2. GROUP MEMBERS
AKSHAY SURVE (GROUP LEADER)
KARISHMA HINGANE
NILIMA CHINCHWALKAR
KUSH DHAROD
UNDER THE GUIDANCE OF
Suwarna Wankhade
BY AKSHAY SURVE 2
3. Background
Objectives
Benefits
Scope
Application
Soft. & Hardware Specification
Planning and Scheduling
System Design
Class Diagram
Operating flow diagram
Description Of Model
Test Case Design
References
BY AKSHAY SURVE 3
4. • It is Educational purpose Android base
application.
• In this Application we have providing
information or notes of some programming
languages.
• There is no need of internet for searching any
topic under this programming languages.
• We are providing facility of bookmarks to
BY AKSsHaAvY eS UyRoVEur favorite pages. 4
5. Study anytime anywhere
Solve all queries of students
Motivate peoples to use e-learning concept
Provide attractive user interface to students
BY AKSHAY SURVE 5
6. Easy to use: E-Notes application is very
easy to use.
Easy to carry: No need to carry heavy
reference books.
Save environment: No need of paper for
printing books.
Save money: It is free application for
everyone.
BY AKSHAY SURVE 6
7. The scope of E-Notes application for
future expansion is very large. At the time
this application only contains 4 Programming
languages. This application is useful in e-learning
concept. Now are days learning to
moving towards e-learning. The scope of this
application in education sector is very large.
BY AKSHAY SURVE 7
8. This Application is useful for :
Students
Teachers
Collages
Tutorials
Non-technical users
BY AKSHAY SURVE 8
9. O Software Specification :
Operating System : Any Android OS
Programming Language : JAVA
O Hardware Specification :
Processor : Minimum 800MHZ
RAM : 256MB
Internal Storage : 256MB
BY AKSHAY SURVE 9
10. Planning of project requires dividing of various
project phases into a defined time scale for
completion of project on time. planning and
scheduling are very crucial phase of project life
cycle because the project successful depends on this.
a high or low time estimation of the projects leads to
large variation in project overall cost estimates.
BY AKSHAY SURVE 10
11. o We will divide project in Four modules.
o Each module will be Construct, Test separately.
o Then these four modules will be integrated in one
application.
Sr.no. Work Weeks
1 Module 1 4
2 Module 2 4
3 Module 3 4
BY AKSHAY4 SURVE Module 4 4 11
15. O The waterfall model is a sequential design
process, often used in software development
processes, in which progress is seen as flowing
steadily downwards (like a waterfall) through the
phases of Communication, Planning, Modeling,
Construction and deployment.
BY AKSHAY SURVE 15
16. O Testing is the process of examining a product to
spot defects it contains and remove them promptly.
Hence, Inventory Management System will go
through various testing phases to check all the
operations it performs and the results produced
matched with ideal results.
Failure
Construct
Software
Examine
Results
Exercise
Function
Analysis and
Design
BY AKSHAY SURVE 16
17. Following methodologies will be used for testing :
O Unit Testing: Unit testing for all the independent
modules will be carried out in isolation.
O Integration Testing: The modules which will be tested
in isolated environment in unit testing will be put
together for integration testing.
O System Testing: After integrating the entire software
modules, the system testing will be performed where the
systems functioning as per the requirements will be
evaluated with its performance too.
O Performance Testing : Performance testing will be
BYc AaKrSrHieAdY SoUuRtV Eon the product. 17
18. WWW.GOOGLE.COM
WWW.WIKIPEDIA.COM/E-LEARNING
WWW.ASK.COM
WWW.developer.android.com/training/ba
sics/firstapp/index.html
BY AKSHAY SURVE 18