There are basically three main units of a thermal power plant:
1. Steam Generator or Boiler
2. Steam Turbine
3. Electric Generator
Electricity From Coal
Basic Principle
Objectives of Instrumentation & Control
Efficient Operation of the plant.
Economic Operation of the plant.
Safe operation of the plant.
Pollution control
This entire task is often taken up by control &
instrumentation or simply instrumentation system which
has following functions:-
a) Measurement
b) Control
c) Operation
d) Monitoring
e) Protection
Quantities To Be Measured:
For a Plant Measurement system needs to be:
 Very accurate
 Reliable
 Delays should be as small as possible
 Should be switched on manually when a overall control
system fails.
 Pressure
 Temperature
 Flow
 Level
 Expansion/ Contraction
 Analysis of (1) Water (2) Steam (3) Flue Gases
And Others
Measurement Points & Variables
Variables/ Measuring Points Types Of Sensors/ Approx. number
Parameters Instruments in the plant
(1)Pressure (a) Boiler Bourdon Tube,
(b) Turbine Diaphragm,
(c) Turbine Throttle Bellows 375-400
(d) Furnace Bell Gauges
(2)Tempera (a Steam at superheater Thermocouple
ture inlet & outlet
(b Feed Water at
economiser inlet
(c Water at condenser RTD 700-750
inlet
(d Air Preheater
(e Flue Gases Thermocouple
(e Bearing of turbine & Thermocouple
generator
(f feed pump, condensate RTD
pump
(3) Flow (a High Pressure Steam Orifice, Venturi, 75-100
(b Feed water inlet Flow Nozzle,etc.
(c Condensate
(4) Level (a Boiler Drum
(b condensate tank Differential 75-100
(c Water line pressure methods
(5) Expansion (a Turbine Shaft Relative 6-8
(b Turbine casing Displacement
(6) Vibration (a turbine & generator Mass spring with
shafts & bearing shells Potentiometric
Capacitive, eddy 30-50
current, piezo
electric & optical
types are used
(7) Analysis
(i) WATER (a feed water at econ-
-omiser inlet
(b Boiler inlet Conductive cell 8-12
(c Condenser with meter
(d Condensate pump
discharge
(ii) STEAM (a Saturated steam Conductive cell 4-6
(b Main line steam with meter
(c Super heater inlet Na Analyser 1-2
(iii) FLUE
GASES (a O2 – Economiser to air Zirconia cell 2-4
heater
(b CO2 – Air heater inlet CO2 analyser 2-4
& outlet
(c CO – stack CO analyser 2-4
(d SO2 - Stack SO2 analyser 1-2
(e Nitrogen Oxide- stack N- Oxide Analysesr 1-2
(f Dust concn.- stack Optical method 2-3
Measurement of Pressure
Pressure measuring devices are divided into two groups:
 Liquid Columns
 Expansion Elements
Liquid columns:
.
Low range pressure measurement
May be of U-Tube type or well-Type.
Unknown
Pressure
These are not favoured in modern power plant but are still used in older
power plants.
Expansion Elements:
Used in modern power plants.
Usually metallic & its movement indicates the pressure.
Either directly coupled with mechanical linkages or indirectly by an
electrical transducer connected to a read out device .
Main Expansion Elements are:
Diaphragms.
Bellows
Bourden tube
Diaphragms
 Commonly corrugated diaphragms are used because large deflection can
be produced without nonlinearity compared with flat type.
 In order to increase the deflection capabilities two or more corrugated
diaphragms are welded at the circumferences--- Capsule element.
Bellows:
Manufactured from
Brass, Brass alloys,
Stainless steel.
Used for low pressure
measurement.
For high pressure
measurement bellows
are connected with
spring.
Bourden Tube
 C shaped and made into an
arc of about 270
0
 Material from which it made
depends upon the pressure range
of the device
 Bourdon tubes are also used
in forms other than C type:-
 Spiral element: large
movement than C tube.
Helical element: produce more
or less circular movement which
is useful for driving a recorder
pen directly.
Measurement of Temperature
Temperature can be measured only by using indirect methods.
The most important parameter in thermal power plant is temperature and its
measurement plays a vital role in safe operation of the plant.
Rise of temperature in a substance is due to the resultant increase in
molecular activity of the substance on application of heat; which increases
the internal energy of the material .
The efficiency of generation also depend on the temperature measurement
T2 = Tempreture inside the condenser.
T1= Superheater temperature.
1T
2T
1
Measurement of Temperature
Expansion Thermometer
In this type of measurement two dissimilar metal tube having different
expansion coefficient are attached end to end.
For same temperature change difference in the lengths are compared and
calibrated for unknown temperature measurement.
Variation in length is slight and has to be magnified for detection.
THERMOELECTRIC THERMOMETRY
This device is based on SEEBACK and PELTIER effect. It comprises of
two junctions at different temperature. Then the emf is induced in the
circuit due to the flow of electrons. This is an important part in the plant.
The actual value depend upon the material used and on temperature
difference between the junctions.
RESISTANCE THERMOMETRY
Suggested by Siemens in 1871- but not satisfactory used for high
temperature .
Today RTD is given by H.L.Calender in 1891
PROPERTY-The resistance of the conductor changes when its temperature
is changed.
Copper is occasionally used.
Platinum, nickel or nickel alloys are commonly used .
Tungsten is used for high temperature applications
METAL MIN. TEMP. MAX.TEMP. MELTING
POINT
PLATINUM -260
0
C 110
0
C 1773
0
C
COPPER 0
0
C 180
0
C 1083
0
C
NICKEL -220
0
C 300
0
C 1435
0
C
TUNGSTEN -200
0
C 1000
0
C 3370
0
C
RTDs
ULTRA VIOLET SENSOR
This device is used in furnace and it measures the intensity of
ultra violet rays there and according to the wave generated
which directly indicates the temperature in the furnace.
Measurement of Flow
A universal flow meter for all applications in power station is not
available.
Infect there are more ways of measuring flow than measuring
pressure & temperature.
Dual function meters usually measure flow rate with linear output &
minimum error.
Vortex & Ultrasonic meters have become available in recent years
(1986) & their full potential is not still fully developed.
Two principle measurements are made by flow meters viz. quantity
of flow and rate of flow.
 'Quantity of flow' is the quantity of fluid passing a given point in a
given time, i.e. gallons or pounds.
 ‘Rate of flow' is the speed of a fluid passing a given point at a given
instant and is proportional to quantity passing at a given instant, i.e.
gallons per minute or pounds per hour.
There are two groups of measuring devices:-
1. POSITIVE, OR VOLUMETRIC, which measure flow by
transferring a measured quantity of fluid from the inlet to the
outlet.
2. INFERENTIAL, which measures the velocity of the flow and the
volume passed is inferred, it being equal to the velocity times the
cross sectional area of the flow. The inferential type is the most
widely used.
Analysis
pH, DO,TURBIDITY & HYDRAZINE:
 Need to be checked for acidity (pH), Dissolved oxygen(DO)
 Turbidity arising out of contamination by suspended
particles .
 Hydrazine which is added from outside to the feed water but
the excess should be monitored.
 Oxygen reacts with thallium to form thallium oxide which in
aqueous solution show good conductivity.
Functions
Control and instrumentation in any process industry, can be compared
to the nerve system in the human being.
The way the nerve system controls the operation of various limbs of
human beings, C&I in the same way controls and operates various
motors, pumps, etc and thus helps us to achieve our targets.
C&I, as the name indicates, is a branch in engineering which deals
with various measurement, indication, transmission and control in
different technical field.
The main work of C&I department is to observe, control and
manipulate electrical as well as non-electrical quantities like
temperature, pressure, vibrations.
C&I department governs the whole functioning and operation of
power plant through the Central Control System (DDC-MIS)
“Distributed Digital Control Monitoring and Information System”.
Labs in Control and Instrumentation
Department of Thermal Plant
Control and Instrumentation Department has following labs:
1. Manometry Lab
2. Protection and Interlocks Lab
3. Automation Lab
4. Electronics Lab
5. Water Treatment Plant
6. Furnaces Safety Supervisory System Lab
Manometry Lab
1. TRANSMITTERS
It is used for pressure measurements of gases and liquids, its working
principle is that the input pressure is converted into electrostatic
capacitance and from there it is conditioned and amplified. It gives an
output of 4-20 ma DC. It can be mounted on a pipe or a wall. For liquid or
steam measurement transmitters is mounted below main process piping
and for gas measurement transmitter is placed above pipe.
2. MANOMETER
It’s a tube which is bent, in U shape. It is filled with a liquid. This device
corresponds to a difference in pressure across the two limbs.
3. BOURDEN PRESSURE GAUGE
It’s an oval section tube. Its one end is fixed. It is provided with a pointer
to indicate the pressure on a calibrated scale. It is of 2 types:
(a) Spiral type: for Low pressure measurement.
(b) Helical Type: for High pressure measurement.
Protection and Interlocking Lab
INTERLOCKING
It is basically interconnecting two or more equipments so that if one
equipments fails other one can perform the tasks. This type of
interdependence is also created so that equipments connected together
are started and shut down in the specific sequence to avoid damage.
 For protection of equipments tripping are provided for all the
equipments. Tripping can be considered as the series of instructions
connected through OR Gates.
 When a fault occurs and any one of the tripping is satisfied a signal is
sent to the relay, which trips the circuit. The main equipments of this
lab are relay and circuit breakers
 Some of instrument used for protection are:
1. RELAY
It is a protective device. It can detect wrong condition in electrical
circuits by constantly measuring the electrical quantities flowing under
normal and faulty conditions. Some of the electrical quantities are
voltage, current, phase angle and velocity.
2. FUSES
It is a short piece of metal inserted in the circuit, which melts when
heavy current flows through it and thus breaks the circuit. Usually
silver is used as a fuse material .
3. MINIATURE CIRCUIT BREAKER
They are used with combination of the control circuits to-
a) Enable the staring of plant and distributors.
b) Protect the circuit in case of a fault.
In consists of current carrying contacts, one movable and other fixed.
When a fault occurs the contacts separate and are is stuck between
them.
Automation Lab
This lab deals in automating the existing equipment and feeding
routes.
Earlier, the old technology dealt with only (DAS) Data
Acquisition System known as primary systems.
The modern technology or the secondary systems are coupled
with (MIS) Management Information System.
All the control instruments are excited by 24V supply (4-20mA)
because voltage can be mathematically handled with ease
therefore all control systems use voltage system for
computation.
FURNACE SAFETY AND SUPERVISORY
SYSTEM LAB
This lab has the responsibility of starting fire in the furnace to
enable the burning of coal..
Unburnt coal is removed using forced draft or induced draft fan.
The temperature inside the boiler is 1100 degree Celsius and its
height is 18 to 40 m. It is made up of mild steel.
An ultra violet sensor is employed in furnace to measure the
intensity of ultra violet rays inside the furnace and according to it a
signal in the same order of same mV is generated which directly
indicates the temperature of the furnace.
For firing the furnace a 10 KV spark plug is operated for ten
seconds over a spray of diesel fuel and pre-heater air along each of
the feeder-mills.
Electronics Lab
This lab undertakes the calibration and testing of various cards. It
houses various types of analytical instruments like oscilloscopes,
integrated circuits, cards auto analyzers etc.
Various processes undertaken in this lab are:
1. Transmitter converts mV to mA.
2. Auto analyzer purifies the sample before it is sent to electrodes
Operation and Maintenance Lab
Electrical Maintenance Division:
It is responsible for maintenance of:
1. Boiler side motors
2. Turbine side motors
3. Outside motors
4. Switchgear
 Protection By switch gear It makes or breaks an electrical
circuit.
Pollution Control systems:
In order to ensure that NTPC comply with all the stipulated environment
norms, various pollution control systems / devices as discussed below have
been installed to control air and water pollution.
1. Electrostatic Precipitators:
The ash left behind after combustion of coal is arrested in high efficiency
Electrostatic Precipitators (ESP’s) and particulate emission is controlled well within
the stipulated norms. The ash collected in the ESP’s is disposed to Ash Ponds in
slurry form.
2. Flue Gas Stacks:
Tall Flue Gas Stacks have been provided for wide dispersion of the gaseous
emissions (SOX, NOX etc) into the atmosphere.
3. Neutralisation Pits:
Neutralisation pits have been provided in the Water Treatment Plant (WTP) for
pH correction of the effluents nbefore discharge into Effluent Treatment Plant
(ETP) for further treatment and use.
5. Cooling Towers
Cooling Towers have been provided for cooling the hot Condenser cooling
water in closed cycle Condenser Cooling Water (CCW) Systems. This helps
in reduction in thermal pollution and conservation of fresh water.
6. Ash Water Recycling System:
In the AWRS, the effluent from ash pond is circulated back to the station for
further ash sluicing to the ash pond. This helps in savings of fresh water
requirements for transportation of ash from the plant.
Liquid Waste Water/Effluents Treatment
Plants & Management System:
1. The objective of industrial liquid effluent treatment plant (ETP) is
to discharge lesser and cleaner effluent from the power plants to
meet environmental regulations.
2. After primary treatment at the source of their generation, the
effluents are sent to the ETP for further treatment.
3. The scheme involves collection of various effluents and their
appropriate treatment centrally and re-circulation of the treated
effluent for various plant uses.
Thermal plant instrumentation and control

More Related Content

What's hot

A technical overview of thermal power plant
A technical overview of thermal power plantA technical overview of thermal power plant
A technical overview of thermal power plant
Mirdul Amin Sarkar
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
Nitin Patel
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
SHIVAJI CHOUDHURY
 
Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul
Manohar Tatwawadi
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
Jaypee power ventures limited
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONS
Manohar Tatwawadi
 
Basics of Gas Turbine Power Plant
Basics of Gas Turbine Power PlantBasics of Gas Turbine Power Plant
Basics of Gas Turbine Power Plant
S.Vijaya Bhaskar
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
Utkarsh Chaubey
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedure
Ashvani Shukla
 
Types of Controllers PID PD I PD
Types of Controllers PID PD I PDTypes of Controllers PID PD I PD
Types of Controllers PID PD I PD
Anaseem Hanini
 
Turbine governing system an overview
Turbine governing system an overviewTurbine governing system an overview
Turbine governing system an overview
Gaurav Kaushik
 
Cogeneration power plant
Cogeneration power plantCogeneration power plant
Cogeneration power plant
Ashish Kumar Jain
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
Gaurav Kaushik
 
Power Plant Boiler feed pump
Power Plant Boiler feed pump Power Plant Boiler feed pump
Power Plant Boiler feed pump
Vundavilli Gautham
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
Billa ParameswaraRao
 
Improvement in the efficiency of thermal power plant
Improvement in the efficiency of thermal power plantImprovement in the efficiency of thermal power plant
Improvement in the efficiency of thermal power plant
Anshu Agrawal
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
Nishkam Dhiman
 
Steam Power Plant
Steam Power PlantSteam Power Plant
Steam Power Plant
Ahmad Bilal
 

What's hot (20)

A technical overview of thermal power plant
A technical overview of thermal power plantA technical overview of thermal power plant
A technical overview of thermal power plant
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
 
Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONS
 
Basics of Gas Turbine Power Plant
Basics of Gas Turbine Power PlantBasics of Gas Turbine Power Plant
Basics of Gas Turbine Power Plant
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedure
 
An Overview of Thermal Power Plant
An Overview of Thermal Power PlantAn Overview of Thermal Power Plant
An Overview of Thermal Power Plant
 
Types of Controllers PID PD I PD
Types of Controllers PID PD I PDTypes of Controllers PID PD I PD
Types of Controllers PID PD I PD
 
Turbine governing system an overview
Turbine governing system an overviewTurbine governing system an overview
Turbine governing system an overview
 
Cogeneration power plant
Cogeneration power plantCogeneration power plant
Cogeneration power plant
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
Power Plant Boiler feed pump
Power Plant Boiler feed pump Power Plant Boiler feed pump
Power Plant Boiler feed pump
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
 
Improvement in the efficiency of thermal power plant
Improvement in the efficiency of thermal power plantImprovement in the efficiency of thermal power plant
Improvement in the efficiency of thermal power plant
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
Steam Power Plant
Steam Power PlantSteam Power Plant
Steam Power Plant
 

Similar to Thermal plant instrumentation and control

Shilpa ppt thermal plant copy
Shilpa ppt thermal plant   copyShilpa ppt thermal plant   copy
Shilpa ppt thermal plant copyShilpa Shukla
 
Sarvesh 2
Sarvesh 2Sarvesh 2
Sarvesh 2
sarvesh kumar
 
Thermal power plant by sarvesh
Thermal power plant by sarveshThermal power plant by sarvesh
Thermal power plant by sarvesh
sarvesh kumar
 
Control System Components
Control System ComponentsControl System Components
Control System Components
Fertiglobe
 
panki thermal power plant presentation c&i.ppt
panki thermal power plant presentation c&i.pptpanki thermal power plant presentation c&i.ppt
panki thermal power plant presentation c&i.ppt
Vikas Tiwari
 
Temperature & Flow By MMS
Temperature & Flow By MMSTemperature & Flow By MMS
Temperature & Flow By MMS
Meer Muhammad Soomro
 
Measuring INSTRUMENTS
Measuring INSTRUMENTSMeasuring INSTRUMENTS
Measuring INSTRUMENTS
SACHINNikam39
 
Automated process control systems
Automated process control systemsAutomated process control systems
Automated process control systems
Shine Thenu
 
"INSTRUMENTS AND ITS MEASUREMENT"
"INSTRUMENTS AND ITS MEASUREMENT""INSTRUMENTS AND ITS MEASUREMENT"
"INSTRUMENTS AND ITS MEASUREMENT"
Yogesh Chauhan
 
Meeting w13 chapter 4 part 3
Meeting w13   chapter 4 part 3Meeting w13   chapter 4 part 3
Meeting w13 chapter 4 part 3Hattori Sidek
 
NTPC Major Training Report
NTPC Major Training ReportNTPC Major Training Report
NTPC Major Training Report
Anand Dwivedi
 
DEEP4.pdf
DEEP4.pdfDEEP4.pdf
DEEP4.pdf
rajvarya
 
i to p conveter
i to p  conveteri to p  conveter
i to p conveter
Mohammed Ali Rayeen
 
1.)(485 pages) C&I Measurements and Conversions.docx
1.)(485 pages) C&I Measurements and Conversions.docx1.)(485 pages) C&I Measurements and Conversions.docx
1.)(485 pages) C&I Measurements and Conversions.docx
ArjunSen24
 
Vikalo instruments Technical Presentation
Vikalo instruments Technical PresentationVikalo instruments Technical Presentation
Vikalo instruments Technical Presentation
Vikalo Instruments
 
Sensors
SensorsSensors
Sensors
nmahi96
 
STUDY Of ENERGY AUDIT INSTRUMENTS
 STUDY Of ENERGY AUDIT INSTRUMENTS STUDY Of ENERGY AUDIT INSTRUMENTS
STUDY Of ENERGY AUDIT INSTRUMENTS
MonishBafna
 
Final report
Final reportFinal report
Final report
Ravi Singh
 

Similar to Thermal plant instrumentation and control (20)

Shilpa ppt thermal plant copy
Shilpa ppt thermal plant   copyShilpa ppt thermal plant   copy
Shilpa ppt thermal plant copy
 
Sarvesh 2
Sarvesh 2Sarvesh 2
Sarvesh 2
 
Thermal power plant by sarvesh
Thermal power plant by sarveshThermal power plant by sarvesh
Thermal power plant by sarvesh
 
Control System Components
Control System ComponentsControl System Components
Control System Components
 
panki thermal power plant presentation c&i.ppt
panki thermal power plant presentation c&i.pptpanki thermal power plant presentation c&i.ppt
panki thermal power plant presentation c&i.ppt
 
Temperature & Flow By MMS
Temperature & Flow By MMSTemperature & Flow By MMS
Temperature & Flow By MMS
 
Iocl
IoclIocl
Iocl
 
Measuring INSTRUMENTS
Measuring INSTRUMENTSMeasuring INSTRUMENTS
Measuring INSTRUMENTS
 
Automated process control systems
Automated process control systemsAutomated process control systems
Automated process control systems
 
"INSTRUMENTS AND ITS MEASUREMENT"
"INSTRUMENTS AND ITS MEASUREMENT""INSTRUMENTS AND ITS MEASUREMENT"
"INSTRUMENTS AND ITS MEASUREMENT"
 
Meeting w13 chapter 4 part 3
Meeting w13   chapter 4 part 3Meeting w13   chapter 4 part 3
Meeting w13 chapter 4 part 3
 
NTPC Major Training Report
NTPC Major Training ReportNTPC Major Training Report
NTPC Major Training Report
 
DEEP4.pdf
DEEP4.pdfDEEP4.pdf
DEEP4.pdf
 
i to p conveter
i to p  conveteri to p  conveter
i to p conveter
 
1.)(485 pages) C&I Measurements and Conversions.docx
1.)(485 pages) C&I Measurements and Conversions.docx1.)(485 pages) C&I Measurements and Conversions.docx
1.)(485 pages) C&I Measurements and Conversions.docx
 
Vikalo instruments Technical Presentation
Vikalo instruments Technical PresentationVikalo instruments Technical Presentation
Vikalo instruments Technical Presentation
 
Sensors
SensorsSensors
Sensors
 
STUDY Of ENERGY AUDIT INSTRUMENTS
 STUDY Of ENERGY AUDIT INSTRUMENTS STUDY Of ENERGY AUDIT INSTRUMENTS
STUDY Of ENERGY AUDIT INSTRUMENTS
 
Temprature sensor
Temprature sensorTemprature sensor
Temprature sensor
 
Final report
Final reportFinal report
Final report
 

Recently uploaded

Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
AkolbilaEmmanuel1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 

Recently uploaded (20)

Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 

Thermal plant instrumentation and control

  • 1. Instrumentation Scheme of Thermal Power Plant By: Shilpa Mishra ME, IC, Panjab
  • 2. There are basically three main units of a thermal power plant: 1. Steam Generator or Boiler 2. Steam Turbine 3. Electric Generator
  • 4. Objectives of Instrumentation & Control Efficient Operation of the plant. Economic Operation of the plant. Safe operation of the plant. Pollution control
  • 5. This entire task is often taken up by control & instrumentation or simply instrumentation system which has following functions:- a) Measurement b) Control c) Operation d) Monitoring e) Protection
  • 6. Quantities To Be Measured: For a Plant Measurement system needs to be:  Very accurate  Reliable  Delays should be as small as possible  Should be switched on manually when a overall control system fails.  Pressure  Temperature  Flow  Level  Expansion/ Contraction  Analysis of (1) Water (2) Steam (3) Flue Gases And Others
  • 7. Measurement Points & Variables Variables/ Measuring Points Types Of Sensors/ Approx. number Parameters Instruments in the plant (1)Pressure (a) Boiler Bourdon Tube, (b) Turbine Diaphragm, (c) Turbine Throttle Bellows 375-400 (d) Furnace Bell Gauges (2)Tempera (a Steam at superheater Thermocouple ture inlet & outlet (b Feed Water at economiser inlet (c Water at condenser RTD 700-750 inlet (d Air Preheater (e Flue Gases Thermocouple
  • 8. (e Bearing of turbine & Thermocouple generator (f feed pump, condensate RTD pump (3) Flow (a High Pressure Steam Orifice, Venturi, 75-100 (b Feed water inlet Flow Nozzle,etc. (c Condensate (4) Level (a Boiler Drum (b condensate tank Differential 75-100 (c Water line pressure methods (5) Expansion (a Turbine Shaft Relative 6-8 (b Turbine casing Displacement (6) Vibration (a turbine & generator Mass spring with shafts & bearing shells Potentiometric Capacitive, eddy 30-50 current, piezo electric & optical types are used
  • 9. (7) Analysis (i) WATER (a feed water at econ- -omiser inlet (b Boiler inlet Conductive cell 8-12 (c Condenser with meter (d Condensate pump discharge (ii) STEAM (a Saturated steam Conductive cell 4-6 (b Main line steam with meter (c Super heater inlet Na Analyser 1-2 (iii) FLUE GASES (a O2 – Economiser to air Zirconia cell 2-4 heater (b CO2 – Air heater inlet CO2 analyser 2-4 & outlet (c CO – stack CO analyser 2-4 (d SO2 - Stack SO2 analyser 1-2 (e Nitrogen Oxide- stack N- Oxide Analysesr 1-2 (f Dust concn.- stack Optical method 2-3
  • 10. Measurement of Pressure Pressure measuring devices are divided into two groups:  Liquid Columns  Expansion Elements Liquid columns: . Low range pressure measurement May be of U-Tube type or well-Type. Unknown Pressure
  • 11. These are not favoured in modern power plant but are still used in older power plants. Expansion Elements: Used in modern power plants. Usually metallic & its movement indicates the pressure. Either directly coupled with mechanical linkages or indirectly by an electrical transducer connected to a read out device . Main Expansion Elements are: Diaphragms. Bellows Bourden tube
  • 12. Diaphragms  Commonly corrugated diaphragms are used because large deflection can be produced without nonlinearity compared with flat type.  In order to increase the deflection capabilities two or more corrugated diaphragms are welded at the circumferences--- Capsule element.
  • 13. Bellows: Manufactured from Brass, Brass alloys, Stainless steel. Used for low pressure measurement. For high pressure measurement bellows are connected with spring.
  • 14. Bourden Tube  C shaped and made into an arc of about 270 0  Material from which it made depends upon the pressure range of the device  Bourdon tubes are also used in forms other than C type:-  Spiral element: large movement than C tube. Helical element: produce more or less circular movement which is useful for driving a recorder pen directly.
  • 15. Measurement of Temperature Temperature can be measured only by using indirect methods.
  • 16. The most important parameter in thermal power plant is temperature and its measurement plays a vital role in safe operation of the plant. Rise of temperature in a substance is due to the resultant increase in molecular activity of the substance on application of heat; which increases the internal energy of the material . The efficiency of generation also depend on the temperature measurement T2 = Tempreture inside the condenser. T1= Superheater temperature. 1T 2T 1
  • 17. Measurement of Temperature Expansion Thermometer In this type of measurement two dissimilar metal tube having different expansion coefficient are attached end to end. For same temperature change difference in the lengths are compared and calibrated for unknown temperature measurement. Variation in length is slight and has to be magnified for detection.
  • 18. THERMOELECTRIC THERMOMETRY This device is based on SEEBACK and PELTIER effect. It comprises of two junctions at different temperature. Then the emf is induced in the circuit due to the flow of electrons. This is an important part in the plant. The actual value depend upon the material used and on temperature difference between the junctions.
  • 19. RESISTANCE THERMOMETRY Suggested by Siemens in 1871- but not satisfactory used for high temperature . Today RTD is given by H.L.Calender in 1891 PROPERTY-The resistance of the conductor changes when its temperature is changed. Copper is occasionally used. Platinum, nickel or nickel alloys are commonly used . Tungsten is used for high temperature applications METAL MIN. TEMP. MAX.TEMP. MELTING POINT PLATINUM -260 0 C 110 0 C 1773 0 C COPPER 0 0 C 180 0 C 1083 0 C NICKEL -220 0 C 300 0 C 1435 0 C TUNGSTEN -200 0 C 1000 0 C 3370 0 C
  • 20. RTDs ULTRA VIOLET SENSOR This device is used in furnace and it measures the intensity of ultra violet rays there and according to the wave generated which directly indicates the temperature in the furnace.
  • 21. Measurement of Flow A universal flow meter for all applications in power station is not available. Infect there are more ways of measuring flow than measuring pressure & temperature. Dual function meters usually measure flow rate with linear output & minimum error. Vortex & Ultrasonic meters have become available in recent years (1986) & their full potential is not still fully developed. Two principle measurements are made by flow meters viz. quantity of flow and rate of flow.  'Quantity of flow' is the quantity of fluid passing a given point in a given time, i.e. gallons or pounds.  ‘Rate of flow' is the speed of a fluid passing a given point at a given instant and is proportional to quantity passing at a given instant, i.e. gallons per minute or pounds per hour.
  • 22. There are two groups of measuring devices:- 1. POSITIVE, OR VOLUMETRIC, which measure flow by transferring a measured quantity of fluid from the inlet to the outlet. 2. INFERENTIAL, which measures the velocity of the flow and the volume passed is inferred, it being equal to the velocity times the cross sectional area of the flow. The inferential type is the most widely used.
  • 23. Analysis pH, DO,TURBIDITY & HYDRAZINE:  Need to be checked for acidity (pH), Dissolved oxygen(DO)  Turbidity arising out of contamination by suspended particles .  Hydrazine which is added from outside to the feed water but the excess should be monitored.  Oxygen reacts with thallium to form thallium oxide which in aqueous solution show good conductivity.
  • 24.
  • 25. Functions Control and instrumentation in any process industry, can be compared to the nerve system in the human being. The way the nerve system controls the operation of various limbs of human beings, C&I in the same way controls and operates various motors, pumps, etc and thus helps us to achieve our targets. C&I, as the name indicates, is a branch in engineering which deals with various measurement, indication, transmission and control in different technical field. The main work of C&I department is to observe, control and manipulate electrical as well as non-electrical quantities like temperature, pressure, vibrations.
  • 26. C&I department governs the whole functioning and operation of power plant through the Central Control System (DDC-MIS) “Distributed Digital Control Monitoring and Information System”.
  • 27. Labs in Control and Instrumentation Department of Thermal Plant Control and Instrumentation Department has following labs: 1. Manometry Lab 2. Protection and Interlocks Lab 3. Automation Lab 4. Electronics Lab 5. Water Treatment Plant 6. Furnaces Safety Supervisory System Lab
  • 28. Manometry Lab 1. TRANSMITTERS It is used for pressure measurements of gases and liquids, its working principle is that the input pressure is converted into electrostatic capacitance and from there it is conditioned and amplified. It gives an output of 4-20 ma DC. It can be mounted on a pipe or a wall. For liquid or steam measurement transmitters is mounted below main process piping and for gas measurement transmitter is placed above pipe. 2. MANOMETER It’s a tube which is bent, in U shape. It is filled with a liquid. This device corresponds to a difference in pressure across the two limbs. 3. BOURDEN PRESSURE GAUGE It’s an oval section tube. Its one end is fixed. It is provided with a pointer to indicate the pressure on a calibrated scale. It is of 2 types: (a) Spiral type: for Low pressure measurement. (b) Helical Type: for High pressure measurement.
  • 29. Protection and Interlocking Lab INTERLOCKING It is basically interconnecting two or more equipments so that if one equipments fails other one can perform the tasks. This type of interdependence is also created so that equipments connected together are started and shut down in the specific sequence to avoid damage.  For protection of equipments tripping are provided for all the equipments. Tripping can be considered as the series of instructions connected through OR Gates.  When a fault occurs and any one of the tripping is satisfied a signal is sent to the relay, which trips the circuit. The main equipments of this lab are relay and circuit breakers
  • 30.  Some of instrument used for protection are: 1. RELAY It is a protective device. It can detect wrong condition in electrical circuits by constantly measuring the electrical quantities flowing under normal and faulty conditions. Some of the electrical quantities are voltage, current, phase angle and velocity. 2. FUSES It is a short piece of metal inserted in the circuit, which melts when heavy current flows through it and thus breaks the circuit. Usually silver is used as a fuse material . 3. MINIATURE CIRCUIT BREAKER They are used with combination of the control circuits to- a) Enable the staring of plant and distributors. b) Protect the circuit in case of a fault. In consists of current carrying contacts, one movable and other fixed. When a fault occurs the contacts separate and are is stuck between them.
  • 31. Automation Lab This lab deals in automating the existing equipment and feeding routes. Earlier, the old technology dealt with only (DAS) Data Acquisition System known as primary systems. The modern technology or the secondary systems are coupled with (MIS) Management Information System. All the control instruments are excited by 24V supply (4-20mA) because voltage can be mathematically handled with ease therefore all control systems use voltage system for computation.
  • 32. FURNACE SAFETY AND SUPERVISORY SYSTEM LAB This lab has the responsibility of starting fire in the furnace to enable the burning of coal.. Unburnt coal is removed using forced draft or induced draft fan. The temperature inside the boiler is 1100 degree Celsius and its height is 18 to 40 m. It is made up of mild steel. An ultra violet sensor is employed in furnace to measure the intensity of ultra violet rays inside the furnace and according to it a signal in the same order of same mV is generated which directly indicates the temperature of the furnace. For firing the furnace a 10 KV spark plug is operated for ten seconds over a spray of diesel fuel and pre-heater air along each of the feeder-mills.
  • 33. Electronics Lab This lab undertakes the calibration and testing of various cards. It houses various types of analytical instruments like oscilloscopes, integrated circuits, cards auto analyzers etc. Various processes undertaken in this lab are: 1. Transmitter converts mV to mA. 2. Auto analyzer purifies the sample before it is sent to electrodes
  • 35. Electrical Maintenance Division: It is responsible for maintenance of: 1. Boiler side motors 2. Turbine side motors 3. Outside motors 4. Switchgear  Protection By switch gear It makes or breaks an electrical circuit.
  • 36. Pollution Control systems: In order to ensure that NTPC comply with all the stipulated environment norms, various pollution control systems / devices as discussed below have been installed to control air and water pollution. 1. Electrostatic Precipitators: The ash left behind after combustion of coal is arrested in high efficiency Electrostatic Precipitators (ESP’s) and particulate emission is controlled well within the stipulated norms. The ash collected in the ESP’s is disposed to Ash Ponds in slurry form. 2. Flue Gas Stacks: Tall Flue Gas Stacks have been provided for wide dispersion of the gaseous emissions (SOX, NOX etc) into the atmosphere. 3. Neutralisation Pits: Neutralisation pits have been provided in the Water Treatment Plant (WTP) for pH correction of the effluents nbefore discharge into Effluent Treatment Plant (ETP) for further treatment and use.
  • 37. 5. Cooling Towers Cooling Towers have been provided for cooling the hot Condenser cooling water in closed cycle Condenser Cooling Water (CCW) Systems. This helps in reduction in thermal pollution and conservation of fresh water. 6. Ash Water Recycling System: In the AWRS, the effluent from ash pond is circulated back to the station for further ash sluicing to the ash pond. This helps in savings of fresh water requirements for transportation of ash from the plant.
  • 38. Liquid Waste Water/Effluents Treatment Plants & Management System: 1. The objective of industrial liquid effluent treatment plant (ETP) is to discharge lesser and cleaner effluent from the power plants to meet environmental regulations. 2. After primary treatment at the source of their generation, the effluents are sent to the ETP for further treatment. 3. The scheme involves collection of various effluents and their appropriate treatment centrally and re-circulation of the treated effluent for various plant uses.