Traffic Signals
Safety and
Efficiency Project
– Stage Two
Implementation
National AITPM Conference,
WA Presentations
20 August 2015
2
The study looked at the Main Roads WA signal refinement processes by
examining two subject sites to identify:
• What signal treatments are currently utilised
• What signal improvements could be achieved
• Measures and methodology for signal timing refinement and
performance
• Main Roads WA signal refinement policy, management, and resources
Testing the use of an alternative method for optimising traffic signals to
squeeze more from existing infrastructure, this method being modelling with
integrated SCATS signal control.
Project Introduction
3
Why do this study?
The dream:
4
Why do this study?
The reality:
5
What is SCATS?
Sydney Coordinated Adaptive Traffic System
• SCATS monitors traffic volumes in real-time and coordinates traffic signals.
• It adjusts the coordination and green time of signals depending on the
traffic volumes detected on each approach.
• Approximately 900 signalised SCATS intersections in WA
(VicRoads Traffic Management Centre. Photograph courtesy of VicRoads.)
6
What is SCATS?
(Image courtesy of Google Street View.)
7
Stage One:
• Information from the Main Roads WA workshops and other sources
• Review of the SCATS settings
• Micro-simulation models built with SCATS signal control
• Morning, Midday, Evening, and Off peak periods tested
Stage Two:
• On-site implementation of recommended SCATS settings
• Assessment and evaluation of AM and PM periods
Many subject sites were considered but two were selected for testing:
• Orrong Road Corridor
• Tonkin Highway/ Kelvin Road intersection
Project Methodology
8
Tonkin Highway/ Kelvin Road Site Description
9
Orrong Road Site Description
10
Orrong Road Model
Orrong Road Model
12
Option Testing Plan
Orrong Road Quantitative Analysis
Option Option Details
Option 1
Determine the optimal cycle time and refine SCATS data which will include
operating incremental split selection
Option 2 Stagger the pedestrian crossing on Wright and Oat Streets
Option 3
On the south approach of Francisco Place implement a left turn only with a u-
turn bay on Orrong Road. At Archer Street and Wright Street implement a lag
right turn. SCATS data refined.
Option 4 Testing of Oats Street under a double diamond overlap operation
Option 5
Ultimate test, as per Option 1 with further refinement to SCATS data and
coordination
13
Percentage Change in Total Corridor Delay:
Orrong Road Quantitative Analysis
AM Midday PM Off-Peak Total
Option 1 -17.6% 25.8% 2.2% -7.0% -4.0%
Option 2 -2.4% 0.3% -7.8% 2.1% -3.7%
Option 3 -15.9% 2.4% 8.5% -7.8% -4.6%
Option 4 15.5% 8.0% 33.3% -2.5% 20.0%
Option 5 -16.8% 18.4% -13.2% -6.7% -10.0%
Equating this to annual delay cost to occupants, Option 5 would save
approximately $760,000 per year in lost time cost.
Carbon Emissions (grams):
AM Midday PM Off-Peak Total
Base 28,866 20,013 26,590 6,418 81,886
Option 1 26,786 20,953 27,641 6,038 81,419
Option 2 28,943 19,913 26,501 6,418 81,775
Option 3 27,273 19,776 28,161 6,044 81,255
Option 4 32,101 20,153 28,086 6,375 86,716
Option 5 27,546 20,484 26,614 6,092 80,736
14
Orrong Road Quantitative Analysis
00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
0 500 1000 1500 2000 2500 3000 3500
TravelTimeSeconds
Distance (m)
Westbound Journey Times - AM Peak
Base
Option 1
Option 2
Option 3
Option 4
Option 5
00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
0 500 1000 1500 2000 2500 3000 3500
TravelTimeSeconds
Distance (m)
Eastbound Journey Times - PM Peak
Base
Option 1
Option 2
Option 3
Option 4
Option 5
15
Orrong Road Base Model at Francisco Street
16
Orrong Road Option 5 Model at Francisco Street
17
• Option 5, widespread incremental split selection and optimal cycle time
with refinement, has the largest improvement in terms of delay and
average speed
• Option 1, 2, and 3 are considered to have performed slightly better
than the base model overall
• While improvement can be found through changes to the SCATS signal
settings, the current phasing setup can not be further improved.
Orrong Road Options Results Summary
18
• Pre-implementation assessment
• Recalibration and testing/ refinement of the option
• Trial Implementation
• On-site refinement
• Post-implementation assessment
• Evaluation Reporting
Stage Two: Orrong Road Implementation and
Evaluation
19
Orrong Road Option 5 Implementation Process
20
Orrong Road Option 5 Implementation Results
*Number of Queued Vehicles
21
Orrong Road Option 5 Implementation Results
*Number of Queued Vehicles
22
Orrong Road Option 5 Implementation Results
*Peak hour volumes
23
Orrong Road Option 5 Implementation Results
*Peak hour volumes
24
Orrong Road Option 5 Implementation Results
25
Orrong Road Option 5 Implementation Results
26
Stage Two Analysis Summary
• Vehicle throughput:
• up to 10% increase westbound, towards the Perth CBD, in the AM
period
• up to 3% increase eastbound, towards the Perth Hills, in the PM period
• Mixed travel time results:
• AM travel times remained relatively similar for both directions of travel
• PM period had a 20% decrease in travel times eastbound but a 16%
increase westbound.
• Overall mid-block and side roads queue lengths:
• 30% decrease in the AM period
• 34% decrease in the PM period
27
Overall Study Summary
• The use of ISS can improve the performance of several Orrong Road
intersections (ISS allows for more dynamic behaviour of the SCATS signal
phase splits)
• The reduction in cycle lengths provide a more balanced outcome for delays
• The use of micro-simulation modelling allowed multiple options to be tested
with the best performing option selected to provide an improvement once
implemented on-site.
• Future studies regarding the performance of signalised intersections should
have clearer communication links and protocols in place regarding signal
changes
28
Other Study Comments
• It is difficult to accurately allocate corridor benefits to individual SCATS settings.
• Higher cycle times allow increased periods of green time which can assist
slower vehicle types but these higher cycle times can lead to:
• Longer queue lengths, particularly on the side roads and in turn bays
• Increased delay for pedestrians.
• Increased driver inattention resulting in poor reaction times
• More red light running to avoid waiting for the next signal cycle
• SCATS setting changes should be assessed on a site by site basis depending
on the traffic patterns and the coordination with surrounding intersections.
29
Modelling Comparison
• Shorter queue lengths observed for both the modelled and on-street scenarios.
• Some variation between the predicted model journey times and the on-street
journey times. Due to:
• The impact of the signal changes on pedestrian phase calls
• The impacts of minor private driveways
• On-street variability in the performance of heavy haul vehicles
• On-street traffic pattern variability
• Looking at the overall model predictions, the model predicted the improvement
in the corridor performance.
30
SCATS Signals Optimisation
It is not just the signals fault!
31
Driver Inattention
32
The WA Space-Time Continuum
(Image Courtesy of Google Earth)
33
Acknowledgements
RAC WA Policy and Research Team
- Anne Still, Senior Manager
- Una Mehta, Senior Traffic Engineer
- Sarah Macaulay, Transport Planning Manager
ATS – Bill Sissons
Main Roads WA TOC and Road Network Operations team
Aurecon – Steve Cotton, Peer Reviewer
Peter Kartsidimas - Initiation Team
34
Thank You
(Image Courtesy of Wikipedia)

More Related Content

What's hot

James wright and philbert chan rssb
James wright and philbert chan rssbJames wright and philbert chan rssb
James wright and philbert chan rssb
IES / IAQM
 
SIE 250 Final Report
SIE 250 Final ReportSIE 250 Final Report
SIE 250 Final ReportQisong Xiao
 
Traffic signal
Traffic signalTraffic signal
Traffic signal
aloknitb
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
Aglaia Connect
 
L17.2 Synchro10
L17.2 Synchro10 L17.2 Synchro10
L17.2 Synchro10
Hossam Shafiq I
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015
Barry Scott
 
Fairfax County Wastewater Collection Asset Management Program Oct 2020
Fairfax County Wastewater Collection Asset Management Program  Oct 2020Fairfax County Wastewater Collection Asset Management Program  Oct 2020
Fairfax County Wastewater Collection Asset Management Program Oct 2020
Fairfax County
 
Antony Johnstone
Antony JohnstoneAntony Johnstone
Antony Johnstone
JumpingJaq
 
Air Quality Modelling
Air Quality ModellingAir Quality Modelling
Air Quality ModellingMark Chapman
 
Light vehicle dynamics and NOx emissions on the motorway network
Light vehicle dynamics and NOx emissions on the motorway networkLight vehicle dynamics and NOx emissions on the motorway network
Light vehicle dynamics and NOx emissions on the motorway network
IES / IAQM
 
Air Quality and the DMRB
Air Quality and the DMRBAir Quality and the DMRB
Air Quality and the DMRBMark Chapman
 
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDORCOORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDORRakesh Venkateswaran
 
LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743
losangelesaep
 
Uses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor developmentUses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor development
IES / IAQM
 
Azhar quaiyoom network rail
Azhar quaiyoom network railAzhar quaiyoom network rail
Azhar quaiyoom network rail
IES / IAQM
 
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2Reuben Juster, EIT
 
LAAEP CEQA Seminar: SB 743 In Practice
LAAEP CEQA Seminar: SB 743 In PracticeLAAEP CEQA Seminar: SB 743 In Practice
LAAEP CEQA Seminar: SB 743 In Practice
losangelesaep
 
Thailand pavement-management-system-tpms-3
Thailand pavement-management-system-tpms-3Thailand pavement-management-system-tpms-3
Thailand pavement-management-system-tpms-3
Priya Krishnan
 
Traffic Impact Assessment (TIA) and Level of Service (LoS)
Traffic Impact Assessment (TIA) and Level of Service (LoS)Traffic Impact Assessment (TIA) and Level of Service (LoS)
Traffic Impact Assessment (TIA) and Level of Service (LoS)
Zara Bizan, P.E., MIEM
 
DMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & EnvironmentDMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
IES / IAQM
 

What's hot (20)

James wright and philbert chan rssb
James wright and philbert chan rssbJames wright and philbert chan rssb
James wright and philbert chan rssb
 
SIE 250 Final Report
SIE 250 Final ReportSIE 250 Final Report
SIE 250 Final Report
 
Traffic signal
Traffic signalTraffic signal
Traffic signal
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
 
L17.2 Synchro10
L17.2 Synchro10 L17.2 Synchro10
L17.2 Synchro10
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015
 
Fairfax County Wastewater Collection Asset Management Program Oct 2020
Fairfax County Wastewater Collection Asset Management Program  Oct 2020Fairfax County Wastewater Collection Asset Management Program  Oct 2020
Fairfax County Wastewater Collection Asset Management Program Oct 2020
 
Antony Johnstone
Antony JohnstoneAntony Johnstone
Antony Johnstone
 
Air Quality Modelling
Air Quality ModellingAir Quality Modelling
Air Quality Modelling
 
Light vehicle dynamics and NOx emissions on the motorway network
Light vehicle dynamics and NOx emissions on the motorway networkLight vehicle dynamics and NOx emissions on the motorway network
Light vehicle dynamics and NOx emissions on the motorway network
 
Air Quality and the DMRB
Air Quality and the DMRBAir Quality and the DMRB
Air Quality and the DMRB
 
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDORCOORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
 
LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743
 
Uses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor developmentUses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor development
 
Azhar quaiyoom network rail
Azhar quaiyoom network railAzhar quaiyoom network rail
Azhar quaiyoom network rail
 
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
 
LAAEP CEQA Seminar: SB 743 In Practice
LAAEP CEQA Seminar: SB 743 In PracticeLAAEP CEQA Seminar: SB 743 In Practice
LAAEP CEQA Seminar: SB 743 In Practice
 
Thailand pavement-management-system-tpms-3
Thailand pavement-management-system-tpms-3Thailand pavement-management-system-tpms-3
Thailand pavement-management-system-tpms-3
 
Traffic Impact Assessment (TIA) and Level of Service (LoS)
Traffic Impact Assessment (TIA) and Level of Service (LoS)Traffic Impact Assessment (TIA) and Level of Service (LoS)
Traffic Impact Assessment (TIA) and Level of Service (LoS)
 
DMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & EnvironmentDMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
 

Viewers also liked

Real time traffic sign analysis
Real time traffic sign analysisReal time traffic sign analysis
Real time traffic sign analysis
Rakesh Patil
 
Automatic detection and recognition of road sign for driver assistance system
Automatic detection and recognition of road sign for driver assistance systemAutomatic detection and recognition of road sign for driver assistance system
Automatic detection and recognition of road sign for driver assistance system
sudhakar5472
 
Computer Vision for Traffic Sign Recognition
Computer Vision for Traffic Sign RecognitionComputer Vision for Traffic Sign Recognition
Computer Vision for Traffic Sign Recognitionthevijayps
 
Suzhou bridges
Suzhou bridgesSuzhou bridges
Suzhou bridges
Pei Zhenquan
 
Smart Traffic Lights that Learn ! Multi-Agent Reinforcement Learning Integ...
Smart Traffic Lights that Learn !    Multi-Agent Reinforcement Learning Integ...Smart Traffic Lights that Learn !    Multi-Agent Reinforcement Learning Integ...
Smart Traffic Lights that Learn ! Multi-Agent Reinforcement Learning Integ...
Jonathan Laba
 
The Future Development of Traffic Signals and the Impact of Autonomous Vehicles
The Future Development of Traffic Signals and the Impact of Autonomous VehiclesThe Future Development of Traffic Signals and the Impact of Autonomous Vehicles
The Future Development of Traffic Signals and the Impact of Autonomous Vehicles
JumpingJaq
 

Viewers also liked (8)

Real time traffic sign analysis
Real time traffic sign analysisReal time traffic sign analysis
Real time traffic sign analysis
 
Automatic detection and recognition of road sign for driver assistance system
Automatic detection and recognition of road sign for driver assistance systemAutomatic detection and recognition of road sign for driver assistance system
Automatic detection and recognition of road sign for driver assistance system
 
Adaptive Signals 101
Adaptive Signals 101Adaptive Signals 101
Adaptive Signals 101
 
Computer Vision for Traffic Sign Recognition
Computer Vision for Traffic Sign RecognitionComputer Vision for Traffic Sign Recognition
Computer Vision for Traffic Sign Recognition
 
Adaptive Signals 101
Adaptive Signals 101Adaptive Signals 101
Adaptive Signals 101
 
Suzhou bridges
Suzhou bridgesSuzhou bridges
Suzhou bridges
 
Smart Traffic Lights that Learn ! Multi-Agent Reinforcement Learning Integ...
Smart Traffic Lights that Learn !    Multi-Agent Reinforcement Learning Integ...Smart Traffic Lights that Learn !    Multi-Agent Reinforcement Learning Integ...
Smart Traffic Lights that Learn ! Multi-Agent Reinforcement Learning Integ...
 
The Future Development of Traffic Signals and the Impact of Autonomous Vehicles
The Future Development of Traffic Signals and the Impact of Autonomous VehiclesThe Future Development of Traffic Signals and the Impact of Autonomous Vehicles
The Future Development of Traffic Signals and the Impact of Autonomous Vehicles
 

Similar to Traffic Signals Safety and Efficiency Project – Stage Two Implementation

AITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony JohnstoneAITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony Johnstone
JumpingJaq
 
Spot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyarSpot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyar
Malika khalil
 
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
IRJET Journal
 
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finForum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Nathan Baker
 
SCT an Advanced Pipeline Integrity Solution
SCT an Advanced Pipeline Integrity SolutionSCT an Advanced Pipeline Integrity Solution
SCT an Advanced Pipeline Integrity Solution
Brett Payton
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATIONPROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
Wael Alawsey
 
ITS presentation final
ITS presentation final ITS presentation final
ITS presentation final
Alaa . H. Mousa
 
IRJET - Smart Traffic Monitoring System
IRJET -  	  Smart Traffic Monitoring SystemIRJET -  	  Smart Traffic Monitoring System
IRJET - Smart Traffic Monitoring System
IRJET Journal
 
Transportation enginering
Transportation engineringTransportation enginering
Transportation enginering
Sathik Mohamed
 
AITPM Conference Presentation -Callan Stirzaker
AITPM Conference Presentation -Callan StirzakerAITPM Conference Presentation -Callan Stirzaker
AITPM Conference Presentation -Callan Stirzaker
JumpingJaq
 
TRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARE
TRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARETRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARE
TRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARE
shrikrishna kesharwani
 
DMUG 2016 - Nigel Bellamy, Highways Agency
DMUG 2016 - Nigel Bellamy, Highways AgencyDMUG 2016 - Nigel Bellamy, Highways Agency
DMUG 2016 - Nigel Bellamy, Highways Agency
IES / IAQM
 
4. traffic engineering
4. traffic engineering4. traffic engineering
4. traffic engineering
holegajendra
 
Dynamic demand
Dynamic demandDynamic demand
Dynamic demand
JumpingJaq
 
Presentation on Spot Speed Study Analysis for the course CE 454
Presentation on Spot Speed Study Analysis for the course CE 454Presentation on Spot Speed Study Analysis for the course CE 454
Presentation on Spot Speed Study Analysis for the course CE 454
nazifa tabassum
 
Adaptive Traffic Control Systems Overview
Adaptive Traffic Control Systems OverviewAdaptive Traffic Control Systems Overview
Adaptive Traffic Control Systems Overview
Ali Goudarz Eghtedari, PhD, PE, PTOE
 
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
Kevin Callen
 
Franklin Pavement Management Presentation
Franklin Pavement Management PresentationFranklin Pavement Management Presentation
Franklin Pavement Management Presentation
Franklin Matters
 
Miranda Blogg
Miranda BloggMiranda Blogg
Miranda Blogg
JumpingJaq
 

Similar to Traffic Signals Safety and Efficiency Project – Stage Two Implementation (20)

AITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony JohnstoneAITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony Johnstone
 
Spot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyarSpot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyar
 
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
 
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finForum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
 
SCT an Advanced Pipeline Integrity Solution
SCT an Advanced Pipeline Integrity SolutionSCT an Advanced Pipeline Integrity Solution
SCT an Advanced Pipeline Integrity Solution
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATIONPROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
 
ITS presentation final
ITS presentation final ITS presentation final
ITS presentation final
 
IRJET - Smart Traffic Monitoring System
IRJET -  	  Smart Traffic Monitoring SystemIRJET -  	  Smart Traffic Monitoring System
IRJET - Smart Traffic Monitoring System
 
Transportation enginering
Transportation engineringTransportation enginering
Transportation enginering
 
AITPM Conference Presentation -Callan Stirzaker
AITPM Conference Presentation -Callan StirzakerAITPM Conference Presentation -Callan Stirzaker
AITPM Conference Presentation -Callan Stirzaker
 
TRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARE
TRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARETRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARE
TRAFFIC SIMULATION AT TOLL ROAD SECTION USING VISSIM SOFTWARE
 
DMUG 2016 - Nigel Bellamy, Highways Agency
DMUG 2016 - Nigel Bellamy, Highways AgencyDMUG 2016 - Nigel Bellamy, Highways Agency
DMUG 2016 - Nigel Bellamy, Highways Agency
 
4. traffic engineering
4. traffic engineering4. traffic engineering
4. traffic engineering
 
Dynamic demand
Dynamic demandDynamic demand
Dynamic demand
 
Presentation on Spot Speed Study Analysis for the course CE 454
Presentation on Spot Speed Study Analysis for the course CE 454Presentation on Spot Speed Study Analysis for the course CE 454
Presentation on Spot Speed Study Analysis for the course CE 454
 
Adaptive Traffic Control Systems Overview
Adaptive Traffic Control Systems OverviewAdaptive Traffic Control Systems Overview
Adaptive Traffic Control Systems Overview
 
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
 
Franklin Pavement Management Presentation
Franklin Pavement Management PresentationFranklin Pavement Management Presentation
Franklin Pavement Management Presentation
 
Miranda Blogg
Miranda BloggMiranda Blogg
Miranda Blogg
 

More from JumpingJaq

Richard Tang - Mitcham Princes Road Crossing
Richard Tang - Mitcham Princes Road CrossingRichard Tang - Mitcham Princes Road Crossing
Richard Tang - Mitcham Princes Road Crossing
JumpingJaq
 
Darren Blasdale - Seaford roundabout
Darren Blasdale - Seaford roundaboutDarren Blasdale - Seaford roundabout
Darren Blasdale - Seaford roundabout
JumpingJaq
 
Zak Valiff - Causeway Road and Semaphore Road Shared Use Paths
Zak Valiff - Causeway Road and Semaphore Road Shared Use PathsZak Valiff - Causeway Road and Semaphore Road Shared Use Paths
Zak Valiff - Causeway Road and Semaphore Road Shared Use Paths
JumpingJaq
 
Lydia Kairl - King William pedestrian crossings
Lydia Kairl - King William pedestrian crossingsLydia Kairl - King William pedestrian crossings
Lydia Kairl - King William pedestrian crossings
JumpingJaq
 
Shaun Smith - Resident street parties
Shaun Smith - Resident street partiesShaun Smith - Resident street parties
Shaun Smith - Resident street parties
JumpingJaq
 
Shaun Smith - Narrow road parking
Shaun Smith - Narrow road parkingShaun Smith - Narrow road parking
Shaun Smith - Narrow road parking
JumpingJaq
 
Edward Chan - Local Area Traffic Management Novar Gardens and Camden Park
Edward Chan - Local Area Traffic Management Novar Gardens and Camden ParkEdward Chan - Local Area Traffic Management Novar Gardens and Camden Park
Edward Chan - Local Area Traffic Management Novar Gardens and Camden Park
JumpingJaq
 
Li Meng - Shared mobility
Li Meng - Shared mobilityLi Meng - Shared mobility
Li Meng - Shared mobility
JumpingJaq
 
Gabby O'Neil - Safe System Approach
Gabby O'Neil - Safe System ApproachGabby O'Neil - Safe System Approach
Gabby O'Neil - Safe System Approach
JumpingJaq
 
Paul Froggatt - KWR presentation
Paul Froggatt - KWR presentationPaul Froggatt - KWR presentation
Paul Froggatt - KWR presentation
JumpingJaq
 
Ingrid Hunt - Traffic control device approval
Ingrid Hunt - Traffic control device approval  Ingrid Hunt - Traffic control device approval
Ingrid Hunt - Traffic control device approval
JumpingJaq
 
David Hayes - Robust decision making
David Hayes - Robust decision makingDavid Hayes - Robust decision making
David Hayes - Robust decision making
JumpingJaq
 
Paul Steely White Plenary
Paul Steely White PlenaryPaul Steely White Plenary
Paul Steely White Plenary
JumpingJaq
 
Aecom - Streets for people workshop
Aecom - Streets for people workshop Aecom - Streets for people workshop
Aecom - Streets for people workshop
JumpingJaq
 
AITPM Conference Presentation - Bob Davis
AITPM Conference Presentation - Bob DavisAITPM Conference Presentation - Bob Davis
AITPM Conference Presentation - Bob Davis
JumpingJaq
 
AITPM Conference Presentation - Casper Baum
AITPM Conference Presentation - Casper BaumAITPM Conference Presentation - Casper Baum
AITPM Conference Presentation - Casper Baum
JumpingJaq
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie Piggott
JumpingJaq
 
AITPM Conference Presentation - David Sanders
AITPM Conference Presentation - David SandersAITPM Conference Presentation - David Sanders
AITPM Conference Presentation - David Sanders
JumpingJaq
 
AITPM Conference Presentation - Willem Deddam
AITPM Conference Presentation - Willem DeddamAITPM Conference Presentation - Willem Deddam
AITPM Conference Presentation - Willem Deddam
JumpingJaq
 
AITPM Conference Presentation - Nicole Lockwood
AITPM Conference Presentation - Nicole LockwoodAITPM Conference Presentation - Nicole Lockwood
AITPM Conference Presentation - Nicole Lockwood
JumpingJaq
 

More from JumpingJaq (20)

Richard Tang - Mitcham Princes Road Crossing
Richard Tang - Mitcham Princes Road CrossingRichard Tang - Mitcham Princes Road Crossing
Richard Tang - Mitcham Princes Road Crossing
 
Darren Blasdale - Seaford roundabout
Darren Blasdale - Seaford roundaboutDarren Blasdale - Seaford roundabout
Darren Blasdale - Seaford roundabout
 
Zak Valiff - Causeway Road and Semaphore Road Shared Use Paths
Zak Valiff - Causeway Road and Semaphore Road Shared Use PathsZak Valiff - Causeway Road and Semaphore Road Shared Use Paths
Zak Valiff - Causeway Road and Semaphore Road Shared Use Paths
 
Lydia Kairl - King William pedestrian crossings
Lydia Kairl - King William pedestrian crossingsLydia Kairl - King William pedestrian crossings
Lydia Kairl - King William pedestrian crossings
 
Shaun Smith - Resident street parties
Shaun Smith - Resident street partiesShaun Smith - Resident street parties
Shaun Smith - Resident street parties
 
Shaun Smith - Narrow road parking
Shaun Smith - Narrow road parkingShaun Smith - Narrow road parking
Shaun Smith - Narrow road parking
 
Edward Chan - Local Area Traffic Management Novar Gardens and Camden Park
Edward Chan - Local Area Traffic Management Novar Gardens and Camden ParkEdward Chan - Local Area Traffic Management Novar Gardens and Camden Park
Edward Chan - Local Area Traffic Management Novar Gardens and Camden Park
 
Li Meng - Shared mobility
Li Meng - Shared mobilityLi Meng - Shared mobility
Li Meng - Shared mobility
 
Gabby O'Neil - Safe System Approach
Gabby O'Neil - Safe System ApproachGabby O'Neil - Safe System Approach
Gabby O'Neil - Safe System Approach
 
Paul Froggatt - KWR presentation
Paul Froggatt - KWR presentationPaul Froggatt - KWR presentation
Paul Froggatt - KWR presentation
 
Ingrid Hunt - Traffic control device approval
Ingrid Hunt - Traffic control device approval  Ingrid Hunt - Traffic control device approval
Ingrid Hunt - Traffic control device approval
 
David Hayes - Robust decision making
David Hayes - Robust decision makingDavid Hayes - Robust decision making
David Hayes - Robust decision making
 
Paul Steely White Plenary
Paul Steely White PlenaryPaul Steely White Plenary
Paul Steely White Plenary
 
Aecom - Streets for people workshop
Aecom - Streets for people workshop Aecom - Streets for people workshop
Aecom - Streets for people workshop
 
AITPM Conference Presentation - Bob Davis
AITPM Conference Presentation - Bob DavisAITPM Conference Presentation - Bob Davis
AITPM Conference Presentation - Bob Davis
 
AITPM Conference Presentation - Casper Baum
AITPM Conference Presentation - Casper BaumAITPM Conference Presentation - Casper Baum
AITPM Conference Presentation - Casper Baum
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie Piggott
 
AITPM Conference Presentation - David Sanders
AITPM Conference Presentation - David SandersAITPM Conference Presentation - David Sanders
AITPM Conference Presentation - David Sanders
 
AITPM Conference Presentation - Willem Deddam
AITPM Conference Presentation - Willem DeddamAITPM Conference Presentation - Willem Deddam
AITPM Conference Presentation - Willem Deddam
 
AITPM Conference Presentation - Nicole Lockwood
AITPM Conference Presentation - Nicole LockwoodAITPM Conference Presentation - Nicole Lockwood
AITPM Conference Presentation - Nicole Lockwood
 

Recently uploaded

A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Chapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdfChapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdf
Kartik Tiwari
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
Wasim Ak
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
deeptiverma2406
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
gb193092
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
Mohammed Sikander
 

Recently uploaded (20)

A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Chapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdfChapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdf
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
 

Traffic Signals Safety and Efficiency Project – Stage Two Implementation

  • 1. Traffic Signals Safety and Efficiency Project – Stage Two Implementation National AITPM Conference, WA Presentations 20 August 2015
  • 2. 2 The study looked at the Main Roads WA signal refinement processes by examining two subject sites to identify: • What signal treatments are currently utilised • What signal improvements could be achieved • Measures and methodology for signal timing refinement and performance • Main Roads WA signal refinement policy, management, and resources Testing the use of an alternative method for optimising traffic signals to squeeze more from existing infrastructure, this method being modelling with integrated SCATS signal control. Project Introduction
  • 3. 3 Why do this study? The dream:
  • 4. 4 Why do this study? The reality:
  • 5. 5 What is SCATS? Sydney Coordinated Adaptive Traffic System • SCATS monitors traffic volumes in real-time and coordinates traffic signals. • It adjusts the coordination and green time of signals depending on the traffic volumes detected on each approach. • Approximately 900 signalised SCATS intersections in WA (VicRoads Traffic Management Centre. Photograph courtesy of VicRoads.)
  • 6. 6 What is SCATS? (Image courtesy of Google Street View.)
  • 7. 7 Stage One: • Information from the Main Roads WA workshops and other sources • Review of the SCATS settings • Micro-simulation models built with SCATS signal control • Morning, Midday, Evening, and Off peak periods tested Stage Two: • On-site implementation of recommended SCATS settings • Assessment and evaluation of AM and PM periods Many subject sites were considered but two were selected for testing: • Orrong Road Corridor • Tonkin Highway/ Kelvin Road intersection Project Methodology
  • 8. 8 Tonkin Highway/ Kelvin Road Site Description
  • 9. 9 Orrong Road Site Description
  • 12. 12 Option Testing Plan Orrong Road Quantitative Analysis Option Option Details Option 1 Determine the optimal cycle time and refine SCATS data which will include operating incremental split selection Option 2 Stagger the pedestrian crossing on Wright and Oat Streets Option 3 On the south approach of Francisco Place implement a left turn only with a u- turn bay on Orrong Road. At Archer Street and Wright Street implement a lag right turn. SCATS data refined. Option 4 Testing of Oats Street under a double diamond overlap operation Option 5 Ultimate test, as per Option 1 with further refinement to SCATS data and coordination
  • 13. 13 Percentage Change in Total Corridor Delay: Orrong Road Quantitative Analysis AM Midday PM Off-Peak Total Option 1 -17.6% 25.8% 2.2% -7.0% -4.0% Option 2 -2.4% 0.3% -7.8% 2.1% -3.7% Option 3 -15.9% 2.4% 8.5% -7.8% -4.6% Option 4 15.5% 8.0% 33.3% -2.5% 20.0% Option 5 -16.8% 18.4% -13.2% -6.7% -10.0% Equating this to annual delay cost to occupants, Option 5 would save approximately $760,000 per year in lost time cost. Carbon Emissions (grams): AM Midday PM Off-Peak Total Base 28,866 20,013 26,590 6,418 81,886 Option 1 26,786 20,953 27,641 6,038 81,419 Option 2 28,943 19,913 26,501 6,418 81,775 Option 3 27,273 19,776 28,161 6,044 81,255 Option 4 32,101 20,153 28,086 6,375 86,716 Option 5 27,546 20,484 26,614 6,092 80,736
  • 14. 14 Orrong Road Quantitative Analysis 00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 0 500 1000 1500 2000 2500 3000 3500 TravelTimeSeconds Distance (m) Westbound Journey Times - AM Peak Base Option 1 Option 2 Option 3 Option 4 Option 5 00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 0 500 1000 1500 2000 2500 3000 3500 TravelTimeSeconds Distance (m) Eastbound Journey Times - PM Peak Base Option 1 Option 2 Option 3 Option 4 Option 5
  • 15. 15 Orrong Road Base Model at Francisco Street
  • 16. 16 Orrong Road Option 5 Model at Francisco Street
  • 17. 17 • Option 5, widespread incremental split selection and optimal cycle time with refinement, has the largest improvement in terms of delay and average speed • Option 1, 2, and 3 are considered to have performed slightly better than the base model overall • While improvement can be found through changes to the SCATS signal settings, the current phasing setup can not be further improved. Orrong Road Options Results Summary
  • 18. 18 • Pre-implementation assessment • Recalibration and testing/ refinement of the option • Trial Implementation • On-site refinement • Post-implementation assessment • Evaluation Reporting Stage Two: Orrong Road Implementation and Evaluation
  • 19. 19 Orrong Road Option 5 Implementation Process
  • 20. 20 Orrong Road Option 5 Implementation Results *Number of Queued Vehicles
  • 21. 21 Orrong Road Option 5 Implementation Results *Number of Queued Vehicles
  • 22. 22 Orrong Road Option 5 Implementation Results *Peak hour volumes
  • 23. 23 Orrong Road Option 5 Implementation Results *Peak hour volumes
  • 24. 24 Orrong Road Option 5 Implementation Results
  • 25. 25 Orrong Road Option 5 Implementation Results
  • 26. 26 Stage Two Analysis Summary • Vehicle throughput: • up to 10% increase westbound, towards the Perth CBD, in the AM period • up to 3% increase eastbound, towards the Perth Hills, in the PM period • Mixed travel time results: • AM travel times remained relatively similar for both directions of travel • PM period had a 20% decrease in travel times eastbound but a 16% increase westbound. • Overall mid-block and side roads queue lengths: • 30% decrease in the AM period • 34% decrease in the PM period
  • 27. 27 Overall Study Summary • The use of ISS can improve the performance of several Orrong Road intersections (ISS allows for more dynamic behaviour of the SCATS signal phase splits) • The reduction in cycle lengths provide a more balanced outcome for delays • The use of micro-simulation modelling allowed multiple options to be tested with the best performing option selected to provide an improvement once implemented on-site. • Future studies regarding the performance of signalised intersections should have clearer communication links and protocols in place regarding signal changes
  • 28. 28 Other Study Comments • It is difficult to accurately allocate corridor benefits to individual SCATS settings. • Higher cycle times allow increased periods of green time which can assist slower vehicle types but these higher cycle times can lead to: • Longer queue lengths, particularly on the side roads and in turn bays • Increased delay for pedestrians. • Increased driver inattention resulting in poor reaction times • More red light running to avoid waiting for the next signal cycle • SCATS setting changes should be assessed on a site by site basis depending on the traffic patterns and the coordination with surrounding intersections.
  • 29. 29 Modelling Comparison • Shorter queue lengths observed for both the modelled and on-street scenarios. • Some variation between the predicted model journey times and the on-street journey times. Due to: • The impact of the signal changes on pedestrian phase calls • The impacts of minor private driveways • On-street variability in the performance of heavy haul vehicles • On-street traffic pattern variability • Looking at the overall model predictions, the model predicted the improvement in the corridor performance.
  • 30. 30 SCATS Signals Optimisation It is not just the signals fault!
  • 32. 32 The WA Space-Time Continuum (Image Courtesy of Google Earth)
  • 33. 33 Acknowledgements RAC WA Policy and Research Team - Anne Still, Senior Manager - Una Mehta, Senior Traffic Engineer - Sarah Macaulay, Transport Planning Manager ATS – Bill Sissons Main Roads WA TOC and Road Network Operations team Aurecon – Steve Cotton, Peer Reviewer Peter Kartsidimas - Initiation Team