Equipped for Future Expansion
PROJECT NAME
žž Hospital Infusion Suite
PROJECT LOCATION
žž Atlanta, Georgia
PROJECT TEAM
žž Owner: Hospital
žž General Contractor:
Segars Group, LLC
žž Architect: Perkins+Will
žž Engineer: McKenney’s, Inc.
SPECIALIZATIONS
	Design/Build
	
Energy Management
	
Sheet Metal Shop Prefab
MARKETS
žž Healthcare

M

cKenney’s updated the HVAC
system controls and Building
Management System (BMS) floor
plan amid renovations at a Georgia hospital.
THE CHALLENGE
The McKenney’s team needed to change
out antiquated HVAC dampers while simultaneously maintaining a tidy workspace during
hospital construction. The team also had to
develop the best solution for integrating the
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316

newly renovated area into the hospital’s
­existing BMS.
THE SOLUTION
The Automation & Control Solutions team
c
­ ollaborated with the McKenney’s Healthcare
& Research experts to replace the older air
dampers with new airflow valves and actuators.
They also selected and implemented Tridium’s
newest network controller (J-603) to integrate
into the hospital’s older BMS. The Tridium

www.mckenneys.com

controller allows future expansion to the next
floor of devices and can accommodate newer
software versions as they’re released.
THE RESULTS
The hospital’s entire infusion suite is now
a direct-digital controlled system, and future
upgrades can be completed without any new
network controller hardware. Building engineers also have better control of the facility’s
space and energy savings.
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214

© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
The content of this document is not intended as an endorsement.

More Related Content

Similar to Equipped for Future Expansion - Hospital Infusion Suite, Atlanta, Georgia

Navigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsNavigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsMcKenney's Inc
 
An Efficient, Non-invasive Relocation
An Efficient, Non-invasive RelocationAn Efficient, Non-invasive Relocation
An Efficient, Non-invasive RelocationMcKenney's Inc
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildMcKenney's Inc
 
Synchronized for Success - Medical Center Expansion Project
Synchronized for Success - Medical Center Expansion ProjectSynchronized for Success - Medical Center Expansion Project
Synchronized for Success - Medical Center Expansion ProjectMcKenney's Inc
 
An Educated Approach to HVAC
An Educated Approach to HVACAn Educated Approach to HVAC
An Educated Approach to HVACMcKenney's Inc
 
Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation McKenney's Inc
 
Programmed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management SystemProgrammed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management SystemMcKenney's Inc
 
Mastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMcKenney's Inc
 
Fast Tracking Office Renovations
Fast Tracking Office RenovationsFast Tracking Office Renovations
Fast Tracking Office RenovationsMcKenney's Inc
 
Creativity Overcomes Challenges - Data Center Colocation
Creativity Overcomes Challenges - Data Center ColocationCreativity Overcomes Challenges - Data Center Colocation
Creativity Overcomes Challenges - Data Center ColocationMcKenney's Inc
 
Delivering Smart, Real-Time Control - Building Automation System Upgrade
Delivering Smart, Real-Time Control -  Building Automation System UpgradeDelivering Smart, Real-Time Control -  Building Automation System Upgrade
Delivering Smart, Real-Time Control - Building Automation System UpgradeMcKenney's Inc
 
Cooling Down a Refrigeration Plant in Columbus, Georgia
Cooling Down a Refrigeration Plant in Columbus, Georgia Cooling Down a Refrigeration Plant in Columbus, Georgia
Cooling Down a Refrigeration Plant in Columbus, Georgia McKenney's Inc
 
Seamless Data Center Operations
Seamless Data Center OperationsSeamless Data Center Operations
Seamless Data Center OperationsMcKenney's Inc
 
Precise Planning, Staged Installation
Precise Planning, Staged InstallationPrecise Planning, Staged Installation
Precise Planning, Staged InstallationMcKenney's Inc
 
Delivering Turnkey Energy Savings
Delivering Turnkey Energy SavingsDelivering Turnkey Energy Savings
Delivering Turnkey Energy SavingsMcKenney's Inc
 
HVAC Installation Makes the Grade
HVAC Installation Makes the GradeHVAC Installation Makes the Grade
HVAC Installation Makes the GradeMcKenney's Inc
 
Mitigating Installation Risks - Data Center Cooling System Installation in At...
Mitigating Installation Risks - Data Center Cooling System Installation in At...Mitigating Installation Risks - Data Center Cooling System Installation in At...
Mitigating Installation Risks - Data Center Cooling System Installation in At...McKenney's Inc
 
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing RenovationCooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing RenovationMcKenney's Inc
 
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NCBuilding Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NCMcKenney's Inc
 
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GADeploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GAMcKenney's Inc
 

Similar to Equipped for Future Expansion - Hospital Infusion Suite, Atlanta, Georgia (20)

Navigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsNavigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top Units
 
An Efficient, Non-invasive Relocation
An Efficient, Non-invasive RelocationAn Efficient, Non-invasive Relocation
An Efficient, Non-invasive Relocation
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
 
Synchronized for Success - Medical Center Expansion Project
Synchronized for Success - Medical Center Expansion ProjectSynchronized for Success - Medical Center Expansion Project
Synchronized for Success - Medical Center Expansion Project
 
An Educated Approach to HVAC
An Educated Approach to HVACAn Educated Approach to HVAC
An Educated Approach to HVAC
 
Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation
 
Programmed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management SystemProgrammed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management System
 
Mastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC Installation
 
Fast Tracking Office Renovations
Fast Tracking Office RenovationsFast Tracking Office Renovations
Fast Tracking Office Renovations
 
Creativity Overcomes Challenges - Data Center Colocation
Creativity Overcomes Challenges - Data Center ColocationCreativity Overcomes Challenges - Data Center Colocation
Creativity Overcomes Challenges - Data Center Colocation
 
Delivering Smart, Real-Time Control - Building Automation System Upgrade
Delivering Smart, Real-Time Control -  Building Automation System UpgradeDelivering Smart, Real-Time Control -  Building Automation System Upgrade
Delivering Smart, Real-Time Control - Building Automation System Upgrade
 
Cooling Down a Refrigeration Plant in Columbus, Georgia
Cooling Down a Refrigeration Plant in Columbus, Georgia Cooling Down a Refrigeration Plant in Columbus, Georgia
Cooling Down a Refrigeration Plant in Columbus, Georgia
 
Seamless Data Center Operations
Seamless Data Center OperationsSeamless Data Center Operations
Seamless Data Center Operations
 
Precise Planning, Staged Installation
Precise Planning, Staged InstallationPrecise Planning, Staged Installation
Precise Planning, Staged Installation
 
Delivering Turnkey Energy Savings
Delivering Turnkey Energy SavingsDelivering Turnkey Energy Savings
Delivering Turnkey Energy Savings
 
HVAC Installation Makes the Grade
HVAC Installation Makes the GradeHVAC Installation Makes the Grade
HVAC Installation Makes the Grade
 
Mitigating Installation Risks - Data Center Cooling System Installation in At...
Mitigating Installation Risks - Data Center Cooling System Installation in At...Mitigating Installation Risks - Data Center Cooling System Installation in At...
Mitigating Installation Risks - Data Center Cooling System Installation in At...
 
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing RenovationCooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
 
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NCBuilding Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
 
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GADeploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
 

More from McKenney's Inc

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GAMcKenney's Inc
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationMcKenney's Inc
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GAMcKenney's Inc
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsMcKenney's Inc
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementMcKenney's Inc
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionMcKenney's Inc
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationMcKenney's Inc
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by DesignMcKenney's Inc
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionMcKenney's Inc
 
A High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionA High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionMcKenney's Inc
 

More from McKenney's Inc (20)

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit Project
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory Renovation
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by Design
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality Construction
 
A High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionA High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use Construction
 

Equipped for Future Expansion - Hospital Infusion Suite, Atlanta, Georgia

  • 1. Equipped for Future Expansion PROJECT NAME žž Hospital Infusion Suite PROJECT LOCATION žž Atlanta, Georgia PROJECT TEAM žž Owner: Hospital žž General Contractor: Segars Group, LLC žž Architect: Perkins+Will žž Engineer: McKenney’s, Inc. SPECIALIZATIONS Design/Build Energy Management Sheet Metal Shop Prefab MARKETS žž Healthcare M cKenney’s updated the HVAC system controls and Building Management System (BMS) floor plan amid renovations at a Georgia hospital. THE CHALLENGE The McKenney’s team needed to change out antiquated HVAC dampers while simultaneously maintaining a tidy workspace during hospital construction. The team also had to develop the best solution for integrating the 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 newly renovated area into the hospital’s ­existing BMS. THE SOLUTION The Automation & Control Solutions team c ­ ollaborated with the McKenney’s Healthcare & Research experts to replace the older air dampers with new airflow valves and actuators. They also selected and implemented Tridium’s newest network controller (J-603) to integrate into the hospital’s older BMS. The Tridium www.mckenneys.com controller allows future expansion to the next floor of devices and can accommodate newer software versions as they’re released. THE RESULTS The hospital’s entire infusion suite is now a direct-digital controlled system, and future upgrades can be completed without any new network controller hardware. Building engineers also have better control of the facility’s space and energy savings. 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. The content of this document is not intended as an endorsement.