PRESENTATION CIVIL ENGINEERING PROJECTS
WORK FOR THE DESIGN
Area of Engineering – Work for the design 
RAILWAY INFRASTRUCTURE 
Logistics projects loading and unloading platforms 
Design pathways beaches 
Layout railway lines 
Removal of level crossings 
Projects of national and international high-speed 
Track renewal projects 
Halts and stations 
Structures and railway tunnels 
Electrification projects 
Facility projects and communications security 
Project operation and maintenance concession 
Management of construction and demolition waste 
Environmental studies 
ROAD AND URBAN INFRASTRUCTURE 
Urban planning and road network 
Logistics centers and unloading cargo 
Layout of motorways 
Links & intersections 
Widening and improvement projects 
Replication projects 
Over and underpasses (road traffic and pedestrian) 
Project operation and maintenance concession 
Management of construction and demolition waste. 
Environmental studies 
GENERAL PRESENTATION 
AREA OF ENGINEERING. WORK FOR THE DESIGN 
DEVELOPED PROJECTS 
WHERE TO FIND US
GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US 
The Consultrans team works continuously on developing new businesses and markets for their customers. The ideas come from both the client and Consultrans own team that offer the client to develop and implement them. 
Functional studies of transport infrastructure: 
Logistic platforms, rail access to ports , 
Railways, highways, ports and airports 
Strategic Plans/Directors of commercial and passenger transport 
Transport and Sustainable Mobility Plans 
Studies on demand and Market Research 
Audits on Demand Studies and Investment Feasibility Studies 
Other studies: piggyback (accompanied combined transport), loading and unloading in urban centers 
Mobility in Logistics Nodes 
Operating Plans-operation of transmission lines 
Traffic Studies 
Quality of service 
Tariff Studies 
Studies of Competition 
Company Evaluation 
Passengers and Freight Transport Consulting
Work for the Design 
Drafts y Basic Projects 
Alternative Studies 
Technical Feasibility Studies and Economic Infrastructure 
Environmental Studies 
Urban and Regional Planning Projects 
Technical Assistance to Construction Companies 
Building Design and Implementation 
Informative Studies 
Projects Concessions and Infrastructure Maintenance 
GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN 
DEVELOPED PROJECTS 
WHERE TO FIND US
Work for the Design 
GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US 
DETAILED DESIGN AND RFP PREPARATION OF A NEW RAILWAY MAINLINE ALONG THE ROUTE OF EXISTING MAINLINE 2 FROM DAMMAM TO RIYADH 
Detailed Project Description The scope of works developed by SUMMIT Consultant Company & CONSULTRANS consists in the Design of the extension or duplication of the existing Main Line 2 from Dammam to Riyadh in KSA, all along approximately 550 km. The development of the project is to design the layout of the ML2 taking into account the current conditions and propose the necessary actions to reconciling the new design with the current situation. One of the most important items taken into account for extension of Main Line 2 is the location side of Main Line 1 regarding Main Line 2 between Hofuf and Dammam. Also other interesting elements included are related to over passes, aerial utilities (electric lines, etc…), and underground utilities (oil/water pipelines, etc…) and stations/sidings. These factors created important conditions in the design of the new line that were taken into account. Finally, other elements, like geological and environmental conditions, were delimited. The proposed projected solutions for the different elements affected by the ML2 design are as following: 
Extension side of the new projected line that should change depending on different conditions, mainly because of parallel utilities and stations. Furthermore, the existing train circulations and intervals must not be affected. 
Redesign of over passes to ensure the right clearance for the new projected line and future Main Line 1 if necessary. Diversions and temporary work on the existing road will be necessary to maintain current vehicles circulation. 
Renewal and modification on stations and sidings, to ensure the same use and movements after the extension of ML2. 
Construction of Level crossings on the duplication track, and modification of level crossing installations according to the new situation. 
Extension of existing culverts for Main Line 2. 
Redesign or relocation of aerial crossing (mainly electric lines), where could not be enough clearance with new projected line. Utility works must be redesigned under companies’ requirements. 
Underground crossing (mainly pipeline crossings), all of which must be protected. As before, all these works must be redesigned under companies’ requirements. 
Relocation of canalization installations which are parallel to existing line and that could be affected by the extension. 
Demolition and new construction other elements like buildings fence, etc…. 
Type of services provided The main work stages were structure as below: 1. Data collection, compilation and surveys. 2. Compilation of existing elements (culverts, utilities, over & under passes, level crossings, stations & siding, etc…) and /or existing horizontal and vertical alignments of ML2, 3. Projected situation with horizontal and vertical alignment of the new line and all the elements (culverts, over & under passes, level crossings, utilities, stations & sidings, etc.) 4. Development of Concept design and Detailed Design documents. 5. Development of Tender Documents. 6. Response to queries from bidders.
Work for the Design 
GENERAL PRESENTATION 
AREA OF ENGINEERING. WORK FOR THE DESIGN 
DEVELOPED PROJECTS 
WHERE TO FIND US 
PRELIMINARY AND DETAILED DESIGN MADINAH DEPOT AND WORKSHOPS FOR THE HARAMAIN HIGH SPEED RAILWAY BETWEEN MAKAH AND MADINAH (HHSR) 
Detailed Project Description The Madinah Depot has been designed in order to perform the maintenance works that should be carried out to preserve HST in order to enable its continued use and function, above a minimum acceptable level of performance over its design service life and without unforeseen renewal or major repair activities. Madinah depot is located on the left side of the line, between approx KKPP 427+187 and 431+077 of the Haramain High Speed line, and occupying an area of approx. close to 50 hectares. Railway access is granted by two links to the main line at both plot extremes to ease HST entrances and maximize line capacity. Road traffic access is granted by an approx 3 km connection to an existing road that leads to the 3rd Ring Road Highway. Haramain Railway Depots and Workshops are designed considering to be implementing in two periods depending railway system capacity. The HHR passenger services are initially foreseen to be operated with 55 high speed trains in the First period (2016 – 2027) and with 100 trains during the second period. Maintenance activities will be carried out in the workshop designed which consists of two different areas: Quick maintenance workshop and Heavy maintenance workshop. Both Workshops are designed as single storey spaces with the exception of a couple of relatively small office areas located at first floors. The Quick Maintenance Workshop has a net floor area of 16,650 m2 (450 x 37 m); approximately It has four electrified 450 m tracks with pit, resulting in 8 maintenance positions for individual train set granting access to roof and lateral of the rolling stock. The Heavy Maintenance Workshop has approximately 27600 m2 (120 x 230 m) of net floor area where big periodic inspections and heavy maintenance is performed. Six tracks run across the workshop in the eastern area where train lifting activities can be done. Two of those have pits where locomotive lifting activities will be performed, and the rest of the track will be set on concrete slabs where all areas and equipment needed for component repairing will be located. In Madinah Depot are located also the tracks for trains circulating, train stabling areas, painting and washing facilities, and all facilities necessary for the correct operation of Depot. 
Type of services provided Consultrans is part of Spanish Consortium (ASC) formed for the design and construction of the High Speed Railway between Makkah and Madinah, being responsible for the Madinah Depot design among other activities. The project design has taken place in several stages: Concept design, preliminary design and Detailed Design, and all of these complying with the international and KSA standards required. It should be noted that the Madinah Depot is the largest maintenance facility in the High Speed Railway, being besides important because in this workshop will be assembled and tested the railway rolling stock units. The content of the project and design activities developed are summarized as follows: 
INITIAL DATA DESIGN 
Data collection, compilation and surveys 
Topographic survey 
Geological and geotechnical studies. 
PROJECT DEVELOPMENT 
Complete development of Madinah depot layout 
Earthworks calculation 
Design of alignments of tracks 
Design of urbanization and access roads 
Drainage design 
Architectural and structural design of the workshops and other facilities 
Design of Buildings and urbanization utilities 
Design of electrical supply to Madinah Depot 
Design of telecommunications and security facilities 
Design of rail signalling system and overhead contact system (catenary) 
Environmental impact study 
EDITION OF PROJECT 
Specifications for construction 
Drawings for construction 
Health and Safety Management Plan 
Environmental Management plan
 Work for the Design 
GENERAL PRESENTATION 
AREA OF ENGINEERING. WORK FOR THE DESIGN 
DEVELOPED PROJECTS 
WHERE TO FIND US 
TECHNICAL ASSISTANCE AND CONSTRUCTION SUPERVISION FOR THE WORKS OF THE MADINAH DEPOT AND WORKSHOPS IN THE HARAMAIN HIGH SPEED RAILWAY 
BETWEEN MAKAH AND MADINAH (HHSR) 
Detailed Project Description 
The Madinah Depot has been designed in order to perform the maintenance works that should be carried out 
to preserve HST in order to enable its continued use and function, above a minimum acceptable level of 
performance over its design service life and without unforeseen renewal or major repair activities. 
Madinah depot is located on the left side of the line, between approx KKPP 427+187 and 431+077 of the 
Haramain High Speed Line, and occupying an area of approx close to 50 hectares. Railway access is granted by 
two links to the main line at both plot extremes to ease HST entrances and maximize line capacity. Road traffic 
access is granted by an approx 3 km connection to an existing road that leads to the 3rd Ring Road Highway. 
In Madinah Depot are located the Heavy maintenance and Quick maintenance workshops where the rolling 
stock maintenance will be realized, the tracks for trains circulating, train stabling areas, painting and washing 
facilities, and all facilities necessary for the correct operation of Depot. 
Consultrans is part of Spanish Consortium (ASC) formed for the design and construction of the High Speed 
Railway between Makkah and Madinah, being responsible for the Madinah Depot design and technical 
assistance construction supervision for the works. 
Type of services provided 
The technical assistance services and construction services includes the following tasks: 
 Coordination and Construction Management 
 Planning control contractor 
 Quality Assurance 
 Process Control and Monitoring of work 
 Health and Safety control 
 Control and monitoring of Environmental Actions 
 Supervision, reports and engineering
Work for the Design 
GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US 
BACKUP OPERATION CONTROL CENTRE (BOCC) AND OPERATION CONTROL CENTRE (OCC) BUILDINGS FOR THE HARAMAIN HIGH SPEED RAILWAY BETWEEN MAKKAH AND MADINAH (HHSR) 
Detailed Project Description Backup Operation Control Centre (BOCC) and Operation Control Centre (OCC) are multidisciplinary centres where different tasks are carried out in areas directly related to railway operation, abnormalities management, planning, maintenance, training and other activities. The BOCC building is located closer to the new KAEC Station and consists of five buildings of one storey each one with a total of 4.500 m2 while the OCC building is located in the city of Jeddah and consists of five storeys building with 2.500 m2 each one: total of 12.500 m2. These areas have the focus on the building from the civil works’ point of view (architecture, structures, utilities…), describing items such as: locations, premises, facilities…. to host the operations and systems. These OCC&BOCC building projects collect requirements from: 
Operational environment: needs of space, rooms, layouts, links between rooms… 
Technical environment: requirements from the disciplines that have systems to support the operations. 
External organizations: Additional aspects are taken into consideration in the OCC (and temporally in the BOCC) as a representative building that has to host the headquarters of HHSR Management. It will contain offices for the Saudi Rail Regulatory Commission, the Railway Police, etc. The requirements in terms of size, location inside the Building will be delivered by the different organizations. According to above requirements, the BOCC and OCC projects involves the architectural and structural design of buildings, the design of electrical, telecommunications and sanitary installations, roads and urbanizations, drainage and all required installations for the control and management of railway activities. The buildings projects have been performed in accordance with KSA and international regulations and have been supervised by international organizations. 
Type of services provided The scope of services and activities to perform the BOCC and OCC Preliminary and Detailed design as follows: 
INITIAL DATA DESIGN 
Data collection, compilation and surveys. 
Topographic survey 
Geological and geotechnical studies. 
PROJECT DEVELOPMENT 
Earthworks calculation 
Flood risk study 
Urbanization and access roads design 
Buildings and urbanization utilities 
Drainage design 
Telecommunications facilities design 
Electrical design 
EDITION OF PROJECT 
Specifications for construction 
Drawings for construction 
Health and Safety Management Plan
Work for the Design 
GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US 
ASSISTANCE TENDERING PROCESS TO RENFE ARABIA IN THE BID PROCESS TO THE MADINAH DEPOT WORK OF THE HHSR (HARAMAIN HIGH SPEED RAILWAYS). PACKAGE 1 
Detailed Project Description The Madinah Depot has been designed in order to perform the maintenance works that should be carried out to preserve HST in order to enable its continued use and function, above a minimum acceptable level of performance over its design service life and without unforeseen renewal or major repair activities. Madinah depot is located on the left side of the line, between approx KKPP 427+187 and 431+077 of the Haramain High Speed line, and occupying an area of approx close to 50 hectares. Railway access is granted by two links to the main line at both plot extremes to ease HST entrances and maximize line capacity. Road traffic access is granted by an approx 3 km connection to an existing road that leads to the 3rd Ring Road Highway. In Madinah Depot are located the Heavy maintenance and Quick maintenance workshops where the rolling stock maintenance will be realized, the tracks for trains circulating, train stabling areas, painting and washing facilities, and all facilities necessary for the correct operation of Depot. The construction process of Madinah Depot is performed in different stages, being Consultrans responsible for the technical assistance in the tendering process to RENFE Arabia. In the first stage of construction are carried out the following activities: 
Earthworks 
Drainage 
Utilities 
Type of services provided Services for assistance in the tendering process to RENFE Arabia to Madinah Depot works for the HHSR Package nº1. Main Tasks: 
Technical support in the bid process. 
Preparation of technical specifications 
Budget preparation 
Clarifications to tenderers, etc. 
Analysis and evaluation of technical bids
 Work for the Design 
GENERAL PRESENTATION 
AREA OF ENGINEERING. WORK FOR THE DESIGN 
DEVELOPED PROJECTS 
WHERE TO FIND US 
ASSISTANCE TENDERING PROCESS TO RENFE ARABIA IN THE BID PROCESS TO THE MADINAH DEPOT WORK OF THE HHSR (HARAMAIN HIGH SPEED RAILWAYS). 
PACKAGE 2 
Detailed Project Description 
The Madinah Depot has been designed in order to perform the maintenance works that should be carried out 
to preserve HST in order to enable its continued use and function, above a minimum acceptable level of 
performance over its design service life and without unforeseen renewal or major repair activities. 
Madinah depot is located on the left side of the line, between approx KKPP 427+187 and 431+077 of the 
Haramain High Speed line, and occupying an area of approx close to 50 hectares. Railway access is granted by 
two links to the main line at both plot extremes to ease HST entrances and maximize line capacity. Road traffic 
access is granted by an approx 3 km connection to an existing road that leads to the 3rd Ring Road Highway. 
In Madinah Depot are located the Heavy maintenance and Quick maintenance workshops where the rolling 
stock maintenance will be realized, the tracks for trains circulating, train stabling areas, painting and washing 
facilities, and all facilities necessary for the correct operation of Depot. 
The construction process of Madinah Depot is performed in different stages, being Consultrans responsible 
for the technical assistance in the tendering process to RENFE Arabia. 
In the second stage of construction (package 2) are carried out the following activities: 
 Tracks 
 Roads 
 Workshops structures and architecture 
 Complementary structures 
 Workshop Utilities 
 Urbanization utilities 
Type of services provided 
Services for a assistance in the tendering process to RENFE Arabia to Madinah Depot works for the 
HHSR Package nº2. Main Tasks: 
 Technical support in the bid process. 
 Preparation of technical specifications 
 Budget preparation 
 Clarifications to tenderers, etc.. 
 Analysis and evaluation of technical bids
Offices of Consultrans 
JEDDAH Prince Sultan Street, Jeddah Saudi Arabia T: (+966) 569 765 548 F: (+966) 569 765 548 E-MAIL: javier.romero@consultrans.es 
MADRID Serrano 6. 2nd Floor 28001 Madrid Telf. (+34) 91 575 46 16 Fax. (+34) 91 575 96 70 E-MAIL: consultrans@consultrans.es

More Related Content

What's hot

Intruductions about metro jeddah
Intruductions about metro jeddahIntruductions about metro jeddah
Intruductions about metro jeddahKhalid Ibrahim
 
Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Ibrahim Al-Hudhaif
 
Creating and operating the Riyadh Bus Network
Creating and operating the Riyadh Bus NetworkCreating and operating the Riyadh Bus Network
Creating and operating the Riyadh Bus Networkcafs-org
 
Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Ibrahim Al-Hudhaif
 
Doha Metro - Fact Sheets
Doha Metro - Fact SheetsDoha Metro - Fact Sheets
Doha Metro - Fact Sheetsjustinhardie
 
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaSaudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaTransnet Port Terminals
 
badr trinee last edit
badr trinee last edit badr trinee last edit
badr trinee last edit Bader aljubair
 
The expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandThe expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandTransnet Port Terminals
 
REP_2011_Retail_Railways
REP_2011_Retail_RailwaysREP_2011_Retail_Railways
REP_2011_Retail_RailwaysConnie Moser
 
The Next Steps in Creating Export Capacity
The Next Steps in Creating Export CapacityThe Next Steps in Creating Export Capacity
The Next Steps in Creating Export CapacityTristan Wiggill
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail Ibrahim Al-Hudhaif
 
Management and technical assistance in a modern rail system
Management and technical assistance in a modern rail systemManagement and technical assistance in a modern rail system
Management and technical assistance in a modern rail systemIbrahim Al-Hudhaif
 
Jeddah Master Transportation Plan
Jeddah Master Transportation PlanJeddah Master Transportation Plan
Jeddah Master Transportation PlanIbrahim Al-Hudhaif
 
Rail transport
Rail transportRail transport
Rail transportNiren Gada
 
FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONDiaa Hilal
 
Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Nishanth Patil
 

What's hot (20)

Intruductions about metro jeddah
Intruductions about metro jeddahIntruductions about metro jeddah
Intruductions about metro jeddah
 
Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th
 
Creating and operating the Riyadh Bus Network
Creating and operating the Riyadh Bus NetworkCreating and operating the Riyadh Bus Network
Creating and operating the Riyadh Bus Network
 
Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)
 
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADARiyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
 
Doha Metro - Fact Sheets
Doha Metro - Fact SheetsDoha Metro - Fact Sheets
Doha Metro - Fact Sheets
 
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaSaudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanha
 
CAF Presentation
CAF PresentationCAF Presentation
CAF Presentation
 
badr trinee last edit
badr trinee last edit badr trinee last edit
badr trinee last edit
 
Makkah Metro Presentation
Makkah Metro Presentation Makkah Metro Presentation
Makkah Metro Presentation
 
The expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandThe expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demand
 
REP_2011_Retail_Railways
REP_2011_Retail_RailwaysREP_2011_Retail_Railways
REP_2011_Retail_Railways
 
The Next Steps in Creating Export Capacity
The Next Steps in Creating Export CapacityThe Next Steps in Creating Export Capacity
The Next Steps in Creating Export Capacity
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail
 
Essam selim egypt
Essam selim   egypt Essam selim   egypt
Essam selim egypt
 
Management and technical assistance in a modern rail system
Management and technical assistance in a modern rail systemManagement and technical assistance in a modern rail system
Management and technical assistance in a modern rail system
 
Jeddah Master Transportation Plan
Jeddah Master Transportation PlanJeddah Master Transportation Plan
Jeddah Master Transportation Plan
 
Rail transport
Rail transportRail transport
Rail transport
 
FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATION
 
Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach
 

Similar to 06 presentation civil-engineering_consultrans

King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentationguest2d44ee
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan  Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan Ibrahim hamdan
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani PortfolioRONIEE Sparks
 
Cv tomasz prymas senior architect+pf2
Cv tomasz prymas senior architect+pf2Cv tomasz prymas senior architect+pf2
Cv tomasz prymas senior architect+pf2Tomek Prymas
 
Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...JumpingJaq
 
Electrical Draftsman
Electrical DraftsmanElectrical Draftsman
Electrical Draftsmanmohammed aly
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction Manish Barwal
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocationJatin Mandhyan
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_TienDuong Nguyen
 

Similar to 06 presentation civil-engineering_consultrans (20)

King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 
Firas Abbawy CV - Atkins
Firas Abbawy CV - AtkinsFiras Abbawy CV - Atkins
Firas Abbawy CV - Atkins
 
CV_Anil Malagi
CV_Anil MalagiCV_Anil Malagi
CV_Anil Malagi
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan  Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
 
Cv tomasz prymas senior architect+pf2
Cv tomasz prymas senior architect+pf2Cv tomasz prymas senior architect+pf2
Cv tomasz prymas senior architect+pf2
 
Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...
 
150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
Electrical Draftsman
Electrical DraftsmanElectrical Draftsman
Electrical Draftsman
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction
 
ToR
ToRToR
ToR
 
Matt Dutton CV
Matt Dutton CVMatt Dutton CV
Matt Dutton CV
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
Experience Record
Experience RecordExperience Record
Experience Record
 
cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 

More from Consultrans, S.A.

07 ports-shipping consultrans-2014
07 ports-shipping consultrans-201407 ports-shipping consultrans-2014
07 ports-shipping consultrans-2014Consultrans, S.A.
 
06 ingenieria consultrans-2014
06 ingenieria consultrans-201406 ingenieria consultrans-2014
06 ingenieria consultrans-2014Consultrans, S.A.
 
Presentation mobility consultrans
Presentation mobility consultransPresentation mobility consultrans
Presentation mobility consultransConsultrans, S.A.
 
05 movilidad urbana-consultrans
05 movilidad urbana-consultrans05 movilidad urbana-consultrans
05 movilidad urbana-consultransConsultrans, S.A.
 
04 presentation logistis-consultrans
04 presentation logistis-consultrans04 presentation logistis-consultrans
04 presentation logistis-consultransConsultrans, S.A.
 
03 presentation railway-consultrans
03 presentation railway-consultrans03 presentation railway-consultrans
03 presentation railway-consultransConsultrans, S.A.
 
03 presentation railway-consultrans
03 presentation railway-consultrans03 presentation railway-consultrans
03 presentation railway-consultransConsultrans, S.A.
 
2. general presentation consultrans
2. general presentation consultrans2. general presentation consultrans
2. general presentation consultransConsultrans, S.A.
 
La española Consultrans gana otro contrato ferroviario en Arabia saudí. (Riya...
La española Consultrans gana otro contrato ferroviario en Arabia saudí. (Riya...La española Consultrans gana otro contrato ferroviario en Arabia saudí. (Riya...
La española Consultrans gana otro contrato ferroviario en Arabia saudí. (Riya...Consultrans, S.A.
 
Nota de Prensa Adjudicacion Ave Riyadh-Dammam
Nota de Prensa Adjudicacion Ave Riyadh-DammamNota de Prensa Adjudicacion Ave Riyadh-Dammam
Nota de Prensa Adjudicacion Ave Riyadh-DammamConsultrans, S.A.
 
España construirá y explotará la alta velocidad en Arabia Saudí
España construirá y explotará la alta velocidad en Arabia SaudíEspaña construirá y explotará la alta velocidad en Arabia Saudí
España construirá y explotará la alta velocidad en Arabia SaudíConsultrans, S.A.
 
Ministerio de Fomento, nota de prensa 2
Ministerio de Fomento, nota de prensa 2Ministerio de Fomento, nota de prensa 2
Ministerio de Fomento, nota de prensa 2Consultrans, S.A.
 
Ministerio de Fomento, nota de prensa
Ministerio de Fomento, nota de prensaMinisterio de Fomento, nota de prensa
Ministerio de Fomento, nota de prensaConsultrans, S.A.
 

More from Consultrans, S.A. (20)

07 ports-shipping consultrans-2014
07 ports-shipping consultrans-201407 ports-shipping consultrans-2014
07 ports-shipping consultrans-2014
 
07 puertos consultrans
07 puertos consultrans07 puertos consultrans
07 puertos consultrans
 
06 ingenieria consultrans-2014
06 ingenieria consultrans-201406 ingenieria consultrans-2014
06 ingenieria consultrans-2014
 
Presentation mobility consultrans
Presentation mobility consultransPresentation mobility consultrans
Presentation mobility consultrans
 
05 movilidad urbana-consultrans
05 movilidad urbana-consultrans05 movilidad urbana-consultrans
05 movilidad urbana-consultrans
 
04 presentation logistis-consultrans
04 presentation logistis-consultrans04 presentation logistis-consultrans
04 presentation logistis-consultrans
 
04 logistica-consultrans
04 logistica-consultrans04 logistica-consultrans
04 logistica-consultrans
 
03 presentation railway-consultrans
03 presentation railway-consultrans03 presentation railway-consultrans
03 presentation railway-consultrans
 
03 ferrocarril consultrans
03 ferrocarril consultrans03 ferrocarril consultrans
03 ferrocarril consultrans
 
03 presentation railway-consultrans
03 presentation railway-consultrans03 presentation railway-consultrans
03 presentation railway-consultrans
 
2. general presentation consultrans
2. general presentation consultrans2. general presentation consultrans
2. general presentation consultrans
 
La española Consultrans gana otro contrato ferroviario en Arabia saudí. (Riya...
La española Consultrans gana otro contrato ferroviario en Arabia saudí. (Riya...La española Consultrans gana otro contrato ferroviario en Arabia saudí. (Riya...
La española Consultrans gana otro contrato ferroviario en Arabia saudí. (Riya...
 
Nota de Prensa Adjudicacion Ave Riyadh-Dammam
Nota de Prensa Adjudicacion Ave Riyadh-DammamNota de Prensa Adjudicacion Ave Riyadh-Dammam
Nota de Prensa Adjudicacion Ave Riyadh-Dammam
 
Saudi Railways Organization
Saudi Railways OrganizationSaudi Railways Organization
Saudi Railways Organization
 
Railway Gazette Article
Railway Gazette ArticleRailway Gazette Article
Railway Gazette Article
 
España construirá y explotará la alta velocidad en Arabia Saudí
España construirá y explotará la alta velocidad en Arabia SaudíEspaña construirá y explotará la alta velocidad en Arabia Saudí
España construirá y explotará la alta velocidad en Arabia Saudí
 
Ministerio de Fomento, nota de prensa 2
Ministerio de Fomento, nota de prensa 2Ministerio de Fomento, nota de prensa 2
Ministerio de Fomento, nota de prensa 2
 
Fomento actual
Fomento actualFomento actual
Fomento actual
 
Ministerio de Fomento, nota de prensa
Ministerio de Fomento, nota de prensaMinisterio de Fomento, nota de prensa
Ministerio de Fomento, nota de prensa
 
iTransporte
iTransporteiTransporte
iTransporte
 

06 presentation civil-engineering_consultrans

  • 1. MADRID, Serrano, 6 - 2nd Floor Telf. (+34) 91 575 46 16 www.consultrans.es consultrans@consultrans.es PRESENTATION CIVIL ENGINEERING PROJECTS
  • 2. WORK FOR THE DESIGN
  • 3. Area of Engineering – Work for the design RAILWAY INFRASTRUCTURE Logistics projects loading and unloading platforms Design pathways beaches Layout railway lines Removal of level crossings Projects of national and international high-speed Track renewal projects Halts and stations Structures and railway tunnels Electrification projects Facility projects and communications security Project operation and maintenance concession Management of construction and demolition waste Environmental studies ROAD AND URBAN INFRASTRUCTURE Urban planning and road network Logistics centers and unloading cargo Layout of motorways Links & intersections Widening and improvement projects Replication projects Over and underpasses (road traffic and pedestrian) Project operation and maintenance concession Management of construction and demolition waste. Environmental studies GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US
  • 4. GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US The Consultrans team works continuously on developing new businesses and markets for their customers. The ideas come from both the client and Consultrans own team that offer the client to develop and implement them. Functional studies of transport infrastructure: Logistic platforms, rail access to ports , Railways, highways, ports and airports Strategic Plans/Directors of commercial and passenger transport Transport and Sustainable Mobility Plans Studies on demand and Market Research Audits on Demand Studies and Investment Feasibility Studies Other studies: piggyback (accompanied combined transport), loading and unloading in urban centers Mobility in Logistics Nodes Operating Plans-operation of transmission lines Traffic Studies Quality of service Tariff Studies Studies of Competition Company Evaluation Passengers and Freight Transport Consulting
  • 5. Work for the Design Drafts y Basic Projects Alternative Studies Technical Feasibility Studies and Economic Infrastructure Environmental Studies Urban and Regional Planning Projects Technical Assistance to Construction Companies Building Design and Implementation Informative Studies Projects Concessions and Infrastructure Maintenance GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US
  • 6. Work for the Design GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US DETAILED DESIGN AND RFP PREPARATION OF A NEW RAILWAY MAINLINE ALONG THE ROUTE OF EXISTING MAINLINE 2 FROM DAMMAM TO RIYADH Detailed Project Description The scope of works developed by SUMMIT Consultant Company & CONSULTRANS consists in the Design of the extension or duplication of the existing Main Line 2 from Dammam to Riyadh in KSA, all along approximately 550 km. The development of the project is to design the layout of the ML2 taking into account the current conditions and propose the necessary actions to reconciling the new design with the current situation. One of the most important items taken into account for extension of Main Line 2 is the location side of Main Line 1 regarding Main Line 2 between Hofuf and Dammam. Also other interesting elements included are related to over passes, aerial utilities (electric lines, etc…), and underground utilities (oil/water pipelines, etc…) and stations/sidings. These factors created important conditions in the design of the new line that were taken into account. Finally, other elements, like geological and environmental conditions, were delimited. The proposed projected solutions for the different elements affected by the ML2 design are as following: Extension side of the new projected line that should change depending on different conditions, mainly because of parallel utilities and stations. Furthermore, the existing train circulations and intervals must not be affected. Redesign of over passes to ensure the right clearance for the new projected line and future Main Line 1 if necessary. Diversions and temporary work on the existing road will be necessary to maintain current vehicles circulation. Renewal and modification on stations and sidings, to ensure the same use and movements after the extension of ML2. Construction of Level crossings on the duplication track, and modification of level crossing installations according to the new situation. Extension of existing culverts for Main Line 2. Redesign or relocation of aerial crossing (mainly electric lines), where could not be enough clearance with new projected line. Utility works must be redesigned under companies’ requirements. Underground crossing (mainly pipeline crossings), all of which must be protected. As before, all these works must be redesigned under companies’ requirements. Relocation of canalization installations which are parallel to existing line and that could be affected by the extension. Demolition and new construction other elements like buildings fence, etc…. Type of services provided The main work stages were structure as below: 1. Data collection, compilation and surveys. 2. Compilation of existing elements (culverts, utilities, over & under passes, level crossings, stations & siding, etc…) and /or existing horizontal and vertical alignments of ML2, 3. Projected situation with horizontal and vertical alignment of the new line and all the elements (culverts, over & under passes, level crossings, utilities, stations & sidings, etc.) 4. Development of Concept design and Detailed Design documents. 5. Development of Tender Documents. 6. Response to queries from bidders.
  • 7. Work for the Design GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US PRELIMINARY AND DETAILED DESIGN MADINAH DEPOT AND WORKSHOPS FOR THE HARAMAIN HIGH SPEED RAILWAY BETWEEN MAKAH AND MADINAH (HHSR) Detailed Project Description The Madinah Depot has been designed in order to perform the maintenance works that should be carried out to preserve HST in order to enable its continued use and function, above a minimum acceptable level of performance over its design service life and without unforeseen renewal or major repair activities. Madinah depot is located on the left side of the line, between approx KKPP 427+187 and 431+077 of the Haramain High Speed line, and occupying an area of approx. close to 50 hectares. Railway access is granted by two links to the main line at both plot extremes to ease HST entrances and maximize line capacity. Road traffic access is granted by an approx 3 km connection to an existing road that leads to the 3rd Ring Road Highway. Haramain Railway Depots and Workshops are designed considering to be implementing in two periods depending railway system capacity. The HHR passenger services are initially foreseen to be operated with 55 high speed trains in the First period (2016 – 2027) and with 100 trains during the second period. Maintenance activities will be carried out in the workshop designed which consists of two different areas: Quick maintenance workshop and Heavy maintenance workshop. Both Workshops are designed as single storey spaces with the exception of a couple of relatively small office areas located at first floors. The Quick Maintenance Workshop has a net floor area of 16,650 m2 (450 x 37 m); approximately It has four electrified 450 m tracks with pit, resulting in 8 maintenance positions for individual train set granting access to roof and lateral of the rolling stock. The Heavy Maintenance Workshop has approximately 27600 m2 (120 x 230 m) of net floor area where big periodic inspections and heavy maintenance is performed. Six tracks run across the workshop in the eastern area where train lifting activities can be done. Two of those have pits where locomotive lifting activities will be performed, and the rest of the track will be set on concrete slabs where all areas and equipment needed for component repairing will be located. In Madinah Depot are located also the tracks for trains circulating, train stabling areas, painting and washing facilities, and all facilities necessary for the correct operation of Depot. Type of services provided Consultrans is part of Spanish Consortium (ASC) formed for the design and construction of the High Speed Railway between Makkah and Madinah, being responsible for the Madinah Depot design among other activities. The project design has taken place in several stages: Concept design, preliminary design and Detailed Design, and all of these complying with the international and KSA standards required. It should be noted that the Madinah Depot is the largest maintenance facility in the High Speed Railway, being besides important because in this workshop will be assembled and tested the railway rolling stock units. The content of the project and design activities developed are summarized as follows: INITIAL DATA DESIGN Data collection, compilation and surveys Topographic survey Geological and geotechnical studies. PROJECT DEVELOPMENT Complete development of Madinah depot layout Earthworks calculation Design of alignments of tracks Design of urbanization and access roads Drainage design Architectural and structural design of the workshops and other facilities Design of Buildings and urbanization utilities Design of electrical supply to Madinah Depot Design of telecommunications and security facilities Design of rail signalling system and overhead contact system (catenary) Environmental impact study EDITION OF PROJECT Specifications for construction Drawings for construction Health and Safety Management Plan Environmental Management plan
  • 8.  Work for the Design GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US TECHNICAL ASSISTANCE AND CONSTRUCTION SUPERVISION FOR THE WORKS OF THE MADINAH DEPOT AND WORKSHOPS IN THE HARAMAIN HIGH SPEED RAILWAY BETWEEN MAKAH AND MADINAH (HHSR) Detailed Project Description The Madinah Depot has been designed in order to perform the maintenance works that should be carried out to preserve HST in order to enable its continued use and function, above a minimum acceptable level of performance over its design service life and without unforeseen renewal or major repair activities. Madinah depot is located on the left side of the line, between approx KKPP 427+187 and 431+077 of the Haramain High Speed Line, and occupying an area of approx close to 50 hectares. Railway access is granted by two links to the main line at both plot extremes to ease HST entrances and maximize line capacity. Road traffic access is granted by an approx 3 km connection to an existing road that leads to the 3rd Ring Road Highway. In Madinah Depot are located the Heavy maintenance and Quick maintenance workshops where the rolling stock maintenance will be realized, the tracks for trains circulating, train stabling areas, painting and washing facilities, and all facilities necessary for the correct operation of Depot. Consultrans is part of Spanish Consortium (ASC) formed for the design and construction of the High Speed Railway between Makkah and Madinah, being responsible for the Madinah Depot design and technical assistance construction supervision for the works. Type of services provided The technical assistance services and construction services includes the following tasks:  Coordination and Construction Management  Planning control contractor  Quality Assurance  Process Control and Monitoring of work  Health and Safety control  Control and monitoring of Environmental Actions  Supervision, reports and engineering
  • 9. Work for the Design GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US BACKUP OPERATION CONTROL CENTRE (BOCC) AND OPERATION CONTROL CENTRE (OCC) BUILDINGS FOR THE HARAMAIN HIGH SPEED RAILWAY BETWEEN MAKKAH AND MADINAH (HHSR) Detailed Project Description Backup Operation Control Centre (BOCC) and Operation Control Centre (OCC) are multidisciplinary centres where different tasks are carried out in areas directly related to railway operation, abnormalities management, planning, maintenance, training and other activities. The BOCC building is located closer to the new KAEC Station and consists of five buildings of one storey each one with a total of 4.500 m2 while the OCC building is located in the city of Jeddah and consists of five storeys building with 2.500 m2 each one: total of 12.500 m2. These areas have the focus on the building from the civil works’ point of view (architecture, structures, utilities…), describing items such as: locations, premises, facilities…. to host the operations and systems. These OCC&BOCC building projects collect requirements from: Operational environment: needs of space, rooms, layouts, links between rooms… Technical environment: requirements from the disciplines that have systems to support the operations. External organizations: Additional aspects are taken into consideration in the OCC (and temporally in the BOCC) as a representative building that has to host the headquarters of HHSR Management. It will contain offices for the Saudi Rail Regulatory Commission, the Railway Police, etc. The requirements in terms of size, location inside the Building will be delivered by the different organizations. According to above requirements, the BOCC and OCC projects involves the architectural and structural design of buildings, the design of electrical, telecommunications and sanitary installations, roads and urbanizations, drainage and all required installations for the control and management of railway activities. The buildings projects have been performed in accordance with KSA and international regulations and have been supervised by international organizations. Type of services provided The scope of services and activities to perform the BOCC and OCC Preliminary and Detailed design as follows: INITIAL DATA DESIGN Data collection, compilation and surveys. Topographic survey Geological and geotechnical studies. PROJECT DEVELOPMENT Earthworks calculation Flood risk study Urbanization and access roads design Buildings and urbanization utilities Drainage design Telecommunications facilities design Electrical design EDITION OF PROJECT Specifications for construction Drawings for construction Health and Safety Management Plan
  • 10. Work for the Design GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US ASSISTANCE TENDERING PROCESS TO RENFE ARABIA IN THE BID PROCESS TO THE MADINAH DEPOT WORK OF THE HHSR (HARAMAIN HIGH SPEED RAILWAYS). PACKAGE 1 Detailed Project Description The Madinah Depot has been designed in order to perform the maintenance works that should be carried out to preserve HST in order to enable its continued use and function, above a minimum acceptable level of performance over its design service life and without unforeseen renewal or major repair activities. Madinah depot is located on the left side of the line, between approx KKPP 427+187 and 431+077 of the Haramain High Speed line, and occupying an area of approx close to 50 hectares. Railway access is granted by two links to the main line at both plot extremes to ease HST entrances and maximize line capacity. Road traffic access is granted by an approx 3 km connection to an existing road that leads to the 3rd Ring Road Highway. In Madinah Depot are located the Heavy maintenance and Quick maintenance workshops where the rolling stock maintenance will be realized, the tracks for trains circulating, train stabling areas, painting and washing facilities, and all facilities necessary for the correct operation of Depot. The construction process of Madinah Depot is performed in different stages, being Consultrans responsible for the technical assistance in the tendering process to RENFE Arabia. In the first stage of construction are carried out the following activities: Earthworks Drainage Utilities Type of services provided Services for assistance in the tendering process to RENFE Arabia to Madinah Depot works for the HHSR Package nº1. Main Tasks: Technical support in the bid process. Preparation of technical specifications Budget preparation Clarifications to tenderers, etc. Analysis and evaluation of technical bids
  • 11.  Work for the Design GENERAL PRESENTATION AREA OF ENGINEERING. WORK FOR THE DESIGN DEVELOPED PROJECTS WHERE TO FIND US ASSISTANCE TENDERING PROCESS TO RENFE ARABIA IN THE BID PROCESS TO THE MADINAH DEPOT WORK OF THE HHSR (HARAMAIN HIGH SPEED RAILWAYS). PACKAGE 2 Detailed Project Description The Madinah Depot has been designed in order to perform the maintenance works that should be carried out to preserve HST in order to enable its continued use and function, above a minimum acceptable level of performance over its design service life and without unforeseen renewal or major repair activities. Madinah depot is located on the left side of the line, between approx KKPP 427+187 and 431+077 of the Haramain High Speed line, and occupying an area of approx close to 50 hectares. Railway access is granted by two links to the main line at both plot extremes to ease HST entrances and maximize line capacity. Road traffic access is granted by an approx 3 km connection to an existing road that leads to the 3rd Ring Road Highway. In Madinah Depot are located the Heavy maintenance and Quick maintenance workshops where the rolling stock maintenance will be realized, the tracks for trains circulating, train stabling areas, painting and washing facilities, and all facilities necessary for the correct operation of Depot. The construction process of Madinah Depot is performed in different stages, being Consultrans responsible for the technical assistance in the tendering process to RENFE Arabia. In the second stage of construction (package 2) are carried out the following activities:  Tracks  Roads  Workshops structures and architecture  Complementary structures  Workshop Utilities  Urbanization utilities Type of services provided Services for a assistance in the tendering process to RENFE Arabia to Madinah Depot works for the HHSR Package nº2. Main Tasks:  Technical support in the bid process.  Preparation of technical specifications  Budget preparation  Clarifications to tenderers, etc..  Analysis and evaluation of technical bids
  • 12. Offices of Consultrans JEDDAH Prince Sultan Street, Jeddah Saudi Arabia T: (+966) 569 765 548 F: (+966) 569 765 548 E-MAIL: javier.romero@consultrans.es MADRID Serrano 6. 2nd Floor 28001 Madrid Telf. (+34) 91 575 46 16 Fax. (+34) 91 575 96 70 E-MAIL: consultrans@consultrans.es