Trimming Cost, Delivering Solutions 
McKenney’s designed the HVAC, 
plumbing and medical gas sys-tems 
for a community hospital 
—part of a larger regional healthcare system. 
THE CHALLENGE 
The owner of this small, rural county hospital 
faced significant cost pressure. To ensure the 
project would not exceed budget limitations, 
the owner instructed McKenney’s to design 
HVAC, plumbing and medical gas systems 
that performed to minimum building code 
requirements—rather than the more costly 
standards of the broader healthcare system. 
THE SOLUTION 
By using its design/build expertise, the 
McKenney’s team was able to reduce the cost 
of all mechanical systems. For instance, the 
team selected direct expansion roof top units 
with variable air volume (VAV) and heat/re-heat 
hydronic coils for low-cost HVAC efficiency. 
Piping mains were kept intentionally small 
and VAV flex was eliminated to minimize 
seismic restraints labor and material costs. 
Additional savings were realized by designing 
the duct system with the static regain method 
thus minimizing the total quantity of ductwork. 
THE RESULTS 
The owner’s savings goals were achieved 
and the mechanical systems are performing 
to specification. 
PROJECT NAME 
žž Community Hospital 
Design/Build 
PROJECT LOCATION 
žž Wadesboro, North Carolina 
PROJECT TEAM 
žž Owner: Multi-State 
Healthcare System 
žž General Contractor: 
Brasfield & Gorrie 
žž Architect: Design Strategies LLC 
žž Engineer: McKenney’s, Inc. 
SPECIALIZATIONS 
Building Information Modeling 
Design/Build 
Pipe Shop Prefab 
Sheet Metal Shop Prefab 
MARKETS 
žž Healthcare 
www.mckenneys.com 
© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. 
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 
The content of this document is not intended as an endorsement. 
404-622-5000 
info@mckenneys.com 
1056 Moreland Industrial Boulevard 
Atlanta, Georgia 30316 
704-357-1200 
info@mckenneys.com 
3601 Performance Road 
Charlotte, North Carolina 28214

More Related Content

Viewers also liked

Extreme Makeover: Healthcare Edition
Extreme Makeover: Healthcare EditionExtreme Makeover: Healthcare Edition
Extreme Makeover: Healthcare Edition
Array Architects
 
HLS Presentation Hospitals 2013
HLS Presentation Hospitals 2013HLS Presentation Hospitals 2013
HLS Presentation Hospitals 2013
Todd Wyatt
 
Houston Area Revit User Group January Presentation
Houston Area Revit User Group January PresentationHouston Area Revit User Group January Presentation
Houston Area Revit User Group January Presentation
pchan925
 
RTCNA2014_Session 11-Profiling-PhilipChan
RTCNA2014_Session 11-Profiling-PhilipChanRTCNA2014_Session 11-Profiling-PhilipChan
RTCNA2014_Session 11-Profiling-PhilipChan
pchan925
 
2D Color Elevations - Photoshop
2D Color Elevations - Photoshop2D Color Elevations - Photoshop
2D Color Elevations - PhotoshopFrank Malawski
 
What's in a Room?
What's in a Room?What's in a Room?
What's in a Room?
Ceilidh Higgins
 
FOSTER & PARTNERS CAMPUS BIOMETROPOLIS
FOSTER & PARTNERS CAMPUS BIOMETROPOLISFOSTER & PARTNERS CAMPUS BIOMETROPOLIS
FOSTER & PARTNERS CAMPUS BIOMETROPOLIS
jcesar1963
 
1st Qatar BIM User Day Business processes supported by BIM methodology, part 1
1st Qatar BIM User Day Business processes supported by BIM methodology, part 11st Qatar BIM User Day Business processes supported by BIM methodology, part 1
1st Qatar BIM User Day Business processes supported by BIM methodology, part 1
BIM User Day
 
Revit MEP 2010 Plumbing Design 101c
Revit MEP 2010 Plumbing Design 101cRevit MEP 2010 Plumbing Design 101c
Revit MEP 2010 Plumbing Design 101c
SJMMC
 
Drafting Instructions--Introductions
Drafting Instructions--IntroductionsDrafting Instructions--Introductions
Drafting Instructions--Introductions
Prof S
 
BIM for Interior Design
BIM for Interior DesignBIM for Interior Design
BIM for Interior Design
Jeff Hong
 
RTC AUS 2014 BIM in the Green Zone
RTC AUS 2014 BIM in the Green ZoneRTC AUS 2014 BIM in the Green Zone
RTC AUS 2014 BIM in the Green Zone
Jason Howden
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
Marc Goldman
 
BIM-onomics slidedeck
BIM-onomics slidedeckBIM-onomics slidedeck
BIM-onomics slidedeck
Ceilidh Higgins
 
InforMeDesign
InforMeDesignInforMeDesign
InforMeDesign
Ceilidh Higgins
 
CIC Building Information Modelling Standards (Phase One)
CIC Building Information Modelling Standards (Phase One)CIC Building Information Modelling Standards (Phase One)
CIC Building Information Modelling Standards (Phase One)
The Hong Kong Institute of Building Information Modelling (HKIBIM)
 
Hong Kong BIM Standards, Building Information Model - Project Execution Plan ...
Hong Kong BIM Standards, Building Information Model - Project Execution Plan ...Hong Kong BIM Standards, Building Information Model - Project Execution Plan ...
Hong Kong BIM Standards, Building Information Model - Project Execution Plan ...
The Hong Kong Institute of Building Information Modelling (HKIBIM)
 
AB433-2--Start Early, Finish Early - Using Autodesk Revit Architecture During...
AB433-2--Start Early, Finish Early - Using Autodesk Revit Architecture During...AB433-2--Start Early, Finish Early - Using Autodesk Revit Architecture During...
AB433-2--Start Early, Finish Early - Using Autodesk Revit Architecture During...
Vincent Poon
 

Viewers also liked (18)

Extreme Makeover: Healthcare Edition
Extreme Makeover: Healthcare EditionExtreme Makeover: Healthcare Edition
Extreme Makeover: Healthcare Edition
 
HLS Presentation Hospitals 2013
HLS Presentation Hospitals 2013HLS Presentation Hospitals 2013
HLS Presentation Hospitals 2013
 
Houston Area Revit User Group January Presentation
Houston Area Revit User Group January PresentationHouston Area Revit User Group January Presentation
Houston Area Revit User Group January Presentation
 
RTCNA2014_Session 11-Profiling-PhilipChan
RTCNA2014_Session 11-Profiling-PhilipChanRTCNA2014_Session 11-Profiling-PhilipChan
RTCNA2014_Session 11-Profiling-PhilipChan
 
2D Color Elevations - Photoshop
2D Color Elevations - Photoshop2D Color Elevations - Photoshop
2D Color Elevations - Photoshop
 
What's in a Room?
What's in a Room?What's in a Room?
What's in a Room?
 
FOSTER & PARTNERS CAMPUS BIOMETROPOLIS
FOSTER & PARTNERS CAMPUS BIOMETROPOLISFOSTER & PARTNERS CAMPUS BIOMETROPOLIS
FOSTER & PARTNERS CAMPUS BIOMETROPOLIS
 
1st Qatar BIM User Day Business processes supported by BIM methodology, part 1
1st Qatar BIM User Day Business processes supported by BIM methodology, part 11st Qatar BIM User Day Business processes supported by BIM methodology, part 1
1st Qatar BIM User Day Business processes supported by BIM methodology, part 1
 
Revit MEP 2010 Plumbing Design 101c
Revit MEP 2010 Plumbing Design 101cRevit MEP 2010 Plumbing Design 101c
Revit MEP 2010 Plumbing Design 101c
 
Drafting Instructions--Introductions
Drafting Instructions--IntroductionsDrafting Instructions--Introductions
Drafting Instructions--Introductions
 
BIM for Interior Design
BIM for Interior DesignBIM for Interior Design
BIM for Interior Design
 
RTC AUS 2014 BIM in the Green Zone
RTC AUS 2014 BIM in the Green ZoneRTC AUS 2014 BIM in the Green Zone
RTC AUS 2014 BIM in the Green Zone
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
 
BIM-onomics slidedeck
BIM-onomics slidedeckBIM-onomics slidedeck
BIM-onomics slidedeck
 
InforMeDesign
InforMeDesignInforMeDesign
InforMeDesign
 
CIC Building Information Modelling Standards (Phase One)
CIC Building Information Modelling Standards (Phase One)CIC Building Information Modelling Standards (Phase One)
CIC Building Information Modelling Standards (Phase One)
 
Hong Kong BIM Standards, Building Information Model - Project Execution Plan ...
Hong Kong BIM Standards, Building Information Model - Project Execution Plan ...Hong Kong BIM Standards, Building Information Model - Project Execution Plan ...
Hong Kong BIM Standards, Building Information Model - Project Execution Plan ...
 
AB433-2--Start Early, Finish Early - Using Autodesk Revit Architecture During...
AB433-2--Start Early, Finish Early - Using Autodesk Revit Architecture During...AB433-2--Start Early, Finish Early - Using Autodesk Revit Architecture During...
AB433-2--Start Early, Finish Early - Using Autodesk Revit Architecture During...
 

Similar to Trimming Cost, Delivering Solutions - Hospital Design/Build

Navigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsNavigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top Units
McKenney's Inc
 
Hospital Mechanical Systems
Hospital Mechanical SystemsHospital Mechanical Systems
Hospital Mechanical Systems
McKenney's Inc
 
Precise Planning Prevails - HVAC and Plumbing Installation
Precise Planning Prevails - HVAC and Plumbing InstallationPrecise Planning Prevails - HVAC and Plumbing Installation
Precise Planning Prevails - HVAC and Plumbing Installation
McKenney's Inc
 
Fast Track for High Tech HVAC
Fast Track for High Tech HVACFast Track for High Tech HVAC
Fast Track for High Tech HVAC
McKenney's Inc
 
Success is in the Details - Colocation Data Centers
Success is in the Details - Colocation Data CentersSuccess is in the Details - Colocation Data Centers
Success is in the Details - Colocation Data Centers
McKenney's Inc
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
Jessica Rearick
 
Programmed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management SystemProgrammed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management System
McKenney's Inc
 
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GADeploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
McKenney's Inc
 
An Efficient, Non-invasive Relocation
An Efficient, Non-invasive RelocationAn Efficient, Non-invasive Relocation
An Efficient, Non-invasive Relocation
McKenney's Inc
 
Demand Control Ventilation Reduces HVAC Load, Saves Cost
Demand Control Ventilation Reduces HVAC Load, Saves CostDemand Control Ventilation Reduces HVAC Load, Saves Cost
Demand Control Ventilation Reduces HVAC Load, Saves Cost
McKenney's Inc
 
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHUREBLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
Berry Veney
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
Stephen Davidson
 
How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"
ARMS Reliability
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014
GWT
 
w-o summary 10-27-15
w-o summary 10-27-15w-o summary 10-27-15
w-o summary 10-27-15
Bill Moran
 
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
McKenney's Inc
 
AMC CEM CDSM
AMC CEM CDSMAMC CEM CDSM
AMC CEM CDSM
Alfonso M. Cabrera
 
AmericInn
AmericInnAmericInn
AmericInn
Travis Hoover
 
122845 Brochure Industrial Binded
122845 Brochure Industrial Binded122845 Brochure Industrial Binded
122845 Brochure Industrial Binded
Leif C. Wismar, P.E., C.E.M
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
Ray Salmons
 

Similar to Trimming Cost, Delivering Solutions - Hospital Design/Build (20)

Navigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsNavigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top Units
 
Hospital Mechanical Systems
Hospital Mechanical SystemsHospital Mechanical Systems
Hospital Mechanical Systems
 
Precise Planning Prevails - HVAC and Plumbing Installation
Precise Planning Prevails - HVAC and Plumbing InstallationPrecise Planning Prevails - HVAC and Plumbing Installation
Precise Planning Prevails - HVAC and Plumbing Installation
 
Fast Track for High Tech HVAC
Fast Track for High Tech HVACFast Track for High Tech HVAC
Fast Track for High Tech HVAC
 
Success is in the Details - Colocation Data Centers
Success is in the Details - Colocation Data CentersSuccess is in the Details - Colocation Data Centers
Success is in the Details - Colocation Data Centers
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
 
Programmed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management SystemProgrammed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management System
 
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GADeploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
 
An Efficient, Non-invasive Relocation
An Efficient, Non-invasive RelocationAn Efficient, Non-invasive Relocation
An Efficient, Non-invasive Relocation
 
Demand Control Ventilation Reduces HVAC Load, Saves Cost
Demand Control Ventilation Reduces HVAC Load, Saves CostDemand Control Ventilation Reduces HVAC Load, Saves Cost
Demand Control Ventilation Reduces HVAC Load, Saves Cost
 
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHUREBLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014
 
w-o summary 10-27-15
w-o summary 10-27-15w-o summary 10-27-15
w-o summary 10-27-15
 
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
 
AMC CEM CDSM
AMC CEM CDSMAMC CEM CDSM
AMC CEM CDSM
 
AmericInn
AmericInnAmericInn
AmericInn
 
122845 Brochure Industrial Binded
122845 Brochure Industrial Binded122845 Brochure Industrial Binded
122845 Brochure Industrial Binded
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
 

More from McKenney's Inc

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
McKenney's Inc
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
McKenney's Inc
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit Project
McKenney's Inc
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory Renovation
McKenney's Inc
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
McKenney's Inc
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
McKenney's Inc
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
McKenney's Inc
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
McKenney's Inc
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
McKenney's Inc
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
McKenney's Inc
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
McKenney's Inc
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
McKenney's Inc
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
McKenney's Inc
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney's Inc
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
McKenney's Inc
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
McKenney's Inc
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney's Inc
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
McKenney's Inc
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by Design
McKenney's Inc
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality Construction
McKenney's Inc
 

More from McKenney's Inc (20)

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit Project
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory Renovation
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by Design
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality Construction
 

Recently uploaded

Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
Top Forex Brokers Review
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
Chandresh Chudasama
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 

Recently uploaded (20)

Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 

Trimming Cost, Delivering Solutions - Hospital Design/Build

  • 1. Trimming Cost, Delivering Solutions McKenney’s designed the HVAC, plumbing and medical gas sys-tems for a community hospital —part of a larger regional healthcare system. THE CHALLENGE The owner of this small, rural county hospital faced significant cost pressure. To ensure the project would not exceed budget limitations, the owner instructed McKenney’s to design HVAC, plumbing and medical gas systems that performed to minimum building code requirements—rather than the more costly standards of the broader healthcare system. THE SOLUTION By using its design/build expertise, the McKenney’s team was able to reduce the cost of all mechanical systems. For instance, the team selected direct expansion roof top units with variable air volume (VAV) and heat/re-heat hydronic coils for low-cost HVAC efficiency. Piping mains were kept intentionally small and VAV flex was eliminated to minimize seismic restraints labor and material costs. Additional savings were realized by designing the duct system with the static regain method thus minimizing the total quantity of ductwork. THE RESULTS The owner’s savings goals were achieved and the mechanical systems are performing to specification. PROJECT NAME žž Community Hospital Design/Build PROJECT LOCATION žž Wadesboro, North Carolina PROJECT TEAM žž Owner: Multi-State Healthcare System žž General Contractor: Brasfield & Gorrie žž Architect: Design Strategies LLC žž Engineer: McKenney’s, Inc. SPECIALIZATIONS Building Information Modeling Design/Build Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS žž Healthcare www.mckenneys.com © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. The content of this document is not intended as an endorsement. 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214