Dan Gira, CEQA Program Manager
Amec Foster Wheeler
Environment & Infrastructure
daniel.gira@amecfw.com
 AB 32 – Global Warming Solutions Act
 Reduce GHGs
 SB375 – Sustainable Communities and Climate
Protection Act
 Link land use & transportation planning
 Reduce Vehicle Miles Traveled (VMT)
 Reduce GHGs
 AB 1358 – Complete Streets Act
 Local government must provide multimodal
transportation network
 Current CEQA Guidelines
 Vehicle delay/level of service (LOS) is a
measurement of transportation impact
 EIR identifies impact of project on traffic flow
 EIR mitigates impact with roadway improvements
 Wider roads/ more turn lanes
 More signalized intersections
 Impacts to other transportation modes
 Impacts to community character
 Financial consequences
 Propose Updated CEQA Guidelines
 Alternative transportation impact methodology
 Vehicle miles traveled
 Vehicle miles traveled per capita
 Automobile trip generation rates
 Automobile trips generated
 Other locally significant metrics or criteria
 Upon new Guidelines adoption
 Vehicle delay no longer an impact within TPAs or
HQTAs.
 Vehicle delay may be impact outside of TPA or
HQTA
Impact analysis with SB 743
 Guidelines Implementation Issues
 Effective date of CEQA Guidelines (2015?)
 Required application limited to TPAs
 TPAs vary widely by jurisdiction
 Focused on more highly urbanized areas
 Limited or not mandated non-TPA areas
 Discretionary for these agencies
 Balancing act for agency staff/ consultants
 Citizen concerns/ acceptance
 Decision-maker understanding/ acceptance
 Challenges
 Adds potential additional EIR complexities
 Optional/ inapplicable in growing urban edge
 Potential need for use of dual standards in EIRs
 LOS/ roadway ADT analysis may still be required
 Hot Spots, Noise, TAC
 Early ID of new thresholds/ methodologies
 Coordination with regional planning agency
 Projects in pipeline
 Determine if agency has goals or thresholds
 Adopted vs. case-by-case
 Options for scope of study (VMT and/or LOS)
 Confirm methodology
 Determine applicability
 Project within ½ mile of major transit stop or
high quality transit corridor
 Other factors
 Decision-maker and citizen awareness/concerns
 Regional VMTs
 Availability of Travel Demand Model
 Regional planning framework
 Adopted sustainable communities plan
 Local VMTs
 Updated jurisdiction-wide model available?
 CalEEMod & Assumptions
 Establish threshold
 VMTs greater than regional average
 General Plan standards
 Different standards within a jurisdiction
 New CEQA Guidelines within TPA
 New Guidelines and/or LOS outside of TPA
 Local and Regional Model Consistency
 Technical Specialist Coordination
 Project timing
 EIR underway
 New projects
 New CEQA Guidelines/possible metrics
 VMTs exceed regional average by land use
 Less than significant in TPA
 Less than significant if project reduces VMTs
 Local discretion to determine significance
 Sustainable Communities Strategy consistency
 Adequacy of bike-pedestrian-transit linkages
 Corridor travel times
 Downtown major mixed use project
 Transit priority project
 In well-served TPA (bus + pending rail)
 Adjacent to new LRT
 Existing Agency Thresholds & Methodology
 Thresholds - LOS, CMP, Bike/Ped./ Transit conflicts
 Travel Demand Model- AVR, transit, bike assumptions
 Detailed travel demand model
 Programmatic SB 743 Analysis
 Model and evaluate project VMTs
 Urban Downtown Specific Plan EIR
 Focus on Transit Priority Projects
 Encompasses Transit Rich TPA (bus/ pending rail)
 Thresholds/ Methodology
 Existing strict LOS standards
 Access to transit, bike, pedestrian facilities
 No net new trips metric
 Key transportation corridor changes in travel times
 Programmatic discussion of SB 743
 Changes in citywide wide VMTs
 Coastal Resort Hotels
 In mapped TPA
 Difficult transit access
 Bike or pedestrian facilities lacking
 Headways greater than 20 minutes
 Dual Methodology Approach
 Address LOS standards
 Programmatic discussion of SB 743
 Transit and Commuting
 Transit system improvement (headways)
 Subsidized transit passes
 Carpooling, telecommuting, flex-schedules
 Parking
 Reduce parking requirements, unbundled or shared
parking programs
 Public parking pricing, cash-out programs
 Bicycling and Walking
 Bike system improvements (bike parking, lockers,
showers)
 Pedestrian system improvements (Safe Routes to
School, wayfinding, ped-only connections)
 Embrace and utilize new CEQA Guidelines
 Adopt tailored thresholds
 Address all modes of transportation
 Promote Transit Priority Projects
 Balance new Guidelines with LOS Standards
 Use Guideline based thresholds
 Multi-modal General Plan standards (LOS+)
 Retain LOS Based Approach
 Outside of TPAs
 Include discussion of SB 743 or dual analysis
 Review of applicability within community
 ID TPA and Non-TPA areas
 Implications of single vs. dual approach
 Real world quality of transit, bike-ped facilities
 Outreach and education
 Workshops- community groups/ developers
 Decision-maker briefings
 Adoption of revised methodologies/ thresholds
 Long Term
 Review regional plans, general plan, CIP, fee
programs and coordination with transit providers
Dan Gira, CEQA Program Manager
daniel.gira@amecfw.com
805-962-0992

More Related Content

What's hot

2040 Metropolitan Transportation Plan and Downtown Huntington Access Study
2040 Metropolitan Transportation Plan and Downtown Huntington Access Study2040 Metropolitan Transportation Plan and Downtown Huntington Access Study
2040 Metropolitan Transportation Plan and Downtown Huntington Access Study
pyoungkyova
 
Reimagining Public Engagement for the Richmond Region
Reimagining Public Engagement for the Richmond RegionReimagining Public Engagement for the Richmond Region
Reimagining Public Engagement for the Richmond Region
RPO America
 
Relief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation PresentationRelief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation Presentation
City of Toronto - Relief Line Project Assessment
 
Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
Toronto Public Consultation Unit
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
SCVTA
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
Toronto Public Consultation Unit
 
Performance Measures for Highway Capacity Decision Making
Performance Measures forHighway Capacity Decision MakingPerformance Measures forHighway Capacity Decision Making
Performance Measures for Highway Capacity Decision Making
pyoungkyova
 
Scarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation PlanScarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation Plan
Toronto Public Consultation Unit
 
KYOVA Freight Presentation
KYOVA Freight PresentationKYOVA Freight Presentation
KYOVA Freight Presentation
pyoungkyova
 
Public workshops for Transit Options Amherst Buffalo
Public workshops for Transit Options Amherst BuffaloPublic workshops for Transit Options Amherst Buffalo
Public workshops for Transit Options Amherst Buffalo
mmartineck
 
Scarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of ReferenceScarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of Reference
Toronto Public Consultation Unit
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
Toronto Public Consultation Unit
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
Toronto Public Consultation Unit
 
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County
 
SmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display BoardsSmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display Boards
Toronto Public Consultation Unit
 
GoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT ProjectGoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT Project
The Chamber For a Greater Chapel Hill-Carrboro
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
Toronto Public Consultation Unit
 
Chapel Hill Transit North-South BRT Project
Chapel Hill Transit North-South BRT ProjectChapel Hill Transit North-South BRT Project
Chapel Hill Transit North-South BRT Project
The Chamber For a Greater Chapel Hill-Carrboro
 
Relief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and CriteriaRelief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and Criteria
Toronto Public Consultation Unit
 
Relief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation ReportRelief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation Report
Toronto Public Consultation Unit
 

What's hot (20)

2040 Metropolitan Transportation Plan and Downtown Huntington Access Study
2040 Metropolitan Transportation Plan and Downtown Huntington Access Study2040 Metropolitan Transportation Plan and Downtown Huntington Access Study
2040 Metropolitan Transportation Plan and Downtown Huntington Access Study
 
Reimagining Public Engagement for the Richmond Region
Reimagining Public Engagement for the Richmond RegionReimagining Public Engagement for the Richmond Region
Reimagining Public Engagement for the Richmond Region
 
Relief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation PresentationRelief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation Presentation
 
Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
 
Performance Measures for Highway Capacity Decision Making
Performance Measures forHighway Capacity Decision MakingPerformance Measures forHighway Capacity Decision Making
Performance Measures for Highway Capacity Decision Making
 
Scarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation PlanScarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation Plan
 
KYOVA Freight Presentation
KYOVA Freight PresentationKYOVA Freight Presentation
KYOVA Freight Presentation
 
Public workshops for Transit Options Amherst Buffalo
Public workshops for Transit Options Amherst BuffaloPublic workshops for Transit Options Amherst Buffalo
Public workshops for Transit Options Amherst Buffalo
 
Scarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of ReferenceScarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of Reference
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
 
SmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display BoardsSmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display Boards
 
GoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT ProjectGoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT Project
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Chapel Hill Transit North-South BRT Project
Chapel Hill Transit North-South BRT ProjectChapel Hill Transit North-South BRT Project
Chapel Hill Transit North-South BRT Project
 
Relief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and CriteriaRelief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and Criteria
 
Relief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation ReportRelief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation Report
 

Similar to LAAEP CEQA Seminar: SB 743 In Practice

Miami-Dade Accessibility Based Needs Assessment presentation
Miami-Dade Accessibility Based Needs Assessment presentationMiami-Dade Accessibility Based Needs Assessment presentation
Miami-Dade Accessibility Based Needs Assessment presentation
Miami-Dade Transportation Planning Organization
 
A Coming Revolution in CEQA and Sustainable Communities Planning
A Coming Revolution in CEQA and Sustainable Communities PlanningA Coming Revolution in CEQA and Sustainable Communities Planning
A Coming Revolution in CEQA and Sustainable Communities Planning
dwayne2m
 
Cleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National PerspectiveCleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National Perspective
Miami-Dade Transportation Planning Organization
 
Routes to Clean Air 2015 - Prof. Graham Parkhurst
Routes to Clean Air 2015 - Prof. Graham ParkhurstRoutes to Clean Air 2015 - Prof. Graham Parkhurst
Routes to Clean Air 2015 - Prof. Graham Parkhurst
IES / IAQM
 
Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...
Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...
Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...
Smart Commute
 
Building a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRTBuilding a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRT
Trailnet
 
SB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
SB 743 & VMT – CEQA Implementation and Issues for Agencies and DevelopersSB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
SB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
Meyers Nave
 
Planning And Compulsory Purchase
Planning And Compulsory PurchasePlanning And Compulsory Purchase
Planning And Compulsory Purchase
ahmad bassiouny
 
Sustainable Transport - David Browne, Brian Caulfield & Margaret O’Mahony - E...
Sustainable Transport - David Browne, Brian Caulfield & Margaret O’Mahony - E...Sustainable Transport - David Browne, Brian Caulfield & Margaret O’Mahony - E...
Sustainable Transport - David Browne, Brian Caulfield & Margaret O’Mahony - E...
Environmental Protection Agency, Ireland
 
Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...
Institute for Transport Studies (ITS)
 
Counting Future Carbs and Decarbs: How to Know You are on a Carbon Diet
Counting Future Carbs and Decarbs:How to Know You are on a Carbon DietCounting Future Carbs and Decarbs:How to Know You are on a Carbon Diet
Counting Future Carbs and Decarbs: How to Know You are on a Carbon Diet
WRI Ross Center for Sustainable Cities
 
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxMKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
NURSUHANABINTIBORHAN
 
Developing A Sustainable Transportation Environmental Improvement Plan
Developing A Sustainable Transportation Environmental Improvement PlanDeveloping A Sustainable Transportation Environmental Improvement Plan
Developing A Sustainable Transportation Environmental Improvement Plan
guest79a6df3
 
Tyrone toole support for pkrmmp 14 june 2011
Tyrone toole support for pkrmmp 14 june 2011Tyrone toole support for pkrmmp 14 june 2011
Tyrone toole support for pkrmmp 14 june 2011
Indonesia Infrastructure Initiative
 
The economic basis of major transport decisions
The economic basis of major transport decisionsThe economic basis of major transport decisions
The economic basis of major transport decisions
Institute for Transport Studies (ITS)
 
12228696.ppt
12228696.ppt12228696.ppt
12228696.ppt
MuhammadIhksanAkbar
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
RPO America
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
ssuserc1ed5e
 
Mobility Fees - An Overview
Mobility Fees - An OverviewMobility Fees - An Overview
Mobility Fees - An Overview
Renaissance Planning
 
TDM and Transportation Infrastructure: An Essential Part of Any Master Plan
TDM and Transportation Infrastructure: An Essential Part of Any Master PlanTDM and Transportation Infrastructure: An Essential Part of Any Master Plan
TDM and Transportation Infrastructure: An Essential Part of Any Master Plan
Harvard Campus Services
 

Similar to LAAEP CEQA Seminar: SB 743 In Practice (20)

Miami-Dade Accessibility Based Needs Assessment presentation
Miami-Dade Accessibility Based Needs Assessment presentationMiami-Dade Accessibility Based Needs Assessment presentation
Miami-Dade Accessibility Based Needs Assessment presentation
 
A Coming Revolution in CEQA and Sustainable Communities Planning
A Coming Revolution in CEQA and Sustainable Communities PlanningA Coming Revolution in CEQA and Sustainable Communities Planning
A Coming Revolution in CEQA and Sustainable Communities Planning
 
Cleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National PerspectiveCleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National Perspective
 
Routes to Clean Air 2015 - Prof. Graham Parkhurst
Routes to Clean Air 2015 - Prof. Graham ParkhurstRoutes to Clean Air 2015 - Prof. Graham Parkhurst
Routes to Clean Air 2015 - Prof. Graham Parkhurst
 
Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...
Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...
Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...
 
Building a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRTBuilding a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRT
 
SB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
SB 743 & VMT – CEQA Implementation and Issues for Agencies and DevelopersSB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
SB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
 
Planning And Compulsory Purchase
Planning And Compulsory PurchasePlanning And Compulsory Purchase
Planning And Compulsory Purchase
 
Sustainable Transport - David Browne, Brian Caulfield & Margaret O’Mahony - E...
Sustainable Transport - David Browne, Brian Caulfield & Margaret O’Mahony - E...Sustainable Transport - David Browne, Brian Caulfield & Margaret O’Mahony - E...
Sustainable Transport - David Browne, Brian Caulfield & Margaret O’Mahony - E...
 
Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...
 
Counting Future Carbs and Decarbs: How to Know You are on a Carbon Diet
Counting Future Carbs and Decarbs:How to Know You are on a Carbon DietCounting Future Carbs and Decarbs:How to Know You are on a Carbon Diet
Counting Future Carbs and Decarbs: How to Know You are on a Carbon Diet
 
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxMKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
 
Developing A Sustainable Transportation Environmental Improvement Plan
Developing A Sustainable Transportation Environmental Improvement PlanDeveloping A Sustainable Transportation Environmental Improvement Plan
Developing A Sustainable Transportation Environmental Improvement Plan
 
Tyrone toole support for pkrmmp 14 june 2011
Tyrone toole support for pkrmmp 14 june 2011Tyrone toole support for pkrmmp 14 june 2011
Tyrone toole support for pkrmmp 14 june 2011
 
The economic basis of major transport decisions
The economic basis of major transport decisionsThe economic basis of major transport decisions
The economic basis of major transport decisions
 
12228696.ppt
12228696.ppt12228696.ppt
12228696.ppt
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
Mobility Fees - An Overview
Mobility Fees - An OverviewMobility Fees - An Overview
Mobility Fees - An Overview
 
TDM and Transportation Infrastructure: An Essential Part of Any Master Plan
TDM and Transportation Infrastructure: An Essential Part of Any Master PlanTDM and Transportation Infrastructure: An Essential Part of Any Master Plan
TDM and Transportation Infrastructure: An Essential Part of Any Master Plan
 

Recently uploaded

BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 

Recently uploaded (20)

BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 

LAAEP CEQA Seminar: SB 743 In Practice

  • 1. Dan Gira, CEQA Program Manager Amec Foster Wheeler Environment & Infrastructure daniel.gira@amecfw.com
  • 2.  AB 32 – Global Warming Solutions Act  Reduce GHGs  SB375 – Sustainable Communities and Climate Protection Act  Link land use & transportation planning  Reduce Vehicle Miles Traveled (VMT)  Reduce GHGs  AB 1358 – Complete Streets Act  Local government must provide multimodal transportation network
  • 3.  Current CEQA Guidelines  Vehicle delay/level of service (LOS) is a measurement of transportation impact  EIR identifies impact of project on traffic flow  EIR mitigates impact with roadway improvements  Wider roads/ more turn lanes  More signalized intersections  Impacts to other transportation modes  Impacts to community character  Financial consequences
  • 4.  Propose Updated CEQA Guidelines  Alternative transportation impact methodology  Vehicle miles traveled  Vehicle miles traveled per capita  Automobile trip generation rates  Automobile trips generated  Other locally significant metrics or criteria  Upon new Guidelines adoption  Vehicle delay no longer an impact within TPAs or HQTAs.  Vehicle delay may be impact outside of TPA or HQTA
  • 6.  Guidelines Implementation Issues  Effective date of CEQA Guidelines (2015?)  Required application limited to TPAs  TPAs vary widely by jurisdiction  Focused on more highly urbanized areas  Limited or not mandated non-TPA areas  Discretionary for these agencies  Balancing act for agency staff/ consultants  Citizen concerns/ acceptance  Decision-maker understanding/ acceptance
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.  Challenges  Adds potential additional EIR complexities  Optional/ inapplicable in growing urban edge  Potential need for use of dual standards in EIRs  LOS/ roadway ADT analysis may still be required  Hot Spots, Noise, TAC  Early ID of new thresholds/ methodologies  Coordination with regional planning agency  Projects in pipeline
  • 12.  Determine if agency has goals or thresholds  Adopted vs. case-by-case  Options for scope of study (VMT and/or LOS)  Confirm methodology  Determine applicability  Project within ½ mile of major transit stop or high quality transit corridor  Other factors  Decision-maker and citizen awareness/concerns
  • 13.  Regional VMTs  Availability of Travel Demand Model  Regional planning framework  Adopted sustainable communities plan  Local VMTs  Updated jurisdiction-wide model available?  CalEEMod & Assumptions  Establish threshold  VMTs greater than regional average  General Plan standards
  • 14.  Different standards within a jurisdiction  New CEQA Guidelines within TPA  New Guidelines and/or LOS outside of TPA  Local and Regional Model Consistency  Technical Specialist Coordination  Project timing  EIR underway  New projects
  • 15.  New CEQA Guidelines/possible metrics  VMTs exceed regional average by land use  Less than significant in TPA  Less than significant if project reduces VMTs  Local discretion to determine significance  Sustainable Communities Strategy consistency  Adequacy of bike-pedestrian-transit linkages  Corridor travel times
  • 16.  Downtown major mixed use project  Transit priority project  In well-served TPA (bus + pending rail)  Adjacent to new LRT  Existing Agency Thresholds & Methodology  Thresholds - LOS, CMP, Bike/Ped./ Transit conflicts  Travel Demand Model- AVR, transit, bike assumptions  Detailed travel demand model  Programmatic SB 743 Analysis  Model and evaluate project VMTs
  • 17.  Urban Downtown Specific Plan EIR  Focus on Transit Priority Projects  Encompasses Transit Rich TPA (bus/ pending rail)  Thresholds/ Methodology  Existing strict LOS standards  Access to transit, bike, pedestrian facilities  No net new trips metric  Key transportation corridor changes in travel times  Programmatic discussion of SB 743  Changes in citywide wide VMTs
  • 18.  Coastal Resort Hotels  In mapped TPA  Difficult transit access  Bike or pedestrian facilities lacking  Headways greater than 20 minutes  Dual Methodology Approach  Address LOS standards  Programmatic discussion of SB 743
  • 19.  Transit and Commuting  Transit system improvement (headways)  Subsidized transit passes  Carpooling, telecommuting, flex-schedules  Parking  Reduce parking requirements, unbundled or shared parking programs  Public parking pricing, cash-out programs  Bicycling and Walking  Bike system improvements (bike parking, lockers, showers)  Pedestrian system improvements (Safe Routes to School, wayfinding, ped-only connections)
  • 20.  Embrace and utilize new CEQA Guidelines  Adopt tailored thresholds  Address all modes of transportation  Promote Transit Priority Projects  Balance new Guidelines with LOS Standards  Use Guideline based thresholds  Multi-modal General Plan standards (LOS+)  Retain LOS Based Approach  Outside of TPAs  Include discussion of SB 743 or dual analysis
  • 21.  Review of applicability within community  ID TPA and Non-TPA areas  Implications of single vs. dual approach  Real world quality of transit, bike-ped facilities  Outreach and education  Workshops- community groups/ developers  Decision-maker briefings  Adoption of revised methodologies/ thresholds  Long Term  Review regional plans, general plan, CIP, fee programs and coordination with transit providers
  • 22. Dan Gira, CEQA Program Manager daniel.gira@amecfw.com 805-962-0992