Indian Electricity Act 2003
& Amendments
Presented By :
Sanket Samantray
NIT Rourkela
Electricity Act 2003
The Need for enactment of Electricity Act 2003, was felt by the Central
Government in the backdrop of the on going Economic Reforms in the
country coupled with power sector reforms in various States.
 Poor performance of SEBs which were formed and operating under IE Act
1910 and Electricity Supply Act 1948 forced the Government to bring out
an uniform and unified law to take care of the current needs of power
sector in the areas of Generation, Transmission, Trading and Distribution of
Electricity
Electricity Act 2003 is a single legislation which addresses all the key areas
of Electricity in the country and provides a road map for over all and
uniform development of electricity sector in the country
Electricity Act 2003
Purpose of the Act
To consolidate the laws relating to generation, transmission,
distribution, trading and use of electricity.
To take measures conducive for development of electricity sector.
To promote Competition in the sector.
To protect the interests of Consumers
To rationalize the electricity tariffs
To Establish Regulatory commissions and Appellate Tribunal for
Electricity.
To ensure supply of electricity to all areas
To rationalize tariff and lowering the cross-subsidization levels
An overview of Electricity Act 2003
Enacted in 2003 and given to effect from 10th June 2003
Consists of 18 ( XVIII) parts, 185 Sections and one schedule.
It extends to the whole of India except the State of Jammu and
Kashmir.
New concepts introduced in Electricity Act 2003
National Electricity Policy and Tariff Policy (section 3)
Separation of Electricity Trading( Section 12 , 39 and 52)
Introduction of Open Access {section 39(d)}
Introduction of MYT ( Multi Year Tariffs) (section 61(f))
Constitution of Appellate Tribunal and its functions ( sections 110 – 125)
Salient features of the Electricity Act, 2003
 Role of Government
 Rural Electrification
 Generation
 Transmission
 Distribution
 Consumer Protection
 Trading / Market Development
 Regulatory Commission / Appellate Tribunal
 Tariff Principles
 CEA
 Measures against Theft of electricity
 Restructuring of SEBs
Role of Government
Central Government to prepare National Electricity Policy and Tariff
Policy.(Section 3)
Central Govt. to notify a National Policy for rural areas permitting stand alone
systems based on renewal and Non-Conventional energy sources in consultation
with States. (Section 4)
Central Government to formulate a National Policy in consultation with the
concerned State. for bulk purchase of power and management of local
distribution through Users’ Association, Cooperatives, Franchisees and
Panchayat Institutions etc. (Section 5)
 Appropriate Government to endeavor to extend supply of electricity to
all villages/hamlets. (Section 6)
 No requirement of licence if a person intends to generate and distribute
power in rural area. (Section 14)
Rural Electrification
 Generation free from licensing. (Section 7)
 Requirement of TEC for non-hydro generation done away with. (Section 7)
 Captive Generation is free from controls. Open access to Captive generating plants subject
to availability of transmission facility. (Section 9)
 Clearance of CEA for hydro projects required. Necessary due to concern of dam safety and
inter-State issues. (Section 8)
 Generation from Non-Conventional Sources / Co-generation to be promoted. Minimum
percentage of purchase of power from renewable may be prescribed by Regulatory
Commissions. (Sections 61 (h), 86 (1) (e))
Generation
There would be Transmission Utility at the Centre and in the States to undertake planning &
development of transmission system. (Sections 38 & 39)
Load dispatch to be in the hands of a government company/organisation. Flexibility regarding
keeping Transmission Utility and load dispatch together or separating them. Load Dispatch
function critical for grid stability and neutrality as compare to generators and distributors.
Instructions to be binding on both. (Sections 26, 27,31, 38, 39)
Transmission companies to be licensed by the Appropriate Commission after giving due
consideration to the views of the Transmission Utility. (Sections 15(5)(b))
The Load Dispatch Centre/Transmission Utility / Transmission Licensee not to trade in power.
Facilitating genuine competition between generators. (Sections 27, 31, 38, 39,41)
Open access to the transmission lines to be provided to distribution licensees, generating
companies. (Sections 38-40)
This would generate competitive pressures and lead to gradual cost reduction.
Transmission
Distribution
Distribution to be licensed by SERCs.
Distribution licensee free to take up generation & Generating co. free to take
up distribution licence. This would facilitate private sector participation
without Government guarantee/ Escrow. (Sections 7, 12)
Retail tariff to be determined by the Regulatory Commission. (Section 62)
Metering made mandatory. (Section 55)
Provision for suspension/revocation of licence by Regulatory Commission as it
is an essential service which can not be allowed to collapse. (Sections 19, 24)
Open access in distribution to be allowed by SERC in phases. (Section 42)
In addition to the wheeling charges provision for surcharge if open access is
allowed before elimination of cross subsidies, to take care of
Current level of cross subsidy
Licensee’s obligation to supply. (Section 42)
This would give choice to customer.
Consumer Protection
 Consumer to be given connection within stipulated time. (Section 43(1))
 Penalty in the event of failure to give connection (Section 43(3))
 Payment of interest on security deposit. (Section 47(4))
 Regulatory commission to specify Electricity supply code to be followed by
licensees. (Section 50)
 No sum due from consumers recoverable after a period of two years
unless the same was shown recoverable continuously. (Section 56(2))
 Redressal forum for redressal of grievances of consumers, to be appointed by every
distribution licensee within six months. Ombudsman scheme (Section 42 )
 Standards of performance
 Licensees required to meet standards of performance specified by Regulatory
Commission. Failure to meet standards makes them liable to pay compensation to
affected person within ninety days.
 Licensee to furnish to the Commission periodical information on standards of
performance (Section 57)
 District level committee - (a) to coordinate and review extension of electrification in
each district; (b) to review quality of power supply and consumer satisfaction, etc.
(Section 166 (5))
Consumer Protection contd…
Trading/Market Development
Trading distinct activity permitted with licensing (Section 12)
Regulatory Commission may fix ceiling on trading margin to avoid
artificial price volatility (Section 79 (2) (b) & 86 (2) (b)
The Regulatory Commission to promote development of market
including trading (Section 66)
State Electricity Regulatory Commission to be constituted within six months. (Section 82)
Provision for Joint Commission by more than one State/UT. (Section 83)
Provision for constitution of Appellate Tribunal consisting of Chairman and three
Members. (Section 110, 112)
Appellate Tribunal to hear appeals against the orders of CERC/SERC, and also to exercise
general supervision and control over the Central/State Commissions. (Section 111)
Appeal against the orders of Appellate Tribunal to lie before the Supreme Court.
(Section 125)
Appellate Tribunal considered necessary to-
Reduce litigation and delay in decisions through High Court.
Provide technical expertise in decision on appeals
Regulatory Commissions/Appellate Tribunal
CEA to continue as the main technical Advisor of the Govt. of India/ State Government
with the responsibility of overall planning. (Section 70)
CEA to specify the technical standards for electrical plants and electrical lines. (Section 73)
CEA to be technical adviser to CERC as well as SERCs.(Section 73)
CEA to specify the safety standards. (Section 53)
Central Electricity Authority
Tariff Principles
 Regulatory Commission to determine tariff for supply of electricity by generating co.
on long/medium term contracts. (Section 62)
No tariff fixation by regulatory commission if tariff is determined through competitive
bidding or where consumers, on being allowed open access enter into agreement with
generators/traders.
 Consumer tariff should progressively reduce cross subsidies and move towards actual
cost of supply. (Section 61 (g), (h))
 State Government may provide subsidy in advance through the budget for specified
target groups if it requires the tariff to be lower than that determined by the Regulatory
Commission. (Section 65)
Regulatory Commissions may undertake regulation including determination of multi-
year tariff principles, which rewards efficiency and is based on commercial principles.
(Section 61 (e), (f))
Regulatory Commission to look at the costs of generation, transmission and distribution
separately. (Section 62 (2))
Measures Against Theft of Electricity
Focus on revenue realization rather than criminal proceedings. (Sections 126, 135)
Penalties linked to the connected load and quantum of energy and financial gain
involved in theft. (Section 135)
Provisions for compounding of offences. (Section 152)
Assessment of electricity charges for unauthorized use of electricity by the assessing
officer designated by the State Government. (Section 126)
Theft punishable with imprisonment. (Section 135)
Punishment provision for abetment of theft. (Section 150)
Special Courts (Sections 153-158)
Restructuring of SEBs
Provision for transfer scheme to create one or more companies
from SEB. (Section 131)
Provision for continuance of SEBs (Section 172 )
States given flexibility to adopt model/path
Amendments in Electricity Act, 2003
Amendments in Electricity Act, 2003
 The Electricity (Amendment) Act,2003
The government passed the Electricity (Amendment) Act in December 2003
 The Electricity (Amendment) Act,2007
In May 2007, the government passed the Electricity (Amendment) Bill, 2007 recommending
amendments to Electricity Act (EA), 2003. Subsequent to this, it passed the Electricity
(Amendment) Act in June 2007
 Electricity (Amendment) Bill, 2014
The Bill was introduced in the Lok Sabha on December 19, 2014
Current Status: Pending
Highlights of The Electricity (Amendment) Act,2003
• The State Commission shall, not later than five years from the date of commencement of the
Electricity (Amendment) Act, 2003, by regulations, provide such open access to all consumers
who require a supply of electricity where the maximum power to be made available at any
time exceeds one megawatt.
(Section 42{4})
• The Appellate Tribunal may, after hearing the Appropriate Commission or other interested
party, if any, from time to time, issue such orders, instructions or directions as it may deem
fit, to any Appropriate Commission for the performance of its statutory functions under this
Act. (Section 121)
• Whoever, negligently breaks, injures, throws down or damages any material connected with
the supply of electricity, shall be punishable with fine which may extend to ten thousand
rupees. (Section 139)
The Electricity (Amendment) Act,2007
Highlights of Amendments :
Joint responsibility of State Government and Central Government in Rural Electrification
(Section 6)
The concerned State Government and the Central Government shall jointly endeavour to
provide access to electricity to all areas including villages and hamlets through rural
electricity infrastructure and electrification of households
The term ‘elimination’ has been omitted in relation to cross-subsidies (Section 42)
The government has omitted the term ‘eliminated’ in the context of cross-subsidies. (Earlier,
the Act stated that ‘the cross-subsidy surcharge and cross subsidies shall be progressively
reduced and eliminated’.)The amendment suggests that cross-subsidies would be reduced
gradually, and not completely eliminated, as per the earlier provision of ‘elimination of cross-
subsidy’. Hence, the amendment is likely to make states more lenient in setting targets for
cross-subsidy reduction.
Captive units will not require a licence to supply power to any user.(Section 9)
Provided further that no licence shall be required under this Act for supply of electricity
generated from a captive generating plant to any licensee in accordance with the provisions
of this Act
The Electricity Supply Code (Section 50)
The State Commission shall specify an electricity supply code to provide for recovery of
electricity charges, intervals for billing of electricity charges, disconnection of supply of
electricity for non-payment thereof, restoration of supply of electricity, measures for
preventing tampering, distress or damage to electrical plant or electrical line or meter, entry
of distribution licensee or any person acting on his behalf for diconnecting supply and
removing the meter, entry for replacing, altering or maintaining electric lines or electrical
plants or meter and such other matters
Strict action against unauthorised usage of power (Section 126)
Amendments related to penalties for unauthorised usage of power amendments would
simplify the process of identifying those consumers stealing power, as well as increase the
assessment amount, which would help curb losses in the system
Power theft has been recognised as a criminal offence, punishable under Section 173 of the
Code of Criminal Procedure, 1973. (Section 135)
The country faces T&D losses of around 30 per cent, which implies that onethird of the
power is lost due to theft, pilferage and technical inefficiencies.Amendments related
recognition of power theft as an offence punishable under Section 173 of the Code of
Criminal Procedure, 1973, are to ensure strict action against power theft. This is expected to
strengthen the drive by respective state utilities to eliminate power theft and improve
operational efficiencies. Therefore, focused efforts towards eliminating theft of power can
help reduce distribution losses substantially
Electricity (Amendment) Bill, 2014
The amendments will usher in much needed further reforms in the power sector. It will also promote
competition, efficiency in operations and improvement in quality of supply of electricity in the country
resulting in capacity addition and ultimate benefit to the consumers.
Salient features of Proposed Amendments
 Enforcing Grid Security.
 Thrust on Renewable Energy.
 Streamlining ofTariff determination process.
 Matters relating to Regulatory Commissions.
 Encouraging Retail Sale Competition: Separation of Carriage and Content in the
Distribution Sector
Enforcing Grid Security
Increase in penalty for non-compliance of orders/ directions relating to Grid Security and
other directions.
 Rupees Fifteen Lacs to Rupees Ten Crore (Section 29),
 Rupees Five Lacs to Rupees One Crore (Section 33),
 Rupees One Lac to Rupees One Crore and recurring penalty of Rupees Six
 thousand to Rupees One Lac on every day of non-compliance (Section 142) and
 Rupees One Lac to Rupees One Crore and recurring penalty of Rupees five
 thousand to Rupees One Lac on every day of non-compliance (Section 146).
Note:
The penalty for Renewable Energy generating companies shall be Rupees Ten Lacs and
in case of continuing failure an additional penalty of Rupees Ten thousand per day; and
No penalty on individuals (Section 149).
Thrust on Renewable Energy
Introducing atleast 10% Renewable Power Generation obligation on
setting up of new coal and lignite based thermal power plants (Section 7)
Exemption of sale of electricity generated from renewable energy sources
from cross subsidy and open access charge for a period as prescribed
(Section 42(4))
Bringing ( Renewable Purchase Obligation) RPO and (Renewable
Generation Obligation) RGO under penal provision with penalty under
Section 142 (Section 142).
Provision for National Renewable Energy Policy (Section 3)
Exemption for licence for persons generating and supplying electricity from
Renewable Energy sources (Section 14).
Streamlining of Tariff Determination Process
Allowing licensees to recover cost of electricity without any revenue deficit
(Section 61(d)).
Provisions ofTariff Policy made mandatory forTariff determination (Section 61(2))
Provision for initiating suo-motu proceedings for determination of tariff (Section
64).
Recommendation for revocation of license by Government due to non-compliance
of standards (Section 59A).
Matters relating to Regulatory Commissions
The term of office for the Chairperson or other Member shall hold office for a
term of three years from the date he enters upon his office or 65 years of age
whichever is earlier and eligible for second term on re-appointment (Section 89).
Provision for expeditious disposal of tariff petitions by the Commission from 120
days to 90 days (Section 64).
Review of performance of Regulatory Commissions by a Peer Committee
constituted by Forum of Regulators (Section 109A).
Removal of Member in case of non-performance (Section 90).
Interim nomination against vacancies in case of delay of more than 5 months in
the appointment of Chairpersons/ Members of the State Commissions
(Section 85).
Promotion of competition and choice to consumers
Electricity Act, 2003 has encouraged competition in generation and
transmission sectors.
Distribution sector has been largely regulated marked by high losses and
inefficient operation.
Competition and choice is proposed through separation of carriage and
content in the proposed amendment.
Encouraging Retail Sale Competition:
Separation of Carriage & Content in the Distribution Sector (1/2)
 Distribution and supply businesses to be recognized as separate licensed activities (Section 14)
 Distribution licensee to be responsible for development, operation and maintenance of
distribution network business and shall have an obligation to provide connection on demand to
any consumer in its area of distribution (Section 42)
 Incumbent supply licensee
 To be carved out of the existing distribution licensee
 Responsible for arranging supply of electricity for all the consumers in its area of supply
(Section 51A)
 Subsequent supply licensee
 Licenses to be granted to other applicants in the area of supply of the incumbent supply licensee
– atleast one company to be a Government Company (Section 14).
 Existing Distribution licensee and Franchisee shall continue as per the terms of their on-going
license/ contract (Section 14).
 Intermediary Company to hold all the PPAs as per re-organization scheme
(Section 131(4A))
 Supply licensees so designated by Appropriate Commission to be Provider of the
last resort (Section 51B)
 Tariff for consumers not to be regulated – only ceiling tariff (Section 51D)
 Sections amended:14, 20, 24, 42, 44, 45, 47, 48, 49, 50, 69A and introduction of new
part VI and VIB as consequential changes.
Encouraging Retail Sale Competition:
Separation of Carriage & Content in the Distribution Sector (2/2)
Exemption to developer of SEZ area for obtaining distribution licence
Exemption to Railways and Metro Rail for obtaining distribution licence
Making provisions for collection and realisation of any dues along with the
electricity dues.
15 days notice period for disconnection of supply not required in case of Pre-
paid meters.
Other Issues
THANK YOU

More Related Content

What's hot

Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
Daya Kherwar
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
susanta das
 
Ancillary Services
Ancillary ServicesAncillary Services
Ancillary ServicesIPPAI
 
Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdf
Sourav Bhunia
 
Energy management
Energy managementEnergy management
Energy management
Shivraj Nalawade
 
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
shyamies11
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 
Availability Based Tariff and UI charges
Availability Based Tariff and UI chargesAvailability Based Tariff and UI charges
Availability Based Tariff and UI charges
Krishnakumar R. Vasudevan
 
Electricity laws and regulations
Electricity laws and regulationsElectricity laws and regulations
Electricity laws and regulations
Akshat Goel
 
Solar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatSolar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawat
Ritesh Kumawat
 
Energy audit
Energy auditEnergy audit
Energy audit
Aglaia Connect
 
Energy audit
Energy auditEnergy audit
Energy audit
Shivraj Nalawade
 
Smart grid ppt
Smart grid pptSmart grid ppt
Smart grid ppt
Ravish Pandey
 
Web based power quality monitoring system
Web based power quality monitoring systemWeb based power quality monitoring system
Web based power quality monitoring system
Vikram Purohit
 
Charging Stations For Electric Vehicle
Charging Stations For Electric VehicleCharging Stations For Electric Vehicle
Charging Stations For Electric Vehicle
Sarang Bongirwar
 
Arbitration And Conciliation
Arbitration And ConciliationArbitration And Conciliation
Arbitration And Conciliation
apurvaagarwal
 
Structure of power system
Structure of power systemStructure of power system
Structure of power system
Revathi Subramaniam
 
Unit 4
Unit 4Unit 4
Unit 4
Arul Jothi
 
Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart grid
Ashfaq khan
 
Demand side management
Demand side managementDemand side management
Demand side management
Shivraj Nalawade
 

What's hot (20)

Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
 
Ancillary Services
Ancillary ServicesAncillary Services
Ancillary Services
 
Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdf
 
Energy management
Energy managementEnergy management
Energy management
 
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
Availability Based Tariff and UI charges
Availability Based Tariff and UI chargesAvailability Based Tariff and UI charges
Availability Based Tariff and UI charges
 
Electricity laws and regulations
Electricity laws and regulationsElectricity laws and regulations
Electricity laws and regulations
 
Solar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatSolar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawat
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Smart grid ppt
Smart grid pptSmart grid ppt
Smart grid ppt
 
Web based power quality monitoring system
Web based power quality monitoring systemWeb based power quality monitoring system
Web based power quality monitoring system
 
Charging Stations For Electric Vehicle
Charging Stations For Electric VehicleCharging Stations For Electric Vehicle
Charging Stations For Electric Vehicle
 
Arbitration And Conciliation
Arbitration And ConciliationArbitration And Conciliation
Arbitration And Conciliation
 
Structure of power system
Structure of power systemStructure of power system
Structure of power system
 
Unit 4
Unit 4Unit 4
Unit 4
 
Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart grid
 
Demand side management
Demand side managementDemand side management
Demand side management
 

Similar to Electricity act 2003

Ee09 801 eed ppt
Ee09 801 eed pptEe09 801 eed ppt
Ee09 801 eed ppt
manickaasagam
 
K a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distributionK a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distributionsrinivasdeepak
 
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...electricitygovernance
 
Electricity Amendment Bill, 2020
Electricity Amendment Bill, 2020Electricity Amendment Bill, 2020
Electricity Amendment Bill, 2020
DVSResearchFoundatio
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptx
msounak95
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012rupeshsingh_1
 
Presentation on IEA 2003.pptx
Presentation on IEA 2003.pptxPresentation on IEA 2003.pptx
Presentation on IEA 2003.pptx
MaheshThombare9
 
Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, D...
Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, D...Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, D...
Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, D...
Das A. K.
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...
Amitava Nag
 
Proposed Amendments to Electricity Act, 2003
Proposed Amendments to Electricity Act, 2003Proposed Amendments to Electricity Act, 2003
Proposed Amendments to Electricity Act, 2003
Gensol Engineering Limited
 
competition project
competition projectcompetition project
competition projectAnshu Kumar
 
DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014
Headway Solar
 
brief policies.pptx
brief policies.pptxbrief policies.pptx
brief policies.pptx
ssuser9f2ad7
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of ElectricityRupesh Bobbili
 
Elect supplyact1948
Elect supplyact1948Elect supplyact1948
Elect supplyact1948
ramesh seervi
 
Cerc open access-in-inter-state-transmission-regulations-2008
Cerc open access-in-inter-state-transmission-regulations-2008Cerc open access-in-inter-state-transmission-regulations-2008
Cerc open access-in-inter-state-transmission-regulations-2008
vikrantdesh
 
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
electricitygovernance
 

Similar to Electricity act 2003 (20)

Ee09 801 eed ppt
Ee09 801 eed pptEe09 801 eed ppt
Ee09 801 eed ppt
 
K a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distributionK a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distribution
 
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
 
Tariff policy
Tariff policyTariff policy
Tariff policy
 
Electricity Amendment Bill, 2020
Electricity Amendment Bill, 2020Electricity Amendment Bill, 2020
Electricity Amendment Bill, 2020
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptx
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012
 
Presentation on IEA 2003.pptx
Presentation on IEA 2003.pptxPresentation on IEA 2003.pptx
Presentation on IEA 2003.pptx
 
Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, D...
Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, D...Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, D...
Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, D...
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...
 
Proposed Amendments to Electricity Act, 2003
Proposed Amendments to Electricity Act, 2003Proposed Amendments to Electricity Act, 2003
Proposed Amendments to Electricity Act, 2003
 
DSM.pptx
DSM.pptxDSM.pptx
DSM.pptx
 
competition project
competition projectcompetition project
competition project
 
Draft Feed-In Tariffs
Draft Feed-In TariffsDraft Feed-In Tariffs
Draft Feed-In Tariffs
 
DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014
 
brief policies.pptx
brief policies.pptxbrief policies.pptx
brief policies.pptx
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
 
Elect supplyact1948
Elect supplyact1948Elect supplyact1948
Elect supplyact1948
 
Cerc open access-in-inter-state-transmission-regulations-2008
Cerc open access-in-inter-state-transmission-regulations-2008Cerc open access-in-inter-state-transmission-regulations-2008
Cerc open access-in-inter-state-transmission-regulations-2008
 
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
 

Recently uploaded

PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
Paul Smith
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
ILC- UK
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key Slides
Andrew Griffith
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
Revenue Department Kerala State
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
ahcitycouncil
 

Recently uploaded (20)

PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key Slides
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 

Electricity act 2003

  • 1. Indian Electricity Act 2003 & Amendments Presented By : Sanket Samantray NIT Rourkela
  • 2. Electricity Act 2003 The Need for enactment of Electricity Act 2003, was felt by the Central Government in the backdrop of the on going Economic Reforms in the country coupled with power sector reforms in various States.  Poor performance of SEBs which were formed and operating under IE Act 1910 and Electricity Supply Act 1948 forced the Government to bring out an uniform and unified law to take care of the current needs of power sector in the areas of Generation, Transmission, Trading and Distribution of Electricity Electricity Act 2003 is a single legislation which addresses all the key areas of Electricity in the country and provides a road map for over all and uniform development of electricity sector in the country
  • 3. Electricity Act 2003 Purpose of the Act To consolidate the laws relating to generation, transmission, distribution, trading and use of electricity. To take measures conducive for development of electricity sector. To promote Competition in the sector. To protect the interests of Consumers To rationalize the electricity tariffs To Establish Regulatory commissions and Appellate Tribunal for Electricity. To ensure supply of electricity to all areas To rationalize tariff and lowering the cross-subsidization levels
  • 4. An overview of Electricity Act 2003 Enacted in 2003 and given to effect from 10th June 2003 Consists of 18 ( XVIII) parts, 185 Sections and one schedule. It extends to the whole of India except the State of Jammu and Kashmir. New concepts introduced in Electricity Act 2003 National Electricity Policy and Tariff Policy (section 3) Separation of Electricity Trading( Section 12 , 39 and 52) Introduction of Open Access {section 39(d)} Introduction of MYT ( Multi Year Tariffs) (section 61(f)) Constitution of Appellate Tribunal and its functions ( sections 110 – 125)
  • 5. Salient features of the Electricity Act, 2003  Role of Government  Rural Electrification  Generation  Transmission  Distribution  Consumer Protection  Trading / Market Development  Regulatory Commission / Appellate Tribunal  Tariff Principles  CEA  Measures against Theft of electricity  Restructuring of SEBs
  • 6. Role of Government Central Government to prepare National Electricity Policy and Tariff Policy.(Section 3) Central Govt. to notify a National Policy for rural areas permitting stand alone systems based on renewal and Non-Conventional energy sources in consultation with States. (Section 4) Central Government to formulate a National Policy in consultation with the concerned State. for bulk purchase of power and management of local distribution through Users’ Association, Cooperatives, Franchisees and Panchayat Institutions etc. (Section 5)
  • 7.  Appropriate Government to endeavor to extend supply of electricity to all villages/hamlets. (Section 6)  No requirement of licence if a person intends to generate and distribute power in rural area. (Section 14) Rural Electrification
  • 8.  Generation free from licensing. (Section 7)  Requirement of TEC for non-hydro generation done away with. (Section 7)  Captive Generation is free from controls. Open access to Captive generating plants subject to availability of transmission facility. (Section 9)  Clearance of CEA for hydro projects required. Necessary due to concern of dam safety and inter-State issues. (Section 8)  Generation from Non-Conventional Sources / Co-generation to be promoted. Minimum percentage of purchase of power from renewable may be prescribed by Regulatory Commissions. (Sections 61 (h), 86 (1) (e)) Generation
  • 9. There would be Transmission Utility at the Centre and in the States to undertake planning & development of transmission system. (Sections 38 & 39) Load dispatch to be in the hands of a government company/organisation. Flexibility regarding keeping Transmission Utility and load dispatch together or separating them. Load Dispatch function critical for grid stability and neutrality as compare to generators and distributors. Instructions to be binding on both. (Sections 26, 27,31, 38, 39) Transmission companies to be licensed by the Appropriate Commission after giving due consideration to the views of the Transmission Utility. (Sections 15(5)(b)) The Load Dispatch Centre/Transmission Utility / Transmission Licensee not to trade in power. Facilitating genuine competition between generators. (Sections 27, 31, 38, 39,41) Open access to the transmission lines to be provided to distribution licensees, generating companies. (Sections 38-40) This would generate competitive pressures and lead to gradual cost reduction. Transmission
  • 10. Distribution Distribution to be licensed by SERCs. Distribution licensee free to take up generation & Generating co. free to take up distribution licence. This would facilitate private sector participation without Government guarantee/ Escrow. (Sections 7, 12) Retail tariff to be determined by the Regulatory Commission. (Section 62) Metering made mandatory. (Section 55) Provision for suspension/revocation of licence by Regulatory Commission as it is an essential service which can not be allowed to collapse. (Sections 19, 24) Open access in distribution to be allowed by SERC in phases. (Section 42) In addition to the wheeling charges provision for surcharge if open access is allowed before elimination of cross subsidies, to take care of Current level of cross subsidy Licensee’s obligation to supply. (Section 42) This would give choice to customer.
  • 11. Consumer Protection  Consumer to be given connection within stipulated time. (Section 43(1))  Penalty in the event of failure to give connection (Section 43(3))  Payment of interest on security deposit. (Section 47(4))  Regulatory commission to specify Electricity supply code to be followed by licensees. (Section 50)  No sum due from consumers recoverable after a period of two years unless the same was shown recoverable continuously. (Section 56(2))
  • 12.  Redressal forum for redressal of grievances of consumers, to be appointed by every distribution licensee within six months. Ombudsman scheme (Section 42 )  Standards of performance  Licensees required to meet standards of performance specified by Regulatory Commission. Failure to meet standards makes them liable to pay compensation to affected person within ninety days.  Licensee to furnish to the Commission periodical information on standards of performance (Section 57)  District level committee - (a) to coordinate and review extension of electrification in each district; (b) to review quality of power supply and consumer satisfaction, etc. (Section 166 (5)) Consumer Protection contd…
  • 13. Trading/Market Development Trading distinct activity permitted with licensing (Section 12) Regulatory Commission may fix ceiling on trading margin to avoid artificial price volatility (Section 79 (2) (b) & 86 (2) (b) The Regulatory Commission to promote development of market including trading (Section 66)
  • 14. State Electricity Regulatory Commission to be constituted within six months. (Section 82) Provision for Joint Commission by more than one State/UT. (Section 83) Provision for constitution of Appellate Tribunal consisting of Chairman and three Members. (Section 110, 112) Appellate Tribunal to hear appeals against the orders of CERC/SERC, and also to exercise general supervision and control over the Central/State Commissions. (Section 111) Appeal against the orders of Appellate Tribunal to lie before the Supreme Court. (Section 125) Appellate Tribunal considered necessary to- Reduce litigation and delay in decisions through High Court. Provide technical expertise in decision on appeals Regulatory Commissions/Appellate Tribunal
  • 15. CEA to continue as the main technical Advisor of the Govt. of India/ State Government with the responsibility of overall planning. (Section 70) CEA to specify the technical standards for electrical plants and electrical lines. (Section 73) CEA to be technical adviser to CERC as well as SERCs.(Section 73) CEA to specify the safety standards. (Section 53) Central Electricity Authority
  • 16. Tariff Principles  Regulatory Commission to determine tariff for supply of electricity by generating co. on long/medium term contracts. (Section 62) No tariff fixation by regulatory commission if tariff is determined through competitive bidding or where consumers, on being allowed open access enter into agreement with generators/traders.  Consumer tariff should progressively reduce cross subsidies and move towards actual cost of supply. (Section 61 (g), (h))  State Government may provide subsidy in advance through the budget for specified target groups if it requires the tariff to be lower than that determined by the Regulatory Commission. (Section 65) Regulatory Commissions may undertake regulation including determination of multi- year tariff principles, which rewards efficiency and is based on commercial principles. (Section 61 (e), (f)) Regulatory Commission to look at the costs of generation, transmission and distribution separately. (Section 62 (2))
  • 17. Measures Against Theft of Electricity Focus on revenue realization rather than criminal proceedings. (Sections 126, 135) Penalties linked to the connected load and quantum of energy and financial gain involved in theft. (Section 135) Provisions for compounding of offences. (Section 152) Assessment of electricity charges for unauthorized use of electricity by the assessing officer designated by the State Government. (Section 126) Theft punishable with imprisonment. (Section 135) Punishment provision for abetment of theft. (Section 150) Special Courts (Sections 153-158)
  • 18. Restructuring of SEBs Provision for transfer scheme to create one or more companies from SEB. (Section 131) Provision for continuance of SEBs (Section 172 ) States given flexibility to adopt model/path
  • 20. Amendments in Electricity Act, 2003  The Electricity (Amendment) Act,2003 The government passed the Electricity (Amendment) Act in December 2003  The Electricity (Amendment) Act,2007 In May 2007, the government passed the Electricity (Amendment) Bill, 2007 recommending amendments to Electricity Act (EA), 2003. Subsequent to this, it passed the Electricity (Amendment) Act in June 2007  Electricity (Amendment) Bill, 2014 The Bill was introduced in the Lok Sabha on December 19, 2014 Current Status: Pending
  • 21. Highlights of The Electricity (Amendment) Act,2003 • The State Commission shall, not later than five years from the date of commencement of the Electricity (Amendment) Act, 2003, by regulations, provide such open access to all consumers who require a supply of electricity where the maximum power to be made available at any time exceeds one megawatt. (Section 42{4}) • The Appellate Tribunal may, after hearing the Appropriate Commission or other interested party, if any, from time to time, issue such orders, instructions or directions as it may deem fit, to any Appropriate Commission for the performance of its statutory functions under this Act. (Section 121) • Whoever, negligently breaks, injures, throws down or damages any material connected with the supply of electricity, shall be punishable with fine which may extend to ten thousand rupees. (Section 139)
  • 22. The Electricity (Amendment) Act,2007 Highlights of Amendments : Joint responsibility of State Government and Central Government in Rural Electrification (Section 6) The concerned State Government and the Central Government shall jointly endeavour to provide access to electricity to all areas including villages and hamlets through rural electricity infrastructure and electrification of households The term ‘elimination’ has been omitted in relation to cross-subsidies (Section 42) The government has omitted the term ‘eliminated’ in the context of cross-subsidies. (Earlier, the Act stated that ‘the cross-subsidy surcharge and cross subsidies shall be progressively reduced and eliminated’.)The amendment suggests that cross-subsidies would be reduced gradually, and not completely eliminated, as per the earlier provision of ‘elimination of cross- subsidy’. Hence, the amendment is likely to make states more lenient in setting targets for cross-subsidy reduction.
  • 23. Captive units will not require a licence to supply power to any user.(Section 9) Provided further that no licence shall be required under this Act for supply of electricity generated from a captive generating plant to any licensee in accordance with the provisions of this Act The Electricity Supply Code (Section 50) The State Commission shall specify an electricity supply code to provide for recovery of electricity charges, intervals for billing of electricity charges, disconnection of supply of electricity for non-payment thereof, restoration of supply of electricity, measures for preventing tampering, distress or damage to electrical plant or electrical line or meter, entry of distribution licensee or any person acting on his behalf for diconnecting supply and removing the meter, entry for replacing, altering or maintaining electric lines or electrical plants or meter and such other matters
  • 24. Strict action against unauthorised usage of power (Section 126) Amendments related to penalties for unauthorised usage of power amendments would simplify the process of identifying those consumers stealing power, as well as increase the assessment amount, which would help curb losses in the system Power theft has been recognised as a criminal offence, punishable under Section 173 of the Code of Criminal Procedure, 1973. (Section 135) The country faces T&D losses of around 30 per cent, which implies that onethird of the power is lost due to theft, pilferage and technical inefficiencies.Amendments related recognition of power theft as an offence punishable under Section 173 of the Code of Criminal Procedure, 1973, are to ensure strict action against power theft. This is expected to strengthen the drive by respective state utilities to eliminate power theft and improve operational efficiencies. Therefore, focused efforts towards eliminating theft of power can help reduce distribution losses substantially
  • 25. Electricity (Amendment) Bill, 2014 The amendments will usher in much needed further reforms in the power sector. It will also promote competition, efficiency in operations and improvement in quality of supply of electricity in the country resulting in capacity addition and ultimate benefit to the consumers. Salient features of Proposed Amendments  Enforcing Grid Security.  Thrust on Renewable Energy.  Streamlining ofTariff determination process.  Matters relating to Regulatory Commissions.  Encouraging Retail Sale Competition: Separation of Carriage and Content in the Distribution Sector
  • 26. Enforcing Grid Security Increase in penalty for non-compliance of orders/ directions relating to Grid Security and other directions.  Rupees Fifteen Lacs to Rupees Ten Crore (Section 29),  Rupees Five Lacs to Rupees One Crore (Section 33),  Rupees One Lac to Rupees One Crore and recurring penalty of Rupees Six  thousand to Rupees One Lac on every day of non-compliance (Section 142) and  Rupees One Lac to Rupees One Crore and recurring penalty of Rupees five  thousand to Rupees One Lac on every day of non-compliance (Section 146). Note: The penalty for Renewable Energy generating companies shall be Rupees Ten Lacs and in case of continuing failure an additional penalty of Rupees Ten thousand per day; and No penalty on individuals (Section 149).
  • 27. Thrust on Renewable Energy Introducing atleast 10% Renewable Power Generation obligation on setting up of new coal and lignite based thermal power plants (Section 7) Exemption of sale of electricity generated from renewable energy sources from cross subsidy and open access charge for a period as prescribed (Section 42(4)) Bringing ( Renewable Purchase Obligation) RPO and (Renewable Generation Obligation) RGO under penal provision with penalty under Section 142 (Section 142). Provision for National Renewable Energy Policy (Section 3) Exemption for licence for persons generating and supplying electricity from Renewable Energy sources (Section 14).
  • 28. Streamlining of Tariff Determination Process Allowing licensees to recover cost of electricity without any revenue deficit (Section 61(d)). Provisions ofTariff Policy made mandatory forTariff determination (Section 61(2)) Provision for initiating suo-motu proceedings for determination of tariff (Section 64). Recommendation for revocation of license by Government due to non-compliance of standards (Section 59A).
  • 29. Matters relating to Regulatory Commissions The term of office for the Chairperson or other Member shall hold office for a term of three years from the date he enters upon his office or 65 years of age whichever is earlier and eligible for second term on re-appointment (Section 89). Provision for expeditious disposal of tariff petitions by the Commission from 120 days to 90 days (Section 64). Review of performance of Regulatory Commissions by a Peer Committee constituted by Forum of Regulators (Section 109A). Removal of Member in case of non-performance (Section 90). Interim nomination against vacancies in case of delay of more than 5 months in the appointment of Chairpersons/ Members of the State Commissions (Section 85).
  • 30. Promotion of competition and choice to consumers Electricity Act, 2003 has encouraged competition in generation and transmission sectors. Distribution sector has been largely regulated marked by high losses and inefficient operation. Competition and choice is proposed through separation of carriage and content in the proposed amendment.
  • 31. Encouraging Retail Sale Competition: Separation of Carriage & Content in the Distribution Sector (1/2)  Distribution and supply businesses to be recognized as separate licensed activities (Section 14)  Distribution licensee to be responsible for development, operation and maintenance of distribution network business and shall have an obligation to provide connection on demand to any consumer in its area of distribution (Section 42)  Incumbent supply licensee  To be carved out of the existing distribution licensee  Responsible for arranging supply of electricity for all the consumers in its area of supply (Section 51A)  Subsequent supply licensee  Licenses to be granted to other applicants in the area of supply of the incumbent supply licensee – atleast one company to be a Government Company (Section 14).  Existing Distribution licensee and Franchisee shall continue as per the terms of their on-going license/ contract (Section 14).
  • 32.  Intermediary Company to hold all the PPAs as per re-organization scheme (Section 131(4A))  Supply licensees so designated by Appropriate Commission to be Provider of the last resort (Section 51B)  Tariff for consumers not to be regulated – only ceiling tariff (Section 51D)  Sections amended:14, 20, 24, 42, 44, 45, 47, 48, 49, 50, 69A and introduction of new part VI and VIB as consequential changes. Encouraging Retail Sale Competition: Separation of Carriage & Content in the Distribution Sector (2/2)
  • 33. Exemption to developer of SEZ area for obtaining distribution licence Exemption to Railways and Metro Rail for obtaining distribution licence Making provisions for collection and realisation of any dues along with the electricity dues. 15 days notice period for disconnection of supply not required in case of Pre- paid meters. Other Issues