TRANSNET PORT TERMINALS
The expansion of the Saldanha Port to meet international growing iron ore demand
- Karl Socikwa, CEO of Transnet Port Terminals
4 June 2013
PAGEPAGE
TABLE OF CONTENTS
SALDANHA IRON ORE TERMINAL
TRANSNET STATE OWNED COMPANY LIMITED
GROWING DEMAND FOR IRON ORE
FROM 60 TO 82MT BY 2018/19
YEAR ONE OF THE MARKET DEMAND STRATEGY
2
PAGEPAGE
• 16 Cargo
Terminals
operating across
7 SA ports
• Revenue 7 bn
• Assets R13.5 bn
• 6 324 employees
Supporting
3
• 8 Commercial
ports along
2943km of
coastline
• Revenue R8.4bn
• Assets R56 bn
• 3558 employees
• 20 500 km of
railway track
• 182 million tons of
freight
• General freight & 2
heavy haul export
lines
• Revenue 22.2 bn
• Assets R54.7 bn
• 24 177 employees
• Support TFR for
rolling stock and
TPT for lifting
equipment
maintenance
• Revenue 9.8 bn
• Assets R8.6 bn
• 13 020 employees
• 18 billion litres of
petrolium
products and gas
through 3 000
km of pipelines,
mainly to
Gauteng
• Revenue 1.3 bn
• Assets R20.1 bn
• 600 employees
• R300 billion of
capital
investments over
next 6 years
• CSI in Education,
Health, Sport,
Arts &
Agriculture
• Property
Management
Capital
Projects
Transnet
Foundation
Property
Transnet
Pipelines
(TPL)
Transnet
Engineerin
g(TE)
Transnet
Freight
Rail
(TFR)
Transnet
Port
Terminals
(TPT)
Transnet
National
Ports
Authority
(TNPA)
PipelinesRailPorts
TRANSNET STATE OWNED COMPANY LTD
PAGEPAGE 4
SALDANHA IRON ORE TERMINAL
- Muscles of Steel
PAGEPAGE
SALDANHA
- Western Cape
Libya
Tunisia
Algeria
Morocco
Western Sahara
Guinea Bissau
Mauritania
Egypt
Chad
Niger
Eritrea
Sudan
Central African
RepublicNigeria
Mali
Senegal
Liberia
Togo
Cameroon
Ethiopia
Somalia
DjiboutiGambia
Sierra Leone
Guinea
Ivory
Coast
Benin
DRC
Uganda
Gabon
Kenya
Burkina
Equatorial
Guinea
Congo
Rwanda
Tanzania
MozambiqueAngola
Zambia
Burundi
Malawi
Madagascar
Botswana
Zimbabwe
Namibia
South Africa
Lesotho
Swaziland
Source: Africa Team
• Saldanha Iron
Ore Terminal
Ghana
5
PAGEPAGE 6
SALDANHA IRON ORE TERMINAL
• Largest iron ore export facility in Africa.
• South Africa’s only dedicated iron ore
terminal.
• Deepest and largest natural port in Southern
Africa.
• Staggered loading and regular dual loading.
• 4 x 8000 tph stacker/reclaimers
• 2 x 8000 tph ship loaders
• 2 x 8000 tph tipplers
• 19 km conveyors
Projected Volumes
2013
2014
2015
2016
2017
2018
2019
59.5
62.3
62.3
62.3
70.3
78.3
82.0
PAGEPAGE 7
SALDANHA BREAK-BULK TERMINAL
Infrastructure Number Comments
Quays 1 Draft max, 13,5-14m, 3 berths, e.g. 201,202,203,
Cape Size, Panamax (250m)
Stockyard O/head Cranes 8 Load Capacity=40/35tons
Forklifts 7 Load Capacity=12/42 tons
Spreaders 2 Load Capacity=40/40 tons
Tractors 14 Load Capacity=30/60 tons
Trailers 14 Load Capacity=30/60 tons
Hoppers 4 Capacity = 20tons
Ware houses 1 Primarily used for coil storage, fitted 4 off
overhead cranes, load cap=36 tons/ 3 157m^2
Rail infrastructure 1 Rail Line split(3), connection to Salkor, potential
CAPECOR
PAGEPAGE 8
SALDANHA IRON ORE PROCESS
Ore Offloading
•2 off Tandem, Dual
Wagon, Rotary
Tipplers
•Rate Capacity
=8000t/hr.
•Cycle Time=90
seconds
•Fully Automated
•Supplemented dust
extraction system
•Bag-house facility
and air emissions
control/recording
•Brake Wagons-
Noise control
Ore Stacking
•4 off bucket wheel
type stacker-
reclaimer
combinations
•Semi-automated,
operator controlled
•Rated capacity, SR 1-
3 (Metso) and SR 4
(Sandvick) = 10
000t/hr.
•Covered conveyance
system
•Supplemented, dust
fogging and
demisting sprays
•Coagulant treated
Ore Stockpile
•Stockpile capacity is
5.1 million tons
•Current provision,
13 ore grades
•Windrow & Conical
Stacking
Methodology
•MTS System-
Support materials
load/offload
tracking
•Water/stockpile
spraying system
•Conveyor belts: 25
(26km
Ore Reclaim
•4 off bucket wheel
type stacker-
reclaimer
combinations
•Semi-automated,
operator controlled
•Rated capacity, SR
1-3 (Metso) and
SR 4 (Sandvick) =
10 000t/hr.
•Covered
conveyance
system
•Supplemented,
dust fogging and
demisting sprays
Ore Loading
•2 0ff extended
boom shiploaders
•4 operating modes,
viz , single load,
staggered loading,
dual loading and
direct loading
•Rated capacity-10
000t/hr.
•Inline product
sampling
•Covered conveyor
systems
•Dust suppression
system, online
dosing and moisture
analysis and control
•Dual Berths, Max
draft 21m
8
8
PAGEPAGE
IRON ORE EXPORT VOLUMES (MT)
9
0
10
20
30
40
50
60
2005/06 2006/7 2007/8 2008/9 2009/10 2010/11 2011/12 2012/13
PAGE
Top 10 Producers of Iron Ore
SA 7’th biggest producer of Iron Ore in the world
Feeding the Dragon and the Tiger
1 China 900*
2 Australia 420
3 Brazil 370
4 India 260
5 Russia 100
6 Ukraine 72
7 South Africa 55
8 United States 49
9 Canada 35
10 Iran 33
Other countries 235
Total world 2400
* Estimated iron ore production in million metric tons for 2010
according to U.S. Geological Survey
GROWING DEMAND FOR IRON ORE
- Feeding the Dragon and the Tiger
10
PAGE
BRICS
- Southern Hub for World Shipping Routes
The position of South Africa’s ports system enables it to access to
South-South trade, Far East trade, Europe & USA, East & West Africa
regional trade
11
Shortest Trade Route between Shanghai and Santos is via South Africa 11,270nm = 22 days @ 21 knots
via Panama Canal13,130nm = 26 days + transit fee
via Suez Canal 13,590nm = 27 days + transit fee
11
PAGE 12
AFRICA
- SOUTH AFRICA’s ROLE IS TO ENABLE REGIONAL INTEGRATION
Monrovia
(Liberia)
Lome
(Togo)
Port Louis
(Mauritius)
Toamasina
(Madagascar)
Takoradi
(Ghana)
San Pedro
(Côte d'Ivoire)
Lagos
(Nigeria)
Cotonou
(Benin)
Walvis Bay
(Namibia)
Tema
(Ghana)
Abidjan
(Côte
d'Ivoire)
Cape Town
(SA)
Dar es Salaam
(Tanzania)
Tanga
(Tanzania)
Mombasa
(Kenya)
Nacala
(Mozambique)
Beira
(Mozambique)
Maputo
(Mozambique)
Richards Bay (SA)
Durban (SA)
East London (SA)
Ngqura (SA)
Libreville
(Gabon)
Pointe Noire
Matadi (Congo)
Douala
(Cameroon)
Source: Team analysis
Port Elizabeth (SA)
Lobito
(Angola)
Luanda
(Angola)
12
PAGE 13
AFRICA
- THE AU HAS IDENTIFIED 14 CORRIDORS AS THE MAIN AFRICAN
CORRIDORS THAT NEEDS DEVELOPMENT
1 Kenitra-Casablanca Corridor
2 Greater Cairo Region
3 The Dakar-Touba corridor (Touba-Mbackѐ)
4 The Greater Ibadan-Lagos-Accra (GILA) urban corridor
5 The great Haoussa-Yoruba-Anshanti city triangle (GHAYA-CT)
6 The Emerging Luanda-N’Djamena corridor
7 The Kampala-Entebbe corridor
8 Nairobi metropolitan region
9 Walvis Bay corridor
10 North South corridor (Cape Town-Johannesburg-Harare-Lusaka-
Dar es Salaam)
11 The Maputo-Gauteng development corridor
12 Durban development corridor
13 Beira corridor
14 Maputo-Limpopo corridor
Source:E&Y Report – Time for Africa
3
4
2
13
10
12
11
14
9
6
5
7
8
6
6
13
PAGEPAGE
5 YEAR CAPEX & YEAR ONE OF THE MDS
- From 45 – 60 mt (Phases 1A, 1B and 1C)
14
Objective:
• Expansion of iron ore export capacity to 60mtpa
Status:
• Desalination (RO) plant in Port and Eskom sub-station at
loop 18
• Rail triangles at Salkor and Erts yards, road surfacing at
Salkor North and various alterations and additions in the
port terminal.
Key Milestones Status
Completion of RO Plant
Commissioning of Eskom sub-station, TFS
and Postmasburg TSS
Installation of upgraded shiploader chutes
Completion of Salkor Yard works
2009 2010 2011 2012 2013
SAL
MPT 2.31 9.27 0.26 0.18 4.41
IOT 427.33 438.02 219.20 90.20 100.25
TOTAL 429.65 447.29 219.45 90.38 104.66
2009 – R256m on phase 1b incl. dust mitigation, R63m on phase 1c
2010 – R68m on phase 1a, R102m on phase 1b and 283m on phase 1c
2011 – R130m on phase 1b and R79m on phase 1c
2012 – R44m on phase 1c and R22m on the Krupp ship loader refurb
2013 – R57m on phase 1c and R25m on the conveyor project
Capex for the past 5 Years
PAGEPAGE
MARKET DEMAND STRATEGY (MDS)
Total Transnet ZAR300bn, TPT ZAR33bn
2012/13 - 2018/19, peaking to ZAR9.5bn in 2016/17
Sishen -Saldanha
Export iron ore ZAR28.6bn
Port Terminals: ZAR5.82bn
Cape Town
Port Terminals: ZAR465ml
7
Durban
Multi Product Pipeline ZAR9.4bn
Port Terminals: ZAR7.4bn
Richards Bay corridor
Export coal line ZAR32.1bn
Port Terminals: ZAR12.4bn
2012/132011/122010/112008/09 2013/14 2017/182016/172015/162014/15 2018/19
3200 2337 913 1137 2551 4138 3492
7670
9545
2812 2670
2009/10
Boom-
time
Ends
Global recession
Market Demand Strategy
TPT R33bn 7yr Investment Plan
Eastern Cape
Port Terminals: ZAR6.7bn
15
PAGEPAGE
• Transnet will spend R28.6-billion on the Sishen-Saldanha iron-ore corridor
between 2012/13 and 2018/19.
• The investment in the rail corridor and the port should raise the capacity of
the export channel, which traverses the Northern Cape and Western Cape
provinces, by 57%, from 53-million tons to 83-million tons over the seven-year
period.
• The MDS also include a plan to raise domestic iron-ore volumes by 134%,
from 7.7-million tons last year, to 18-million tons by the end of the seven-year
period.
MEANING OF MDS FOR SISHEN-SALDANHA
16
PAGEPAGE 17
FROM 60 TO 82MT BY 2018/19
Initial Bulk Terminal
Operations, 1976
Targeted capacity = 27mtpa
1 tippler, 2 stacker
Reclaimers, 2 ship loaders
Bulk Terminal
Expansion, Phase 1 A
Capacity - 45mtpa
Completed June 2005
2 tipplers, 3 stacker
Reclaimers, 2 ship
loaders
Bulk Terminal
Expansion, Phase 1B
Capacity-55mtp
Completed , May 2009
2 tipplers, 4 stacker
Reclaimers, 2 ship
loaders),
Bulk terminal Expansion,
Phase 1C
Capacity = 60mtpa
Completed July 2012
Improvement on phase 1B
Port Expansion, Phase 2A
FEL 2 in progress
Targeted commissioning
2018 onward
Targeted capacity =
82mtpa
3 tipplers, 6 stacker
Reclaimers, 3 ship loaders
17
Project 2012/13
Budget
R m
2013/14
Projected
R m
2014/15
Projected
R m
2015/16
Projected
R m
2016/17
Projected
R m
2017/18
Projected
R m
2018/19
Projected
R m
7y Plan
Total
R m
Iron Ore Expansion (60 to 80mtpa) 20 205 1 200 1 950 900 4 275
PAGE
Milestones Forecast
Finish
Status Comments
FEL 2 phase – Confirm go-forward port
and rail options
27Apr 2012 Confirm rail expansion concept
BC and funding approval for FEL-3 10 May 2013 TPT approval pending
Environmental Authorisation 31 July 2014 24 months allowed for EIA
process
Engineering(FEL3) & Procurement 30 Sep 2014
Commissioning 30 Nov 2017 48 Months const. & comm.
Objective:
• Expand Iron ore export capacity to ~ 82mtpa
Status:
• FEL 2 report has been completed in collaboration with mining industry, still requiring refinement by Transnet.
• TNPA and TFR Capics have approved funding for the FEL3 stage, TPT Capic approval still pending.
Preliminary Scope
• Construction of a new berth at Port, 2 new SRs, 1 tippler, 1 shiploader
• Extension of rail loops to accommodate 360 wagon trains
• Construction of a new Eskom substation and Track Feeder Station
• Acquisition of locos and rolling stock
Next Steps
• Finalise go-forward berth location via ship motion and navigational simulations
• Confirm rail expansion concepts with TFR
• Issue tender for FEL3 design and initiate Environmental Impact Assessment (EIA)
IRON ORE EXPANSION PROJECT
- From 60 – 82mt (Phase 2)
18
The expansion of Saldanha Port to meet nternational growing iron ore demand

More Related Content

What's hot

QATAR GAS
QATAR GASQATAR GAS
QATAR GAS
mubarak2009
 
Terminal operation hub Ngqura and spoke model
Terminal  operation hub  Ngqura and spoke modelTerminal  operation hub  Ngqura and spoke model
Terminal operation hub Ngqura and spoke model
Transnet Port Terminals
 
Asset Velocity
Asset VelocityAsset Velocity
Asset Velocity
findram
 
KPCT Presentation
KPCT PresentationKPCT Presentation
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress report
Neha Singh
 
doubling project synopsis
doubling project synopsisdoubling project synopsis
doubling project synopsis
Neha Singh
 
Frac Sand Market and Logistics, Plus Special Report on Permian Takeaway Logis...
Frac Sand Market and Logistics, Plus Special Report on Permian Takeaway Logis...Frac Sand Market and Logistics, Plus Special Report on Permian Takeaway Logis...
Frac Sand Market and Logistics, Plus Special Report on Permian Takeaway Logis...
PLG Consulting
 
A problem in_the_permian
A problem in_the_permianA problem in_the_permian
A problem in_the_permian
PLG Consulting
 
Panama Canal Expansion Impacts on North America Trade
Panama Canal Expansion Impacts on North America TradePanama Canal Expansion Impacts on North America Trade
Panama Canal Expansion Impacts on North America Trade
Chartered Institute of Logistics and Transport (International)
 
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
Taylor Robinson
 
Kpct presentation
Kpct presentation Kpct presentation
Kpct presentation
Kiran K.V.S.
 
Optimisation vs. Automation in South African Ports
Optimisation vs. Automation in South African PortsOptimisation vs. Automation in South African Ports
Optimisation vs. Automation in South African Ports
Tristan Wiggill
 
Multi-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In ChevronMulti-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In Chevron
Yokogawa1
 
Roll On-Roll Off service
Roll On-Roll Off serviceRoll On-Roll Off service
Roll On-Roll Off service
Gladwin Andrews
 
The Future Has Arrived: Petrochemicals And Energy By Rail | Southwest Rail Sh...
The Future Has Arrived: Petrochemicals And Energy By Rail | Southwest Rail Sh...The Future Has Arrived: Petrochemicals And Energy By Rail | Southwest Rail Sh...
The Future Has Arrived: Petrochemicals And Energy By Rail | Southwest Rail Sh...
PLG Consulting
 
Evolving Frac Sand Supply Chain and Logistics Trends
Evolving Frac Sand Supply Chain and Logistics TrendsEvolving Frac Sand Supply Chain and Logistics Trends
Evolving Frac Sand Supply Chain and Logistics Trends
Taylor Robinson
 
JP Morgan transportation and logistics frac sand logistics by plg consulting ...
JP Morgan transportation and logistics frac sand logistics by plg consulting ...JP Morgan transportation and logistics frac sand logistics by plg consulting ...
JP Morgan transportation and logistics frac sand logistics by plg consulting ...
Taylor Robinson
 

What's hot (20)

QATAR GAS
QATAR GASQATAR GAS
QATAR GAS
 
Terminal operation hub Ngqura and spoke model
Terminal  operation hub  Ngqura and spoke modelTerminal  operation hub  Ngqura and spoke model
Terminal operation hub Ngqura and spoke model
 
Asset Velocity
Asset VelocityAsset Velocity
Asset Velocity
 
KPCT Presentation
KPCT PresentationKPCT Presentation
KPCT Presentation
 
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress report
 
doubling project synopsis
doubling project synopsisdoubling project synopsis
doubling project synopsis
 
Rmc fev13
Rmc fev13Rmc fev13
Rmc fev13
 
Rmc jan2012 v2
Rmc jan2012 v2Rmc jan2012 v2
Rmc jan2012 v2
 
Frac Sand Market and Logistics, Plus Special Report on Permian Takeaway Logis...
Frac Sand Market and Logistics, Plus Special Report on Permian Takeaway Logis...Frac Sand Market and Logistics, Plus Special Report on Permian Takeaway Logis...
Frac Sand Market and Logistics, Plus Special Report on Permian Takeaway Logis...
 
A problem in_the_permian
A problem in_the_permianA problem in_the_permian
A problem in_the_permian
 
Panama Canal Expansion Impacts on North America Trade
Panama Canal Expansion Impacts on North America TradePanama Canal Expansion Impacts on North America Trade
Panama Canal Expansion Impacts on North America Trade
 
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
Permian Basin Frac Design & New Completions Technologies 2017 - frac sand sup...
 
Experiencia en Viaductos
Experiencia en ViaductosExperiencia en Viaductos
Experiencia en Viaductos
 
Kpct presentation
Kpct presentation Kpct presentation
Kpct presentation
 
Optimisation vs. Automation in South African Ports
Optimisation vs. Automation in South African PortsOptimisation vs. Automation in South African Ports
Optimisation vs. Automation in South African Ports
 
Multi-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In ChevronMulti-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In Chevron
 
Roll On-Roll Off service
Roll On-Roll Off serviceRoll On-Roll Off service
Roll On-Roll Off service
 
The Future Has Arrived: Petrochemicals And Energy By Rail | Southwest Rail Sh...
The Future Has Arrived: Petrochemicals And Energy By Rail | Southwest Rail Sh...The Future Has Arrived: Petrochemicals And Energy By Rail | Southwest Rail Sh...
The Future Has Arrived: Petrochemicals And Energy By Rail | Southwest Rail Sh...
 
Evolving Frac Sand Supply Chain and Logistics Trends
Evolving Frac Sand Supply Chain and Logistics TrendsEvolving Frac Sand Supply Chain and Logistics Trends
Evolving Frac Sand Supply Chain and Logistics Trends
 
JP Morgan transportation and logistics frac sand logistics by plg consulting ...
JP Morgan transportation and logistics frac sand logistics by plg consulting ...JP Morgan transportation and logistics frac sand logistics by plg consulting ...
JP Morgan transportation and logistics frac sand logistics by plg consulting ...
 

Viewers also liked

The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2
Railways and Harbours
 
Mega Ships, Alliances, Ports, Supply Chains, Chaos
Mega Ships, Alliances, Ports, Supply Chains, ChaosMega Ships, Alliances, Ports, Supply Chains, Chaos
Mega Ships, Alliances, Ports, Supply Chains, Chaos
Tom Craig
 
The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2
Railways and Harbours
 
Aees summit 2014 transnet port terminals on africa
Aees summit 2014 transnet port terminals on africaAees summit 2014 transnet port terminals on africa
Aees summit 2014 transnet port terminals on africa
AEES_AEEN
 
Oppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African portsOppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African ports
Railways and Harbours
 
Port terminal operations cost contribution to the supply chain
Port terminal operations cost contribution to the supply chain  Port terminal operations cost contribution to the supply chain
Port terminal operations cost contribution to the supply chain
Tristan Wiggill
 
Trusses Sections
Trusses SectionsTrusses Sections
Trusses SectionsAmr Hamed
 
Group 4 group assignment presentation 20150227
Group 4  group assignment presentation 20150227Group 4  group assignment presentation 20150227
Group 4 group assignment presentation 20150227
Nongcebo Vukile McKenzie
 
Benefit from a Wilcox Planned Maintenance Program
Benefit from a Wilcox Planned Maintenance ProgramBenefit from a Wilcox Planned Maintenance Program
Benefit from a Wilcox Planned Maintenance Program
Bill Stewart
 
Bill robllee, drydock issues
Bill robllee, drydock issuesBill robllee, drydock issues
Bill robllee, drydock issuesRick Albert
 
Rail and Port Integration
Rail and Port IntegrationRail and Port Integration
Rail and Port Integration
Railways and Harbours
 
Trusses The Method Of Sections
Trusses  The Method Of SectionsTrusses  The Method Of Sections
Trusses The Method Of SectionsAmr Hamed
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileMitchell Mantiri
 
Group 3 mod2010 e1_group assignment im wms_august2011.
Group 3 mod2010 e1_group assignment im wms_august2011.Group 3 mod2010 e1_group assignment im wms_august2011.
Group 3 mod2010 e1_group assignment im wms_august2011.
ryancoldman
 
4th 2 lecture shear and moment diagram structure i
4th 2  lecture shear and moment diagram structure i4th 2  lecture shear and moment diagram structure i
4th 2 lecture shear and moment diagram structure i
muhand mousa
 
Shear Force And Bending Moment Diagram For Frames
Shear Force And Bending Moment Diagram For FramesShear Force And Bending Moment Diagram For Frames
Shear Force And Bending Moment Diagram For FramesAmr Hamed
 

Viewers also liked (20)

The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2
 
Mega Ships, Alliances, Ports, Supply Chains, Chaos
Mega Ships, Alliances, Ports, Supply Chains, ChaosMega Ships, Alliances, Ports, Supply Chains, Chaos
Mega Ships, Alliances, Ports, Supply Chains, Chaos
 
The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2
 
Aees summit 2014 transnet port terminals on africa
Aees summit 2014 transnet port terminals on africaAees summit 2014 transnet port terminals on africa
Aees summit 2014 transnet port terminals on africa
 
Oppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African portsOppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African ports
 
Port terminal operations cost contribution to the supply chain
Port terminal operations cost contribution to the supply chain  Port terminal operations cost contribution to the supply chain
Port terminal operations cost contribution to the supply chain
 
Emma maersk
Emma  maerskEmma  maersk
Emma maersk
 
Trusses Sections
Trusses SectionsTrusses Sections
Trusses Sections
 
Group 4 group assignment presentation 20150227
Group 4  group assignment presentation 20150227Group 4  group assignment presentation 20150227
Group 4 group assignment presentation 20150227
 
Benefit from a Wilcox Planned Maintenance Program
Benefit from a Wilcox Planned Maintenance ProgramBenefit from a Wilcox Planned Maintenance Program
Benefit from a Wilcox Planned Maintenance Program
 
Bill robllee, drydock issues
Bill robllee, drydock issuesBill robllee, drydock issues
Bill robllee, drydock issues
 
Rail and Port Integration
Rail and Port IntegrationRail and Port Integration
Rail and Port Integration
 
Trusses The Method Of Sections
Trusses  The Method Of SectionsTrusses  The Method Of Sections
Trusses The Method Of Sections
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company Profile
 
Group 3 mod2010 e1_group assignment im wms_august2011.
Group 3 mod2010 e1_group assignment im wms_august2011.Group 3 mod2010 e1_group assignment im wms_august2011.
Group 3 mod2010 e1_group assignment im wms_august2011.
 
Port of Beira
Port of BeiraPort of Beira
Port of Beira
 
Bending Moment
Bending MomentBending Moment
Bending Moment
 
4th 2 lecture shear and moment diagram structure i
4th 2  lecture shear and moment diagram structure i4th 2  lecture shear and moment diagram structure i
4th 2 lecture shear and moment diagram structure i
 
Shear Force And Bending Moment Diagram For Frames
Shear Force And Bending Moment Diagram For FramesShear Force And Bending Moment Diagram For Frames
Shear Force And Bending Moment Diagram For Frames
 
Namibia
NamibiaNamibia
Namibia
 

Similar to The expansion of Saldanha Port to meet nternational growing iron ore demand

Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet  who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet  who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet Port Terminals
 
The role of TPT in the export led growth strategy- Eastern Cape Region
The  role of TPT in the export  led growth strategy- Eastern Cape RegionThe  role of TPT in the export  led growth strategy- Eastern Cape Region
The role of TPT in the export led growth strategy- Eastern Cape Region
Transnet Port Terminals
 
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaSaudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Transnet Port Terminals
 
Readying our ports for an onslaught of trade
Readying our ports for an onslaught of tradeReadying our ports for an onslaught of trade
Readying our ports for an onslaught of tradeTransnet Port Terminals
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3
Parti Djibouti
 
2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf
KhalidJ6
 
South African Port Trends and Current Developments
South African Port Trends and Current DevelopmentsSouth African Port Trends and Current Developments
South African Port Trends and Current Developments
Transnet Port Terminals
 
Mormugao Port Trust
Mormugao Port TrustMormugao Port Trust
Mormugao Port Trust
niravrajyaguru
 
Chennai port trust
Chennai port trustChennai port trust
Chennai port trustim_sushant
 
Coal Logistic Challenges in Mozambique
Coal Logistic Challenges in MozambiqueCoal Logistic Challenges in Mozambique
Coal Logistic Challenges in Mozambique
Tristan Wiggill
 
Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals
Ahamedul Karim Chowdhury
 
African seaports expansion summit
African seaports expansion summitAfrican seaports expansion summit
African seaports expansion summit
Transnet Port Terminals
 
Sri Lanka - The hub of South Asia
Sri Lanka - The hub of South AsiaSri Lanka - The hub of South Asia
Sri Lanka - The hub of South Asia
energiewaechterGmbH
 
Competitiveness Of Indian Ports
Competitiveness Of Indian PortsCompetitiveness Of Indian Ports
Competitiveness Of Indian Portsjansowri
 
WA Iron Ore Ports and Supply Chains
WA Iron Ore Ports and Supply ChainsWA Iron Ore Ports and Supply Chains
WA Iron Ore Ports and Supply Chains
Mark Biggs
 
Underground cavern project
Underground cavern projectUnderground cavern project
Underground cavern project
Manveer Shetty
 
Syrah Resources (ASX:SYR) Investor Presentation September 2014
Syrah Resources (ASX:SYR) Investor Presentation September 2014Syrah Resources (ASX:SYR) Investor Presentation September 2014
Syrah Resources (ASX:SYR) Investor Presentation September 2014
Symposium
 
Ex ispat rm procurement sai placement
Ex ispat rm procurement  sai placementEx ispat rm procurement  sai placement
Ex ispat rm procurement sai placement
Subhankar Mahapatra
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
gangadhar7907
 

Similar to The expansion of Saldanha Port to meet nternational growing iron ore demand (20)

Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet  who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet  who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
 
The role of TPT in the export led growth strategy- Eastern Cape Region
The  role of TPT in the export  led growth strategy- Eastern Cape RegionThe  role of TPT in the export  led growth strategy- Eastern Cape Region
The role of TPT in the export led growth strategy- Eastern Cape Region
 
Session 11 – site visits port of maputo
Session 11  – site visits  port of maputoSession 11  – site visits  port of maputo
Session 11 – site visits port of maputo
 
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaSaudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanha
 
Readying our ports for an onslaught of trade
Readying our ports for an onslaught of tradeReadying our ports for an onslaught of trade
Readying our ports for an onslaught of trade
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3
 
2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf
 
South African Port Trends and Current Developments
South African Port Trends and Current DevelopmentsSouth African Port Trends and Current Developments
South African Port Trends and Current Developments
 
Mormugao Port Trust
Mormugao Port TrustMormugao Port Trust
Mormugao Port Trust
 
Chennai port trust
Chennai port trustChennai port trust
Chennai port trust
 
Coal Logistic Challenges in Mozambique
Coal Logistic Challenges in MozambiqueCoal Logistic Challenges in Mozambique
Coal Logistic Challenges in Mozambique
 
Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals
 
African seaports expansion summit
African seaports expansion summitAfrican seaports expansion summit
African seaports expansion summit
 
Sri Lanka - The hub of South Asia
Sri Lanka - The hub of South AsiaSri Lanka - The hub of South Asia
Sri Lanka - The hub of South Asia
 
Competitiveness Of Indian Ports
Competitiveness Of Indian PortsCompetitiveness Of Indian Ports
Competitiveness Of Indian Ports
 
WA Iron Ore Ports and Supply Chains
WA Iron Ore Ports and Supply ChainsWA Iron Ore Ports and Supply Chains
WA Iron Ore Ports and Supply Chains
 
Underground cavern project
Underground cavern projectUnderground cavern project
Underground cavern project
 
Syrah Resources (ASX:SYR) Investor Presentation September 2014
Syrah Resources (ASX:SYR) Investor Presentation September 2014Syrah Resources (ASX:SYR) Investor Presentation September 2014
Syrah Resources (ASX:SYR) Investor Presentation September 2014
 
Ex ispat rm procurement sai placement
Ex ispat rm procurement  sai placementEx ispat rm procurement  sai placement
Ex ispat rm procurement sai placement
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
 

More from Transnet Port Terminals

Eastern Cape Maritime Summit Oct 2016
Eastern Cape Maritime Summit Oct 2016Eastern Cape Maritime Summit Oct 2016
Eastern Cape Maritime Summit Oct 2016
Transnet Port Terminals
 
Procurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern CapeProcurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern Cape
Transnet Port Terminals
 
Our Business Engages Stakeholders
Our Business Engages StakeholdersOur Business Engages Stakeholders
Our Business Engages Stakeholders
Transnet Port Terminals
 
Transnet Annual Results Presentation March 2016
Transnet Annual Results Presentation  March 2016 Transnet Annual Results Presentation  March 2016
Transnet Annual Results Presentation March 2016
Transnet Port Terminals
 
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals
 
Transnet Port Terminals SOLAS frequently asked questions
Transnet Port Terminals SOLAS frequently asked questionsTransnet Port Terminals SOLAS frequently asked questions
Transnet Port Terminals SOLAS frequently asked questions
Transnet Port Terminals
 
Business overview and opportunities at the Ports
Business overview and opportunities at the PortsBusiness overview and opportunities at the Ports
Business overview and opportunities at the Ports
Transnet Port Terminals
 
Tpt's tendering process at a glance
Tpt's tendering process at a glanceTpt's tendering process at a glance
Tpt's tendering process at a glance
Transnet Port Terminals
 
Tpt's supplier development (sd) initiative outline
Tpt's supplier  development (sd) initiative outlineTpt's supplier  development (sd) initiative outline
Tpt's supplier development (sd) initiative outline
Transnet Port Terminals
 
Tpt's bid specification considerations
Tpt's bid specification considerationsTpt's bid specification considerations
Tpt's bid specification considerations
Transnet Port Terminals
 
As a supplier, know tpt's governance
As a supplier, know tpt's  governanceAs a supplier, know tpt's  governance
As a supplier, know tpt's governance
Transnet Port Terminals
 
Customer commitment brochure 2015 (10)
Customer commitment brochure 2015 (10)Customer commitment brochure 2015 (10)
Customer commitment brochure 2015 (10)
Transnet Port Terminals
 
Transnet annual results 2015
Transnet annual results 2015Transnet annual results 2015
Transnet annual results 2015
Transnet Port Terminals
 
Transnet enterprise development hub Saldanha - 2015
Transnet enterprise development hub  Saldanha - 2015Transnet enterprise development hub  Saldanha - 2015
Transnet enterprise development hub Saldanha - 2015
Transnet Port Terminals
 
Transnet anti bullying talk guide 2015
Transnet anti bullying talk guide 2015Transnet anti bullying talk guide 2015
Transnet anti bullying talk guide 2015
Transnet Port Terminals
 
South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...
Transnet Port Terminals
 
Richards bay port terminal business overview
Richards bay port  terminal business overviewRichards bay port  terminal business overview
Richards bay port terminal business overviewTransnet Port Terminals
 
Indicators and innovations to improve efficiency at ports
Indicators and innovations to improve efficiency at portsIndicators and innovations to improve efficiency at ports
Indicators and innovations to improve efficiency at portsTransnet Port Terminals
 
Transnet port terminals on stay ahead of the competition, presented during af...
Transnet port terminals on stay ahead of the competition, presented during af...Transnet port terminals on stay ahead of the competition, presented during af...
Transnet port terminals on stay ahead of the competition, presented during af...Transnet Port Terminals
 

More from Transnet Port Terminals (20)

Eastern Cape Maritime Summit Oct 2016
Eastern Cape Maritime Summit Oct 2016Eastern Cape Maritime Summit Oct 2016
Eastern Cape Maritime Summit Oct 2016
 
Procurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern CapeProcurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern Cape
 
Our Business Engages Stakeholders
Our Business Engages StakeholdersOur Business Engages Stakeholders
Our Business Engages Stakeholders
 
Transnet Annual Results Presentation March 2016
Transnet Annual Results Presentation  March 2016 Transnet Annual Results Presentation  March 2016
Transnet Annual Results Presentation March 2016
 
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
 
Transnet Port Terminals SOLAS frequently asked questions
Transnet Port Terminals SOLAS frequently asked questionsTransnet Port Terminals SOLAS frequently asked questions
Transnet Port Terminals SOLAS frequently asked questions
 
Business overview and opportunities at the Ports
Business overview and opportunities at the PortsBusiness overview and opportunities at the Ports
Business overview and opportunities at the Ports
 
Tpt's tendering process at a glance
Tpt's tendering process at a glanceTpt's tendering process at a glance
Tpt's tendering process at a glance
 
Tpt's supplier development (sd) initiative outline
Tpt's supplier  development (sd) initiative outlineTpt's supplier  development (sd) initiative outline
Tpt's supplier development (sd) initiative outline
 
Tpt's bid specification considerations
Tpt's bid specification considerationsTpt's bid specification considerations
Tpt's bid specification considerations
 
As a supplier, know tpt's governance
As a supplier, know tpt's  governanceAs a supplier, know tpt's  governance
As a supplier, know tpt's governance
 
Customer commitment brochure 2015 (10)
Customer commitment brochure 2015 (10)Customer commitment brochure 2015 (10)
Customer commitment brochure 2015 (10)
 
Transnet annual results 2015
Transnet annual results 2015Transnet annual results 2015
Transnet annual results 2015
 
Transnet enterprise development hub Saldanha - 2015
Transnet enterprise development hub  Saldanha - 2015Transnet enterprise development hub  Saldanha - 2015
Transnet enterprise development hub Saldanha - 2015
 
Transnet anti bullying talk guide 2015
Transnet anti bullying talk guide 2015Transnet anti bullying talk guide 2015
Transnet anti bullying talk guide 2015
 
South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...
 
Richards bay port terminal business overview
Richards bay port  terminal business overviewRichards bay port  terminal business overview
Richards bay port terminal business overview
 
Indicators and innovations to improve efficiency at ports
Indicators and innovations to improve efficiency at portsIndicators and innovations to improve efficiency at ports
Indicators and innovations to improve efficiency at ports
 
Transnet port terminals on stay ahead of the competition, presented during af...
Transnet port terminals on stay ahead of the competition, presented during af...Transnet port terminals on stay ahead of the competition, presented during af...
Transnet port terminals on stay ahead of the competition, presented during af...
 
Excellence showcased at tpt
Excellence showcased at tptExcellence showcased at tpt
Excellence showcased at tpt
 

Recently uploaded

LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 

Recently uploaded (20)

LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 

The expansion of Saldanha Port to meet nternational growing iron ore demand

  • 1. TRANSNET PORT TERMINALS The expansion of the Saldanha Port to meet international growing iron ore demand - Karl Socikwa, CEO of Transnet Port Terminals 4 June 2013
  • 2. PAGEPAGE TABLE OF CONTENTS SALDANHA IRON ORE TERMINAL TRANSNET STATE OWNED COMPANY LIMITED GROWING DEMAND FOR IRON ORE FROM 60 TO 82MT BY 2018/19 YEAR ONE OF THE MARKET DEMAND STRATEGY 2
  • 3. PAGEPAGE • 16 Cargo Terminals operating across 7 SA ports • Revenue 7 bn • Assets R13.5 bn • 6 324 employees Supporting 3 • 8 Commercial ports along 2943km of coastline • Revenue R8.4bn • Assets R56 bn • 3558 employees • 20 500 km of railway track • 182 million tons of freight • General freight & 2 heavy haul export lines • Revenue 22.2 bn • Assets R54.7 bn • 24 177 employees • Support TFR for rolling stock and TPT for lifting equipment maintenance • Revenue 9.8 bn • Assets R8.6 bn • 13 020 employees • 18 billion litres of petrolium products and gas through 3 000 km of pipelines, mainly to Gauteng • Revenue 1.3 bn • Assets R20.1 bn • 600 employees • R300 billion of capital investments over next 6 years • CSI in Education, Health, Sport, Arts & Agriculture • Property Management Capital Projects Transnet Foundation Property Transnet Pipelines (TPL) Transnet Engineerin g(TE) Transnet Freight Rail (TFR) Transnet Port Terminals (TPT) Transnet National Ports Authority (TNPA) PipelinesRailPorts TRANSNET STATE OWNED COMPANY LTD
  • 4. PAGEPAGE 4 SALDANHA IRON ORE TERMINAL - Muscles of Steel
  • 5. PAGEPAGE SALDANHA - Western Cape Libya Tunisia Algeria Morocco Western Sahara Guinea Bissau Mauritania Egypt Chad Niger Eritrea Sudan Central African RepublicNigeria Mali Senegal Liberia Togo Cameroon Ethiopia Somalia DjiboutiGambia Sierra Leone Guinea Ivory Coast Benin DRC Uganda Gabon Kenya Burkina Equatorial Guinea Congo Rwanda Tanzania MozambiqueAngola Zambia Burundi Malawi Madagascar Botswana Zimbabwe Namibia South Africa Lesotho Swaziland Source: Africa Team • Saldanha Iron Ore Terminal Ghana 5
  • 6. PAGEPAGE 6 SALDANHA IRON ORE TERMINAL • Largest iron ore export facility in Africa. • South Africa’s only dedicated iron ore terminal. • Deepest and largest natural port in Southern Africa. • Staggered loading and regular dual loading. • 4 x 8000 tph stacker/reclaimers • 2 x 8000 tph ship loaders • 2 x 8000 tph tipplers • 19 km conveyors Projected Volumes 2013 2014 2015 2016 2017 2018 2019 59.5 62.3 62.3 62.3 70.3 78.3 82.0
  • 7. PAGEPAGE 7 SALDANHA BREAK-BULK TERMINAL Infrastructure Number Comments Quays 1 Draft max, 13,5-14m, 3 berths, e.g. 201,202,203, Cape Size, Panamax (250m) Stockyard O/head Cranes 8 Load Capacity=40/35tons Forklifts 7 Load Capacity=12/42 tons Spreaders 2 Load Capacity=40/40 tons Tractors 14 Load Capacity=30/60 tons Trailers 14 Load Capacity=30/60 tons Hoppers 4 Capacity = 20tons Ware houses 1 Primarily used for coil storage, fitted 4 off overhead cranes, load cap=36 tons/ 3 157m^2 Rail infrastructure 1 Rail Line split(3), connection to Salkor, potential CAPECOR
  • 8. PAGEPAGE 8 SALDANHA IRON ORE PROCESS Ore Offloading •2 off Tandem, Dual Wagon, Rotary Tipplers •Rate Capacity =8000t/hr. •Cycle Time=90 seconds •Fully Automated •Supplemented dust extraction system •Bag-house facility and air emissions control/recording •Brake Wagons- Noise control Ore Stacking •4 off bucket wheel type stacker- reclaimer combinations •Semi-automated, operator controlled •Rated capacity, SR 1- 3 (Metso) and SR 4 (Sandvick) = 10 000t/hr. •Covered conveyance system •Supplemented, dust fogging and demisting sprays •Coagulant treated Ore Stockpile •Stockpile capacity is 5.1 million tons •Current provision, 13 ore grades •Windrow & Conical Stacking Methodology •MTS System- Support materials load/offload tracking •Water/stockpile spraying system •Conveyor belts: 25 (26km Ore Reclaim •4 off bucket wheel type stacker- reclaimer combinations •Semi-automated, operator controlled •Rated capacity, SR 1-3 (Metso) and SR 4 (Sandvick) = 10 000t/hr. •Covered conveyance system •Supplemented, dust fogging and demisting sprays Ore Loading •2 0ff extended boom shiploaders •4 operating modes, viz , single load, staggered loading, dual loading and direct loading •Rated capacity-10 000t/hr. •Inline product sampling •Covered conveyor systems •Dust suppression system, online dosing and moisture analysis and control •Dual Berths, Max draft 21m 8 8
  • 9. PAGEPAGE IRON ORE EXPORT VOLUMES (MT) 9 0 10 20 30 40 50 60 2005/06 2006/7 2007/8 2008/9 2009/10 2010/11 2011/12 2012/13
  • 10. PAGE Top 10 Producers of Iron Ore SA 7’th biggest producer of Iron Ore in the world Feeding the Dragon and the Tiger 1 China 900* 2 Australia 420 3 Brazil 370 4 India 260 5 Russia 100 6 Ukraine 72 7 South Africa 55 8 United States 49 9 Canada 35 10 Iran 33 Other countries 235 Total world 2400 * Estimated iron ore production in million metric tons for 2010 according to U.S. Geological Survey GROWING DEMAND FOR IRON ORE - Feeding the Dragon and the Tiger 10
  • 11. PAGE BRICS - Southern Hub for World Shipping Routes The position of South Africa’s ports system enables it to access to South-South trade, Far East trade, Europe & USA, East & West Africa regional trade 11 Shortest Trade Route between Shanghai and Santos is via South Africa 11,270nm = 22 days @ 21 knots via Panama Canal13,130nm = 26 days + transit fee via Suez Canal 13,590nm = 27 days + transit fee 11
  • 12. PAGE 12 AFRICA - SOUTH AFRICA’s ROLE IS TO ENABLE REGIONAL INTEGRATION Monrovia (Liberia) Lome (Togo) Port Louis (Mauritius) Toamasina (Madagascar) Takoradi (Ghana) San Pedro (Côte d'Ivoire) Lagos (Nigeria) Cotonou (Benin) Walvis Bay (Namibia) Tema (Ghana) Abidjan (Côte d'Ivoire) Cape Town (SA) Dar es Salaam (Tanzania) Tanga (Tanzania) Mombasa (Kenya) Nacala (Mozambique) Beira (Mozambique) Maputo (Mozambique) Richards Bay (SA) Durban (SA) East London (SA) Ngqura (SA) Libreville (Gabon) Pointe Noire Matadi (Congo) Douala (Cameroon) Source: Team analysis Port Elizabeth (SA) Lobito (Angola) Luanda (Angola) 12
  • 13. PAGE 13 AFRICA - THE AU HAS IDENTIFIED 14 CORRIDORS AS THE MAIN AFRICAN CORRIDORS THAT NEEDS DEVELOPMENT 1 Kenitra-Casablanca Corridor 2 Greater Cairo Region 3 The Dakar-Touba corridor (Touba-Mbackѐ) 4 The Greater Ibadan-Lagos-Accra (GILA) urban corridor 5 The great Haoussa-Yoruba-Anshanti city triangle (GHAYA-CT) 6 The Emerging Luanda-N’Djamena corridor 7 The Kampala-Entebbe corridor 8 Nairobi metropolitan region 9 Walvis Bay corridor 10 North South corridor (Cape Town-Johannesburg-Harare-Lusaka- Dar es Salaam) 11 The Maputo-Gauteng development corridor 12 Durban development corridor 13 Beira corridor 14 Maputo-Limpopo corridor Source:E&Y Report – Time for Africa 3 4 2 13 10 12 11 14 9 6 5 7 8 6 6 13
  • 14. PAGEPAGE 5 YEAR CAPEX & YEAR ONE OF THE MDS - From 45 – 60 mt (Phases 1A, 1B and 1C) 14 Objective: • Expansion of iron ore export capacity to 60mtpa Status: • Desalination (RO) plant in Port and Eskom sub-station at loop 18 • Rail triangles at Salkor and Erts yards, road surfacing at Salkor North and various alterations and additions in the port terminal. Key Milestones Status Completion of RO Plant Commissioning of Eskom sub-station, TFS and Postmasburg TSS Installation of upgraded shiploader chutes Completion of Salkor Yard works 2009 2010 2011 2012 2013 SAL MPT 2.31 9.27 0.26 0.18 4.41 IOT 427.33 438.02 219.20 90.20 100.25 TOTAL 429.65 447.29 219.45 90.38 104.66 2009 – R256m on phase 1b incl. dust mitigation, R63m on phase 1c 2010 – R68m on phase 1a, R102m on phase 1b and 283m on phase 1c 2011 – R130m on phase 1b and R79m on phase 1c 2012 – R44m on phase 1c and R22m on the Krupp ship loader refurb 2013 – R57m on phase 1c and R25m on the conveyor project Capex for the past 5 Years
  • 15. PAGEPAGE MARKET DEMAND STRATEGY (MDS) Total Transnet ZAR300bn, TPT ZAR33bn 2012/13 - 2018/19, peaking to ZAR9.5bn in 2016/17 Sishen -Saldanha Export iron ore ZAR28.6bn Port Terminals: ZAR5.82bn Cape Town Port Terminals: ZAR465ml 7 Durban Multi Product Pipeline ZAR9.4bn Port Terminals: ZAR7.4bn Richards Bay corridor Export coal line ZAR32.1bn Port Terminals: ZAR12.4bn 2012/132011/122010/112008/09 2013/14 2017/182016/172015/162014/15 2018/19 3200 2337 913 1137 2551 4138 3492 7670 9545 2812 2670 2009/10 Boom- time Ends Global recession Market Demand Strategy TPT R33bn 7yr Investment Plan Eastern Cape Port Terminals: ZAR6.7bn 15
  • 16. PAGEPAGE • Transnet will spend R28.6-billion on the Sishen-Saldanha iron-ore corridor between 2012/13 and 2018/19. • The investment in the rail corridor and the port should raise the capacity of the export channel, which traverses the Northern Cape and Western Cape provinces, by 57%, from 53-million tons to 83-million tons over the seven-year period. • The MDS also include a plan to raise domestic iron-ore volumes by 134%, from 7.7-million tons last year, to 18-million tons by the end of the seven-year period. MEANING OF MDS FOR SISHEN-SALDANHA 16
  • 17. PAGEPAGE 17 FROM 60 TO 82MT BY 2018/19 Initial Bulk Terminal Operations, 1976 Targeted capacity = 27mtpa 1 tippler, 2 stacker Reclaimers, 2 ship loaders Bulk Terminal Expansion, Phase 1 A Capacity - 45mtpa Completed June 2005 2 tipplers, 3 stacker Reclaimers, 2 ship loaders Bulk Terminal Expansion, Phase 1B Capacity-55mtp Completed , May 2009 2 tipplers, 4 stacker Reclaimers, 2 ship loaders), Bulk terminal Expansion, Phase 1C Capacity = 60mtpa Completed July 2012 Improvement on phase 1B Port Expansion, Phase 2A FEL 2 in progress Targeted commissioning 2018 onward Targeted capacity = 82mtpa 3 tipplers, 6 stacker Reclaimers, 3 ship loaders 17 Project 2012/13 Budget R m 2013/14 Projected R m 2014/15 Projected R m 2015/16 Projected R m 2016/17 Projected R m 2017/18 Projected R m 2018/19 Projected R m 7y Plan Total R m Iron Ore Expansion (60 to 80mtpa) 20 205 1 200 1 950 900 4 275
  • 18. PAGE Milestones Forecast Finish Status Comments FEL 2 phase – Confirm go-forward port and rail options 27Apr 2012 Confirm rail expansion concept BC and funding approval for FEL-3 10 May 2013 TPT approval pending Environmental Authorisation 31 July 2014 24 months allowed for EIA process Engineering(FEL3) & Procurement 30 Sep 2014 Commissioning 30 Nov 2017 48 Months const. & comm. Objective: • Expand Iron ore export capacity to ~ 82mtpa Status: • FEL 2 report has been completed in collaboration with mining industry, still requiring refinement by Transnet. • TNPA and TFR Capics have approved funding for the FEL3 stage, TPT Capic approval still pending. Preliminary Scope • Construction of a new berth at Port, 2 new SRs, 1 tippler, 1 shiploader • Extension of rail loops to accommodate 360 wagon trains • Construction of a new Eskom substation and Track Feeder Station • Acquisition of locos and rolling stock Next Steps • Finalise go-forward berth location via ship motion and navigational simulations • Confirm rail expansion concepts with TFR • Issue tender for FEL3 design and initiate Environmental Impact Assessment (EIA) IRON ORE EXPANSION PROJECT - From 60 – 82mt (Phase 2) 18