Mena 10th Rail & Metro Summit 
October, 2014 
Dr. Bashar AlMalik 
Projects Department Director
•KSA Transportation Network 
•Operation & Maintenance Activities 
•Expansion Plans 
•Projects Photos
Passenger/ Freight line links the Eastern Province and Riyadh where 40% of the population is located as well as 50% of the economic activities. 
Mineral line links Ras AlKhair port and AlJalamid mines in the North to transport Millions of tons of Phosphate and Bauxite.
Project 
Length (KM) 
Location 
Responsible Agency 
North - South 
2750 
Central / East / North 
SAR 
HHR 
450 
W. Province 
MOT/SRO 
Riyadh Metro 
176 
Riyadh 
ADA 
GCC 
663 
E. Provence 
MOT 
Landbridge 
958 (double track) 
East - West 
SAR 
Mashaer 
18 
Makkha 
MOMRA 
Jeddah Metro 
108 
Jeddah 
MOMRA 
Makkha Metro 
182 
Makkha 
MOMRA 
Eastern Region Metro 
86 
E. Provence 
MOMRA 
SRO Upgrade 
450 
Central / East 
SRO
Roads 
Total: 233,000 km 
Paved: 94,000 km 
Ports 
Arabian Gulf: Dammam; Jubail 2 ports; Ras Tanura; Khafji; Khobar and Ras Al-Khair (under construction); 
Red Sea: Jeddah; Yanbu' al Bahr; Al Lith; Duba; Rabigh; Jizan and Farasan.
Main airports 
Dammam King Fahd International Airport (5.3M/year passengers) 
Jeddah King Abdulaziz International Airport (18M/year passengers 
Riyadh King Khalid International Airport (15M/year passengers) 
Al Madinah Prince Mohammad Bin Abdulaziz International Airport (1.8M/year passengers).
Max axle Load 32.5 tones. 
Max gradient: Empty direction 1.5 %, loaded direction 0.5%. 
Max speed : 80 km/hr. 
Train Control System is ETCS level 2 . 
25 EMD – SD70 ACS locos ( 4300 hp ) . 
524 Phosphate hopper wagons 
240 open Top Bauxite hopper wagons .
Phosphate Operations Commencement ,May 2011. 
Safety certificate from SRC issued, April 2013. 
Operating License from SRC issued, January 2014. 
Total Transported Tonnages Since Launching is approximately 6 Million. 
 3 train sets configured to 155 phosphate wagons. 
Launching Bauxite Operations , April 2014. 
 2 train Sets Configured to 100 Bauxite Wagons & 3 locos.
1.Environmental (sandstorm, heat,…). 
2. Immature industry (lack of market support, Residents, …). 
3.People competency (scarcity in qualified staff). 
4.Communications & Logistics.
0 
50000 
100000 
150000 
200000 
250000 
300000 
Tonnage 2011 
Tonnage 2012 
Tonnage 2013 
Tonnage 2014
SAR has released a maintenance tender in May 2014 to outsource the maintenance of its mineral line (Bids under evaluation). 
SAR has also released a tender for Technical Assistance for Infrastructure Management & Rail Operations (Bids under evaluation).
Contract 
Between 
Length (km) 
Status 
CTW 100 
Ras Al-Khair to Az Zabirah Mines 
555 
Under Operation 
CTW 110 
Ras Al-Khair to Jubail 
85 
Under Construction 
CTW 120 (D&B) 
Jubail to Dammam 
107 
Under Construction 
CTW 130 
Jubail industrial city internal network 
55 
Will be awarded soon 
CTW 200 
Bauxite Junction to An Nafud 
450 
Under Operation 
CTW 300 
An Nafud to Al-Haditah, Al Jalamid and Al Basayta 
785 
Under Operation 
CTW 320 
Wa'ad Al-Shamal 
132 
Under Construction 
S&T 120, 130, & 320 
Ras Al-Khair to Dammam & Wa'ad Al-Shamal 
294 
Will be Tendered Soon 
CTW 400 
A z Zabirah Junction to King Khalid International Airport (KKIA) 
460 
Under Construction 
CTW 410 
(KKIA) to SRO Station in Riyadh 
47 
Not Yet Started 
Landbridge 
Riyadh to Jeddah 
958 (double track) 
Under Design
مدينة وعد الشمال 
CTW 400
مدينة وعد الشمال 
CTW 110
مدينة وعد الشمال 
CTW 120
مدينة وعد الشمال 
CTW 130
مدينة وعد الشمال 
CTW 320
• 958km of double track rail for passenger & heavy freight. 
• 32.4t axle load. 
• Design speed 160 k/h (Freight) & 300 k/h (Passenger) 
• Stations, Depots, Facilities, and a Dry Port in Riyadh. 
•Railway Systems (Signaling) ETCS level 2
1- Announcements targeting International and Local firms for Prequalification. 
2- Applicants to collect, prepare, and submit their prequalification documents. 
3- Issue the tender document to the qualified bidder. 
4- Review and Evaluate Technical & Commercial bids separately. 
5- Award to the lowest technically qualified bidder meeting the tender documents terms & conditions.
Landbridge Contracts 
Contract 
Status 
Project Management Consultant (PMC) 
Awarded on 3-July-2013 
Detailed Engineering Design Consultant (DEDC) 
Awarded on 22-July-2013 
Construction Supervision Consultant (CSC) 
Prequalification requests under evaluation 
Civil & Trackworks 
Not tendered yet 
S&T 
Not tendered yet 
Rolling stock 
Not tendered yet
Landbridge Estimated Quantity 
Item 
Quantity 
Unit 
Rail 
300,000 
ton 
Sleeprs 
4.1 million 
unit 
Fastening System 
8.2 million 
unit 
Turnouts 
1200 
unit 
Ballast 
12 million 
m3
Primary line from Riyadh to Jeddah 
Secondary Links with HHR 
Link to Taif City 
Link to Makkah City 
Link to SRO Line ( Riyadh-Dammam) 
Link to North-South Network
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014

More Related Content

What's hot

project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
Engr.Jahangir Ali Ahmed
 
Gassim Al Gassim - sar environmental challenges
Gassim Al Gassim - sar environmental challengesGassim Al Gassim - sar environmental challenges
Gassim Al Gassim - sar environmental challengesimadhammoud
 
Planning Engineer Resume-mech
Planning Engineer Resume-mechPlanning Engineer Resume-mech
Planning Engineer Resume-mechMohammed Maqsood
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
sajid hasan
 
MEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeMEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeAmr Sakr
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Estimation Engineer
Estimation EngineerEstimation Engineer
Estimation EngineerZafar Ali
 
GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
saryhasabadly
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
Jefferson Tomas Tulabot
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
Planning for a World Cup: Transportation Strategy & Optimization for Qatar 2022
Planning for a World Cup: Transportation Strategy & Optimization for Qatar 2022Planning for a World Cup: Transportation Strategy & Optimization for Qatar 2022
Planning for a World Cup: Transportation Strategy & Optimization for Qatar 2022
Davies DeCesare-Fousek
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updatedSantosh Gurajada
 
Summer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling StockSummer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling Stock
Rahul Rai
 
مساح عام استشارى عبدالرحمن سالم عارف منذ 1999
مساح عام استشارى عبدالرحمن سالم عارف منذ 1999مساح عام استشارى عبدالرحمن سالم عارف منذ 1999
مساح عام استشارى عبدالرحمن سالم عارف منذ 1999
Abdelrahman Aref
 

What's hot (20)

project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
Gassim Al Gassim - sar environmental challenges
Gassim Al Gassim - sar environmental challengesGassim Al Gassim - sar environmental challenges
Gassim Al Gassim - sar environmental challenges
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
Planning Engineer Resume-mech
Planning Engineer Resume-mechPlanning Engineer Resume-mech
Planning Engineer Resume-mech
 
vikanksh
vikankshvikanksh
vikanksh
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
MEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeMEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr Resume
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Estimation Engineer
Estimation EngineerEstimation Engineer
Estimation Engineer
 
GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M - 2016
GURUDEV S M - 2016
 
CV ELECTRICAL ENGINEER
CV ELECTRICAL ENGINEERCV ELECTRICAL ENGINEER
CV ELECTRICAL ENGINEER
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Works programme
Works programmeWorks programme
Works programme
 
Planning for a World Cup: Transportation Strategy & Optimization for Qatar 2022
Planning for a World Cup: Transportation Strategy & Optimization for Qatar 2022Planning for a World Cup: Transportation Strategy & Optimization for Qatar 2022
Planning for a World Cup: Transportation Strategy & Optimization for Qatar 2022
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
Summer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling StockSummer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling Stock
 
مساح عام استشارى عبدالرحمن سالم عارف منذ 1999
مساح عام استشارى عبدالرحمن سالم عارف منذ 1999مساح عام استشارى عبدالرحمن سالم عارف منذ 1999
مساح عام استشارى عبدالرحمن سالم عارف منذ 1999
 

Viewers also liked

Open Adaptronik
Open AdaptronikOpen Adaptronik
Open Adaptronik
Dirk Mayer
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerah
Ibrahim Al-Hudhaif
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
ravindra sonkar
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approach
Ibrahim Al-Hudhaif
 
Metro And Bangalore
Metro And BangaloreMetro And Bangalore
Metro And Bangalore
Dasarathi GV
 
Ed james meed
Ed james   meedEd james   meed
Ed james meed
Ibrahim Al-Hudhaif
 
Metro Jeddah - Public Transportation Plan EN
Metro Jeddah - Public Transportation Plan ENMetro Jeddah - Public Transportation Plan EN
Metro Jeddah - Public Transportation Plan EN
Ibrahim Al-Hudhaif
 
Conferencia de Julian Herbert (MEED): "New Projects in the Middle East (Duba...
Conferencia de Julian Herbert (MEED): "New Projects in the Middle East  (Duba...Conferencia de Julian Herbert (MEED): "New Projects in the Middle East  (Duba...
Conferencia de Julian Herbert (MEED): "New Projects in the Middle East (Duba...
GrupoRLD
 
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
Mayur Soni
 
Metro Jeddah - Public Transportation Plan AR
Metro Jeddah - Public Transportation Plan ARMetro Jeddah - Public Transportation Plan AR
Metro Jeddah - Public Transportation Plan AR
Ibrahim Al-Hudhaif
 
EURASIA_RAIL_2012- IntegralDesign
EURASIA_RAIL_2012- IntegralDesignEURASIA_RAIL_2012- IntegralDesign
EURASIA_RAIL_2012- IntegralDesign
ftellechea2
 
ACCIONA Infrastructure's experience in Railways
ACCIONA Infrastructure's experience in RailwaysACCIONA Infrastructure's experience in Railways
ACCIONA Infrastructure's experience in Railways
acciona
 
Global vision for railway development
Global vision for railway developmentGlobal vision for railway development
Global vision for railway development
UICrail
 
Präsentation Hardware in the Loop Industrietag 2017
Präsentation Hardware in the Loop Industrietag 2017Präsentation Hardware in the Loop Industrietag 2017
Präsentation Hardware in the Loop Industrietag 2017
Dirk Mayer
 
Open Adaptronik at Open Photonik in Berlin
Open Adaptronik at Open Photonik in BerlinOpen Adaptronik at Open Photonik in Berlin
Open Adaptronik at Open Photonik in Berlin
Dirk Mayer
 
TrainSense
TrainSenseTrainSense
TrainSense
Dirk Mayer
 
Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemond
Ibrahim Al-Hudhaif
 
meed projects - gcc mainline network projects
meed projects - gcc mainline network projectsmeed projects - gcc mainline network projects
meed projects - gcc mainline network projects
Ibrahim Al-Hudhaif
 
Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)
Ibrahim Al-Hudhaif
 

Viewers also liked (20)

Open Adaptronik
Open AdaptronikOpen Adaptronik
Open Adaptronik
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerah
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approach
 
Metro And Bangalore
Metro And BangaloreMetro And Bangalore
Metro And Bangalore
 
Ed james meed
Ed james   meedEd james   meed
Ed james meed
 
Metro Jeddah - Public Transportation Plan EN
Metro Jeddah - Public Transportation Plan ENMetro Jeddah - Public Transportation Plan EN
Metro Jeddah - Public Transportation Plan EN
 
Conferencia de Julian Herbert (MEED): "New Projects in the Middle East (Duba...
Conferencia de Julian Herbert (MEED): "New Projects in the Middle East  (Duba...Conferencia de Julian Herbert (MEED): "New Projects in the Middle East  (Duba...
Conferencia de Julian Herbert (MEED): "New Projects in the Middle East (Duba...
 
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
 
Metro Jeddah - Public Transportation Plan AR
Metro Jeddah - Public Transportation Plan ARMetro Jeddah - Public Transportation Plan AR
Metro Jeddah - Public Transportation Plan AR
 
EURASIA_RAIL_2012- IntegralDesign
EURASIA_RAIL_2012- IntegralDesignEURASIA_RAIL_2012- IntegralDesign
EURASIA_RAIL_2012- IntegralDesign
 
ACCIONA Infrastructure's experience in Railways
ACCIONA Infrastructure's experience in RailwaysACCIONA Infrastructure's experience in Railways
ACCIONA Infrastructure's experience in Railways
 
Global vision for railway development
Global vision for railway developmentGlobal vision for railway development
Global vision for railway development
 
Präsentation Hardware in the Loop Industrietag 2017
Präsentation Hardware in the Loop Industrietag 2017Präsentation Hardware in the Loop Industrietag 2017
Präsentation Hardware in the Loop Industrietag 2017
 
Open Adaptronik at Open Photonik in Berlin
Open Adaptronik at Open Photonik in BerlinOpen Adaptronik at Open Photonik in Berlin
Open Adaptronik at Open Photonik in Berlin
 
TrainSense
TrainSenseTrainSense
TrainSense
 
Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemond
 
meed projects - gcc mainline network projects
meed projects - gcc mainline network projectsmeed projects - gcc mainline network projects
meed projects - gcc mainline network projects
 
Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)
 

Similar to Saudi Railway Company Presentation - Railways Projects 2014

EXPORT IMPORT SHIPMENT VIA ICD THAR DRY PORT JODHPUR (RAJASTHAN) FROM MUNDRA...
EXPORT IMPORT SHIPMENT  VIA ICD THAR DRY PORT JODHPUR (RAJASTHAN) FROM MUNDRA...EXPORT IMPORT SHIPMENT  VIA ICD THAR DRY PORT JODHPUR (RAJASTHAN) FROM MUNDRA...
EXPORT IMPORT SHIPMENT VIA ICD THAR DRY PORT JODHPUR (RAJASTHAN) FROM MUNDRA...
The Thar Dry Port - Jodhpur / Sanand
 
MPH Global Services
MPH Global ServicesMPH Global Services
MPH Global ServicesPrasad Uchil
 
TIMMINT MI - KSA Construction & Real Estate Weekly Report (Issue 2014-19)
TIMMINT MI - KSA Construction & Real Estate Weekly Report (Issue 2014-19)TIMMINT MI - KSA Construction & Real Estate Weekly Report (Issue 2014-19)
TIMMINT MI - KSA Construction & Real Estate Weekly Report (Issue 2014-19)
The TIMMINT Group
 
Dedicated Freight Corridor
Dedicated Freight CorridorDedicated Freight Corridor
Dedicated Freight Corridor
Sameer Dhurat
 
AKTOR - NewsletterJune2015
AKTOR - NewsletterJune2015AKTOR - NewsletterJune2015
AKTOR - NewsletterJune2015Khalek Khan
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLift Events
 
moloy roy sea and air logistics presentation
moloy roy   sea and air logistics presentationmoloy roy   sea and air logistics presentation
moloy roy sea and air logistics presentation
Akash Maurya
 
The expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandThe expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demand
Transnet Port Terminals
 
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet  who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet  who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet Port Terminals
 
Gwadar
GwadarGwadar
Gwadar
LG &RDD KP
 
Bt Freight 2015 Brochure
Bt Freight 2015 BrochureBt Freight 2015 Brochure
Bt Freight 2015 Brochureabid ali
 
Bt freight 2015 brochure
Bt freight 2015 brochureBt freight 2015 brochure
Bt freight 2015 brochure
abid ali
 
Business expousure
Business expousureBusiness expousure
Business expousureproject2312
 
Mena Infrastructure Growing Sectors - 2013
Mena Infrastructure Growing Sectors - 2013Mena Infrastructure Growing Sectors - 2013
Mena Infrastructure Growing Sectors - 2013
Loay Ghazaleh MBA, BSc Civil Eng.
 
Middle East Rail 2016 Prospectus
Middle East Rail 2016 ProspectusMiddle East Rail 2016 Prospectus
Middle East Rail 2016 ProspectusAlex Augusti
 
Great Egyptioan Dream.pptx
Great Egyptioan Dream.pptxGreat Egyptioan Dream.pptx
Great Egyptioan Dream.pptx
MohamedSaladinIbrahi
 
Impact of the New Suez Canal on North America
Impact of the New Suez Canal on North AmericaImpact of the New Suez Canal on North America
Impact of the New Suez Canal on North America
Chartered Institute of Logistics and Transport (International)
 

Similar to Saudi Railway Company Presentation - Railways Projects 2014 (20)

EXPORT IMPORT SHIPMENT VIA ICD THAR DRY PORT JODHPUR (RAJASTHAN) FROM MUNDRA...
EXPORT IMPORT SHIPMENT  VIA ICD THAR DRY PORT JODHPUR (RAJASTHAN) FROM MUNDRA...EXPORT IMPORT SHIPMENT  VIA ICD THAR DRY PORT JODHPUR (RAJASTHAN) FROM MUNDRA...
EXPORT IMPORT SHIPMENT VIA ICD THAR DRY PORT JODHPUR (RAJASTHAN) FROM MUNDRA...
 
Qatar rail - Geoff Mee presentation
Qatar rail - Geoff Mee presentationQatar rail - Geoff Mee presentation
Qatar rail - Geoff Mee presentation
 
MPH Global Services
MPH Global ServicesMPH Global Services
MPH Global Services
 
TIMMINT MI - KSA Construction & Real Estate Weekly Report (Issue 2014-19)
TIMMINT MI - KSA Construction & Real Estate Weekly Report (Issue 2014-19)TIMMINT MI - KSA Construction & Real Estate Weekly Report (Issue 2014-19)
TIMMINT MI - KSA Construction & Real Estate Weekly Report (Issue 2014-19)
 
Dedicated Freight Corridor
Dedicated Freight CorridorDedicated Freight Corridor
Dedicated Freight Corridor
 
AKTOR - NewsletterJune2015
AKTOR - NewsletterJune2015AKTOR - NewsletterJune2015
AKTOR - NewsletterJune2015
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
CV - Mouhamad al Mouallem
CV - Mouhamad al MouallemCV - Mouhamad al Mouallem
CV - Mouhamad al Mouallem
 
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
 
moloy roy sea and air logistics presentation
moloy roy   sea and air logistics presentationmoloy roy   sea and air logistics presentation
moloy roy sea and air logistics presentation
 
The expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandThe expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demand
 
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet  who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet  who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
 
Gwadar
GwadarGwadar
Gwadar
 
Bt Freight 2015 Brochure
Bt Freight 2015 BrochureBt Freight 2015 Brochure
Bt Freight 2015 Brochure
 
Bt freight 2015 brochure
Bt freight 2015 brochureBt freight 2015 brochure
Bt freight 2015 brochure
 
Business expousure
Business expousureBusiness expousure
Business expousure
 
Mena Infrastructure Growing Sectors - 2013
Mena Infrastructure Growing Sectors - 2013Mena Infrastructure Growing Sectors - 2013
Mena Infrastructure Growing Sectors - 2013
 
Middle East Rail 2016 Prospectus
Middle East Rail 2016 ProspectusMiddle East Rail 2016 Prospectus
Middle East Rail 2016 Prospectus
 
Great Egyptioan Dream.pptx
Great Egyptioan Dream.pptxGreat Egyptioan Dream.pptx
Great Egyptioan Dream.pptx
 
Impact of the New Suez Canal on North America
Impact of the New Suez Canal on North AmericaImpact of the New Suez Canal on North America
Impact of the New Suez Canal on North America
 

More from Ibrahim Al-Hudhaif

Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreau
Ibrahim Al-Hudhaif
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016
Ibrahim Al-Hudhaif
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega Projects
Ibrahim Al-Hudhaif
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings
Ibrahim Al-Hudhaif
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings Codes
Ibrahim Al-Hudhaif
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...
Ibrahim Al-Hudhaif
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Ibrahim Al-Hudhaif
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power
Ibrahim Al-Hudhaif
 
Saudi Talent in Mega Projects
Saudi Talent in Mega ProjectsSaudi Talent in Mega Projects
Saudi Talent in Mega Projects
Ibrahim Al-Hudhaif
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM
Ibrahim Al-Hudhaif
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EY
Ibrahim Al-Hudhaif
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - Hitachi
Ibrahim Al-Hudhaif
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise Optram
Ibrahim Al-Hudhaif
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative Showcase
Ibrahim Al-Hudhaif
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail
Ibrahim Al-Hudhaif
 
Kuwait PPP Transport Projects
Kuwait PPP Transport ProjectsKuwait PPP Transport Projects
Kuwait PPP Transport Projects
Ibrahim Al-Hudhaif
 
cit- cross-border passenger and freight traffic legal interoperability - Cesa...
cit- cross-border passenger and freight traffic legal interoperability - Cesa...cit- cross-border passenger and freight traffic legal interoperability - Cesa...
cit- cross-border passenger and freight traffic legal interoperability - Cesa...
Ibrahim Al-Hudhaif
 
URBAN TRANSPORT, SUSTAINABILITY AND THE ECONOMY
URBAN TRANSPORT,  SUSTAINABILITY AND THE ECONOMY URBAN TRANSPORT,  SUSTAINABILITY AND THE ECONOMY
URBAN TRANSPORT, SUSTAINABILITY AND THE ECONOMY
Ibrahim Al-Hudhaif
 
Hitachi Rail - Alistair Dormer
Hitachi Rail - Alistair DormerHitachi Rail - Alistair Dormer
Hitachi Rail - Alistair Dormer
Ibrahim Al-Hudhaif
 
Jordan Hejaz Rail - Abdullah malkawi
Jordan Hejaz Rail - Abdullah malkawi  Jordan Hejaz Rail - Abdullah malkawi
Jordan Hejaz Rail - Abdullah malkawi
Ibrahim Al-Hudhaif
 

More from Ibrahim Al-Hudhaif (20)

Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreau
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega Projects
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings Codes
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power
 
Saudi Talent in Mega Projects
Saudi Talent in Mega ProjectsSaudi Talent in Mega Projects
Saudi Talent in Mega Projects
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EY
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - Hitachi
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise Optram
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative Showcase
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail
 
Kuwait PPP Transport Projects
Kuwait PPP Transport ProjectsKuwait PPP Transport Projects
Kuwait PPP Transport Projects
 
cit- cross-border passenger and freight traffic legal interoperability - Cesa...
cit- cross-border passenger and freight traffic legal interoperability - Cesa...cit- cross-border passenger and freight traffic legal interoperability - Cesa...
cit- cross-border passenger and freight traffic legal interoperability - Cesa...
 
URBAN TRANSPORT, SUSTAINABILITY AND THE ECONOMY
URBAN TRANSPORT,  SUSTAINABILITY AND THE ECONOMY URBAN TRANSPORT,  SUSTAINABILITY AND THE ECONOMY
URBAN TRANSPORT, SUSTAINABILITY AND THE ECONOMY
 
Hitachi Rail - Alistair Dormer
Hitachi Rail - Alistair DormerHitachi Rail - Alistair Dormer
Hitachi Rail - Alistair Dormer
 
Jordan Hejaz Rail - Abdullah malkawi
Jordan Hejaz Rail - Abdullah malkawi  Jordan Hejaz Rail - Abdullah malkawi
Jordan Hejaz Rail - Abdullah malkawi
 

Recently uploaded

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 

Recently uploaded (20)

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 

Saudi Railway Company Presentation - Railways Projects 2014

  • 1. Mena 10th Rail & Metro Summit October, 2014 Dr. Bashar AlMalik Projects Department Director
  • 2. •KSA Transportation Network •Operation & Maintenance Activities •Expansion Plans •Projects Photos
  • 3.
  • 4. Passenger/ Freight line links the Eastern Province and Riyadh where 40% of the population is located as well as 50% of the economic activities. Mineral line links Ras AlKhair port and AlJalamid mines in the North to transport Millions of tons of Phosphate and Bauxite.
  • 5. Project Length (KM) Location Responsible Agency North - South 2750 Central / East / North SAR HHR 450 W. Province MOT/SRO Riyadh Metro 176 Riyadh ADA GCC 663 E. Provence MOT Landbridge 958 (double track) East - West SAR Mashaer 18 Makkha MOMRA Jeddah Metro 108 Jeddah MOMRA Makkha Metro 182 Makkha MOMRA Eastern Region Metro 86 E. Provence MOMRA SRO Upgrade 450 Central / East SRO
  • 6. Roads Total: 233,000 km Paved: 94,000 km Ports Arabian Gulf: Dammam; Jubail 2 ports; Ras Tanura; Khafji; Khobar and Ras Al-Khair (under construction); Red Sea: Jeddah; Yanbu' al Bahr; Al Lith; Duba; Rabigh; Jizan and Farasan.
  • 7. Main airports Dammam King Fahd International Airport (5.3M/year passengers) Jeddah King Abdulaziz International Airport (18M/year passengers Riyadh King Khalid International Airport (15M/year passengers) Al Madinah Prince Mohammad Bin Abdulaziz International Airport (1.8M/year passengers).
  • 8. Max axle Load 32.5 tones. Max gradient: Empty direction 1.5 %, loaded direction 0.5%. Max speed : 80 km/hr. Train Control System is ETCS level 2 . 25 EMD – SD70 ACS locos ( 4300 hp ) . 524 Phosphate hopper wagons 240 open Top Bauxite hopper wagons .
  • 9. Phosphate Operations Commencement ,May 2011. Safety certificate from SRC issued, April 2013. Operating License from SRC issued, January 2014. Total Transported Tonnages Since Launching is approximately 6 Million.  3 train sets configured to 155 phosphate wagons. Launching Bauxite Operations , April 2014.  2 train Sets Configured to 100 Bauxite Wagons & 3 locos.
  • 10.
  • 11.
  • 12.
  • 13. 1.Environmental (sandstorm, heat,…). 2. Immature industry (lack of market support, Residents, …). 3.People competency (scarcity in qualified staff). 4.Communications & Logistics.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. 0 50000 100000 150000 200000 250000 300000 Tonnage 2011 Tonnage 2012 Tonnage 2013 Tonnage 2014
  • 24.
  • 25. SAR has released a maintenance tender in May 2014 to outsource the maintenance of its mineral line (Bids under evaluation). SAR has also released a tender for Technical Assistance for Infrastructure Management & Rail Operations (Bids under evaluation).
  • 26. Contract Between Length (km) Status CTW 100 Ras Al-Khair to Az Zabirah Mines 555 Under Operation CTW 110 Ras Al-Khair to Jubail 85 Under Construction CTW 120 (D&B) Jubail to Dammam 107 Under Construction CTW 130 Jubail industrial city internal network 55 Will be awarded soon CTW 200 Bauxite Junction to An Nafud 450 Under Operation CTW 300 An Nafud to Al-Haditah, Al Jalamid and Al Basayta 785 Under Operation CTW 320 Wa'ad Al-Shamal 132 Under Construction S&T 120, 130, & 320 Ras Al-Khair to Dammam & Wa'ad Al-Shamal 294 Will be Tendered Soon CTW 400 A z Zabirah Junction to King Khalid International Airport (KKIA) 460 Under Construction CTW 410 (KKIA) to SRO Station in Riyadh 47 Not Yet Started Landbridge Riyadh to Jeddah 958 (double track) Under Design
  • 32. • 958km of double track rail for passenger & heavy freight. • 32.4t axle load. • Design speed 160 k/h (Freight) & 300 k/h (Passenger) • Stations, Depots, Facilities, and a Dry Port in Riyadh. •Railway Systems (Signaling) ETCS level 2
  • 33. 1- Announcements targeting International and Local firms for Prequalification. 2- Applicants to collect, prepare, and submit their prequalification documents. 3- Issue the tender document to the qualified bidder. 4- Review and Evaluate Technical & Commercial bids separately. 5- Award to the lowest technically qualified bidder meeting the tender documents terms & conditions.
  • 34. Landbridge Contracts Contract Status Project Management Consultant (PMC) Awarded on 3-July-2013 Detailed Engineering Design Consultant (DEDC) Awarded on 22-July-2013 Construction Supervision Consultant (CSC) Prequalification requests under evaluation Civil & Trackworks Not tendered yet S&T Not tendered yet Rolling stock Not tendered yet
  • 35. Landbridge Estimated Quantity Item Quantity Unit Rail 300,000 ton Sleeprs 4.1 million unit Fastening System 8.2 million unit Turnouts 1200 unit Ballast 12 million m3
  • 36. Primary line from Riyadh to Jeddah Secondary Links with HHR Link to Taif City Link to Makkah City Link to SRO Line ( Riyadh-Dammam) Link to North-South Network