Contents
• Systems
o Introduction
• Information systems models
o Waterfall
 Classical
 Iterative
o Prototype
o Spiral
o RAD
o UP
Introduction
• What is
o a system?
 Elements of a system
 System classification
o an information system?
 Data and information
 Computer based information systems
Systems
1.Information Systems
2.Automation Systems
3.Geographical Information Systems
4.Knowledge Management Systems
5.Management Support Systems
6.Content Management Systems
7.Enterprise Resource Planning Systems
8.Expert Systems
9.Embedded Systems
Biscuit Manufacturing Process
Information System Models
• Waterfall
o Classical
o Iterative
• Prototype
• Spiral
• Rapid Applications Development
• UP
Classical Waterfall Model
• A cascade of phases………
Feasibility Study
Analysis & Specification
Design
Implementation
Testing
Maintenance
Development
Feasibility Study: Aims
• Preliminary investigation
o Current system
o Problems
o Alternate solutions
o Prioritization
• Evaluate solution strategies in terms of:
o Technical feasibility
o Economical feasibility
o Operational feasibility
o Organizational feasibility
The Requirements Phase
• Aim: to document the customer requirements:
o i.e. the PROBLEM!
• A customer may be a single person, a group, a
department, or an entire organization:
o often with many employees (potential users).
• This phase involves two distinct activities:
o requirements gathering and analysis;
o requirements specification.
Requirements gathering
• Gather Information via meetings, interviews
and discussions:
o this information is typically inadequate at first –
each user has only a partial view of the system.
• Identify and eliminate errors:
 inconsistency (contradictions);
 vagueness (ambiguities);
 incompleteness (omissions).
• Clarification involves further gathering and
analysis of information.
Requirements Analysis
• Aim: to understand exactly what the customer
needs…
…which may not be what they ask for:
• data to be input to the system;
• processing to be performed on these data;
• data to be output from the system;
• characteristics of the system as a whole;
• constraints on the system/project.
• WHAT, not HOW!
• Requirements
o Functional requirements
o Non-functional requirements
Functional Requirements:
• Functional requirements describe a software
system as a set of functions {f()}.
• Each function f() transforms a domain of
inputs to a corresponding range of outputs:
Input Data f() Output Data
• Each function is described in terms of:
o the input from and output to the user;
o the processing required.
Functional Requirements: A black box
specification
• The functional requirements are a “black box”
specification of the system:
o only externally visible behavior (i.e. input and output)
is documented;
o the internal details of the system are not known.
• In short, the functional requirements describe
what the system must do, but not how!
Input
Data
Output
Data
Functional Requirements
• Example: F1 – Find Books
o Input: the name of an author.
o Output: details of any books by the author –
 title, publisher, ISBN, etc.
o Processing: search library catalogue for books
by the specified author.
Book
Details
Author
Name
f()
Non Functional Requirements
• These are characteristics of the system that
cannot be expressed as functions...
o security – e.g. internet systems;
o reliability – e.g. safety-critical systems;
o performance – e.g. real-time systems;
o usability (human-computer interface);
o maintainability and portability.
• Non-functional requirements are within the
control of the developers – use metrics!
The Requirements Engineering
Process
Requirements Engineering
• Requirements Definition
o Requirements definition is the activity of
translating the information gathered during the
analysis activity into a document that defines a
set of requirements.
• Requirements Specification
o A detailed and precise description of the system
requirement is set out to act as a basis for a
contract between client and software developer.
• Use case diagrams
• Activity diagrams
• Document flow diagrams
• Data flow diagrams
Requirements Analysis Tools
The Design Phase
• Aim: to transform the specification into a form
suitable for implementation in a programming
language.
• Design is a creative activity – so it’s hard!
• The software design is derived from the
software requirements specification(SRS)
document using one of two approaches:
o function oriented methods - e.g. Structured Analysis
& Design (SA/SD);
o object oriented methods.
The development phase
• This is the coding and unit testing phase.
• Each module is implemented independently,
as a stand alone unit:
o translation into source code and documentation;
• Unit testing and debugging.
o Unit testing ensures that each module works
correctly in isolation.
• The end product of this phase is a set of
independently tested software modules....
The testing phase: Integration Testing
• Aim: to integrate modules in a series of
carefully planned steps.
• Integrating modules one at a time makes error
location and correction much easier:
o it would be foolish to integrate several different
modules at the same time…
o …big bang!
• At the end of each step the incomplete system
is re-tested using ALL of the test data.
The testing phase: System Testing
• Aim: to ensure that the system meets the
requirements in the SRS document.
• System testing takes place after all the
modules have been integrated:
o alpha & beta testing;
o stress & acceptance testing.
• The system is delivered to the customer at
the end of this phase:
o you get paid, and maintenance begins….
The Maintenance Phase
• For almost all software products:
o maintenance requires far more effort than the
development phases;
o the ratio of development effort to maintenance
effort is typically 40:60.
• There is now considerable emphasis on
designing software to be maintainable:
o this is supposed to be a major advantage of
OO methods over “traditional” ones.
In reality
Iterative Waterfall Mode
Feasibility Study
Analysis &
Specification
Design
Implementation
Testing
Maintenance
The Prototyping Model
• Before starting development of the actual
system, a prototype may be built.
• A prototype is a ‘toy’ system (or part thereof):
o limited functionality;
o low reliability (often full of bugs);
o inefficient performance;
o inaccurate results.
• Nevertheless, prototypes help in developing
high-quality software products!
Prototyping: Why Bother ?
• To demonstrate concepts to the customer:
o user interfaces, novel ideas, etc;
o e.g. GUI-based prototypes are commonly used to
refine customer requirements.
• To explore difficult technical issues:
o major design and implementation decisions often
depend on technical issues –
o e.g. hardware performance;
o e.g. efficiency (in time & space) of software.
Prototyping: Why Bother ?
• Construction of a working prototype
involves additional cost; however...
o Overall development cost might be lower for:
 systems with unclear requirements;
 systems with unresolved technical issues.
o User requirements are clarified and technical
difficulties are resolved:
 omitting the prototype would lead to change
requests, and hence redesign costs.
Prototyping :Method (Part 1)
• It may be impossible to get a system right the
first time, so build one to throw away!
1.Carry out a quick requirements analysis.
2.Carry out a quick design.
3.Build a prototype using short-cuts:
o e.g. use look-up tables rather than performing
difficult computations;
o e.g. do not perform error checking or exception
handling.
Prototyping :Method (Part II)
1.Submit the working prototype to the
customer for evaluation.
2.Use customer feedback to refine the
requirements, and hence the prototype.
• The cycle (phases 2-5) continues until
the customer approves the prototype.
• The final system is then developed
using the classical waterfall model.
The Prototyping Model
Build Prototype
Gather
requirements
Design
Prototype Evaluate Prototype
Refine requirements
COMPUTER
APPROVAL
Implement
Test
Maintenance
FEEDBACK
Design
The Prototyping Model
• The requirements phase is eliminated:
o the prototype (with customer feedback) serves as
a specification.
• The prototype must be thrown away:
o however, the experience gained from it is
invaluable for developing the final product.
• Never give in to management or customer
pressure to patch the prototype for release:
o it will be a maintenance nightmare!
The Spiral Model
• Proposed by Boehm (1988):
o “A spiral model of software development and
enhancement”. IEEE Computer, 21 (5), pp 61–
72.
• Each loop of the spiral focuses on a phase of
the software process; for example:
o the innermost loop might be concerned with
system feasibility;
o the next loop with requirements specification;
o the next with system design; and so on.
The Spiral Model
• There are no fixed phases in this model (the
diagram that follows is just one example).
• The team must decide how to structure the
project into tasks and iterations:
o there are typically 3–6 task regions (framework
activities) per iteration.
• Work begins using a generic model; extra
tasks and iterations are added, either:
o to suit specific projects; or
o when problems are identified.
Example: A Spiral Model
Each loop in this spiral is split in to four
task regions(quadrants) :
Quadrant 1- Objective Setting
• The objectives of the phase are identified:
o strategies for meeting these objectives are
considered.
• Risks are also identified:
o a risk is loosely defined as anything that might
hamper successful completion of a project;
Quadrant 2- Risk Management
• In each iteration, the spiral model facilitates
understanding of, and reaction to, risks.
• A detailed assessment is carried out for each
potential risk to the project.
• Steps are taken to reduce the risks:
o e.g. if the requirements are vague, a prototype
may be developed;
o e.g. if the project is short-staffed, its scope may be
reduced, or more staff recruited.
Quadrant 3 & 4
• Quadrant 3 - Development and Validation:
o the next level of the product is developed and
validated;
o this is not necessarily an implementation phase!
• Quadrant 4 - Review and Planning:
o the results are reviewed with the customer;
o the next iteration of the spiral is planned.
• Each iteration of the spiral yields a more complete
version of the software product.
The Spiral Model: A Meta-Model
• The spiral model subsumes the other life
cycle models:
o it retains the step-by-step approach of the
classical waterfall model;
o it uses prototyping as a risk reduction mechanism;
o each iteration of the spiral is an incremental level.
• The classical waterfall model corresponds to a
single iteration of a simple spiral model:
o but the reverse is not necessary true!
Rapid Application Development (RAD)
• Because of rapidly changing business
environments, businesses have to respond
to new opportunities and competition.
• This requires software and rapid
development and delivery is not often the
most critical requirement for software
systems.
• Businesses may be willing to accept lower
quality software if rapid delivery of essential
functionality is possible.
Why RAD?
• Because of the changing environment,
it is often impossible to arrive at a
stable, consistent set of system
requirements.
• Therefore a waterfall model of
development is impractical and an
approach to development based on
iterative specification and delivery is the
only way to deliver software quickly.
Characteristics
• The processes of specification, design and
implementation are concurrent.
• There is no detailed specification and
design documentation is minimized.
• The system is developed in a series of
increments.
• End users evaluate each increment and
make proposals for later increments.
• System user interfaces are usually
developed using an interactive
development system.
Unified Process
• The Unified Process (UP) is related to the spiral
and incremental lifecycle models:
– highly iterative;
– highly configurable.
• Compared to other methodologies the UP is:
– adaptive, rather than predictive;
– 'agile', rather than 'heavy'.
• The Rational Unified Process (RUP) is a
commercial package of information and tools for the
UP.
The UP Phases
• Inception:
– conduct feasibility study, produce business plan, sign contract with
customer (i.e. project sponsor).
• Elaboration (build the bones):
– build software architecture, plan schedule, manage risks.
• Construction (build the flesh):
– highly iterative phase involving implementation and testing.
• Transition:
– beta release of software;
– final delivery and installation.
The Unified Process: Example
1. Inception
• Inception is typically 10% of the project duration.
– Define the main project requirements and
constraints.
– Produce a business model for the project,
including risk analysis and management strategies.
– Define an architecture for the proposed system.
– Produce an initial use case model (10–20%
complete).
– Develop an overall project plan with major
milestones.
– Client agrees with estimates of cost, schedule, and
scope.
– Client agrees with the initial use case model but is
aware that there is more to come.
2. Elaboration: Build The Bones
• Elaboration is typically 30% of the project duration.
• Elaboration involves establishing an overall design
for the system:
– most of the architectural (large-scale) design is
finalised;
– however, most of the detailed design is done later.
• The end of this phase is the point of no return for
the developer:
– the Use Case model is about 80% complete;
– an executable prototype is available;
– hardware requirements have been finalized.
3. Construction: Build The Flesh
• Construction is typically 50% of the project
duration.
• Construction focuses on completing the elements
that make up the software system:
– design work is still happening, but the emphasis is on
implementation and testing;
– the first version of the software is implemented on
hardware like that at the proposed installation site.
– testing begins in earnest, but continues into transition.
• Documentation is completed:
– user manuals, training courses, release
information.
4. Transition
• Transition is typically 10% of the project duration.
• The software is installed on site.
• The users are trained and let loose – beta testing.
• Problems are documented and used to plan new
releases.
• If the software is replacing an existing system, the
two may be run in tandem during transition:
– discrepancies between the output of the two systems
are used to identify bugs in the new system.
Iteration
• Iteration occurs within each phase of the UP.
• Each discipline (see later) occurs in at least two
phases, and some occur in all phases:
– e.g. project management.
• What changes from one phase to the next is the
emphasis:
– e.g. elaboration emphasises requirements and
design;
– e.g. construction emphasises implementation
and testing.
Modeling Elements
• The UP uses four modeling elements:
1 Workers:
• which team members perform which activities?
2 Activities:
• which activities must be performed to produce the
software?
3 Artifacts:
• the result of an activity – e.g. diagrams, test cases,
code.
4 Disciplines:
• which workers perform which activities to generate
which artifacts?
Models & Views
• A Model is a representation of a software
system.
• A View is a way of looking at a model.
• An analogy:
o Rodin's famous sculpture "The Thinker" is a
model of a thoughtful gentleman who has
misplaced his clothes.
o A sketch or photograph of "The Thinker"
presents a single view of the model.
The Thinker
by Auguste Rodin
Front View
A close-up
view
RUP Models
• RUP has a number of models:
o Business Model;
o Use Case Model;
o Design Model;
o Implementation Model;
o Deployment Model.
RUP – 4+1 views
Use Case
view
Life Cycle Models: Comparison
• The Classical Waterfall Model:
o is a hopelessly simplistic ideal.
• The Iterative Waterfall Model:
o is one of the most widely used life cycle models;
o is only suitable for well-understood projects.
• The Prototyping Model:
o is suitable for projects that are not well
understood;for example –
o when the requirements are unclear.
Life Cycle Models: Comparison
• The Incremental (Evolutionary) Model:
o is suitable for large projects that can be
decomposed into (almost) independent parts –
 incrementally developed and tested;
 Incrementally delivered to the customer.
• The Spiral (Evolutionary) Model:
o is suitable for technically challenging projects or
projects that are subject to various kinds of risks.
• The Rational Unified Process (RUP) is partly
based on a variant of the spiral model.
References
• Pfleeger, S. “Software Engineering:
Theory and Practice”. Prentice Hall,
1997

Year13_SystemModelsmypresentationTechnology.ppt

  • 2.
    Contents • Systems o Introduction •Information systems models o Waterfall  Classical  Iterative o Prototype o Spiral o RAD o UP
  • 3.
    Introduction • What is oa system?  Elements of a system  System classification o an information system?  Data and information  Computer based information systems
  • 4.
    Systems 1.Information Systems 2.Automation Systems 3.GeographicalInformation Systems 4.Knowledge Management Systems 5.Management Support Systems 6.Content Management Systems 7.Enterprise Resource Planning Systems 8.Expert Systems 9.Embedded Systems
  • 5.
  • 6.
    Information System Models •Waterfall o Classical o Iterative • Prototype • Spiral • Rapid Applications Development • UP
  • 7.
    Classical Waterfall Model •A cascade of phases……… Feasibility Study Analysis & Specification Design Implementation Testing Maintenance Development
  • 8.
    Feasibility Study: Aims •Preliminary investigation o Current system o Problems o Alternate solutions o Prioritization • Evaluate solution strategies in terms of: o Technical feasibility o Economical feasibility o Operational feasibility o Organizational feasibility
  • 9.
    The Requirements Phase •Aim: to document the customer requirements: o i.e. the PROBLEM! • A customer may be a single person, a group, a department, or an entire organization: o often with many employees (potential users). • This phase involves two distinct activities: o requirements gathering and analysis; o requirements specification.
  • 10.
    Requirements gathering • GatherInformation via meetings, interviews and discussions: o this information is typically inadequate at first – each user has only a partial view of the system. • Identify and eliminate errors:  inconsistency (contradictions);  vagueness (ambiguities);  incompleteness (omissions). • Clarification involves further gathering and analysis of information.
  • 11.
    Requirements Analysis • Aim:to understand exactly what the customer needs… …which may not be what they ask for: • data to be input to the system; • processing to be performed on these data; • data to be output from the system; • characteristics of the system as a whole; • constraints on the system/project. • WHAT, not HOW! • Requirements o Functional requirements o Non-functional requirements
  • 12.
    Functional Requirements: • Functionalrequirements describe a software system as a set of functions {f()}. • Each function f() transforms a domain of inputs to a corresponding range of outputs: Input Data f() Output Data • Each function is described in terms of: o the input from and output to the user; o the processing required.
  • 13.
    Functional Requirements: Ablack box specification • The functional requirements are a “black box” specification of the system: o only externally visible behavior (i.e. input and output) is documented; o the internal details of the system are not known. • In short, the functional requirements describe what the system must do, but not how! Input Data Output Data
  • 14.
    Functional Requirements • Example:F1 – Find Books o Input: the name of an author. o Output: details of any books by the author –  title, publisher, ISBN, etc. o Processing: search library catalogue for books by the specified author. Book Details Author Name f()
  • 15.
    Non Functional Requirements •These are characteristics of the system that cannot be expressed as functions... o security – e.g. internet systems; o reliability – e.g. safety-critical systems; o performance – e.g. real-time systems; o usability (human-computer interface); o maintainability and portability. • Non-functional requirements are within the control of the developers – use metrics!
  • 16.
  • 17.
    Requirements Engineering • RequirementsDefinition o Requirements definition is the activity of translating the information gathered during the analysis activity into a document that defines a set of requirements. • Requirements Specification o A detailed and precise description of the system requirement is set out to act as a basis for a contract between client and software developer.
  • 18.
    • Use casediagrams • Activity diagrams • Document flow diagrams • Data flow diagrams Requirements Analysis Tools
  • 19.
    The Design Phase •Aim: to transform the specification into a form suitable for implementation in a programming language. • Design is a creative activity – so it’s hard! • The software design is derived from the software requirements specification(SRS) document using one of two approaches: o function oriented methods - e.g. Structured Analysis & Design (SA/SD); o object oriented methods.
  • 20.
    The development phase •This is the coding and unit testing phase. • Each module is implemented independently, as a stand alone unit: o translation into source code and documentation; • Unit testing and debugging. o Unit testing ensures that each module works correctly in isolation. • The end product of this phase is a set of independently tested software modules....
  • 21.
    The testing phase:Integration Testing • Aim: to integrate modules in a series of carefully planned steps. • Integrating modules one at a time makes error location and correction much easier: o it would be foolish to integrate several different modules at the same time… o …big bang! • At the end of each step the incomplete system is re-tested using ALL of the test data.
  • 22.
    The testing phase:System Testing • Aim: to ensure that the system meets the requirements in the SRS document. • System testing takes place after all the modules have been integrated: o alpha & beta testing; o stress & acceptance testing. • The system is delivered to the customer at the end of this phase: o you get paid, and maintenance begins….
  • 23.
    The Maintenance Phase •For almost all software products: o maintenance requires far more effort than the development phases; o the ratio of development effort to maintenance effort is typically 40:60. • There is now considerable emphasis on designing software to be maintainable: o this is supposed to be a major advantage of OO methods over “traditional” ones.
  • 24.
  • 25.
    Iterative Waterfall Mode FeasibilityStudy Analysis & Specification Design Implementation Testing Maintenance
  • 26.
    The Prototyping Model •Before starting development of the actual system, a prototype may be built. • A prototype is a ‘toy’ system (or part thereof): o limited functionality; o low reliability (often full of bugs); o inefficient performance; o inaccurate results. • Nevertheless, prototypes help in developing high-quality software products!
  • 27.
    Prototyping: Why Bother? • To demonstrate concepts to the customer: o user interfaces, novel ideas, etc; o e.g. GUI-based prototypes are commonly used to refine customer requirements. • To explore difficult technical issues: o major design and implementation decisions often depend on technical issues – o e.g. hardware performance; o e.g. efficiency (in time & space) of software.
  • 28.
    Prototyping: Why Bother? • Construction of a working prototype involves additional cost; however... o Overall development cost might be lower for:  systems with unclear requirements;  systems with unresolved technical issues. o User requirements are clarified and technical difficulties are resolved:  omitting the prototype would lead to change requests, and hence redesign costs.
  • 29.
    Prototyping :Method (Part1) • It may be impossible to get a system right the first time, so build one to throw away! 1.Carry out a quick requirements analysis. 2.Carry out a quick design. 3.Build a prototype using short-cuts: o e.g. use look-up tables rather than performing difficult computations; o e.g. do not perform error checking or exception handling.
  • 30.
    Prototyping :Method (PartII) 1.Submit the working prototype to the customer for evaluation. 2.Use customer feedback to refine the requirements, and hence the prototype. • The cycle (phases 2-5) continues until the customer approves the prototype. • The final system is then developed using the classical waterfall model.
  • 31.
    The Prototyping Model BuildPrototype Gather requirements Design Prototype Evaluate Prototype Refine requirements COMPUTER APPROVAL Implement Test Maintenance FEEDBACK Design
  • 32.
    The Prototyping Model •The requirements phase is eliminated: o the prototype (with customer feedback) serves as a specification. • The prototype must be thrown away: o however, the experience gained from it is invaluable for developing the final product. • Never give in to management or customer pressure to patch the prototype for release: o it will be a maintenance nightmare!
  • 33.
    The Spiral Model •Proposed by Boehm (1988): o “A spiral model of software development and enhancement”. IEEE Computer, 21 (5), pp 61– 72. • Each loop of the spiral focuses on a phase of the software process; for example: o the innermost loop might be concerned with system feasibility; o the next loop with requirements specification; o the next with system design; and so on.
  • 34.
    The Spiral Model •There are no fixed phases in this model (the diagram that follows is just one example). • The team must decide how to structure the project into tasks and iterations: o there are typically 3–6 task regions (framework activities) per iteration. • Work begins using a generic model; extra tasks and iterations are added, either: o to suit specific projects; or o when problems are identified.
  • 35.
    Example: A SpiralModel Each loop in this spiral is split in to four task regions(quadrants) :
  • 36.
    Quadrant 1- ObjectiveSetting • The objectives of the phase are identified: o strategies for meeting these objectives are considered. • Risks are also identified: o a risk is loosely defined as anything that might hamper successful completion of a project;
  • 37.
    Quadrant 2- RiskManagement • In each iteration, the spiral model facilitates understanding of, and reaction to, risks. • A detailed assessment is carried out for each potential risk to the project. • Steps are taken to reduce the risks: o e.g. if the requirements are vague, a prototype may be developed; o e.g. if the project is short-staffed, its scope may be reduced, or more staff recruited.
  • 38.
    Quadrant 3 &4 • Quadrant 3 - Development and Validation: o the next level of the product is developed and validated; o this is not necessarily an implementation phase! • Quadrant 4 - Review and Planning: o the results are reviewed with the customer; o the next iteration of the spiral is planned. • Each iteration of the spiral yields a more complete version of the software product.
  • 39.
    The Spiral Model:A Meta-Model • The spiral model subsumes the other life cycle models: o it retains the step-by-step approach of the classical waterfall model; o it uses prototyping as a risk reduction mechanism; o each iteration of the spiral is an incremental level. • The classical waterfall model corresponds to a single iteration of a simple spiral model: o but the reverse is not necessary true!
  • 40.
    Rapid Application Development(RAD) • Because of rapidly changing business environments, businesses have to respond to new opportunities and competition. • This requires software and rapid development and delivery is not often the most critical requirement for software systems. • Businesses may be willing to accept lower quality software if rapid delivery of essential functionality is possible.
  • 41.
    Why RAD? • Becauseof the changing environment, it is often impossible to arrive at a stable, consistent set of system requirements. • Therefore a waterfall model of development is impractical and an approach to development based on iterative specification and delivery is the only way to deliver software quickly.
  • 42.
    Characteristics • The processesof specification, design and implementation are concurrent. • There is no detailed specification and design documentation is minimized. • The system is developed in a series of increments. • End users evaluate each increment and make proposals for later increments. • System user interfaces are usually developed using an interactive development system.
  • 43.
    Unified Process • TheUnified Process (UP) is related to the spiral and incremental lifecycle models: – highly iterative; – highly configurable. • Compared to other methodologies the UP is: – adaptive, rather than predictive; – 'agile', rather than 'heavy'. • The Rational Unified Process (RUP) is a commercial package of information and tools for the UP.
  • 44.
    The UP Phases •Inception: – conduct feasibility study, produce business plan, sign contract with customer (i.e. project sponsor). • Elaboration (build the bones): – build software architecture, plan schedule, manage risks. • Construction (build the flesh): – highly iterative phase involving implementation and testing. • Transition: – beta release of software; – final delivery and installation.
  • 45.
  • 46.
    1. Inception • Inceptionis typically 10% of the project duration. – Define the main project requirements and constraints. – Produce a business model for the project, including risk analysis and management strategies. – Define an architecture for the proposed system. – Produce an initial use case model (10–20% complete). – Develop an overall project plan with major milestones. – Client agrees with estimates of cost, schedule, and scope. – Client agrees with the initial use case model but is aware that there is more to come.
  • 47.
    2. Elaboration: BuildThe Bones • Elaboration is typically 30% of the project duration. • Elaboration involves establishing an overall design for the system: – most of the architectural (large-scale) design is finalised; – however, most of the detailed design is done later. • The end of this phase is the point of no return for the developer: – the Use Case model is about 80% complete; – an executable prototype is available; – hardware requirements have been finalized.
  • 48.
    3. Construction: BuildThe Flesh • Construction is typically 50% of the project duration. • Construction focuses on completing the elements that make up the software system: – design work is still happening, but the emphasis is on implementation and testing; – the first version of the software is implemented on hardware like that at the proposed installation site. – testing begins in earnest, but continues into transition. • Documentation is completed: – user manuals, training courses, release information.
  • 49.
    4. Transition • Transitionis typically 10% of the project duration. • The software is installed on site. • The users are trained and let loose – beta testing. • Problems are documented and used to plan new releases. • If the software is replacing an existing system, the two may be run in tandem during transition: – discrepancies between the output of the two systems are used to identify bugs in the new system.
  • 50.
    Iteration • Iteration occurswithin each phase of the UP. • Each discipline (see later) occurs in at least two phases, and some occur in all phases: – e.g. project management. • What changes from one phase to the next is the emphasis: – e.g. elaboration emphasises requirements and design; – e.g. construction emphasises implementation and testing.
  • 51.
    Modeling Elements • TheUP uses four modeling elements: 1 Workers: • which team members perform which activities? 2 Activities: • which activities must be performed to produce the software? 3 Artifacts: • the result of an activity – e.g. diagrams, test cases, code. 4 Disciplines: • which workers perform which activities to generate which artifacts?
  • 52.
    Models & Views •A Model is a representation of a software system. • A View is a way of looking at a model. • An analogy: o Rodin's famous sculpture "The Thinker" is a model of a thoughtful gentleman who has misplaced his clothes. o A sketch or photograph of "The Thinker" presents a single view of the model.
  • 53.
    The Thinker by AugusteRodin Front View A close-up view
  • 54.
    RUP Models • RUPhas a number of models: o Business Model; o Use Case Model; o Design Model; o Implementation Model; o Deployment Model.
  • 55.
    RUP – 4+1views Use Case view
  • 56.
    Life Cycle Models:Comparison • The Classical Waterfall Model: o is a hopelessly simplistic ideal. • The Iterative Waterfall Model: o is one of the most widely used life cycle models; o is only suitable for well-understood projects. • The Prototyping Model: o is suitable for projects that are not well understood;for example – o when the requirements are unclear.
  • 57.
    Life Cycle Models:Comparison • The Incremental (Evolutionary) Model: o is suitable for large projects that can be decomposed into (almost) independent parts –  incrementally developed and tested;  Incrementally delivered to the customer. • The Spiral (Evolutionary) Model: o is suitable for technically challenging projects or projects that are subject to various kinds of risks. • The Rational Unified Process (RUP) is partly based on a variant of the spiral model.
  • 58.
    References • Pfleeger, S.“Software Engineering: Theory and Practice”. Prentice Hall, 1997