Contents
Transnet Port Terminals
• Overview of TPT
Market Demand Strategy
• Equipment
2
• Transnet Port Terminals provides cargo
handling services at 16 terminal facilities in
seven ports to a wide range of customers
including shipping lines, freight forwarders and
cargo owners.
• Operations are in containers, bulk, break-bulk
and automotives.
• We invest in state-of-the-art cargo handling
equipment (ship-to-shore cranes, straddle
carriers, rubber-tyre gantries, tipplers,
conveyors) and manage the logistics interface
with inbound and outbound rail and trucking
carriers.
• We are proud of the implementation of the
NAVIS-terminal operating system and the
certification of all our terminals to ISO
standards.
• Transnet Port Terminals is Africa’s biggest
container terminal operator in terms of
volumes handled.
• TPT Video
In line with Transnet’s new market demand strategy
(MDS) and related investments, Transnet’s Port
Terminals are currently expanding in response to
growing business in the country.
Expansion includes creating storage capacity, the
replacement of old equipment and upgrading of
software.
TRANSNET PORT TERMINALS
20
21
TPT EXCO
Mr Karl Socikwa
CE Transnet Port Terminals
Mr Pru Archary
Chief Financial Officer
Dr Deirdre Ackermann
Chief Information Officer
Ms Michelle Phillips
GM Commercial & Planning
Mr Dumisani Khuzwayo
GM Human Resources
Ms Ntombeziningi Shezi
GM Procurement
Mr Zeph Ndlovu
GM Risk & Corporate Affairs
Ms Nombuso Afolayan
GM Ops: KZN BBC
Ms Brenda Magqwaka
GM Ops: KZN Containers
Mr Siyabulelwa Mhlaluka
GM Ops: Eastern Cape
Mr Velile Dube
GM Ops: Western Cape
TPT’s Vision
23
24
OUR TERMINALS
24
THE TEAMTRANSNET PORT TERMINALS
16 Port Terminals across South Africa:
- 4 Container Terminals with a total of 8m TEU capacity
(96% market share)
- 3 Bulk Terminals with 89m Tonnes combined capacity
(52% market share in dry bulk – 0% liquid bulk)
- 3 Automotive Terminals (100% market share of newly build)
- 6 Break-Bulk Terminals with 19m Tonnes capacity
(69% market share)
26
Transnet & TPT Values
26
A Safety
MindsetGood
Communication
Dignity &
Respect
Empowered to
PerformBusiness
Focus
Recognition &
Reward
Deliver on our
Promises
Transnet’s Culture
Charter Values
TPT
26
SALDANHA BAY
27
OUR TERMINALS
THE TEAMSALDANHA BAY
PORT OF CAPE TOWN
OUR TERMINALS
THE TEAMPORT OF CAPE TOWN
29
PORT OF CAPE TOWN
OUR TERMINALS
THE TEAM
PORT ELIZABETH
- Containers, Bulk, Break-Bulk & Automotive Terminals
PORT OF NGQURAPORT OF CAPE TOWN
OUR TERMINALS
THE TEAM
PORT OF NGQURA
- Containers, Bulk
31
PORT OF EAST LONDON
31
PORT OF NGQURAPORT OF CAPE TOWN
OUR TERMINALS
THE TEAM
PORT OF EAST LONDON
- Agricultural Bulk, Automotives, Containers, Break-Bulk
DURBAN
32
32
PORT OF NGQURAPORT OF CAPE TOWN
OUR TERMINALS
THE TEAM
PORT OF DURBAN
- Containers, Automotives, Bulk & Break Bulk
DURBAN CONTAINER TERMINALS
33
PORT OF NGQURAPORT OF CAPE TOWN
OUR TERMINALS
THE TEAM
PORT OF DURBAN
- Container Terminals
DURBAN CONTAINER TERMINALS
34
PORT OF NGQURAPORT OF CAPE TOWN
OUR TERMINALS
THE TEAM
PORT OF DURBAN
- Container Terminals
15 cranes deployed servicing 18 vessels pw
92 Straddles deployed per shift, 3 Rail Cranes
Ave Call size = 2 000 TEU
4 Big callers (300-350 m) with 4 500 – 6 500 TEU MSC,
MAERSK, K-Line, PIL, Evergreen, COSCO, MOL
150 Trucks p/h, 24 Hour operation.
~1 500 employees, 12 Waterside & 2 Landside Gangs
Third busiest container port in the Southern Hemisphere
61% of all South Africa’s container imports and exports
through the port of Durban
Volumes (TEU) 5 307 pd 37 153 pw 1.93m pa
TEU on Rail 743 pd 5 200 pw 270 400 pa
Truck Gate Moves 2 600 pd 18 200 pw 946 400 pa
35
DCT Plan To Achieve 35 GCH By FY 2019/2020
DCT PIER 2
- Container Terminals Truck Staging Area
DURBAN MULTI PURPOSE TERMINALS
– MAYDON WHARF, AGRI
PORT OF NGQURAPORT OF CAPE TOWN
OUR TERMINALS
THE TEAM
PORT OF DURBAN
- Maydon Wharf
37
DURBAN MULTI PURPOSE TERMINALS
– MAYDON WHARF, AGRI
PORT OF NGQURAPORT OF CAPE TOWN
OUR TERMINALS
THE TEAM
PORT OF DURBAN
- Agri Terminals
Ro-Ro TerminalsDURBAN MULTI PURPOSE TERMINALS
– POINT RORO
DURBAN MULTI PURPOSE TERMINALS
– MAYDON WHARF, AGRI
PORT OF NGQURAPORT OF CAPE TOWN
OUR TERMINALS
THE TEAM
PORT OF DURBAN
- MPT Point, Ro-Ro Terminals
Ro-Ro TerminalsDURBAN MULTI PURPOSE TERMINALS
– RORO
RICHARDS BAY
- Bulk and Break-Bulk Terminals
RICHARDS BAY
DURBAN MULTI PURPOSE TERMINALS
– MAYDON WHARF, AGRI
PORT OF NGQURAPORT OF CAPE TOWN
OUR TERMINALS
THE TEAM
PORT OF RICHARDS BAY
- Bulk & Break-Bulk Terminals
AT TRANSNET PORT TERMINALS WE HAVE LONG
BELIEVED THAT OUR STAFF ARE OUR GREATEST ASSEST
RICHARDS BAY
DURBAN MULTI PURPOSE TERMINALS
– MAYDON WHARF, AGRI
PORT OF NGQURAPORT OF CAPE TOWN
OUR TERMINALS
THE TEAMTransnet Port Terminals
OUR ACHIEVEMENTS
• The fastest growing container terminal in the world – Ngqura Container Terminal (NCT);
Drewry Maritime Research. During 2012, NCT’s volumes more than doubled, peaking at 129%
year-on-year.
• Winner of the Safety Award at the 2013 Transport Africa Awards. TPT was also shortlisted for the
Best African Port Operator Award as well as the Transport Green Award.
• NOSCAR grading for Port Elizabeth and East London car terminals – 2012 NOSA audits.
The NOSCAR is the highest safety accolade in the industry.
• Most moves per hour, highest in Africa (January to March 2013) – Port Elizabeth Container
Terminal. Ranking done by Maersk, the world’s largest ocean carrier and container shipping
container company. Durban Container Terminal was ranked fifth in the same study.
• Service Excellence PMR Africa Awards 2012 – Durban, Richards Bay, Ngqura and Cape Town.
In 2013, Durban and Ngqura scooped the Service Excellence awards.
• Best performing container terminal in Africa – Durban Container Terminal; Container
Management Top 120 World Container Terminals Survey 2013. Cape Town Container Terminal
was also listed for the first time in 2013.
• Best Success in Africa Award for TPT from CNBC Africa.
• World class rail dual cycle operation on Navis pioneered by Durban Container Terminal: Pier 2 in
March 2013.
• TPT dominates Transet Internal Audit (TIA) Integrated Governance Awards.
- Best compliance internal control environment
- Leader in fraud risk management environment
- Most improved internal control environment
• Level three B-BBEE status for TPT attained in 2014.
43
TRANSNET’s MARKET DEMAND STRATEGY
43Source: TPT Growth Strategy, Market Demand Strategy.
44
TNPA INFRASTRUCTURE INVESTMENT
44Source: TPT Growth Strategy, Market Demand Strategy.
Saldanha (9%) R6.3bn
Cape Town (5%)
R 3.2bn
Richards Bay (24%)
R 16.8bn
Durban (45%)
R 30.3bn
SLD
R 7.1bn
(15%)
Ngqura (4%)
R 3.0bn
PE (2%)
R 1.4bn
Manganese (11%)
R7.9bn
EL
R 38m
TPT 10-year Capital Investment Plan:
- R69 billion
5,190
2021/22
4,990
2024/25
69,227
Total2023/24
7,557
2022/23
12,741
2020/21
10,020
2019/20
6,581
2018/19
6,7299,505
2016/17
4,294
2015/16
1,620
Replacement
R 24.4bn
35%
Expansion
R44.6bn
65%
2017/18
Expansion
R 22.2bn
62%
Replacement
R 13.6bn
38%
Containers: R 35.8bn (52%)
Expansion
R 22bn
72%
Replacement
R 8.5bn
28%
Bulk: R 30.5bn (44%)
Investment per Sector (Expansion vs Replacement)
Break-Bulk: R 2.5bn (3%) Automotive: R 360m (1%)
Replacement
R 2.4bn
96%
Expansion
R 332m
92%
Expansion
R 95m
4%
Replacement
R 28m
8%
65
DCT Berth Deepening & Lengthening
Business need
In order to address the safety of the existing quay walls; to restore the terminal capacity of 2.9m TEU pa and
for the Port of Durban to handle larger vessels of 9200 TEU capacity, the current berths on the north quay
need to be deepened and lengthened.
Scope
• Deepen Berths 203 to 205 from -12,8m CD to -16,5m CD
• Lengthen the berths from 914m to 1,200m to accommodate three 9200 TEU or 12000 TEU vessels with a
draft of -14,5m CD, (3x vessels with LOA of 350m) thereby restoring capacity to 2.9m TEU
• The new quay wall shall accommodate 80 ton tandem-lift STS cranes with a rail gauge of 30,480m
• Dredging for the container berths and channel to -16,5m chart datum.
• Construction of new caisson quay wall 50m seawards of existing quay wall
Operating Divisions & Funding
Dependencies
• 2 Environmental appeals received. TNPA expected to respond by May 2015
• Approval of FEL-4 funding
Progress to date:
• Engineering design– 95% complete.
• EIA appeal process underway
Look ahead
• Complete FEL-3 by Sept-15
• FEL-4 funding approval by Transnet Board in November-15
• FEL-4 funding approval by DPE in February -16
Key milestones:
• Start construction at berth 205 in 2017
• 18 months occupation per berth
• FEL - 4 completion :August 2021
Planned investment
O.D. FEL-3 FEL-4 Total
TNPA R128m R6,000m R6,078m
TPT Nil but project will impact on terminal operations & capacity
TFR Nil
CAPIC Approval R128m -
Project Sponsor Richard Valihu
Project Director David McGillewe
TPT Owner Brenda Magqwaka
Terminal Rep Shane Narainsamy
TPT PM Previn Govender
TPT Obligations Provide and approve terminal requirements
Provide interface bet project & operations
Ensure compliance to end user needs
Monitor progress
Steerco Still to be setup
TNPA Planned investment
588548
359
5
18/1915/16 16/17 17/18 20/21
2,252
19/20
2,252
Phasing Start Complete
Phase 1 – Berth 205 January 2017 October 2018
Phase 2 – Berth 204 November
2018
April 2020
Phase 3 – berth 203 April 2020 August 2021
66
DCT - North Quay Upgrade : Superstructure and Paving
Business need
With the new lengthened North Quay, DCT will required additional cranes and straddle carriers to restore
terminal capacity to 2.9m TEU. The North Quay occupations for deepening also provides an opportunity to
rehabilitate the “end-of-life” safety critical stack paving.
Scope
• Replacement of 2x STS cranes to accommodate 30.480m gauge
• Acquisition of additional 3x STS Cranes for longer quay
• Acquisition of additional stacking equipment
• Replacement of the concrete stack paving
Operating Divisions & Funding
Dependencies
• Deepening & lengthening of North Quay by TNPA
• Approval of FEL-3 & FEL-4 funding
Progress to date:
• Option analysis indicates conversion of landside to RMG’s not viable and DCT P2 should remain as a
straddle carrier operations.
Look ahead
• EXCO resolution to remain with straddle carriers in Mar-15.
• Funding approval for FEL-3 study in 2015
Key milestones:
• EXCO approval to remain with straddle carriers
• Start of FEL-3 study in 2015
Planned investment
O.D. FEL-3 FEL-4 Total
TNPA Nil
TPT R25m R5,609m R5,634m
TFR Nil
CAPIC Approval -
Project Sponsor Karl Socikwa
Project Director TBA
TPT Owner Brenda Magqwaka
Terminal Rep Shane Narainsamy
TPT PM Ebrahim Ali (Acting)
TPT Obligations Provide and approve terminal requirements
Provide interface bet project & operations
Ensure compliance to end user needs
Monitor progress
Ensure alignment with the TNPA Berth
Deepening and Lengthening project
Steerco Still to be setup
TPT Planned investment
266250
624
314
250
21/22 beyond20/2118/1916/17
1,758
17/18 19/2015/16
2,397
67
Pier 1 Phase 2 Infill
Business need
Increase container handling capacity in the Port of Durban and provide additional deep water berths for
larger vessels. Pier 1 capacity is envisaged to increase from 0.7m TEU to 2.5m TEU pa
Scope
• Construction of new quay walls to provide additional deep water berths (-16.5m CD)
• Provision of associated container stacking area
• Acquisition of container handling equipment
• Construction of container stack paving
• New entrance and staff facilities
Operating Divisions & Funding
Dependencies
• Lease of land by TNPA from DPW (TNPA CE meeting with Sec of Defense in Feb)
• TNPA Terminal Operator License approval
• Environmental Authorization for infill
• Approval of FEL-4 funding
Progress to date:
• FEL-3 study in progress
Look ahead
• Approval of Terminal Operator Licence
• Completion of FEL-3 by May 2017
• Environmental application
• Request for FEL-4 funding
Key milestones:
• FEL - 3 completion : May 2017
• Lodging of Environmental application in November 2015
• Environmental Authorization in May 2017
• Request for FEL-4 funding to start @ OD CAPIC’s in 2017
Planned investment
24
O.D. FEL-3 FEL-4 Total
TNPA R47m R6,000m R6,047m
TPT R15m (pending TNPA
licence approval)
R14,000m R14,015m
TFR Nil
CAPIC Approval R47m -
Project Sponsor Richard Valihu
Project Director David McGillewe
TPT Owner Brenda Magqwaka
Terminal Rep Shane Narainsamy
TPT PM Previn Govender
TPT Obligations Provide and approve terminal requirements
Provide interface bet project & operations
Ensure compliance to end user needs
Monitor progress
Steerco Still to be setup
TPT Planned investment
Pier 1 expansion with new
Salisbury Island infill and
deepwater berths
113351500
16/1715/16 19/20
4,879
21/2218/1917/18 beyond
7,329
20/21
1,922
DCT Stack Rehabilitation
Background
The paving in certain of DCT P2’s stack area had cracked and failed. The ensuing settlement resulted in unsafe operations and damage to
equipment. The replacement if the scour protection at DCT South Quay by the TNPA provided an opportunity for DCT to capitalize on the
outage to replace all the failed paving. Phase 1 of the works was completed ahead of schedule and Berth 108/9 was handed over on 14-Jul-
14. The remaining 3 phases have also been completed with Phase 4 handed over in June 2015. The project is now complete.
Planned Actual
Cost R 140m R 120m
Completion Mar-15 Jun-15
Benefits
1. Restore DCT’s capacity to 2.5m TEU pa.
2. Improve safety and reduce damage to straddle carriers & injury to personnel.
27
Sustaining of
capacity
STS Crane for DCT East Quay
Background
DCT’s East Quay is currently equipped with old ship to shore cranes which are unreliable. The acquisition of new cranes with the latest
technology will assist in improving productivity. The order for these cranes was placed with Liehberr Container Cranes. The cranes arrived in
component form on 6 July 2015 and is currently being off loaded for erection.
Planned Forecast
Cost R 340m R 340m
Completion June-2015 Sept-15
Benefits
The East Quay at DCT will have the ability to handle bigger ships given the higher and longer reach of the new twin lift cranes.
28
Sustaining
of capacity
Construction of Central Staff Facility at Pier 1
Background
The Pier 1 container terminal consists of many temporary facilities for staff accommodation which are inadequate. This has led to low staff
moral and unhappiness. TPT recognized that the current facilities are not conducive for the operational environment and approved capital
funds to construct a central mess and ablution facility to accommodate the operational staff.
Planned Forecast
Cost R 86 m R 84 m
Completion Apr-15 Jul-15
Benefits
1. Optimize human resources through a modern staff facility at Pier 1.
2. The successful completion of this project will contribute towards employee care and improved morale.
3. Reduce employee fatigue.
29
Staff
Facilities
Overview of transnet port terminals

More Related Content

What's hot

Abdallah Shazly_ CV
Abdallah Shazly_ CVAbdallah Shazly_ CV
Abdallah Shazly_ CV
Abdallah Shazly
 
Kandla port
Kandla portKandla port
Kandla port
Mahek Patel
 
Terminal operation hub Ngqura and spoke model
Terminal  operation hub  Ngqura and spoke modelTerminal  operation hub  Ngqura and spoke model
Terminal operation hub Ngqura and spoke model
Transnet Port Terminals
 
Water Transportation
Water TransportationWater Transportation
Water Transportation
Jerome Jaime
 
Shipping Systems
Shipping SystemsShipping Systems
Shipping Systems
premsai999
 
Waterborne transport
Waterborne transportWaterborne transport
Waterborne transport
Jinadev Kv
 
Jebel ali port
Jebel ali portJebel ali port
Jebel ali port
kotakrishnadaskota2
 
Presentation by star shipping
Presentation by star shippingPresentation by star shipping
Presentation by star shipping
Muhammad Kamran
 
port of Hong kong
port of Hong kong port of Hong kong
port of Hong kong
ihab tarek
 
Transnet freight rail corridor development programme and road to rail strategy
Transnet freight rail corridor development programme and road to rail strategyTransnet freight rail corridor development programme and road to rail strategy
Transnet freight rail corridor development programme and road to rail strategy
Tristan Wiggill
 
port technologies
port technologies port technologies
port technologies
Abhishek
 
Lesson 4 national transport policy
Lesson 4 national transport policyLesson 4 national transport policy
Lesson 4 national transport policy
RK Murugan
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
REHAN MUMTAZ
 
Presentation of ocean transportation
Presentation of ocean transportationPresentation of ocean transportation
Presentation of ocean transportation
Hüseyin Tekler
 
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRYINTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
RAGHUNANDAN RAMACHANDRAN
 
Integrated Railway Transport Management System
Integrated Railway Transport Management SystemIntegrated Railway Transport Management System
Integrated Railway Transport Management System
SIS Group International
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
Shaik Ghouse
 
Transportation and Urban Planning
Transportation and Urban PlanningTransportation and Urban Planning
Transportation and Urban Planning
sorbi
 
Resume-Oil & Gas
Resume-Oil & GasResume-Oil & Gas
Resume-Oil & Gas
Narenndra kumar
 
Transportation Service
Transportation ServiceTransportation Service
Transportation Service
Ethan Rodrick
 

What's hot (20)

Abdallah Shazly_ CV
Abdallah Shazly_ CVAbdallah Shazly_ CV
Abdallah Shazly_ CV
 
Kandla port
Kandla portKandla port
Kandla port
 
Terminal operation hub Ngqura and spoke model
Terminal  operation hub  Ngqura and spoke modelTerminal  operation hub  Ngqura and spoke model
Terminal operation hub Ngqura and spoke model
 
Water Transportation
Water TransportationWater Transportation
Water Transportation
 
Shipping Systems
Shipping SystemsShipping Systems
Shipping Systems
 
Waterborne transport
Waterborne transportWaterborne transport
Waterborne transport
 
Jebel ali port
Jebel ali portJebel ali port
Jebel ali port
 
Presentation by star shipping
Presentation by star shippingPresentation by star shipping
Presentation by star shipping
 
port of Hong kong
port of Hong kong port of Hong kong
port of Hong kong
 
Transnet freight rail corridor development programme and road to rail strategy
Transnet freight rail corridor development programme and road to rail strategyTransnet freight rail corridor development programme and road to rail strategy
Transnet freight rail corridor development programme and road to rail strategy
 
port technologies
port technologies port technologies
port technologies
 
Lesson 4 national transport policy
Lesson 4 national transport policyLesson 4 national transport policy
Lesson 4 national transport policy
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
 
Presentation of ocean transportation
Presentation of ocean transportationPresentation of ocean transportation
Presentation of ocean transportation
 
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRYINTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
INTRODUCTION ON CONTAINER SHIPPING AND LINER INDUSTRY
 
Integrated Railway Transport Management System
Integrated Railway Transport Management SystemIntegrated Railway Transport Management System
Integrated Railway Transport Management System
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Transportation and Urban Planning
Transportation and Urban PlanningTransportation and Urban Planning
Transportation and Urban Planning
 
Resume-Oil & Gas
Resume-Oil & GasResume-Oil & Gas
Resume-Oil & Gas
 
Transportation Service
Transportation ServiceTransportation Service
Transportation Service
 

Similar to Overview of transnet port terminals

African seaports expansion summit
African seaports expansion summitAfrican seaports expansion summit
African seaports expansion summit
Transnet Port Terminals
 
Readying our ports for an onslaught of trade
Readying our ports for an onslaught of tradeReadying our ports for an onslaught of trade
Readying our ports for an onslaught of trade
Transnet Port Terminals
 
TRANSNET NEWSLETTER
TRANSNET NEWSLETTER TRANSNET NEWSLETTER
TRANSNET NEWSLETTER
Marketing Durban Chamber
 
Aees summit 2014 transnet port terminals on africa
Aees summit 2014 transnet port terminals on africaAees summit 2014 transnet port terminals on africa
Aees summit 2014 transnet port terminals on africa
AEES_AEEN
 
Our Business Engages Stakeholders
Our Business Engages StakeholdersOur Business Engages Stakeholders
Our Business Engages Stakeholders
Transnet Port Terminals
 
South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...
Transnet Port Terminals
 
Trade and Investment Forum
Trade and Investment ForumTrade and Investment Forum
Trade and Investment Forum
Marketing Durban Chamber
 
Drc delegation visit
Drc delegation visitDrc delegation visit
Drc delegation visit
Transnet Port Terminals
 
The role of TPT in the export led growth strategy- Eastern Cape Region
The  role of TPT in the export  led growth strategy- Eastern Cape RegionThe  role of TPT in the export  led growth strategy- Eastern Cape Region
The role of TPT in the export led growth strategy- Eastern Cape Region
Transnet Port Terminals
 
Business overview and opportunities at the Ports
Business overview and opportunities at the PortsBusiness overview and opportunities at the Ports
Business overview and opportunities at the Ports
Transnet Port Terminals
 
Eastern Cape Maritime Summit Oct 2016
Eastern Cape Maritime Summit Oct 2016Eastern Cape Maritime Summit Oct 2016
Eastern Cape Maritime Summit Oct 2016
Transnet Port Terminals
 
Richards bay port terminal business overview
Richards bay port  terminal business overviewRichards bay port  terminal business overview
Richards bay port terminal business overview
Transnet Port Terminals
 
Transnet and TPT overview 12 Sept 2016
Transnet and TPT overview 12 Sept 2016Transnet and TPT overview 12 Sept 2016
Transnet and TPT overview 12 Sept 2016
Willie Coetsee
 
Session 11 – site visits port of maputo
Session 11  – site visits  port of maputoSession 11  – site visits  port of maputo
Session 11 – site visits port of maputo
Centro de Informação de Negócios - CIN Moçambique
 
Public-Private participation to improve supply chains
Public-Private participation to improve supply chainsPublic-Private participation to improve supply chains
Public-Private participation to improve supply chains
Tristan Wiggill
 
Mervin chetty transnet sa
Mervin chetty transnet saMervin chetty transnet sa
Mervin chetty transnet sa
csear
 
ITL Keppel Presentation 2015
ITL Keppel Presentation 2015ITL Keppel Presentation 2015
ITL Keppel Presentation 2015
Alex Tran Quy Hien
 
Chetty 5f
Chetty 5fChetty 5f
Chetty 5f
csear
 
Durban Port Operators Awarded
Durban Port Operators AwardedDurban Port Operators Awarded
Durban Port Operators Awarded
Marketing Durban Chamber
 
Port of Baltimore - Business Services Presentation 06.08.15
Port of Baltimore - Business Services Presentation 06.08.15Port of Baltimore - Business Services Presentation 06.08.15
Port of Baltimore - Business Services Presentation 06.08.15
Susquehanna Workforce Network
 

Similar to Overview of transnet port terminals (20)

African seaports expansion summit
African seaports expansion summitAfrican seaports expansion summit
African seaports expansion summit
 
Readying our ports for an onslaught of trade
Readying our ports for an onslaught of tradeReadying our ports for an onslaught of trade
Readying our ports for an onslaught of trade
 
TRANSNET NEWSLETTER
TRANSNET NEWSLETTER TRANSNET NEWSLETTER
TRANSNET NEWSLETTER
 
Aees summit 2014 transnet port terminals on africa
Aees summit 2014 transnet port terminals on africaAees summit 2014 transnet port terminals on africa
Aees summit 2014 transnet port terminals on africa
 
Our Business Engages Stakeholders
Our Business Engages StakeholdersOur Business Engages Stakeholders
Our Business Engages Stakeholders
 
South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...
 
Trade and Investment Forum
Trade and Investment ForumTrade and Investment Forum
Trade and Investment Forum
 
Drc delegation visit
Drc delegation visitDrc delegation visit
Drc delegation visit
 
The role of TPT in the export led growth strategy- Eastern Cape Region
The  role of TPT in the export  led growth strategy- Eastern Cape RegionThe  role of TPT in the export  led growth strategy- Eastern Cape Region
The role of TPT in the export led growth strategy- Eastern Cape Region
 
Business overview and opportunities at the Ports
Business overview and opportunities at the PortsBusiness overview and opportunities at the Ports
Business overview and opportunities at the Ports
 
Eastern Cape Maritime Summit Oct 2016
Eastern Cape Maritime Summit Oct 2016Eastern Cape Maritime Summit Oct 2016
Eastern Cape Maritime Summit Oct 2016
 
Richards bay port terminal business overview
Richards bay port  terminal business overviewRichards bay port  terminal business overview
Richards bay port terminal business overview
 
Transnet and TPT overview 12 Sept 2016
Transnet and TPT overview 12 Sept 2016Transnet and TPT overview 12 Sept 2016
Transnet and TPT overview 12 Sept 2016
 
Session 11 – site visits port of maputo
Session 11  – site visits  port of maputoSession 11  – site visits  port of maputo
Session 11 – site visits port of maputo
 
Public-Private participation to improve supply chains
Public-Private participation to improve supply chainsPublic-Private participation to improve supply chains
Public-Private participation to improve supply chains
 
Mervin chetty transnet sa
Mervin chetty transnet saMervin chetty transnet sa
Mervin chetty transnet sa
 
ITL Keppel Presentation 2015
ITL Keppel Presentation 2015ITL Keppel Presentation 2015
ITL Keppel Presentation 2015
 
Chetty 5f
Chetty 5fChetty 5f
Chetty 5f
 
Durban Port Operators Awarded
Durban Port Operators AwardedDurban Port Operators Awarded
Durban Port Operators Awarded
 
Port of Baltimore - Business Services Presentation 06.08.15
Port of Baltimore - Business Services Presentation 06.08.15Port of Baltimore - Business Services Presentation 06.08.15
Port of Baltimore - Business Services Presentation 06.08.15
 

More from Transnet Port Terminals

Procurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern CapeProcurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern Cape
Transnet Port Terminals
 
Transnet Annual Results Presentation March 2016
Transnet Annual Results Presentation  March 2016 Transnet Annual Results Presentation  March 2016
Transnet Annual Results Presentation March 2016
Transnet Port Terminals
 
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals
 
Transnet Port Terminals SOLAS frequently asked questions
Transnet Port Terminals SOLAS frequently asked questionsTransnet Port Terminals SOLAS frequently asked questions
Transnet Port Terminals SOLAS frequently asked questions
Transnet Port Terminals
 
Tpt's tendering process at a glance
Tpt's tendering process at a glanceTpt's tendering process at a glance
Tpt's tendering process at a glance
Transnet Port Terminals
 
Tpt's supplier development (sd) initiative outline
Tpt's supplier  development (sd) initiative outlineTpt's supplier  development (sd) initiative outline
Tpt's supplier development (sd) initiative outline
Transnet Port Terminals
 
Tpt's bid specification considerations
Tpt's bid specification considerationsTpt's bid specification considerations
Tpt's bid specification considerations
Transnet Port Terminals
 
As a supplier, know tpt's governance
As a supplier, know tpt's  governanceAs a supplier, know tpt's  governance
As a supplier, know tpt's governance
Transnet Port Terminals
 
Customer commitment brochure 2015 (10)
Customer commitment brochure 2015 (10)Customer commitment brochure 2015 (10)
Customer commitment brochure 2015 (10)
Transnet Port Terminals
 
Transnet annual results 2015
Transnet annual results 2015Transnet annual results 2015
Transnet annual results 2015
Transnet Port Terminals
 
Transnet enterprise development hub Saldanha - 2015
Transnet enterprise development hub  Saldanha - 2015Transnet enterprise development hub  Saldanha - 2015
Transnet enterprise development hub Saldanha - 2015
Transnet Port Terminals
 
Transnet anti bullying talk guide 2015
Transnet anti bullying talk guide 2015Transnet anti bullying talk guide 2015
Transnet anti bullying talk guide 2015
Transnet Port Terminals
 
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaSaudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Transnet Port Terminals
 
Indicators and innovations to improve efficiency at ports
Indicators and innovations to improve efficiency at portsIndicators and innovations to improve efficiency at ports
Indicators and innovations to improve efficiency at ports
Transnet Port Terminals
 
Transnet port terminals on stay ahead of the competition, presented during af...
Transnet port terminals on stay ahead of the competition, presented during af...Transnet port terminals on stay ahead of the competition, presented during af...
Transnet port terminals on stay ahead of the competition, presented during af...
Transnet Port Terminals
 
Excellence showcased at tpt
Excellence showcased at tptExcellence showcased at tpt
Excellence showcased at tpt
Transnet Port Terminals
 
Transnet port terminals careers brochure
Transnet port terminals careers brochureTransnet port terminals careers brochure
Transnet port terminals careers brochure
Transnet Port Terminals
 
The expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandThe expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demand
Transnet Port Terminals
 

More from Transnet Port Terminals (18)

Procurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern CapeProcurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern Cape
 
Transnet Annual Results Presentation March 2016
Transnet Annual Results Presentation  March 2016 Transnet Annual Results Presentation  March 2016
Transnet Annual Results Presentation March 2016
 
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
 
Transnet Port Terminals SOLAS frequently asked questions
Transnet Port Terminals SOLAS frequently asked questionsTransnet Port Terminals SOLAS frequently asked questions
Transnet Port Terminals SOLAS frequently asked questions
 
Tpt's tendering process at a glance
Tpt's tendering process at a glanceTpt's tendering process at a glance
Tpt's tendering process at a glance
 
Tpt's supplier development (sd) initiative outline
Tpt's supplier  development (sd) initiative outlineTpt's supplier  development (sd) initiative outline
Tpt's supplier development (sd) initiative outline
 
Tpt's bid specification considerations
Tpt's bid specification considerationsTpt's bid specification considerations
Tpt's bid specification considerations
 
As a supplier, know tpt's governance
As a supplier, know tpt's  governanceAs a supplier, know tpt's  governance
As a supplier, know tpt's governance
 
Customer commitment brochure 2015 (10)
Customer commitment brochure 2015 (10)Customer commitment brochure 2015 (10)
Customer commitment brochure 2015 (10)
 
Transnet annual results 2015
Transnet annual results 2015Transnet annual results 2015
Transnet annual results 2015
 
Transnet enterprise development hub Saldanha - 2015
Transnet enterprise development hub  Saldanha - 2015Transnet enterprise development hub  Saldanha - 2015
Transnet enterprise development hub Saldanha - 2015
 
Transnet anti bullying talk guide 2015
Transnet anti bullying talk guide 2015Transnet anti bullying talk guide 2015
Transnet anti bullying talk guide 2015
 
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaSaudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanha
 
Indicators and innovations to improve efficiency at ports
Indicators and innovations to improve efficiency at portsIndicators and innovations to improve efficiency at ports
Indicators and innovations to improve efficiency at ports
 
Transnet port terminals on stay ahead of the competition, presented during af...
Transnet port terminals on stay ahead of the competition, presented during af...Transnet port terminals on stay ahead of the competition, presented during af...
Transnet port terminals on stay ahead of the competition, presented during af...
 
Excellence showcased at tpt
Excellence showcased at tptExcellence showcased at tpt
Excellence showcased at tpt
 
Transnet port terminals careers brochure
Transnet port terminals careers brochureTransnet port terminals careers brochure
Transnet port terminals careers brochure
 
The expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandThe expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demand
 

Recently uploaded

Satta matka guessing Kalyan result sattamatka
Satta matka guessing Kalyan result sattamatkaSatta matka guessing Kalyan result sattamatka
Satta matka guessing Kalyan result sattamatka
➑➌➋➑➒➎➑➑➊➍
 
Module 4 Business Strategy competitive advantages
Module 4 Business Strategy competitive advantagesModule 4 Business Strategy competitive advantages
Module 4 Business Strategy competitive advantages
Seta Wicaksana
 
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
Growth Buyouts - The  Dawn of the GBO (Slow Ventures)Growth Buyouts - The  Dawn of the GBO (Slow Ventures)
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
Razin Mustafiz
 
Mandated reporting powerpoint to help with understanding your role
Mandated reporting powerpoint to help with understanding your roleMandated reporting powerpoint to help with understanding your role
Mandated reporting powerpoint to help with understanding your role
khidalgo2
 
TALENT ACQUISITION AND MANAGEMENT LECTURE 2
TALENT ACQUISITION AND MANAGEMENT LECTURE 2TALENT ACQUISITION AND MANAGEMENT LECTURE 2
TALENT ACQUISITION AND MANAGEMENT LECTURE 2
projectseasy
 
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptxSTRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
ImranTabish1
 
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
kevinkariuki227
 
WAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdfWAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdf
Western Alaska Minerals Corp.
 
حبوب %77 الميفيبريستون 200 ملغ في دبي الامارات العين ابوظبي عجمان واتس - 0096...
حبوب %77 الميفيبريستون 200 ملغ في دبي الامارات العين ابوظبي عجمان واتس - 0096...حبوب %77 الميفيبريستون 200 ملغ في دبي الامارات العين ابوظبي عجمان واتس - 0096...
حبوب %77 الميفيبريستون 200 ملغ في دبي الامارات العين ابوظبي عجمان واتس - 0096...
حبوب الاجهاض سايتوتك للبيع في الامارات cytotec واتس 00966583759617
 
The-Three-Pillars-of-Doctoral-Research-What-Why-and-How (1).pptx
The-Three-Pillars-of-Doctoral-Research-What-Why-and-How (1).pptxThe-Three-Pillars-of-Doctoral-Research-What-Why-and-How (1).pptx
The-Three-Pillars-of-Doctoral-Research-What-Why-and-How (1).pptx
Jindal Global University, Sonipat Haryana 131001
 
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual TrainingpptxYou Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
Cynthia Clay
 
Restaurant Chiraz Sindbad Hotel Hammamet
Restaurant Chiraz Sindbad Hotel HammametRestaurant Chiraz Sindbad Hotel Hammamet
Restaurant Chiraz Sindbad Hotel Hammamet
rihabkorbi24
 
BBA Final SML 501 INTERNATIONAL BUSINESS .pdf
BBA Final SML 501 INTERNATIONAL BUSINESS .pdfBBA Final SML 501 INTERNATIONAL BUSINESS .pdf
BBA Final SML 501 INTERNATIONAL BUSINESS .pdf
mcdopex6
 
AI at Work​ The demystification of AI and real-world stories on how to apply ...
AI at Work​ The demystification of AI and real-world stories on how to apply ...AI at Work​ The demystification of AI and real-world stories on how to apply ...
AI at Work​ The demystification of AI and real-world stories on how to apply ...
Auxis Consulting & Outsourcing
 
foodgasm restaurant and Bar pune road.docx
foodgasm restaurant and Bar pune road.docxfoodgasm restaurant and Bar pune road.docx
foodgasm restaurant and Bar pune road.docx
PraghyaBhandari
 
Managing Customer & User Experience of Customers
Managing Customer & User Experience of CustomersManaging Customer & User Experience of Customers
Managing Customer & User Experience of Customers
SalmanTahir60
 
Green Minimalist Aesthetic Project Proposal Presentation.pdf
Green Minimalist Aesthetic Project Proposal Presentation.pdfGreen Minimalist Aesthetic Project Proposal Presentation.pdf
Green Minimalist Aesthetic Project Proposal Presentation.pdf
shivamkush646
 
Millionaire track government application
Millionaire track government applicationMillionaire track government application
Millionaire track government application
pragyasharma659549
 
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological StyleZodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
my Pandit
 
Corporate Governance for South African Mining Companies
Corporate Governance for South African Mining CompaniesCorporate Governance for South African Mining Companies
Corporate Governance for South African Mining Companies
James AH Campbell
 

Recently uploaded (20)

Satta matka guessing Kalyan result sattamatka
Satta matka guessing Kalyan result sattamatkaSatta matka guessing Kalyan result sattamatka
Satta matka guessing Kalyan result sattamatka
 
Module 4 Business Strategy competitive advantages
Module 4 Business Strategy competitive advantagesModule 4 Business Strategy competitive advantages
Module 4 Business Strategy competitive advantages
 
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
Growth Buyouts - The  Dawn of the GBO (Slow Ventures)Growth Buyouts - The  Dawn of the GBO (Slow Ventures)
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
 
Mandated reporting powerpoint to help with understanding your role
Mandated reporting powerpoint to help with understanding your roleMandated reporting powerpoint to help with understanding your role
Mandated reporting powerpoint to help with understanding your role
 
TALENT ACQUISITION AND MANAGEMENT LECTURE 2
TALENT ACQUISITION AND MANAGEMENT LECTURE 2TALENT ACQUISITION AND MANAGEMENT LECTURE 2
TALENT ACQUISITION AND MANAGEMENT LECTURE 2
 
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptxSTRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
 
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
 
WAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdfWAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdf
 
حبوب %77 الميفيبريستون 200 ملغ في دبي الامارات العين ابوظبي عجمان واتس - 0096...
حبوب %77 الميفيبريستون 200 ملغ في دبي الامارات العين ابوظبي عجمان واتس - 0096...حبوب %77 الميفيبريستون 200 ملغ في دبي الامارات العين ابوظبي عجمان واتس - 0096...
حبوب %77 الميفيبريستون 200 ملغ في دبي الامارات العين ابوظبي عجمان واتس - 0096...
 
The-Three-Pillars-of-Doctoral-Research-What-Why-and-How (1).pptx
The-Three-Pillars-of-Doctoral-Research-What-Why-and-How (1).pptxThe-Three-Pillars-of-Doctoral-Research-What-Why-and-How (1).pptx
The-Three-Pillars-of-Doctoral-Research-What-Why-and-How (1).pptx
 
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual TrainingpptxYou Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
 
Restaurant Chiraz Sindbad Hotel Hammamet
Restaurant Chiraz Sindbad Hotel HammametRestaurant Chiraz Sindbad Hotel Hammamet
Restaurant Chiraz Sindbad Hotel Hammamet
 
BBA Final SML 501 INTERNATIONAL BUSINESS .pdf
BBA Final SML 501 INTERNATIONAL BUSINESS .pdfBBA Final SML 501 INTERNATIONAL BUSINESS .pdf
BBA Final SML 501 INTERNATIONAL BUSINESS .pdf
 
AI at Work​ The demystification of AI and real-world stories on how to apply ...
AI at Work​ The demystification of AI and real-world stories on how to apply ...AI at Work​ The demystification of AI and real-world stories on how to apply ...
AI at Work​ The demystification of AI and real-world stories on how to apply ...
 
foodgasm restaurant and Bar pune road.docx
foodgasm restaurant and Bar pune road.docxfoodgasm restaurant and Bar pune road.docx
foodgasm restaurant and Bar pune road.docx
 
Managing Customer & User Experience of Customers
Managing Customer & User Experience of CustomersManaging Customer & User Experience of Customers
Managing Customer & User Experience of Customers
 
Green Minimalist Aesthetic Project Proposal Presentation.pdf
Green Minimalist Aesthetic Project Proposal Presentation.pdfGreen Minimalist Aesthetic Project Proposal Presentation.pdf
Green Minimalist Aesthetic Project Proposal Presentation.pdf
 
Millionaire track government application
Millionaire track government applicationMillionaire track government application
Millionaire track government application
 
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological StyleZodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
 
Corporate Governance for South African Mining Companies
Corporate Governance for South African Mining CompaniesCorporate Governance for South African Mining Companies
Corporate Governance for South African Mining Companies
 

Overview of transnet port terminals

  • 1. Heading heading heading DateTransnet Port Terminals hosts honourable Mayor Councillor James Nxumalo 7 October 2015
  • 2. PAGE Contents Transnet Port Terminals • Overview of TPT Market Demand Strategy • Equipment 2
  • 3. • Transnet Port Terminals provides cargo handling services at 16 terminal facilities in seven ports to a wide range of customers including shipping lines, freight forwarders and cargo owners. • Operations are in containers, bulk, break-bulk and automotives. • We invest in state-of-the-art cargo handling equipment (ship-to-shore cranes, straddle carriers, rubber-tyre gantries, tipplers, conveyors) and manage the logistics interface with inbound and outbound rail and trucking carriers. • We are proud of the implementation of the NAVIS-terminal operating system and the certification of all our terminals to ISO standards. • Transnet Port Terminals is Africa’s biggest container terminal operator in terms of volumes handled. • TPT Video In line with Transnet’s new market demand strategy (MDS) and related investments, Transnet’s Port Terminals are currently expanding in response to growing business in the country. Expansion includes creating storage capacity, the replacement of old equipment and upgrading of software. TRANSNET PORT TERMINALS 20
  • 4. 21 TPT EXCO Mr Karl Socikwa CE Transnet Port Terminals Mr Pru Archary Chief Financial Officer Dr Deirdre Ackermann Chief Information Officer Ms Michelle Phillips GM Commercial & Planning Mr Dumisani Khuzwayo GM Human Resources Ms Ntombeziningi Shezi GM Procurement Mr Zeph Ndlovu GM Risk & Corporate Affairs Ms Nombuso Afolayan GM Ops: KZN BBC Ms Brenda Magqwaka GM Ops: KZN Containers Mr Siyabulelwa Mhlaluka GM Ops: Eastern Cape Mr Velile Dube GM Ops: Western Cape
  • 6. 24 OUR TERMINALS 24 THE TEAMTRANSNET PORT TERMINALS 16 Port Terminals across South Africa: - 4 Container Terminals with a total of 8m TEU capacity (96% market share) - 3 Bulk Terminals with 89m Tonnes combined capacity (52% market share in dry bulk – 0% liquid bulk) - 3 Automotive Terminals (100% market share of newly build) - 6 Break-Bulk Terminals with 19m Tonnes capacity (69% market share)
  • 7. 26 Transnet & TPT Values 26 A Safety MindsetGood Communication Dignity & Respect Empowered to PerformBusiness Focus Recognition & Reward Deliver on our Promises Transnet’s Culture Charter Values TPT 26
  • 9. PORT OF CAPE TOWN OUR TERMINALS THE TEAMPORT OF CAPE TOWN
  • 10. 29 PORT OF CAPE TOWN OUR TERMINALS THE TEAM PORT ELIZABETH - Containers, Bulk, Break-Bulk & Automotive Terminals
  • 11. PORT OF NGQURAPORT OF CAPE TOWN OUR TERMINALS THE TEAM PORT OF NGQURA - Containers, Bulk
  • 12. 31 PORT OF EAST LONDON 31 PORT OF NGQURAPORT OF CAPE TOWN OUR TERMINALS THE TEAM PORT OF EAST LONDON - Agricultural Bulk, Automotives, Containers, Break-Bulk
  • 13. DURBAN 32 32 PORT OF NGQURAPORT OF CAPE TOWN OUR TERMINALS THE TEAM PORT OF DURBAN - Containers, Automotives, Bulk & Break Bulk
  • 14. DURBAN CONTAINER TERMINALS 33 PORT OF NGQURAPORT OF CAPE TOWN OUR TERMINALS THE TEAM PORT OF DURBAN - Container Terminals
  • 15. DURBAN CONTAINER TERMINALS 34 PORT OF NGQURAPORT OF CAPE TOWN OUR TERMINALS THE TEAM PORT OF DURBAN - Container Terminals 15 cranes deployed servicing 18 vessels pw 92 Straddles deployed per shift, 3 Rail Cranes Ave Call size = 2 000 TEU 4 Big callers (300-350 m) with 4 500 – 6 500 TEU MSC, MAERSK, K-Line, PIL, Evergreen, COSCO, MOL 150 Trucks p/h, 24 Hour operation. ~1 500 employees, 12 Waterside & 2 Landside Gangs Third busiest container port in the Southern Hemisphere 61% of all South Africa’s container imports and exports through the port of Durban Volumes (TEU) 5 307 pd 37 153 pw 1.93m pa TEU on Rail 743 pd 5 200 pw 270 400 pa Truck Gate Moves 2 600 pd 18 200 pw 946 400 pa
  • 16. 35 DCT Plan To Achieve 35 GCH By FY 2019/2020 DCT PIER 2 - Container Terminals Truck Staging Area
  • 17. DURBAN MULTI PURPOSE TERMINALS – MAYDON WHARF, AGRI PORT OF NGQURAPORT OF CAPE TOWN OUR TERMINALS THE TEAM PORT OF DURBAN - Maydon Wharf
  • 18. 37 DURBAN MULTI PURPOSE TERMINALS – MAYDON WHARF, AGRI PORT OF NGQURAPORT OF CAPE TOWN OUR TERMINALS THE TEAM PORT OF DURBAN - Agri Terminals
  • 19. Ro-Ro TerminalsDURBAN MULTI PURPOSE TERMINALS – POINT RORO DURBAN MULTI PURPOSE TERMINALS – MAYDON WHARF, AGRI PORT OF NGQURAPORT OF CAPE TOWN OUR TERMINALS THE TEAM PORT OF DURBAN - MPT Point, Ro-Ro Terminals
  • 20. Ro-Ro TerminalsDURBAN MULTI PURPOSE TERMINALS – RORO
  • 21. RICHARDS BAY - Bulk and Break-Bulk Terminals RICHARDS BAY DURBAN MULTI PURPOSE TERMINALS – MAYDON WHARF, AGRI PORT OF NGQURAPORT OF CAPE TOWN OUR TERMINALS THE TEAM PORT OF RICHARDS BAY - Bulk & Break-Bulk Terminals
  • 22. AT TRANSNET PORT TERMINALS WE HAVE LONG BELIEVED THAT OUR STAFF ARE OUR GREATEST ASSEST RICHARDS BAY DURBAN MULTI PURPOSE TERMINALS – MAYDON WHARF, AGRI PORT OF NGQURAPORT OF CAPE TOWN OUR TERMINALS THE TEAMTransnet Port Terminals
  • 23. OUR ACHIEVEMENTS • The fastest growing container terminal in the world – Ngqura Container Terminal (NCT); Drewry Maritime Research. During 2012, NCT’s volumes more than doubled, peaking at 129% year-on-year. • Winner of the Safety Award at the 2013 Transport Africa Awards. TPT was also shortlisted for the Best African Port Operator Award as well as the Transport Green Award. • NOSCAR grading for Port Elizabeth and East London car terminals – 2012 NOSA audits. The NOSCAR is the highest safety accolade in the industry. • Most moves per hour, highest in Africa (January to March 2013) – Port Elizabeth Container Terminal. Ranking done by Maersk, the world’s largest ocean carrier and container shipping container company. Durban Container Terminal was ranked fifth in the same study. • Service Excellence PMR Africa Awards 2012 – Durban, Richards Bay, Ngqura and Cape Town. In 2013, Durban and Ngqura scooped the Service Excellence awards. • Best performing container terminal in Africa – Durban Container Terminal; Container Management Top 120 World Container Terminals Survey 2013. Cape Town Container Terminal was also listed for the first time in 2013. • Best Success in Africa Award for TPT from CNBC Africa. • World class rail dual cycle operation on Navis pioneered by Durban Container Terminal: Pier 2 in March 2013. • TPT dominates Transet Internal Audit (TIA) Integrated Governance Awards. - Best compliance internal control environment - Leader in fraud risk management environment - Most improved internal control environment • Level three B-BBEE status for TPT attained in 2014.
  • 24. 43 TRANSNET’s MARKET DEMAND STRATEGY 43Source: TPT Growth Strategy, Market Demand Strategy.
  • 25. 44 TNPA INFRASTRUCTURE INVESTMENT 44Source: TPT Growth Strategy, Market Demand Strategy.
  • 26. Saldanha (9%) R6.3bn Cape Town (5%) R 3.2bn Richards Bay (24%) R 16.8bn Durban (45%) R 30.3bn SLD R 7.1bn (15%) Ngqura (4%) R 3.0bn PE (2%) R 1.4bn Manganese (11%) R7.9bn EL R 38m TPT 10-year Capital Investment Plan: - R69 billion 5,190 2021/22 4,990 2024/25 69,227 Total2023/24 7,557 2022/23 12,741 2020/21 10,020 2019/20 6,581 2018/19 6,7299,505 2016/17 4,294 2015/16 1,620 Replacement R 24.4bn 35% Expansion R44.6bn 65% 2017/18
  • 27. Expansion R 22.2bn 62% Replacement R 13.6bn 38% Containers: R 35.8bn (52%) Expansion R 22bn 72% Replacement R 8.5bn 28% Bulk: R 30.5bn (44%) Investment per Sector (Expansion vs Replacement) Break-Bulk: R 2.5bn (3%) Automotive: R 360m (1%) Replacement R 2.4bn 96% Expansion R 332m 92% Expansion R 95m 4% Replacement R 28m 8%
  • 28. 65 DCT Berth Deepening & Lengthening Business need In order to address the safety of the existing quay walls; to restore the terminal capacity of 2.9m TEU pa and for the Port of Durban to handle larger vessels of 9200 TEU capacity, the current berths on the north quay need to be deepened and lengthened. Scope • Deepen Berths 203 to 205 from -12,8m CD to -16,5m CD • Lengthen the berths from 914m to 1,200m to accommodate three 9200 TEU or 12000 TEU vessels with a draft of -14,5m CD, (3x vessels with LOA of 350m) thereby restoring capacity to 2.9m TEU • The new quay wall shall accommodate 80 ton tandem-lift STS cranes with a rail gauge of 30,480m • Dredging for the container berths and channel to -16,5m chart datum. • Construction of new caisson quay wall 50m seawards of existing quay wall Operating Divisions & Funding Dependencies • 2 Environmental appeals received. TNPA expected to respond by May 2015 • Approval of FEL-4 funding Progress to date: • Engineering design– 95% complete. • EIA appeal process underway Look ahead • Complete FEL-3 by Sept-15 • FEL-4 funding approval by Transnet Board in November-15 • FEL-4 funding approval by DPE in February -16 Key milestones: • Start construction at berth 205 in 2017 • 18 months occupation per berth • FEL - 4 completion :August 2021 Planned investment O.D. FEL-3 FEL-4 Total TNPA R128m R6,000m R6,078m TPT Nil but project will impact on terminal operations & capacity TFR Nil CAPIC Approval R128m - Project Sponsor Richard Valihu Project Director David McGillewe TPT Owner Brenda Magqwaka Terminal Rep Shane Narainsamy TPT PM Previn Govender TPT Obligations Provide and approve terminal requirements Provide interface bet project & operations Ensure compliance to end user needs Monitor progress Steerco Still to be setup TNPA Planned investment 588548 359 5 18/1915/16 16/17 17/18 20/21 2,252 19/20 2,252 Phasing Start Complete Phase 1 – Berth 205 January 2017 October 2018 Phase 2 – Berth 204 November 2018 April 2020 Phase 3 – berth 203 April 2020 August 2021
  • 29. 66 DCT - North Quay Upgrade : Superstructure and Paving Business need With the new lengthened North Quay, DCT will required additional cranes and straddle carriers to restore terminal capacity to 2.9m TEU. The North Quay occupations for deepening also provides an opportunity to rehabilitate the “end-of-life” safety critical stack paving. Scope • Replacement of 2x STS cranes to accommodate 30.480m gauge • Acquisition of additional 3x STS Cranes for longer quay • Acquisition of additional stacking equipment • Replacement of the concrete stack paving Operating Divisions & Funding Dependencies • Deepening & lengthening of North Quay by TNPA • Approval of FEL-3 & FEL-4 funding Progress to date: • Option analysis indicates conversion of landside to RMG’s not viable and DCT P2 should remain as a straddle carrier operations. Look ahead • EXCO resolution to remain with straddle carriers in Mar-15. • Funding approval for FEL-3 study in 2015 Key milestones: • EXCO approval to remain with straddle carriers • Start of FEL-3 study in 2015 Planned investment O.D. FEL-3 FEL-4 Total TNPA Nil TPT R25m R5,609m R5,634m TFR Nil CAPIC Approval - Project Sponsor Karl Socikwa Project Director TBA TPT Owner Brenda Magqwaka Terminal Rep Shane Narainsamy TPT PM Ebrahim Ali (Acting) TPT Obligations Provide and approve terminal requirements Provide interface bet project & operations Ensure compliance to end user needs Monitor progress Ensure alignment with the TNPA Berth Deepening and Lengthening project Steerco Still to be setup TPT Planned investment 266250 624 314 250 21/22 beyond20/2118/1916/17 1,758 17/18 19/2015/16 2,397
  • 30. 67 Pier 1 Phase 2 Infill Business need Increase container handling capacity in the Port of Durban and provide additional deep water berths for larger vessels. Pier 1 capacity is envisaged to increase from 0.7m TEU to 2.5m TEU pa Scope • Construction of new quay walls to provide additional deep water berths (-16.5m CD) • Provision of associated container stacking area • Acquisition of container handling equipment • Construction of container stack paving • New entrance and staff facilities Operating Divisions & Funding Dependencies • Lease of land by TNPA from DPW (TNPA CE meeting with Sec of Defense in Feb) • TNPA Terminal Operator License approval • Environmental Authorization for infill • Approval of FEL-4 funding Progress to date: • FEL-3 study in progress Look ahead • Approval of Terminal Operator Licence • Completion of FEL-3 by May 2017 • Environmental application • Request for FEL-4 funding Key milestones: • FEL - 3 completion : May 2017 • Lodging of Environmental application in November 2015 • Environmental Authorization in May 2017 • Request for FEL-4 funding to start @ OD CAPIC’s in 2017 Planned investment 24 O.D. FEL-3 FEL-4 Total TNPA R47m R6,000m R6,047m TPT R15m (pending TNPA licence approval) R14,000m R14,015m TFR Nil CAPIC Approval R47m - Project Sponsor Richard Valihu Project Director David McGillewe TPT Owner Brenda Magqwaka Terminal Rep Shane Narainsamy TPT PM Previn Govender TPT Obligations Provide and approve terminal requirements Provide interface bet project & operations Ensure compliance to end user needs Monitor progress Steerco Still to be setup TPT Planned investment Pier 1 expansion with new Salisbury Island infill and deepwater berths 113351500 16/1715/16 19/20 4,879 21/2218/1917/18 beyond 7,329 20/21 1,922
  • 31. DCT Stack Rehabilitation Background The paving in certain of DCT P2’s stack area had cracked and failed. The ensuing settlement resulted in unsafe operations and damage to equipment. The replacement if the scour protection at DCT South Quay by the TNPA provided an opportunity for DCT to capitalize on the outage to replace all the failed paving. Phase 1 of the works was completed ahead of schedule and Berth 108/9 was handed over on 14-Jul- 14. The remaining 3 phases have also been completed with Phase 4 handed over in June 2015. The project is now complete. Planned Actual Cost R 140m R 120m Completion Mar-15 Jun-15 Benefits 1. Restore DCT’s capacity to 2.5m TEU pa. 2. Improve safety and reduce damage to straddle carriers & injury to personnel. 27 Sustaining of capacity
  • 32. STS Crane for DCT East Quay Background DCT’s East Quay is currently equipped with old ship to shore cranes which are unreliable. The acquisition of new cranes with the latest technology will assist in improving productivity. The order for these cranes was placed with Liehberr Container Cranes. The cranes arrived in component form on 6 July 2015 and is currently being off loaded for erection. Planned Forecast Cost R 340m R 340m Completion June-2015 Sept-15 Benefits The East Quay at DCT will have the ability to handle bigger ships given the higher and longer reach of the new twin lift cranes. 28 Sustaining of capacity
  • 33. Construction of Central Staff Facility at Pier 1 Background The Pier 1 container terminal consists of many temporary facilities for staff accommodation which are inadequate. This has led to low staff moral and unhappiness. TPT recognized that the current facilities are not conducive for the operational environment and approved capital funds to construct a central mess and ablution facility to accommodate the operational staff. Planned Forecast Cost R 86 m R 84 m Completion Apr-15 Jul-15 Benefits 1. Optimize human resources through a modern staff facility at Pier 1. 2. The successful completion of this project will contribute towards employee care and improved morale. 3. Reduce employee fatigue. 29 Staff Facilities