• INTRODUCTION 
• PROJECT ANALYSIS 
• HARDWARE AND SOFTWARE REQUIREMENTS 
• PLANNING AND SCHEDULING 
• PROJECT PLAN 
• PROJECT DESIGN 
• UML DIAGRAMS 
• ER DIAGRAMS 
• PROJECT TESTING 
• SOFTWARE TESTING 
• TESTING TECHNIQUES 
• TESTING STRATEGIES 
• BENEFITS 
• CONCLUSION & ENHANCEMENTS 
• BIBLOGRAPHY & ADDENDUM
• We have developed Student Feedback System to provide feedback in an 
easy and quick manner to the college principal. 
• So we call it as Student Feedback System which delivers via the student 
staff interface as online system which acting as a Service Provider. 
• By using this technology we can make fast feedback about the staff by 
students on time to head of departments as they referred in online 
system. 
• This project has two kinds of modules Student and Admin. The student 
can give feedback in online system provided by college staff. 
• This feedback report is checked by the Principal. 
• He can view grades and view the grades obtained to the lecturers and 
give this report to the principal and he give counseling to the college 
staff. 
4 
INTRODUCTION
5 
 Hardware Requirements 
 Processor: Pentium IV. 
 Speed: 3.06 GHZ. 
 Primary Memory: 256 MB RAM. 
 Hard Disk: 2GB. 
 Software Requirements 
 Language used: JAVA, oracle 10-g. 
 Platform : Windows 7/8/XP 
 Tools used: Internet explorer, Mozilla Firefox, Chrome.
6 
Planning of project requires dividing of various 
project phases into a defined time scale for 
completion of project on time. planning and 
scheduling are very crucial phase of project life 
cycle because the project successful depends on this. 
a high or low time estimation of the projects leads to 
large variation in project overall cost estimates.
PROJECT PLAN 
7 
• We have divided our project in Five modules. 
• Each module will be Construct, Test separately. 
• Then these five modules will be integrated in one 
system. 
SR.NO WORK WEEKS 
1 MODULE 1 2 
2 MODULE 2 2 
3 MODULE 3 4 
4 MODULE 4 4 
5 MODULE 5 4
MODULE 1: 
It generally deals with gathering information about the project. 
MODULE 2: 
Planning about how to start with the project. 
MODULE 3: 
It deals with the architecture of our project. 
MODULE 4: 
It will tell us which language will be used and actual code used for developing 
project. 
MODULE 5: 
At last the testing of project. 
8
PROJECT DESIGN 
• Software design is an interactive process through which requirements are translated 
into a ‘Blue Print’ for constructing the software. The design is represented at high 
level of abstraction, a level that can be directly translated to specific data, functional 
and behavioral requirements. 
• Preliminary design is concerned with the transformation of requirements into data and 
software architecture. Detailed design focuses on refinements to the architectural 
representation that lead to detailed data structure and algorithmic representation for 
software. 
• Introduction to UML 
The Unified modeling language (UML) provides a blueprint to Software Engineers 
and Developers. It is a Language for Specifying, Documenting, Visualizing and 
constructing the various aspects of a Software System. 
UML is an Industry-Standard Modeling Language. It contains a number of graphical 
notations and symbols (diagrams) that allow the analyst and designer of a Software 
Application to describe the architecture of the application in a graphical form. 
• Definition: 
UML is a general purpose visual modeling language that is used to 
Specify 
Visualize 
Construct 
Document 
The artifacts of the software system 
9
UML Diagrams : 
A diagram is a graphical representation of a set of elements. The various diagrams in UML are as follows: 
3.4.1 CLASS DIAGRAM: 
3.4.2 OBJECT DIAGRAM: 
3.4.3 USECASE DIAGRAM: 
3.4.4 SEQUENCE DIAGRAM: 
10
11 
LOGIN 
Answer the 
Questions 
regarding 
to staff. 
LOGOUT 
Feed Back stored 
in Database 
ADMIN Login 
Portal 
Principal 
Student 
Student 
Login 
Portal
Student 
Institute 
Feedback 
Staff 
Feedback 
System 
Feedback 
Logout 
Enrolls 
Into 
Technology 
Canteen 
Other 
Activities Labs Skills 
Availability 
Regularity 
Proficiency 
ER DIAGRAM 
12
RADModel 
• Rapid application development (RAD) is both a general term used to refer 
to alternatives to the conventional waterfall model of software development 
as well as the name for James Martin's approach to rapid development. In 
general, RAD approaches to software development put less emphasis on 
planning tasks and more emphasis on development. In contrast to the 
waterfall model, which emphasizes rigorous specification and planning, 
RAD approaches emphasize the necessity of adjusting requirements in 
reaction to knowledge gained as the project progresses. 
• This causes RAD to use prototypes in addition to or even sometimes in 
place of design specifications. 
• RAD approaches also emphasize a flexible process that can adapt as the 
project evolves rather than rigorously defining specifications and plans 
correctly from the start. 
13
Test Case Strategies 
• Software testing is a critical element of software quality assurance and 
represents the ultimate reuse of specification. Design and code testing 
represents interesting anomaly for the software during earlier definition and 
development phase, it was attempted to build software from an abstract 
concept to tangible implementation. 
• The testing phase involves, testing of the development of the system using 
various techniques such as White Box Testing, Control Structure Testing. 
• A strategy for software testing must accommodate low-level tests that are 
necessary to verify that a small source code segment has been correctly 
implemented as well as high level against customer requirements. 
14
• Unit Testing:: 
Unit testing focuses verification on the smaller unit 
of software design such as form. This is known as form 
testing. 
• Integration Testing: 
Data can be lost across an interface, one module can 
have an adverse effect on another sub function, when 
combined, may not produce the desired major function. 
• System Testing: 
Testing the entire system as a whole and checking 
for its correctness is system testing. The system is listed for 
dispensaries between the system and its original objectives. 
This project was effective and efficient. 
15
• Cut your time: 
By giving feedback on online system when compared to the 
manual process this saves time of user. 
• Manage the entire process: 
The entire process of giving feedback and viewing that 
report after giving feedback can manage easily . 
• Enhance the staff: 
Find the details about the lecturer’s interest in teaching to the 
students. 
• Meet web standards: 
An easy to use system that successfully combines form with 
function. 
16
CONCLUSION AND ENHANCEMENTS 
• Conclusion : 
The Project “Student Feedback System” is designed in order reduce the burden 
of maintaining bulk of records of all the students feedback details of who study in an 
Educational Institution. Inserting, retrieving and updating the feedback details of a student 
are easy when it is compared to the manual feedback and storing. Maintaining the project 
is also easy which can is easily understandable. Maintaining the details in the database is 
manageable. 
• Future Enhancements: 
Due to the lack of time, the design part is not done so attractive. Further 
enhancements can be made in designing the screens. Some more forms can also be added 
so as to better retrieve the feedback details. Various other options can also be added for the 
better usability of project 
17
https://www.google.co.in/?gfe_rd=cr&ei=Eb8eVNf2NcrV8gfwyYHYAw&gws_rd=ssl 
http://en.wikipedia.org/wiki/Java_(programming_language) 
http://docs.oracle.com/javase/tutorial/deployment/applet/ 
http://en.wikipedia.org/wiki/Rapid_application_development 
TEXT BOOKS: 
• Software Engineering by Roger S. Pressman (Tata MC-GRAW hill,5th edition) 
• Data Base Management System by Raghu Rama Krishnan (Tata MC-GRAW 
hill,3rd edition) 
• Unified Modeling Language 2 tool kit by Nons-Erik Eriksson, Magnus penkee, 
Brian lyons, Davidfode (2nd Edition) 
• The Unified Modeling Language User Guide by Grady Booch (Pearson 
education) 18
19

More Related Content

What's hot

Online Examination System Project report
Online Examination System Project report Online Examination System Project report
Online Examination System Project report
SARASWATENDRA SINGH
 
Online examination system
Online examination systemOnline examination system
Online examination system
Mr. Vikram Singh Slathia
 
Project Report of Faculty feedback system
Project Report of Faculty feedback systemProject Report of Faculty feedback system
Project Report of Faculty feedback system
BalajeeSofTech
 
SRS for online examination system
SRS for online examination systemSRS for online examination system
SRS for online examination system
lunarrain
 
College admission system
College admission system College admission system
College admission system
Sourabh Upadhyay
 
Web based online shopping system Presentation slide
Web based online shopping system Presentation  slideWeb based online shopping system Presentation  slide
Web based online shopping system Presentation slide
Rakibul Hasan Pranto
 
Library Management System Project Report
Library Management System Project Report Library Management System Project Report
Library Management System Project Report
Abu Kaisar
 
Synopsis of online student feedback system(cse)
Synopsis of online student feedback system(cse)Synopsis of online student feedback system(cse)
Synopsis of online student feedback system(cse)
shindept123
 
srs for railway reservation system
 srs for railway reservation system srs for railway reservation system
srs for railway reservation system
khushi kalaria
 
Student Management System report
Student Management System reportStudent Management System report
Student Management System report
Chandresh Prasad
 
Software requirement specification for online examination system
Software requirement specification for online examination systemSoftware requirement specification for online examination system
Software requirement specification for online examination system
karthik venkatesh
 
408372362-Student-Result-management-System-project-report-docx.docx
408372362-Student-Result-management-System-project-report-docx.docx408372362-Student-Result-management-System-project-report-docx.docx
408372362-Student-Result-management-System-project-report-docx.docx
santhoshyadav23
 
Online shopping
Online shoppingOnline shopping
Online shopping
gajapandiyan
 
Online shopping Report
Online shopping ReportOnline shopping Report
Online shopping Report
Pragnya Dash
 
Library management system
Library management systemLibrary management system
Library management system
Paresh Gosavi
 
College management system ppt
College management system pptCollege management system ppt
College management system ppt
Shanthan Reddy
 
Student Management System
Student Management System Student Management System
Student Management System
Vinay Yadav
 
Web Development on Web Project Report
Web Development on Web Project ReportWeb Development on Web Project Report
Web Development on Web Project Report
Milind Gokhale
 
Project report college information management system on Advanced Java
Project report college information management system on Advanced JavaProject report college information management system on Advanced Java
Project report college information management system on Advanced Java
Rishabh Kumar ☁️
 
Library management system presentation
Library management system presentation Library management system presentation
Library management system presentation
Smit Patel
 

What's hot (20)

Online Examination System Project report
Online Examination System Project report Online Examination System Project report
Online Examination System Project report
 
Online examination system
Online examination systemOnline examination system
Online examination system
 
Project Report of Faculty feedback system
Project Report of Faculty feedback systemProject Report of Faculty feedback system
Project Report of Faculty feedback system
 
SRS for online examination system
SRS for online examination systemSRS for online examination system
SRS for online examination system
 
College admission system
College admission system College admission system
College admission system
 
Web based online shopping system Presentation slide
Web based online shopping system Presentation  slideWeb based online shopping system Presentation  slide
Web based online shopping system Presentation slide
 
Library Management System Project Report
Library Management System Project Report Library Management System Project Report
Library Management System Project Report
 
Synopsis of online student feedback system(cse)
Synopsis of online student feedback system(cse)Synopsis of online student feedback system(cse)
Synopsis of online student feedback system(cse)
 
srs for railway reservation system
 srs for railway reservation system srs for railway reservation system
srs for railway reservation system
 
Student Management System report
Student Management System reportStudent Management System report
Student Management System report
 
Software requirement specification for online examination system
Software requirement specification for online examination systemSoftware requirement specification for online examination system
Software requirement specification for online examination system
 
408372362-Student-Result-management-System-project-report-docx.docx
408372362-Student-Result-management-System-project-report-docx.docx408372362-Student-Result-management-System-project-report-docx.docx
408372362-Student-Result-management-System-project-report-docx.docx
 
Online shopping
Online shoppingOnline shopping
Online shopping
 
Online shopping Report
Online shopping ReportOnline shopping Report
Online shopping Report
 
Library management system
Library management systemLibrary management system
Library management system
 
College management system ppt
College management system pptCollege management system ppt
College management system ppt
 
Student Management System
Student Management System Student Management System
Student Management System
 
Web Development on Web Project Report
Web Development on Web Project ReportWeb Development on Web Project Report
Web Development on Web Project Report
 
Project report college information management system on Advanced Java
Project report college information management system on Advanced JavaProject report college information management system on Advanced Java
Project report college information management system on Advanced Java
 
Library management system presentation
Library management system presentation Library management system presentation
Library management system presentation
 

Similar to Student feedback system

Student feedback system
Student feedback systemStudent feedback system
Student feedback system
msandbhor
 
Chapter 2
Chapter 2 Chapter 2
Chapter 2
KaiEnTee1
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )
eshtiyak
 
Waterfall Model
Waterfall ModelWaterfall Model
DITEC - Software Engineering
DITEC - Software EngineeringDITEC - Software Engineering
DITEC - Software Engineering
Rasan Samarasinghe
 
Lecture 1.pptx
Lecture 1.pptxLecture 1.pptx
Lecture 1.pptx
UnknownPerson201264
 
Software development life cycle (SDLC)
Software development life cycle (SDLC)Software development life cycle (SDLC)
Software development life cycle (SDLC)
Simran Kaur
 
ecse ppt.pptx
ecse ppt.pptxecse ppt.pptx
ecse ppt.pptx
DanyDany88
 
Conventional software Management---.pptx
Conventional software Management---.pptxConventional software Management---.pptx
Conventional software Management---.pptx
TONY562
 
Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design  Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design
Sutharshan Sharma
 
Software engineering lecture notes
Software engineering lecture notesSoftware engineering lecture notes
Software engineering lecture notes
Siva Ayyakutti
 
ecse ppt.pptx
ecse ppt.pptxecse ppt.pptx
ecse ppt.pptx
DanyDany88
 
Module-02.pptx
Module-02.pptxModule-02.pptx
Module-02.pptx
AbcXyz302255
 
software process model
software process modelsoftware process model
software process model
juhi kumari
 
Structured system analysis and design
Structured system analysis and design Structured system analysis and design
Structured system analysis and design
Jayant Dalvi
 
S.E Lec #1.pptx
S.E Lec #1.pptxS.E Lec #1.pptx
S.E Lec #1.pptx
RaajpootQueen
 
Introduction to Software engineering ch03
Introduction to Software engineering ch03Introduction to Software engineering ch03
Introduction to Software engineering ch03
YousefYassin5
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
Atul Karmyal
 
61f4fc87-9977-4003-baf8-37f13200977b.pptx
61f4fc87-9977-4003-baf8-37f13200977b.pptx61f4fc87-9977-4003-baf8-37f13200977b.pptx
61f4fc87-9977-4003-baf8-37f13200977b.pptx
SuhleemAhmd
 
Software Process Model.ppt
Software Process Model.pptSoftware Process Model.ppt
Software Process Model.ppt
SasiR18
 

Similar to Student feedback system (20)

Student feedback system
Student feedback systemStudent feedback system
Student feedback system
 
Chapter 2
Chapter 2 Chapter 2
Chapter 2
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )
 
Waterfall Model
Waterfall ModelWaterfall Model
Waterfall Model
 
DITEC - Software Engineering
DITEC - Software EngineeringDITEC - Software Engineering
DITEC - Software Engineering
 
Lecture 1.pptx
Lecture 1.pptxLecture 1.pptx
Lecture 1.pptx
 
Software development life cycle (SDLC)
Software development life cycle (SDLC)Software development life cycle (SDLC)
Software development life cycle (SDLC)
 
ecse ppt.pptx
ecse ppt.pptxecse ppt.pptx
ecse ppt.pptx
 
Conventional software Management---.pptx
Conventional software Management---.pptxConventional software Management---.pptx
Conventional software Management---.pptx
 
Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design  Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design
 
Software engineering lecture notes
Software engineering lecture notesSoftware engineering lecture notes
Software engineering lecture notes
 
ecse ppt.pptx
ecse ppt.pptxecse ppt.pptx
ecse ppt.pptx
 
Module-02.pptx
Module-02.pptxModule-02.pptx
Module-02.pptx
 
software process model
software process modelsoftware process model
software process model
 
Structured system analysis and design
Structured system analysis and design Structured system analysis and design
Structured system analysis and design
 
S.E Lec #1.pptx
S.E Lec #1.pptxS.E Lec #1.pptx
S.E Lec #1.pptx
 
Introduction to Software engineering ch03
Introduction to Software engineering ch03Introduction to Software engineering ch03
Introduction to Software engineering ch03
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
 
61f4fc87-9977-4003-baf8-37f13200977b.pptx
61f4fc87-9977-4003-baf8-37f13200977b.pptx61f4fc87-9977-4003-baf8-37f13200977b.pptx
61f4fc87-9977-4003-baf8-37f13200977b.pptx
 
Software Process Model.ppt
Software Process Model.pptSoftware Process Model.ppt
Software Process Model.ppt
 

More from Akshay Surve

Women security application
Women security applicationWomen security application
Women security application
Akshay Surve
 
Virus detection system
Virus detection systemVirus detection system
Virus detection system
Akshay Surve
 
Travel planning
Travel planningTravel planning
Travel planning
Akshay Surve
 
Software security
Software securitySoftware security
Software security
Akshay Surve
 
Shoulder surfing resistant graphical and image based login system
Shoulder surfing resistant graphical and image based login systemShoulder surfing resistant graphical and image based login system
Shoulder surfing resistant graphical and image based login system
Akshay Surve
 
Pharming attack
Pharming attackPharming attack
Pharming attack
Akshay Surve
 
Motion based security alarm
Motion based security alarmMotion based security alarm
Motion based security alarm
Akshay Surve
 
Issue tracking system
Issue tracking systemIssue tracking system
Issue tracking system
Akshay Surve
 
Face detection system
Face detection systemFace detection system
Face detection system
Akshay Surve
 
Buget planning system
Buget planning systemBuget planning system
Buget planning system
Akshay Surve
 
Automatic attendance system
Automatic attendance systemAutomatic attendance system
Automatic attendance system
Akshay Surve
 
E notes application2.ppsx
E notes application2.ppsxE notes application2.ppsx
E notes application2.ppsx
Akshay Surve
 
Attitude
AttitudeAttitude
Attitude
Akshay Surve
 

More from Akshay Surve (13)

Women security application
Women security applicationWomen security application
Women security application
 
Virus detection system
Virus detection systemVirus detection system
Virus detection system
 
Travel planning
Travel planningTravel planning
Travel planning
 
Software security
Software securitySoftware security
Software security
 
Shoulder surfing resistant graphical and image based login system
Shoulder surfing resistant graphical and image based login systemShoulder surfing resistant graphical and image based login system
Shoulder surfing resistant graphical and image based login system
 
Pharming attack
Pharming attackPharming attack
Pharming attack
 
Motion based security alarm
Motion based security alarmMotion based security alarm
Motion based security alarm
 
Issue tracking system
Issue tracking systemIssue tracking system
Issue tracking system
 
Face detection system
Face detection systemFace detection system
Face detection system
 
Buget planning system
Buget planning systemBuget planning system
Buget planning system
 
Automatic attendance system
Automatic attendance systemAutomatic attendance system
Automatic attendance system
 
E notes application2.ppsx
E notes application2.ppsxE notes application2.ppsx
E notes application2.ppsx
 
Attitude
AttitudeAttitude
Attitude
 

Recently uploaded

ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 

Recently uploaded (20)

ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 

Student feedback system

  • 1. 1
  • 2. GROUP MEMBERS:  Mayur Sandbhor  Ganesh Mali  Atish Johare UNDER THE GUIDANCE OF Mithun Mhatre 2
  • 3. 3 • INTRODUCTION • PROJECT ANALYSIS • HARDWARE AND SOFTWARE REQUIREMENTS • PLANNING AND SCHEDULING • PROJECT PLAN • PROJECT DESIGN • UML DIAGRAMS • ER DIAGRAMS • PROJECT TESTING • SOFTWARE TESTING • TESTING TECHNIQUES • TESTING STRATEGIES • BENEFITS • CONCLUSION & ENHANCEMENTS • BIBLOGRAPHY & ADDENDUM
  • 4. • We have developed Student Feedback System to provide feedback in an easy and quick manner to the college principal. • So we call it as Student Feedback System which delivers via the student staff interface as online system which acting as a Service Provider. • By using this technology we can make fast feedback about the staff by students on time to head of departments as they referred in online system. • This project has two kinds of modules Student and Admin. The student can give feedback in online system provided by college staff. • This feedback report is checked by the Principal. • He can view grades and view the grades obtained to the lecturers and give this report to the principal and he give counseling to the college staff. 4 INTRODUCTION
  • 5. 5  Hardware Requirements  Processor: Pentium IV.  Speed: 3.06 GHZ.  Primary Memory: 256 MB RAM.  Hard Disk: 2GB.  Software Requirements  Language used: JAVA, oracle 10-g.  Platform : Windows 7/8/XP  Tools used: Internet explorer, Mozilla Firefox, Chrome.
  • 6. 6 Planning of project requires dividing of various project phases into a defined time scale for completion of project on time. planning and scheduling are very crucial phase of project life cycle because the project successful depends on this. a high or low time estimation of the projects leads to large variation in project overall cost estimates.
  • 7. PROJECT PLAN 7 • We have divided our project in Five modules. • Each module will be Construct, Test separately. • Then these five modules will be integrated in one system. SR.NO WORK WEEKS 1 MODULE 1 2 2 MODULE 2 2 3 MODULE 3 4 4 MODULE 4 4 5 MODULE 5 4
  • 8. MODULE 1: It generally deals with gathering information about the project. MODULE 2: Planning about how to start with the project. MODULE 3: It deals with the architecture of our project. MODULE 4: It will tell us which language will be used and actual code used for developing project. MODULE 5: At last the testing of project. 8
  • 9. PROJECT DESIGN • Software design is an interactive process through which requirements are translated into a ‘Blue Print’ for constructing the software. The design is represented at high level of abstraction, a level that can be directly translated to specific data, functional and behavioral requirements. • Preliminary design is concerned with the transformation of requirements into data and software architecture. Detailed design focuses on refinements to the architectural representation that lead to detailed data structure and algorithmic representation for software. • Introduction to UML The Unified modeling language (UML) provides a blueprint to Software Engineers and Developers. It is a Language for Specifying, Documenting, Visualizing and constructing the various aspects of a Software System. UML is an Industry-Standard Modeling Language. It contains a number of graphical notations and symbols (diagrams) that allow the analyst and designer of a Software Application to describe the architecture of the application in a graphical form. • Definition: UML is a general purpose visual modeling language that is used to Specify Visualize Construct Document The artifacts of the software system 9
  • 10. UML Diagrams : A diagram is a graphical representation of a set of elements. The various diagrams in UML are as follows: 3.4.1 CLASS DIAGRAM: 3.4.2 OBJECT DIAGRAM: 3.4.3 USECASE DIAGRAM: 3.4.4 SEQUENCE DIAGRAM: 10
  • 11. 11 LOGIN Answer the Questions regarding to staff. LOGOUT Feed Back stored in Database ADMIN Login Portal Principal Student Student Login Portal
  • 12. Student Institute Feedback Staff Feedback System Feedback Logout Enrolls Into Technology Canteen Other Activities Labs Skills Availability Regularity Proficiency ER DIAGRAM 12
  • 13. RADModel • Rapid application development (RAD) is both a general term used to refer to alternatives to the conventional waterfall model of software development as well as the name for James Martin's approach to rapid development. In general, RAD approaches to software development put less emphasis on planning tasks and more emphasis on development. In contrast to the waterfall model, which emphasizes rigorous specification and planning, RAD approaches emphasize the necessity of adjusting requirements in reaction to knowledge gained as the project progresses. • This causes RAD to use prototypes in addition to or even sometimes in place of design specifications. • RAD approaches also emphasize a flexible process that can adapt as the project evolves rather than rigorously defining specifications and plans correctly from the start. 13
  • 14. Test Case Strategies • Software testing is a critical element of software quality assurance and represents the ultimate reuse of specification. Design and code testing represents interesting anomaly for the software during earlier definition and development phase, it was attempted to build software from an abstract concept to tangible implementation. • The testing phase involves, testing of the development of the system using various techniques such as White Box Testing, Control Structure Testing. • A strategy for software testing must accommodate low-level tests that are necessary to verify that a small source code segment has been correctly implemented as well as high level against customer requirements. 14
  • 15. • Unit Testing:: Unit testing focuses verification on the smaller unit of software design such as form. This is known as form testing. • Integration Testing: Data can be lost across an interface, one module can have an adverse effect on another sub function, when combined, may not produce the desired major function. • System Testing: Testing the entire system as a whole and checking for its correctness is system testing. The system is listed for dispensaries between the system and its original objectives. This project was effective and efficient. 15
  • 16. • Cut your time: By giving feedback on online system when compared to the manual process this saves time of user. • Manage the entire process: The entire process of giving feedback and viewing that report after giving feedback can manage easily . • Enhance the staff: Find the details about the lecturer’s interest in teaching to the students. • Meet web standards: An easy to use system that successfully combines form with function. 16
  • 17. CONCLUSION AND ENHANCEMENTS • Conclusion : The Project “Student Feedback System” is designed in order reduce the burden of maintaining bulk of records of all the students feedback details of who study in an Educational Institution. Inserting, retrieving and updating the feedback details of a student are easy when it is compared to the manual feedback and storing. Maintaining the project is also easy which can is easily understandable. Maintaining the details in the database is manageable. • Future Enhancements: Due to the lack of time, the design part is not done so attractive. Further enhancements can be made in designing the screens. Some more forms can also be added so as to better retrieve the feedback details. Various other options can also be added for the better usability of project 17
  • 18. https://www.google.co.in/?gfe_rd=cr&ei=Eb8eVNf2NcrV8gfwyYHYAw&gws_rd=ssl http://en.wikipedia.org/wiki/Java_(programming_language) http://docs.oracle.com/javase/tutorial/deployment/applet/ http://en.wikipedia.org/wiki/Rapid_application_development TEXT BOOKS: • Software Engineering by Roger S. Pressman (Tata MC-GRAW hill,5th edition) • Data Base Management System by Raghu Rama Krishnan (Tata MC-GRAW hill,3rd edition) • Unified Modeling Language 2 tool kit by Nons-Erik Eriksson, Magnus penkee, Brian lyons, Davidfode (2nd Edition) • The Unified Modeling Language User Guide by Grady Booch (Pearson education) 18
  • 19. 19