIM process. Key benefits of BIM include parametric modeling that allows for quick drafting and revisions, integrated 3D modeling for visualization, and optimization of schedules and quantities for cost estimation. The document outlines BIM's advantages at each phase of design including coordination, specification generation, quantity take-offs, and facility management. BIM is presented as allowing interior designers to be more integrated into architectural BIM files from project start, reducing errors and improving collaboration between disciplines. Qualifications for an interior design BIM coordinator are identified to help practices transition their work to the new BIM-based workflow.
BIM in the Green Zone focus's on using Revit as a tool to assess and manage sustainable and safety in design attributes in Architecture and Construction.
The document discusses Building Information Modeling (BIM) and its importance for construction. It defines BIM as a building database that contains interconnected digital models for various building components (e.g. architectural, structural, HVAC). BIM is also described as both a process involving different project phases and as various software tools. The document emphasizes that BIM is important because it allows product selection decisions to occur earlier in the design process. It also outlines how BIM is practiced for different stakeholders and the types of product information that should be delivered throughout the building lifecycle.
“BIM-onomics: how will BIM change the business of design?” We all know that BIM takes design to the next level, but how does it change your business? We will look at how by embracing BIM not just as a design tool, but as a completely new way of working will change the way we operate as a business. In this presentation, we will look at potential business challenges, analyse project data, and suggest strategies to prepare your organisation for changes to your underlying business model in the face of a new BIM-driven industry. This presentation will use business examples and discuss the challenges from the perspective of different practices and project scales.
Can we use BIM to help us design? Information is not only a construction or post construction benefit. The use of information at the early design stages and throughout design can help us to design by checking and testing our design assumptions and options
BIM STANDARDS (PHASE ONE)
Introduction
In order to promote BIM to industry stakeholders and establish a set of BIM specifications and common practice for the industry’s reference, the CIC commissioned a consultant to prepare Hong Kong’s local BIM standards
Phase One of the consultancy service would focus on the architectural and structural models in the stages of scheme, preliminary design, detailed design, submission to approving authority, construction, and as-built. Mechanical, electrical and plumbing (MEP) models would cover up to the scheme and preliminary design stages only.
The Standards
The Standards is now officially published. Industry practitioners are welcome to download the Standards:
English: http://www.hkcic.org/eng/news/BIM/PreparationofBIMStandards.aspx?langType=1033
Chinese: http://www.hkcic.org/chi/news/BIM/PreparationofBIMStandards.aspx?langType=1028
(Text from CIC website)
Source: Construction Industry Council [www.hkcic.org]
https://www.hkcic.org/eng/news/BIM/PreparationofBIMStandards.aspx?langType=1033
Document for comment
Stakeholder Forum for the CIC BIM Standards
https://www.eventbrite.hk/e/stakeholder-forum-for-the-cic-bim-standards-registration-12014719349
AB433-2--Start Early, Finish Early - Using Autodesk Revit Architecture During...Vincent Poon
This document summarizes a presentation by Vincent Poon and Tony Caputo on using Autodesk Revit for early design stages. They discuss how Revit can be used for massing studies, computational form finding, curtain wall design, and more. The presentation provides examples of how to generate and manipulate massing forms in Revit, develop curtain wall designs, and utilize rendering and animation tools to explore design options in the early stages of a project. It emphasizes how Revit enables accurate, transparent and consistent analysis throughout the design process.
Navigating Safety Obstacles - Installation of Roof top UnitsMcKenney's Inc
McKenney's successfully installed new roof top units and chilled water piping at a medical center kitchen despite safety challenges. Piping had to be run through areas with asbestos and tight clearances for lifting the large, heavy roof top units. McKenney's conducted hazard analysis and training and worked with partners to develop a safe crane lift plan including added supports to facilitate the installation and complete the project safely within budget and schedule.
At the 2016 ACE Summit, Array's Adrian Hagerty discussed adaptive reuse in healthcare design. His presentation covers cost & time savings, planning approaches and more.
The document provides an overview of the Healthcare Licensing and Surveys (HLS) division of the Wyoming Department of Health. It discusses HLS personnel, the statutes and regulations they operate under, and their policies and procedures for reviewing construction projects and inspecting healthcare facilities. Specifically, it outlines HLS's project review queue system, which aims to manage workload by reviewing plans in the order received and prioritizing those impacting facilities' certification status.
Houston Area Revit User Group January Presentationpchan925
This document summarizes a presentation about creating custom families in Revit. It discusses the pros and cons of using free downloaded families versus creating customized families. The presentation provides rules for building effective families and examines case studies of complex family types like exterior shading devices and vertical trash chute systems. The speaker is a Revit specialist who provides their contact information and recommends additional learning resources for working with families in Revit.
- The document discusses using nested profile families in Revit to create more robust and parametric families.
- It provides three exercises demonstrating how to use nested profiles to control rotation, void visibility, and exposed structural beams in families.
- Nested profiles allow families to be driven by linked parameters, reducing the need for constraints and enabling more complex geometries.
Based on the problems of working with Revit rooms and Room Data Sheets, this presentation will cover many aspects of typical workflows seen in architecture and interiors, discuss where the difficulties are and investigate better, more integrated solutions.
1st Qatar BIM User Day Business processes supported by BIM methodology, part 1BIM User Day
Speaker: Chris Brown, HOK
-Design creation and coordination
About the Qatar BIM User Day:
Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
More information: www.bimuserday.com
Follow BUD on Twitter @bimuserday
This document provides guidance on how to structure instructions or a tutorial. It recommends including a title page with a descriptive title, an introduction establishing context and scope, prerequisites for any required background knowledge, a list of required equipment and supplies, and warnings about any dangers or cautions. It also provides examples of well-structured instruction introductions and sources for more information.
This document discusses how building information modeling (BIM) can shift interior design workflows from CAD to a more collaborative BIM process. Key benefits of BIM include parametric modeling that allows for quick drafting and revisions, integrated 3D modeling for visualization, and optimization of schedules and quantities for cost estimation. The document outlines BIM's advantages at each phase of design including coordination, specification generation, quantity take-offs, and facility management. BIM is presented as allowing interior designers to be more integrated into architectural BIM files from project start, reducing errors and improving collaboration between disciplines. Qualifications for an interior design BIM coordinator are identified to help practices transition their work to the new BIM-based workflow.
BIM in the Green Zone focus's on using Revit as a tool to assess and manage sustainable and safety in design attributes in Architecture and Construction.
The document discusses Building Information Modeling (BIM) and its importance for construction. It defines BIM as a building database that contains interconnected digital models for various building components (e.g. architectural, structural, HVAC). BIM is also described as both a process involving different project phases and as various software tools. The document emphasizes that BIM is important because it allows product selection decisions to occur earlier in the design process. It also outlines how BIM is practiced for different stakeholders and the types of product information that should be delivered throughout the building lifecycle.
“BIM-onomics: how will BIM change the business of design?” We all know that BIM takes design to the next level, but how does it change your business? We will look at how by embracing BIM not just as a design tool, but as a completely new way of working will change the way we operate as a business. In this presentation, we will look at potential business challenges, analyse project data, and suggest strategies to prepare your organisation for changes to your underlying business model in the face of a new BIM-driven industry. This presentation will use business examples and discuss the challenges from the perspective of different practices and project scales.
Can we use BIM to help us design? Information is not only a construction or post construction benefit. The use of information at the early design stages and throughout design can help us to design by checking and testing our design assumptions and options
BIM STANDARDS (PHASE ONE)
Introduction
In order to promote BIM to industry stakeholders and establish a set of BIM specifications and common practice for the industry’s reference, the CIC commissioned a consultant to prepare Hong Kong’s local BIM standards
Phase One of the consultancy service would focus on the architectural and structural models in the stages of scheme, preliminary design, detailed design, submission to approving authority, construction, and as-built. Mechanical, electrical and plumbing (MEP) models would cover up to the scheme and preliminary design stages only.
The Standards
The Standards is now officially published. Industry practitioners are welcome to download the Standards:
English: http://www.hkcic.org/eng/news/BIM/PreparationofBIMStandards.aspx?langType=1033
Chinese: http://www.hkcic.org/chi/news/BIM/PreparationofBIMStandards.aspx?langType=1028
(Text from CIC website)
Source: Construction Industry Council [www.hkcic.org]
https://www.hkcic.org/eng/news/BIM/PreparationofBIMStandards.aspx?langType=1033
Document for comment
Stakeholder Forum for the CIC BIM Standards
https://www.eventbrite.hk/e/stakeholder-forum-for-the-cic-bim-standards-registration-12014719349
AB433-2--Start Early, Finish Early - Using Autodesk Revit Architecture During...Vincent Poon
This document summarizes a presentation by Vincent Poon and Tony Caputo on using Autodesk Revit for early design stages. They discuss how Revit can be used for massing studies, computational form finding, curtain wall design, and more. The presentation provides examples of how to generate and manipulate massing forms in Revit, develop curtain wall designs, and utilize rendering and animation tools to explore design options in the early stages of a project. It emphasizes how Revit enables accurate, transparent and consistent analysis throughout the design process.
Navigating Safety Obstacles - Installation of Roof top UnitsMcKenney's Inc
McKenney's successfully installed new roof top units and chilled water piping at a medical center kitchen despite safety challenges. Piping had to be run through areas with asbestos and tight clearances for lifting the large, heavy roof top units. McKenney's conducted hazard analysis and training and worked with partners to develop a safe crane lift plan including added supports to facilitate the installation and complete the project safely within budget and schedule.
Success is in the Details - Colocation Data CentersMcKenney's Inc
McKenney's installed a prefabricated chiller plant and piping system to support a data center in North Carolina on an aggressive schedule. They used Building Information Modeling (BIM) and prefabricated piping to minimize on-site congestion and optimize installation. Through detailed scheduling and coordination between trades, the chiller plant installation was completed in two weeks instead of the planned four weeks, and the on-site pipe fitting crew size was kept under 10 people.
SECS is an engineering consulting firm that provides project management services for facilities projects. They begin every project with a kickoff meeting to establish roles and communication. Regular status meetings ensure client satisfaction. SECS has experience managing all aspects of projects from simple equipment installations to entire facility builds. They provide services including engineering design, construction management, commissioning, and training. SECS follows standard project management methodologies and uses data-driven approaches to ensure projects meet goals.
Demand Control Ventilation Reduces HVAC Load, Saves CostMcKenney's Inc
Columbia Property Trust implemented a demand control ventilation system at one of its office buildings in Atlanta to improve HVAC efficiency and reduce costs. McKenney's Automation & Control Solutions team recommended installing CO2 monitors and a DCV system to automatically adjust outside air ventilation based on occupancy levels. This lowered the HVAC load by an estimated 70 tons and energy usage by 65,000 kWh per month while maintaining comfort. The project achieved a return on investment of less than four months.
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHUREBerry Veney
BLV Professional Engineers is an engineering firm that designs electrical systems for a variety of projects including commercial, education, government, and military facilities. They promise to organize projects efficiently to reduce costs, produce quality construction documents that meet codes and standards, and deliver projects on time and within budget. Notable past projects include electrical system designs for an advanced technology center, military hangars and training facilities, a public transit maintenance facility, and several schools and office buildings across the Southeastern United States.
This document provides a resume for Stephen L. Davidson, a mechanical engineer with over 30 years of experience managing projects in petroleum refining, petrochemical, power generation, and hazardous waste industries. It lists his education, licenses, skills, and extensive work history managing complex capital projects from inception through commissioning. His background includes expertise in process engineering, piping, mechanical, electrical, and instrumentation systems with a strong emphasis on safety.
How to Instill a Culture of Reliability - "The Big Bang"ARMS Reliability
Asset-intensive organisations continue to significantly invest in resources, processes, and systems to meet asset performance and cost expectations of customers. Yet, meeting this expectation successfully over time remains a challenge for many organisations. It's easy to fall into a cycle of reactive maintenance, use suboptimal, outdated, or inconsistent asset strategies which produce subpar results.
When Icon Water made the decision to transition to a new Oracle EAM system, they seized the opportunity to revolutionize their entire approach to Asset Management. They began a journey starting from behind the curve to now joining Water Industry leaders in digital transformation.
At the start of their Asset Management overhaul, no asset strategy existed for Icon Water’s assets. They relied on very knowledgeable personnel executing maintenance activities built up from experience. Execution crews were accountable for planned and reactive work and justification for maintenance was not documented or linked to the asset’s function. Asset Criticality Analysis had not been completed and the existing EAM system had reached end of life. Rather than work through this long list of improvement opportunities one by one, Icon Water adopted a “Big Bang” approach to Reliability and Work Management improvement—a major overhaul of roles, accountabilities, business processes, and systems.
This story shares how Reliability Centred Maintenance principles have shaped the establishment of Asset Management foundations. A significant part of the step change was an upgrade to the paperless Oracle Works Asset Management System (WAM), however, rather than simply implementing a new planning, scheduling and execution tool to deliver the same maintenance, Icon Water developed new asset strategies for all 700,000 assets using an Asset Strategy Management (ASM) process. The ASM system accelerated EAM system implementation by packaging and loading of all corrective work orders into WAM.
As a result, significant cultural change has evolved through clear ownership and structure of the new base asset strategies. Currently, Icon Water has full visibility of asset reliability strategies and a process for optimizing those strategies and risks moving forward. Future strategy updates can happen efficiently and dynamically across the entire-asset base. Their new approach to Asset Strategy Management drives continuous improvement and supports a sustainable company-wide culture of reliability.
Conservation Solutions Corporation provides energy and water efficiency services and renewable energy systems. They conduct detailed energy and water audits of commercial buildings to develop efficiency projects. They represent various technology manufacturers and offer services including water treatment, steam trap installation, and pressure independent control valves. Case studies describe projects installing these technologies that achieved energy and water savings as well as improved comfort and reduced maintenance needs.
William Moran has over 35 years of experience in engineering and management roles developing customized equipment solutions. He is currently the President and CEO of SLC Enterprises, which he founded in 2003 to specialize in used vehicle sales and financing. Prior to that, he spent 15 years at The Coca-Cola Company in various engineering and management roles developing customized fountain equipment and technologies to meet clients' needs.
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...McKenney's Inc
Starting in April 2009, McKenney’s, Inc performed HVAC, sheet metal and piping installation on multiple energy-efficient barracks, which included a total of 125 dorm-style rooms with kitchenettes at Fort Benning, a US Army Base in Georgia.
This document provides a summary of Alfonso M. Cabrera's extensive experience in energy engineering over 30 years, including 18 years in energy management roles. He has managed energy programs for various organizations, including the US Postal Service, American Sugar Refining, and Naval facilities in the Mid-Atlantic region. Cabrera has significant experience developing and implementing energy savings performance contracts to reduce energy consumption and costs for clients in various sectors.
The AmericInn hotel was in need of replacing its boiler system to meet its 24-hour energy demands and reduce costs. It installed two 19kW cogeneration systems to provide heat, hot water, air conditioning, and electricity for the entire facility. This resulted in reduced energy costs, lower carbon emissions, extended the lifespan of existing equipment, and a 10% tax credit. The hotel now saves $2,594 per month with the new system.
Matrix is an HVAC engineering firm located in Mandeville, LA that provides various HVAC services including engineering design, building surveys, compliance reports, testing, balancing, and energy audits. They serve commercial, industrial, and offshore markets. Matrix's professional engineers develop customized solutions that meet energy efficiency and practicality standards.
Kinetiq Solutions is an electrical contracting company that specializes in design, installation, and maintenance services. They aim to make clients' lives easier by completing projects on time and on budget while meeting health and safety standards. They have experience in heavy industry projects both large and small, including designing and installing electrical systems, programming PLCs, and providing maintenance services. Kinetiq Solutions works to become an integral part of clients' project teams and offers a one-stop shop for electrical and instrumentation needs by partnering with leading manufacturers and service providers.
Similar to Trimming Cost, Delivering Solutions - Hospital Design/Build (20)
CRAC Units Installation for a Data Center Project in Alpharetta, GAMcKenney's Inc
McKenney’s installed very complex, industry-leading computer room air conditioning (CRAC) units at a new data center under construction in Alpharetta, Georgia.
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center campus to comply with new emission standards. They devised an assembly line approach to quickly lift and move each generator enclosure to install the new scrubbers and piping, finishing the retrofit in 7 months instead of the planned 11 months to minimize downtime for the facility with only N+1 redundancy. Working closely with the customer and crane contractor, the coordinated team was able to keep the backup generators operational throughout the project.
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center to help the facility meet new emission standards on an expedited schedule. They devised an assembly line approach to efficiently remove each generator enclosure and install the new scrubbers and piping. This allowed them to complete the work in 7 months instead of 11 months, saving costs for the customer while keeping the backup generators operational throughout the project.
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
McKenney's developed energy conservation measures and overhauled the HVAC system of a landmark municipal building. They replaced hard-to-access air handling units and chillers after hours to ensure no disruptions. Over 30 ECMs were developed and the customer selected projects providing the best ROI. Replacements were done safely, on schedule and budget and the ECMs are beginning to pay for themselves through utility savings.
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
A zero-energy building (ZEB) produces enough renewable energy to meet its own annual energy consumption requirements by using all cost-effective measures to reduce energy usage through energy efficiency. Learn more at http://blog.mckenneys.com/2018/06/reducing-building-energy-consumption-in-zero-energy-buildings-zeb/
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
Through an energy savings performance contract, McKenney’s Building Performance Solutions provided a turnkey solution to an aging, inefficient heating system at a large maximum security prison in Georgia.
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
McKenney’s, Inc. Critical Systems offers a comprehensive approach for constructing or renovating high-quality mechanical systems for data centers and operations centers that meet the most exacting demands and schedules.
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
McKenney’s is the right choice for reliable, well-designed rainwater and condensate harvesting systems because they bring a powerful combination of experience, commitment and innovation.
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
Protect your investment and consider a plumbing preventive maintenance program for your facility. Check out our plumbing services page for more information at http://plumbing.mckenneys.com/
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
McKenney’s Interiors & Special Projects (ISP) team responds quickly to a wide range of mechanical needs, including interior renovations, infrastructure repairs, replacements and retrocommissioning projects.
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
McKenney's installed mechanical systems at a high-rise office building in downtown Charlotte that faced a tight schedule for completion. Extensive planning and coordination allowed McKenney's to sequence the work and overcome equipment issues to finish installation on time, allowing the owners to lease spaces as scheduled. The project team worked creatively within the compressed timeline for startup and commissioning of key mechanical equipment.
McKenney’s is building a wide range of energy-efficient mechanical systems using green practices for the 325,000-square-foot medical center in Braselton, Georgia.
At Techbox Square, in Singapore, we're not just creative web designers and developers, we're the driving force behind your brand identity. Contact us today.
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
SATTA MATKA SATTA FAST RESULT KALYAN TOP MATKA RESULT KALYAN SATTA MATKA FAST RESULT MILAN RATAN RAJDHANI MAIN BAZAR MATKA FAST TIPS RESULT MATKA CHART JODI CHART PANEL CHART FREE FIX GAME SATTAMATKA ! MATKA MOBI SATTA 143 spboss.in TOP NO1 RESULT FULL RATE MATKA ONLINE GAME PLAY BY APP SPBOSS
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesHolger Mueller
Holger Mueller of Constellation Research shares his key takeaways from SAP's Sapphire confernece, held in Orlando, June 3rd till 5th 2024, in the Orange Convention Center.
Navigating the world of forex trading can be challenging, especially for beginners. To help you make an informed decision, we have comprehensively compared the best forex brokers in India for 2024. This article, reviewed by Top Forex Brokers Review, will cover featured award winners, the best forex brokers, featured offers, the best copy trading platforms, the best forex brokers for beginners, the best MetaTrader brokers, and recently updated reviews. We will focus on FP Markets, Black Bull, EightCap, IC Markets, and Octa.
Best practices for project execution and deliveryCLIVE MINCHIN
A select set of project management best practices to keep your project on-track, on-cost and aligned to scope. Many firms have don't have the necessary skills, diligence, methods and oversight of their projects; this leads to slippage, higher costs and longer timeframes. Often firms have a history of projects that simply failed to move the needle. These best practices will help your firm avoid these pitfalls but they require fortitude to apply.
Top mailing list providers in the USA.pptxJeremyPeirce1
Discover the top mailing list providers in the USA, offering targeted lists, segmentation, and analytics to optimize your marketing campaigns and drive engagement.
Structural Design Process: Step-by-Step Guide for BuildingsChandresh Chudasama
The structural design process is explained: Follow our step-by-step guide to understand building design intricacies and ensure structural integrity. Learn how to build wonderful buildings with the help of our detailed information. Learn how to create structures with durability and reliability and also gain insights on ways of managing structures.