THE CHALLENGE
A federal agency required an enclosure
that could maintain precise conditions—
within tolerances of ±0.2 °C temperature
and ±0.5% relative humidity—for highly
sensitive experiments. In an existing building
with limited square footage, the McKenney’s
team had to coordinate and manage design
and installation for several trades outside the
typical scope of mechanical contracting to
complete the lab.
THE SOLUTION
As the prime contractor, McKenney’s completely
designed, built and installed the mechanical,
plumbing and controls systems.The McKenney’s
team also created a coordinated schedule
to manage a wide range of subcontractors
for electrical, fire protection, epoxy flooring,
ACT ceilings, cabinetry and doors. Project
manage­ment and equipment designers met
regularly with building owners, engineers,
agency personnel and others to monitor
­progress and revise the schedule as needed.
THE RESULTS
The climate-controlled laboratory enclosure
was completed on-time, on budget and met
all the tenant’s exact tolerance specifications
for the facility while minimizing the impact
in the existing occupants of the building.
Lab Installation Cools Concerns
PROJECT NAME
žž Federal Laboratory Renovation
PROJECT LOCATION
žž Atlanta, Georgia
PROJECT TEAM
žž Owner: Federal Agency
žž Prime Contractor:
McKenney’s, Inc.
SPECIALIZATIONS
	Design/Build
MARKETS
žž Government
žž Science & Technology
The content of this document is not intended as an endorsement.
www.mckenneys.com
© 2018 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214

More Related Content

What's hot

Resume 12-1-15
Resume 12-1-15Resume 12-1-15
Resume 12-1-15
Ryan Daly
 
Hse alert 55 hot works fire risk
Hse alert 55 hot works fire riskHse alert 55 hot works fire risk
Hse alert 55 hot works fire risk
Dwarika Bhushan Sharma
 

What's hot (6)

Resume 12-1-15
Resume 12-1-15Resume 12-1-15
Resume 12-1-15
 
Hse alert 55 hot works fire risk
Hse alert 55 hot works fire riskHse alert 55 hot works fire risk
Hse alert 55 hot works fire risk
 
Pj mechanical
Pj mechanicalPj mechanical
Pj mechanical
 
Linkedin-Doc
Linkedin-DocLinkedin-Doc
Linkedin-Doc
 
Phillip lacy resume (2) (2)
Phillip lacy resume (2) (2)Phillip lacy resume (2) (2)
Phillip lacy resume (2) (2)
 
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
 

Similar to Lab Installation Cools Concerns - Federal Laboratory Renovation

ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
Steven MacDonald
 

Similar to Lab Installation Cools Concerns - Federal Laboratory Renovation (20)

Beating the Mid-Summer Heat - Air Handling Units Replacement
Beating the Mid-Summer Heat - Air Handling Units ReplacementBeating the Mid-Summer Heat - Air Handling Units Replacement
Beating the Mid-Summer Heat - Air Handling Units Replacement
 
Mastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC Installation
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
 
Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintLarge Campus Reduces Carbon Footprint
Large Campus Reduces Carbon Footprint
 
Luxury Meets Systems Expertise
Luxury Meets Systems ExpertiseLuxury Meets Systems Expertise
Luxury Meets Systems Expertise
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit Project
 
Helping Homeowners Breathe Easy - Multifamily & Mixed-Use Construction
Helping Homeowners Breathe Easy - Multifamily & Mixed-Use ConstructionHelping Homeowners Breathe Easy - Multifamily & Mixed-Use Construction
Helping Homeowners Breathe Easy - Multifamily & Mixed-Use Construction
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 
Precise Planning, Staged Installation
Precise Planning, Staged InstallationPrecise Planning, Staged Installation
Precise Planning, Staged Installation
 
Demand Control Ventilation Reduces HVAC Load, Saves Cost
Demand Control Ventilation Reduces HVAC Load, Saves CostDemand Control Ventilation Reduces HVAC Load, Saves Cost
Demand Control Ventilation Reduces HVAC Load, Saves Cost
 
HVAC Installation Makes the Grade
HVAC Installation Makes the GradeHVAC Installation Makes the Grade
HVAC Installation Makes the Grade
 
Addressing Unique Job Site Demands
Addressing Unique Job Site DemandsAddressing Unique Job Site Demands
Addressing Unique Job Site Demands
 
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GADeploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
 
Fast Track to Energy Savings
Fast Track to Energy SavingsFast Track to Energy Savings
Fast Track to Energy Savings
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
 
Direct Digital Control (DDC) System Installation for HVAC
Direct Digital Control (DDC) System Installation for HVACDirect Digital Control (DDC) System Installation for HVAC
Direct Digital Control (DDC) System Installation for HVAC
 
Automation and Control Systems Case Study - Fort Gillem Atlanta, Georgia
Automation and Control Systems Case Study - Fort Gillem Atlanta, GeorgiaAutomation and Control Systems Case Study - Fort Gillem Atlanta, Georgia
Automation and Control Systems Case Study - Fort Gillem Atlanta, Georgia
 
Putting Efficiency at the Top
Putting Efficiency at the TopPutting Efficiency at the Top
Putting Efficiency at the Top
 
Conserving Energy One Step at a Time
Conserving Energy One Step at a TimeConserving Energy One Step at a Time
Conserving Energy One Step at a Time
 
resume 2014
resume 2014resume 2014
resume 2014
 

More from McKenney's Inc

More from McKenney's Inc (20)

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
 
Performing a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaPerforming a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, Georgia
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by Design
 
A High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionA High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use Construction
 
Timely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationTimely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems Installation
 
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GA
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GARooftop Data Center Chilled Water Plant Installation | Atlanta, GA
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GA
 
Pre-fab Headers Keep Job Ahead of Schedule
Pre-fab Headers Keep Job Ahead of SchedulePre-fab Headers Keep Job Ahead of Schedule
Pre-fab Headers Keep Job Ahead of Schedule
 

Recently uploaded

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 

Recently uploaded (20)

What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and Employees
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdfMatt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best FilmmakerDid Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Falcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small Businesses
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptx
 
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlastUnlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
 

Lab Installation Cools Concerns - Federal Laboratory Renovation

  • 1. M cKenney’s assembled and installed a modular lab with customized HVAC conditioning equipment and more for a federal laboratory. THE CHALLENGE A federal agency required an enclosure that could maintain precise conditions— within tolerances of ±0.2 °C temperature and ±0.5% relative humidity—for highly sensitive experiments. In an existing building with limited square footage, the McKenney’s team had to coordinate and manage design and installation for several trades outside the typical scope of mechanical contracting to complete the lab. THE SOLUTION As the prime contractor, McKenney’s completely designed, built and installed the mechanical, plumbing and controls systems.The McKenney’s team also created a coordinated schedule to manage a wide range of subcontractors for electrical, fire protection, epoxy flooring, ACT ceilings, cabinetry and doors. Project manage­ment and equipment designers met regularly with building owners, engineers, agency personnel and others to monitor ­progress and revise the schedule as needed. THE RESULTS The climate-controlled laboratory enclosure was completed on-time, on budget and met all the tenant’s exact tolerance specifications for the facility while minimizing the impact in the existing occupants of the building. Lab Installation Cools Concerns PROJECT NAME žž Federal Laboratory Renovation PROJECT LOCATION žž Atlanta, Georgia PROJECT TEAM žž Owner: Federal Agency žž Prime Contractor: McKenney’s, Inc. SPECIALIZATIONS Design/Build MARKETS žž Government žž Science & Technology The content of this document is not intended as an endorsement. www.mckenneys.com © 2018 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214