SlideShare a Scribd company logo
Background image: Boiler plant skid. Above: Rendering of the boiler plant skid.
T
he McKenney’s team worked on
a series of HVAC and domestic hot
water improvements for three sites
in Georgia’s state prison system.
THE CHALLENGE
The team had to convert outdated systems
and provide revitalized, energy efficient
solutions while maintaining standard
­conditions for the inmates. Multiple trade
crews required precise coordination by the
­McKenney’s team to stay on schedule while
in an active prison environment. Safety was
also a high priority while working in dark,
damp and ­confined spaces.
THE SOLUTION
The McKenney’s team installed new steam
to hot water heat exchangers, piping, fan
coil units, ducts and air distribution for 920
inmates, including two maximum security cell
blocks (240 inmates). At the other two prisons,
steam boilers were replaced with condensing
boilers to serve the facilities’ needs for heating
and DHW. Other improvements included a
chiller/cooling tower replacement, DDC controls
systems and electrical infrastructure. To keep
workers safe, the team followed protocols for
emergency egress procedures, air monitoring,
communication and lighting. Most of the assem-
blies were prefabricated and work was pre-
planned using three-week look-ahead schedules.
THE RESULTS
The prisons now have highly energy efficient
HVAC and domestic hot water systems.
A Breakout Turnkey HVAC Conversion
PROJECT NAME
žž GA DOC ESP Phase 2 –
HVAC Improvements
PROJECT LOCATION
žž Reidsville, Georgia
žž Jackson, Georgia
žž Trion, Georgia
PROJECT TEAM
žž Owner: Georgia Department
of Corrections
žž Turnkey Design Builder:
McKenney’s, Inc.
SPECIALIZATIONS
	Design/Build
	 Plumbing Shop Prefab
	 Sheet Metal Shop Prefab
MARKETS
žž Government
žž Central Plant
The content of this document is not intended as an endorsement.
www.mckenneys.com
© 2018 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214
Background image: Boiler plant skid.
Right: Rendering of the boiler plant skid.

More Related Content

Similar to A Breakout Turnkey HVAC Conversion - Turnkey Design/Build

Performing a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaPerforming a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, Georgia
McKenney's Inc
 
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NCBuilding Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
McKenney's Inc
 
Fast Track for High Tech HVAC
Fast Track for High Tech HVACFast Track for High Tech HVAC
Fast Track for High Tech HVAC
McKenney's Inc
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
McKenney's Inc
 
Cooling Down a Refrigeration Plant in Columbus, Georgia
Cooling Down a Refrigeration Plant in Columbus, Georgia Cooling Down a Refrigeration Plant in Columbus, Georgia
Cooling Down a Refrigeration Plant in Columbus, Georgia
McKenney's Inc
 
Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation
McKenney's Inc
 
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
McKenney's Inc
 
Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintLarge Campus Reduces Carbon Footprint
Large Campus Reduces Carbon Footprint
McKenney's Inc
 
Navigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsNavigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsMcKenney's Inc
 
Ensuring a Comfortable Hotel Stay | Chiller Plant Replacement Project
Ensuring a Comfortable Hotel Stay | Chiller Plant Replacement ProjectEnsuring a Comfortable Hotel Stay | Chiller Plant Replacement Project
Ensuring a Comfortable Hotel Stay | Chiller Plant Replacement Project
McKenney's Inc
 
Gig Harbor High School Promotional Sheet
Gig Harbor High School Promotional SheetGig Harbor High School Promotional Sheet
Gig Harbor High School Promotional SheetLinda Burman
 
Direct Digital Control (DDC) System Installation for HVAC
Direct Digital Control (DDC) System Installation for HVACDirect Digital Control (DDC) System Installation for HVAC
Direct Digital Control (DDC) System Installation for HVAC
McKenney's Inc
 
Equipped for Future Expansion - Hospital Infusion Suite, Atlanta, Georgia
Equipped for Future Expansion - Hospital Infusion Suite, Atlanta, GeorgiaEquipped for Future Expansion - Hospital Infusion Suite, Atlanta, Georgia
Equipped for Future Expansion - Hospital Infusion Suite, Atlanta, Georgia
McKenney's Inc
 
Luxury Meets Systems Expertise
Luxury Meets Systems ExpertiseLuxury Meets Systems Expertise
Luxury Meets Systems Expertise
McKenney's Inc
 
Evergreen alabama lyeffion 5 final report (5)
Evergreen alabama   lyeffion 5 final report (5)Evergreen alabama   lyeffion 5 final report (5)
Evergreen alabama lyeffion 5 final report (5)Thermacote
 
Delivering Turnkey Energy Savings
Delivering Turnkey Energy SavingsDelivering Turnkey Energy Savings
Delivering Turnkey Energy Savings
McKenney's Inc
 
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
McKenney's Inc
 
Conserving Energy One Step at a Time
Conserving Energy One Step at a TimeConserving Energy One Step at a Time
Conserving Energy One Step at a Time
McKenney's Inc
 
Cooling Down a Refrigeration Plant - Columbus, Georgia
Cooling Down a Refrigeration Plant - Columbus, GeorgiaCooling Down a Refrigeration Plant - Columbus, Georgia
Cooling Down a Refrigeration Plant - Columbus, Georgia
McKenney's Inc
 
Retrocommissioning Gets Results
Retrocommissioning Gets ResultsRetrocommissioning Gets Results
Retrocommissioning Gets Results
McKenney's Inc
 

Similar to A Breakout Turnkey HVAC Conversion - Turnkey Design/Build (20)

Performing a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaPerforming a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, Georgia
 
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NCBuilding Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
 
Fast Track for High Tech HVAC
Fast Track for High Tech HVACFast Track for High Tech HVAC
Fast Track for High Tech HVAC
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
 
Cooling Down a Refrigeration Plant in Columbus, Georgia
Cooling Down a Refrigeration Plant in Columbus, Georgia Cooling Down a Refrigeration Plant in Columbus, Georgia
Cooling Down a Refrigeration Plant in Columbus, Georgia
 
Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation
 
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
 
Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintLarge Campus Reduces Carbon Footprint
Large Campus Reduces Carbon Footprint
 
Navigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsNavigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top Units
 
Ensuring a Comfortable Hotel Stay | Chiller Plant Replacement Project
Ensuring a Comfortable Hotel Stay | Chiller Plant Replacement ProjectEnsuring a Comfortable Hotel Stay | Chiller Plant Replacement Project
Ensuring a Comfortable Hotel Stay | Chiller Plant Replacement Project
 
Gig Harbor High School Promotional Sheet
Gig Harbor High School Promotional SheetGig Harbor High School Promotional Sheet
Gig Harbor High School Promotional Sheet
 
Direct Digital Control (DDC) System Installation for HVAC
Direct Digital Control (DDC) System Installation for HVACDirect Digital Control (DDC) System Installation for HVAC
Direct Digital Control (DDC) System Installation for HVAC
 
Equipped for Future Expansion - Hospital Infusion Suite, Atlanta, Georgia
Equipped for Future Expansion - Hospital Infusion Suite, Atlanta, GeorgiaEquipped for Future Expansion - Hospital Infusion Suite, Atlanta, Georgia
Equipped for Future Expansion - Hospital Infusion Suite, Atlanta, Georgia
 
Luxury Meets Systems Expertise
Luxury Meets Systems ExpertiseLuxury Meets Systems Expertise
Luxury Meets Systems Expertise
 
Evergreen alabama lyeffion 5 final report (5)
Evergreen alabama   lyeffion 5 final report (5)Evergreen alabama   lyeffion 5 final report (5)
Evergreen alabama lyeffion 5 final report (5)
 
Delivering Turnkey Energy Savings
Delivering Turnkey Energy SavingsDelivering Turnkey Energy Savings
Delivering Turnkey Energy Savings
 
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
 
Conserving Energy One Step at a Time
Conserving Energy One Step at a TimeConserving Energy One Step at a Time
Conserving Energy One Step at a Time
 
Cooling Down a Refrigeration Plant - Columbus, Georgia
Cooling Down a Refrigeration Plant - Columbus, GeorgiaCooling Down a Refrigeration Plant - Columbus, Georgia
Cooling Down a Refrigeration Plant - Columbus, Georgia
 
Retrocommissioning Gets Results
Retrocommissioning Gets ResultsRetrocommissioning Gets Results
Retrocommissioning Gets Results
 

More from McKenney's Inc

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
McKenney's Inc
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
McKenney's Inc
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit Project
McKenney's Inc
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory Renovation
McKenney's Inc
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
McKenney's Inc
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
McKenney's Inc
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
McKenney's Inc
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
McKenney's Inc
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
McKenney's Inc
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
McKenney's Inc
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
McKenney's Inc
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney's Inc
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
McKenney's Inc
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
McKenney's Inc
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney's Inc
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
McKenney's Inc
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality Construction
McKenney's Inc
 
A High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionA High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use Construction
McKenney's Inc
 
Timely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationTimely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems Installation
McKenney's Inc
 
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GA
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GARooftop Data Center Chilled Water Plant Installation | Atlanta, GA
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GA
McKenney's Inc
 

More from McKenney's Inc (20)

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit Project
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory Renovation
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality Construction
 
A High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionA High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use Construction
 
Timely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationTimely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems Installation
 
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GA
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GARooftop Data Center Chilled Water Plant Installation | Atlanta, GA
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GA
 

Recently uploaded

Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
narasimhamurthyh4
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 

Recently uploaded (20)

Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 

A Breakout Turnkey HVAC Conversion - Turnkey Design/Build

  • 1. Background image: Boiler plant skid. Above: Rendering of the boiler plant skid. T he McKenney’s team worked on a series of HVAC and domestic hot water improvements for three sites in Georgia’s state prison system. THE CHALLENGE The team had to convert outdated systems and provide revitalized, energy efficient solutions while maintaining standard ­conditions for the inmates. Multiple trade crews required precise coordination by the ­McKenney’s team to stay on schedule while in an active prison environment. Safety was also a high priority while working in dark, damp and ­confined spaces. THE SOLUTION The McKenney’s team installed new steam to hot water heat exchangers, piping, fan coil units, ducts and air distribution for 920 inmates, including two maximum security cell blocks (240 inmates). At the other two prisons, steam boilers were replaced with condensing boilers to serve the facilities’ needs for heating and DHW. Other improvements included a chiller/cooling tower replacement, DDC controls systems and electrical infrastructure. To keep workers safe, the team followed protocols for emergency egress procedures, air monitoring, communication and lighting. Most of the assem- blies were prefabricated and work was pre- planned using three-week look-ahead schedules. THE RESULTS The prisons now have highly energy efficient HVAC and domestic hot water systems. A Breakout Turnkey HVAC Conversion PROJECT NAME žž GA DOC ESP Phase 2 – HVAC Improvements PROJECT LOCATION žž Reidsville, Georgia žž Jackson, Georgia žž Trion, Georgia PROJECT TEAM žž Owner: Georgia Department of Corrections žž Turnkey Design Builder: McKenney’s, Inc. SPECIALIZATIONS Design/Build Plumbing Shop Prefab Sheet Metal Shop Prefab MARKETS žž Government žž Central Plant The content of this document is not intended as an endorsement. www.mckenneys.com © 2018 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 Background image: Boiler plant skid. Right: Rendering of the boiler plant skid.