THE CHALLENGE
In addition to installing HVAC systems for a new
high-rise hotel, McKenney’s had to coordinate
the installation of an INNCOMTM
guestroom
automation system. However, before construc-
tion, the team first had to modify the original
design to meet budget parameters. Heavy
rains during building construction revealed
site drainage issues, requiring additional
structural work and jeopardizing the schedule.
THE SOLUTION
To safely and efficiently install mechanical sys-
tems, the team enlisted proven material han-
dling and layout procedures, automated building
layout technology and precise planning by fore-
men and the virtual construction team. When
site drainage issues presented delays, man-
power was reallocated to meet the compressed
schedule. The McKenney’s team coordinated
with the electrician to install, power up and test
the guestroom automation system in every room.
THE RESULTS
By collaborating with the project team on
design issues and navigating unforeseen
delays, McKenney’s kept the project on track
and on budget.
Playing Multiple Roles
PROJECT NAME
žž Hotel Tower Development
PROJECT LOCATION
žž Atlanta, Georgia
PROJECT TEAM
žž Owner: Major Hotel Chain
žž General Contractor:
Batson Cook Construction
žž Subcontractor: McKenney’s, Inc.
­PROJECT COMPLETION
žž 2017
SPECIALIZATIONS
	Design/Assist
	 Pipe Shop Prefab
MARKETS
žž Hospitality
The content of this document is not intended as an endorsement.
www.mckenneys.com
© 2017 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214

Playing Multiple Roles - Hospitality Construction

  • 1.
    M cKenney’s installed mechanical systemsand provided support for room control systems at a new hotel tower in Atlanta. THE CHALLENGE In addition to installing HVAC systems for a new high-rise hotel, McKenney’s had to coordinate the installation of an INNCOMTM guestroom automation system. However, before construc- tion, the team first had to modify the original design to meet budget parameters. Heavy rains during building construction revealed site drainage issues, requiring additional structural work and jeopardizing the schedule. THE SOLUTION To safely and efficiently install mechanical sys- tems, the team enlisted proven material han- dling and layout procedures, automated building layout technology and precise planning by fore- men and the virtual construction team. When site drainage issues presented delays, man- power was reallocated to meet the compressed schedule. The McKenney’s team coordinated with the electrician to install, power up and test the guestroom automation system in every room. THE RESULTS By collaborating with the project team on design issues and navigating unforeseen delays, McKenney’s kept the project on track and on budget. Playing Multiple Roles PROJECT NAME žž Hotel Tower Development PROJECT LOCATION žž Atlanta, Georgia PROJECT TEAM žž Owner: Major Hotel Chain žž General Contractor: Batson Cook Construction žž Subcontractor: McKenney’s, Inc. ­PROJECT COMPLETION žž 2017 SPECIALIZATIONS Design/Assist Pipe Shop Prefab MARKETS žž Hospitality The content of this document is not intended as an endorsement. www.mckenneys.com © 2017 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214